A. Existing streets shall be connected and extended throughout the limits of proposed developments. 1) Where vehicular interconnectivity is required/proposed to an adjacent parcel for future cross access, all elements of the roadway including curb, gutter and asphalt shall be constructed completely to the property line where the future connection will occur. Vehicle interconnectivity is a stated goal within the City's 2023 Comprehensive Plan. a) Signage shall be placed at the end of the roadway indicated both the temporary roadway termination as well as the planned future interconnection. b) The final plat shall also reference the future interconnectivity.