Sec. 89-998. Large water supply watersheds; restrictions.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following limitations shall apply to all perennial streams within a large water supply watershed, in addition to the limitations on land use proscribed by the underlying zoning district:

(a) Stream corridor setbacks; large water supply watersheds.

(1) For all perennial streams within the water quality critical area, no impervious surface shall be constructed within a 150-foot setback area on both sides of the streams as measured from the stream banks.

(2) For all perennial streams within the limited development area of a water supply watershed, there is no additional impervious surface setback required beyond the stream buffer itself.

(b) Stream buffers; large water supply watersheds.

(1) For all perennial streams within the water quality critical area, an undisturbed vegetative stream buffer shall be maintained for a distance of 100 feet on both sides of the stream as measured from the stream banks, unless a greater distance is required specifically by this Development Code.

(2) For all perennial streams within the limited development area, an undisturbed vegetative stream buffer shall be maintained for a distance of 25 feet on both sides of the stream as measured from the stream banks, unless a greater distance is required specifically by this Development Code.

(c) Land use restrictions; large water supply watersheds.

(1) Any new facility that handles hazardous materials of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and amounts of 10,000 pounds or more on any one day, shall perform their operations on impermeable surfaces having spill and leak collection systems as prescribed by DNR.

(2) Agricultural application of animal waste. The application of animal waste on land must be accomplished in accordance with the agricultural best management practices of the Georgia Department of Agriculture.

History

The history line the source prints at the end of the section.

(Ord. of 10-13-2020)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:barrow-county/zoning/89-998@2026-11-23-fc3c7cb551