--- title: Austell Zoning Ordinance, Sec. 16-108. Conditions for development generally collection: local-codes id: local-code:austell/zoning/16-108 cite_as: Austell, Ga., Zoning Ordinance § 16-108 canonical_url: https://georgiacommons.org/code/local/austell/zoning/16-108 md_url: https://georgiacommons.org/code/local/austell/zoning/16-108.md text_url: https://georgiacommons.org/code/local/austell/zoning/16-108/text source_url: https://library.municode.com/ga/austell/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:austell jurisdiction_name: Austell place_fips: "1304252" corpus_version: local-codes-austell-0e80268c00f0 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/austell/zoning/~part-ii/~chapter-16/~article-iii/~division-3.md previous: https://georgiacommons.org/code/local/austell/zoning/16-107.md next: https://georgiacommons.org/code/local/austell/zoning/16-109.md index: https://georgiacommons.org/code/local/austell.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:austell/zoning/16-108@2026-11-11-fd55cf0d0f --- # Austell Zoning Ordinance, Sec. 16-108. Conditions for development generally > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 16 - ENVIRONMENT / Article III - FLOOD PREVENTION AND DAMAGE CONTROL / Division 3 - DEVELOPMENT STANDARDS AND SPECIFICATIONS Any development within any area of special flood hazard or area of future-conditions allowed under section 16-107 shall also meet the following conditions: (1) Compensation for storage capacity shall occur between the average groundwater table elevation and the base flood elevation for the base flood, and between the average groundwater table elevation and the future-condition flood elevation for the futureconditions flood, and lie either within the boundaries of ownership of the property being developed and shall be within the immediate vicinity of the location of the encroachment. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain or lowering of adjoining land areas to create additional floodplain storage. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the natural (pre-development) stream channel unless such excavation results from the widening or relocation of the stream channel; (2) Cut areas shall be stabilized and graded to a slope of no less than two percent; (3) Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased; (4) Verification of no-rise conditions (0.01 foot or less), flood storage volumes, and flow characteristics shall be provided via a step-backwater analysis meeting the requirements of section 16-109; (5) Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, shall be located and constructed to minimize or eliminate infiltration or contamination from floodwaters; and (6) Any significant physical changes to the base flood floodplain shall be submitted as a CLOMR or CLOMA, whichever is applicable. The CLOMR submittal shall be subject to approval by the city stormwater management office using FEMA community concurrence forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. Within six months of the completion of development, the applicant shall submit as-built surveys for a LOMR. ## History (Ord. of 11-4-2013, § 5-24.3(2))