Barrow County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 89 - UNIFIED DEVELOPMENT CODE / Article IX - ENVIRONMENTAL PROTECTION / Division 2 - RIVER AND STREAM CORRIDOR PROTECTION

Sec. 89-971. Stream buffers.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Unless more restrictive requirements under this Development Code apply, all perennial streams and other state waters shall be provided with a natural vegetative stream buffer as follows:

(a) Minimum width of stream buffer.

(1) The minimum stream buffer width must be provided along any protected state river or trout stream as required under subsections 89-970(a) and (b), respectively;

(2) The minimum stream buffer width must be provided along any protected stream within any water supply watershed and around any water supply reservoir, as required under sections 89-998 through 89-1000 in this article.

(3) For all other perennial streams and state waters, the stream buffer is to be established under subsection 89-970(c)(2).

(b) Minimum setback for land disturbance. All clearing, earth moving, construction and ground disturbance must remain at least 50 feet from the edge of any stream buffer within a water quality critical area. Exceptions include bike and footpaths constructed of permeable material, gravity sanitary sewers, and road crossings perpendicular to streams. The installation of storm sewers will also be allowed. The area that is within this restricted construction area is to be left natural or developed as a trail with a minimum of disturbance to the natural habitat.

(c) Protection of stream buffers.

(1) No land disturbing activities shall be conducted within a stream buffer and a stream buffer shall remain in its natural, undisturbed state of vegetation until all land disturbing activities on the construction site are completed. Land disturbing activities may only be allowed as follows:

a. Where the EPD director determines to allow a variance that is at least as protective of natural resources and the environment; or

b. Where otherwise allowed by the EPD director pursuant to O.C.G.A.

§ 12-2-8; or

c. Where a drainage structure or a roadway structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented; provided, however, that stream buffers of at least 50 feet established pursuant to O.C.G.A.

Part 6 of Article 5, Chapter 5 of Title 12, the Georgia Water Quality Control Act, shall remain in force unless a variance is granted by the EPD director.

(2) A stream buffer is to be included within a conservation or natural resources easement that meets the requirements of this article.

(3) All stream buffer areas shall be maintained with appropriate indigenous plant species for the maintenance of groundcover and limitation of erosion. Undisturbed natural vegetation is the preferred, optimum state of a stream buffer. In the alternate, careful reestablishment of indigenous vegetation and ground cover is encouraged.

(4) Once the final stabilization of the site is achieved, a stream buffer may be thinned or trimmed of vegetation, consistent with the terms of any applicable conservation or natural resources easement, as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed.

(5) Any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a stream buffer at any time, consistent with the terms of any applicable conservation or natural resources easement, as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed.

Table 9.1. Stream Buffers and Setbacks Summary of River and Stream Corridor and Water Supply Watershed Requirements Stream

Corridor Total1 Stream Buffer1 Setback from Stream Buffer2 Protected State Rivers Figure 9.1 - Stream Corridor Stream Corridor Total1 Stream Buffer1 Setback from Stream Buffer2 Apalachee, Middle Oconee and Mulberry Rivers Within Water Quality Critical Area 3 150 feet 100 feet 50 feet Remainder of River 100 feet 100 feet None

Trout Streams The following apply unless greater widths are required for water supply protection, below:

For Single-Family Dwellings:

First Order Trout Streams 25 feet 25 feet None Other Primary Trout Streams 50 feet 50 feet None Other Secondary Trout Waters 50 feet 50 feet None For All Other Uses 100 feet 100 feet None Large Water Supply Watersheds Apalachee River, Middle Oconee River and the Mulberry River Watersheds Water Quality Critical Area 3 150 feet 100 feet 50 feet

Remainder of Watershed 25 feet 25 feet None Small Water Supply Watersheds Cedar Creek, Laurel Lane Reservoir, Fort Yargo Lake, Barber's Creek and Bear Creek Watersheds

Water Quality Critical Area 3 150 feet 100 feet 50 feet Remainder of Watershed 100 feet 50 feet 50 feet Water Supply Reservoirs 150 feet 150 feet None Other Streams not in Water Supply Watersheds 25 feet 25 feet None 1 Measured outwardly from and perpendicular to the top of each bank of the stream or reservoir.

2 Measured outwardly from and perpendicular to the edge of stream buffer.

3 Within seven-mile radius of water supply intake or bank of water supply reservoir.

History

The history line the source prints at the end of the section.

(Ord. of 10-13-2020)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:barrow-county/zoning/89-971@2026-11-23-1ae655937f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Barrow County Zoning Ordinance, Sec. 89-971. Stream buffers | Georgia Commons