--- title: Aragon Zoning Ordinance, Sec. 6.5 (Appendix B, Article VI). Sanitary sewerage collection: local-codes id: local-code:aragon/zoning/appendix-b-article-vi-6.5 cite_as: Aragon, Ga., Zoning Ordinance, Appendix B, Article VI, ยง 6.5 canonical_url: https://georgiacommons.org/code/local/aragon/zoning/appendix-b-article-vi-6.5 md_url: https://georgiacommons.org/code/local/aragon/zoning/appendix-b-article-vi-6.5.md text_url: https://georgiacommons.org/code/local/aragon/zoning/appendix-b-article-vi-6.5/text source_url: https://library.municode.com/ga/aragon date: 2019-03-26 status: active jurisdiction: city:aragon jurisdiction_name: Aragon place_fips: "1302592" corpus_version: local-codes-aragon-28cd53fc3ee5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/aragon/zoning/~appendix-b/~article-vi.md previous: https://georgiacommons.org/code/local/aragon/zoning/appendix-b-article-vi-6.4.md next: https://georgiacommons.org/code/local/aragon/zoning/appendix-b-article-vi-6.6.md index: https://georgiacommons.org/code/local/aragon.md branch: zoning edition: As published by Municode, current through 2019-03-26 edition_date_kind: current_through source_publisher: Municode version_id: local-code:aragon/zoning/appendix-b-article-vi-6.5@2019-03-26-586ecd0fd0 --- # Aragon Zoning Ordinance, Sec. 6.5 (Appendix B, Article VI). Sanitary sewerage > As published by Municode, current through 2019-03-26 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISIONS / Article VI - REQUIRED IMPROVEMENTS Where public sewerage is available at the property being subdivided and the topography is such that extension is feasible, the subdivider shall install public sanitary sewers to plans and specifications approved by the appropriate city official and approved by the health department. When the sewer is located in a street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot prior to surfacing the street.