Ball Ground · Zoning Ordinance
Appendix A - ZONING / Division 106 - SUPPLEMENTARY USE REGULATIONS
Sec. 106.4. Telecommunication towers and infrastructure.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Towers may be permitted in any NC, CBD, HO and LI zoning districts pursuant to those additional restrictions listed herein.
A. General requirements.
1) A Special Land Use Permit granted by Board of Zoning Appeals shall be required for the construction of all new communications towers within the City limits after the following factors are considered:
a) The proposed height of the tower;
b) Proximity to residential structures and residential district boundaries;
c) Nature of uses on adjacent and nearby properties;
d) Surrounding topography, tree coverage and foliage;
e) Design of the tower, with particular reference to design characteristics which have the effect of reducing or eliminating visual obtrusiveness.
2) All permit applications submitted to the Administrator shall include a complete inventory of the applicant's existing towers and receivers/transmitters located within Cherokee County including each asset's location, height and co-location usage or capabilities so that the City may promote co-location alternatives for other applicants.
3) All applicants must demonstrate that no existing tower or structure can accommodate the proposed antenna(s). Evidence of an engineering nature shall be documented by the submission of a certification by a qualified engineer. Such evidence may consist of the following:
a) No existing towers or structures are located within the geographic area required to meet applicant's engineering requirements.
b) No existing structure has sufficient height to meet the applicant's engineering requirements.
c) No existing tower or structure has sufficient structural strength to support applicant's proposed antenna(s) and related equipment.
d) Applicant's proposed antenna(s) would cause electromagnetic interference with the antenna(s) on the existing tower or structure.
e) The fees or costs required to share the existing tower or structure or to adapt the existing tower or structure for shared use are unreasonable. Costs exceeding new tower development are presumed unreasonable.
f) Such other limiting factor(s) as may be demonstrated by the applicant.
4) At the time of filing the application for a tower, the applicant shall provide a site plan and information regarding tower location, accessory structures, neighboring uses and proposed landscaping. Documentation must be submitted and certified by a qualified engineer delineating coverage and propagation zones, tower design and co-location capabilities.
5) In granting a Special Land Use Permit, the Board may impose additional conditions to the extent determined necessary to minimize adverse effects on adjoining properties.
B. Standards.
1) All towers must be set back a distance of twice (x2) the full height of the tower from any residentially zoned property or structure used for residential purposes.
2) All towers shall be separated from each other by a distance of at least 1000 feet.
3) All new self-supporting towers which do not incorporate approved alternative design features must be designed and built in a manner that allows at least two other entities to co-locate on the structure.
4) All towers and their related structures shall maximize the use of building materials, colors, textures, screening and landscaping that effectively blend the tower facilities within the surrounding natural setting and built environment. Towers shall be painted so as to reduce their visual obtrusiveness, subject to any applicable standards of the Federal Aviation Administration (FAA).
5) Any tower which directly abuts a residentially zoned property shall have a minimum 50' landscaped buffer with a solid fence or wall no less than 8 feet in height.
6) All landscaping plans shall be prepared by a registered landscape architect. For each 30 linear feet of perimeter fencing, no less than 2 trees and 2 shrubs shall be installed. The remainder of the property shall be landscaped in accordance with City standards (see standards set forth in Section 106.5).
7) Towers shall be enclosed by security fencing not less than 8 feet in height and shall be equipped with an appropriate anti-climbing device; provided, however, that such requirements may be waived for alternative design mounting structures.
8) All towers shall be monopole designed except those located in LI districts that are greater than 150 feet in height.
9) All towers must meet or exceed current standards and regulations of the Federal Communications Commission (FCC) and FAA.
10) Subsequent to ZBA approval but prior to the issuance of any building permits, compliance with Section 106 of the Natural Historic Preservation Act, shall be demonstrated.
11) Tower heights shall be measured from the existing ground base level to the highest point on the tower or other structure, even if said highest point is an antenna, in accordance with Table 106-2.
TABLE 106-2 - MAXIMUM TELECOMMUNICATION
TOWER HEIGHTS
Zoning District Three Users* Four or More Users* LI 150' 200'
NC, CBD, HO 125' 150'
*Refers to the number of separate entities co-locating on the same structure.
C. Administrative approval.
1) The addition of transmitting and/or receiving whip antennas and panels may be approved administratively by the Administrator, so long as any such addition does not add more than 10 feet in height to an existing structure greater than 50 feet in height or more than 5 feet in height to an existing structure less than 50 feet in height but greater than 20 feet in height and all necessary building permits are obtained. Such acceptable structures include buildings, signs, light poles, water towers, and other free standing nonresidential structures. Antennas attached to existing structures, along with supporting electrical and mechanical equipment, shall be of a color identical to, or closely compatible with, that of the supporting structure. Notification shall be given to City Council at least 10 days prior to the granting of said request, and if no objection is lodged, considered valid.
2) The Administrator may administratively approve alternative mounting structures such as fake trees, clock towers, bell steeples, light standards, and similar alternative mounting structures, provided such alternative structure is determined by the Administrator to satisfy such factors set forth in subsection A[ of this section].
These structures shall also be exempt from the additional separation and setback requirements pertaining to towers. Notification shall be given to City Council at least 10 days prior to the granting of said request, and if no objection is lodged, considered valid.
3) The Administrator may administratively approve the shared use of an existing tower or structure by another provider, including the placement of additional accessory buildings or other supporting equipment. The Administrator may waive district setback requirements by up to 50% to accommodate the placement of such additional buildings or other supporting equipment in order to encourage the shared use of existing infrastructure.
4) The addition of antennas to an existing structure are exempted from all setback requirements which pertain to residentially zoned or used properties.
D. Removal of antennas and/or towers. All towers shall be maintained in compliance with standards contained in applicable building and technical codes so as to ensure the structural integrity of such towers. If upon inspection such tower is determined not to comply with the code standards and to constitute a danger to persons or property, then upon written notice by certified mail, return receipt requested, or by personal service being provided to the owner of the tower, the owner shall have 30 days to bring such tower into compliance. The owner of the tower may appeal the determination by filing a written appeal to the Mayor and Council within 10 days of the receipt of the notice of non-compliance by the owner. The Mayor and Council shall hold a hearing within 5 days of receiving said written appeal. In the event such tower is not brought into compliance within 30 days, the City may petition the municipal court for an order removing such antenna and/or tower and may petition the court for a lien upon the property for the costs of removal.
E. Exceptions.
1) Antennas or towers located on publicly owned property or owned by governmental bodies shall be exempt from the requirements of this ordinance, provided a license or lease authorizing such antenna or tower has been approved by the appropriate governing body.
2) A tower under seventy (70) feet in height owned and operated by a federallylicensed amateur radio station operator shall be exempted from these requirements. However, the owner or operator of such tower shall be required to comply with all applicable local, state and federal codes.
3) Any existing or previously approved tower or antenna shall be considered "grandfathered" and will not be required to meet any additional requirements of this ordinance other than those in place prior.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.