--- title: Athens-Clarke County unified government Zoning Ordinance, Sec. 9-11-6. E-I (Employment-Industrial) and I (Industrial) design standards collection: local-codes id: local-code:athens-clarke/zoning/9-11-6 cite_as: Athens-Clarke County unified government, Ga., Zoning Ordinance § 9-11-6 canonical_url: https://georgiacommons.org/code/local/athens-clarke/zoning/9-11-6 md_url: https://georgiacommons.org/code/local/athens-clarke/zoning/9-11-6.md text_url: https://georgiacommons.org/code/local/athens-clarke/zoning/9-11-6/text source_url: https://library.municode.com/ga/athens-clarke_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:athens-clarke jurisdiction_name: Athens-Clarke County unified government place_fips: "1303440" county_fips: "13059" corpus_version: local-codes-athens-clarke-9452e3e17c58 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/athens-clarke/zoning/~appendix-c/~title-9/~article-i/~chapter-9-11.md previous: https://georgiacommons.org/code/local/athens-clarke/zoning/9-11-5.md next: https://georgiacommons.org/code/local/athens-clarke/zoning/9-12-1.md index: https://georgiacommons.org/code/local/athens-clarke.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:athens-clarke/zoning/9-11-6@2026-11-14-e1708efe7e --- # Athens-Clarke County unified government Zoning Ordinance, Sec. 9-11-6. E-I (Employment-Industrial) and I (Industrial) design standards > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - COMMERCIAL-GENERAL (C-G) ZONED PROPERTIES ALLOWING BILLBOARDS / Title 9 - ZONING AND DEVELOPMENT STANDARDS / Article I - ZONING / Chapter 9-11 - EMPLOYMENT-OFFICE, EMPLOYMENT-INDUSTRIAL, AND INDUSTRIAL (E, I) DISTRICTS A. All outside storage must be completely screened from view from adjacent properties and the street(s). B. Loading docks must be located to the side or rear of the building unless the loading area is completely screened from the street. C. Site must be designed to permit on-site maneuvering of all vehicles (no backing in from street). D. Front yard landscaping. A minimum of 25 percent of the designated front yard setback shall be landscaped with a combination of trees, shrubs, and ground cover. The remainder of the front yard setback areas not paved with driveways or sidewalk shall be vegetated, which may be grass or other ground cover. E. Riparian buffers for the I (Industrial) zone. Developments in the I (Industrial) zone must observe a minimum buffer of 150 feet (measured horizontally from uppermost part of the river, stream or lake bank usually marked by a break in slope) from all perennial rivers, lakes, and streams identified on the Athens-Clarke County Environmental Areas Map. Buffers are to be maintained in accordance with section 8-6-8, "Land Disturbing Activity Standards for Riparian Buffer Areas," of the Code of Athens-Clarke County, Georgia. F. When within 400 feet of a property line associated with a residential or agricultural zoned property, mechanical equipment located on the property, whether on a roof top, on the ground level, or elsewhere on the subject property, must be screened on all four sides by an acoustical barrier. For purposes of this section, acoustical barrier is defined as an exterior solid or louvered wall containing sound-proofing materials designed to absorb noise. G. When within 400 feet of a property line associated with a residential or agricultural zoned property, applicants are required to have a buffer wall per the requirements of Section 9-15-3 of this Code and the required buffering must also have an earthen berm that has a minimum height of 6 feet and a grade lower than 2:1. Use of natural topography and preservation of existing vegetation, supplemented by new vegetation, if needed, may be substituted if determined by the Planning Director. H. Generator testing is limited to 9:00 a.m.—5:00 p.m. Except for generator testing or commissioning activities, generator use is limited to backup/emergency use only. I. Data Centers. Data Centers shall use a true closed-loop cooling system. ## History (Ord. of 12-5-2000, § 1; Ord. of 9-4-2001, § 3; Ord. of 4-7-2026(1), § 9) ## Meetings that refer to this section Found 2: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed. - 2026-04-07: [Athens-Clarke County Mayor & Commission regular meeting minutes, April 7, 2026](https://georgiacommons.org/meetings/2026-04-07/athens-clarke-mayor-and-commission.md) (minutes) refers to this section: "Sec. 9-11-6" - 2026-02-05: [Athens-Clarke County Planning Commission meeting minutes, February 5, 2026](https://georgiacommons.org/meetings/2026-02-05/athens-clarke-planning-commission.md) (minutes) refers to this section: "section 9-11-6"