Skip to content
Georgia Commons
Menu

Barrow County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 89 - UNIFIED DEVELOPMENT CODE / Article IX - ENVIRONMENTAL PROTECTION / Division 3 - WATER SUPPLY WATERSHEDS

Sec. 89-996. Establishment of water supply watersheds.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) River Basin, along the Apalachee River. There are three large watersheds having over 100 square miles of drainage above a water supply intake, and five small water supply watersheds having less than 100 square miles of drainage above a water supply intake within Barrow County.

(1) Large water supply watersheds; established. Large water supply watersheds are hereby designated and shall comprise the land that drains into the Apalachee River Watershed, the Middle Oconee River Watershed and the Mulberry River Watershed.

The City of Winder has a primary public water intake on the Mulberry River.

(2) Small water supply watersheds; established. Small water supply watersheds located within the jurisdiction of the county include: Cedar Creek, Laurel Lane Reservoir, Fort Yargo Lake, Barber's Creek and Bear Creek.

(b) Protected watersheds; boundaries. All lands within water supply watersheds are designated as watershed protection areas, and include all land that drains to the stream bank from the ridgeline of each watershed. The boundary of the water supply watersheds is defined by the ridgeline of the watershed or by the political boundaries of the county, where those boundaries occur within the watershed.

(1) Water quality critical area. The water quality critical area shall comprise all lands within seven miles upstream from a public water supply reservoir boundary and all lands located within a seven-mile radius of a public water supply intake, whether or not the intake or reservoir is located within Barrow County. See Figure 9.2.

(2) Limited development area. The limited development area is established for the remaining part of the watershed protection area outside the water quality critical area.

History

The history line the source prints at the end of the section.

(Ord. of 10-13-2020)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:barrow-county/zoning/89-996@2026-11-23-e7d6cd240c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Barrow County Zoning Ordinance, Sec. 89-996. Establishment of water supply watersheds | Georgia Commons