APPENDIX A—ZONING CDA:3 Supp. No. 18 Sec. A.1. Purpose. Sec. A.2. Findings and rationale. Sec. A.3. Adult entertainment establishments. BARTOW COUNTY ZONING ORDINANCE An ordinance regulating within the county the location, height, bulk, number of stories and size of buildings and other structures; the sizes of yards, courts, and other open spaces; the density and distribution of population; the uses of buildings, structures, and land for trade, industry, residence, recreation, mining, agriculture, sanitation, public activities, and boundaries thereof; defining certain terms used herein; providing for the method of administration and amendment; establishing and defining the powers and duties of the board of appeals; establishing and defining the powers and duties of the planning commission; providing penalties for violations; repealing conflicting ordinances; and for other purposes. (Ord. of 7-21-2021(4)) ARTICLE I. PREAMBLE AND ENACTMENT CLAUSE The County Commissioner of Bartow County, pursuant to Article 9, Section 2, Paragraph IV of the 1983 Constitution of the State of Georgia, hereby ordains and enacts into law the articles, sections, and appendices of this Ordinance. This Ordinance shall be known and may be cited as "Bartow County Zoning Ordinance." (Ord. of 7-21-2021(4)) ARTICLE II. PURPOSES In addition to the specific purposes stated in connection with the sign ordinance provisions and the adult establishment provisions, both of which enjoy special protections under the First Amendment, it is the purpose of this entire zoning ordinance to promote the public health, safety, and welfare of the citizens of Bartow County and visitors thereto. To these ends, this ordinance is intended to achieve, and is enacted for, the following purposes: (A) To guide and regulate the orderly growth, development, redevelopment and preservation of Bartow County in accordance with a well-considered comprehensive plan and with long-term objectives, principles and standards deemed beneficial to the interest and welfare of the people. (B) To protect the established character and the social and economic well-being of both private and public property. (C) To promote, in the public interest, the wise utilization of land. (D) To provide for adequate light, air, convenience of access, and safety from fire, flood and other dangers. (E) To reduce or prevent congestion in the public streets. (F) To facilitate the creation of a convenient, attractive and harmonious community. (G) To encourage an aesthetically attractive environment, both built and natural, and to provide for regulations that protect and enhance these aesthetic considerations. CDA:5 Supp. No. 14 (H) To expedite the provision of adequate police and fire protection, safety from crime, disaster evacuation, civil defense, transportation, water, sewerage, flood protection, schools, parks, forests, playgrounds, recreational facilities, airports and other public requirements. (I) To protect against destruction of, or encroachment upon, historic areas. (J) To protect against overcrowding of land, overcrowding of population in relation to the community facilities existing or available, obstruction of light and air, danger and congestion in travel and transportation, and loss of life, health or property from fire, flood, or other danger. (K) To encourage economic development activities that provide desirable employment and enlarge the tax base. (L) To promote the preservation of the unique natural and physical resources of the county including forested areas, riverbeds, stream beds, and archaeological sites. (M) To achieve compliance with all applicable state and federal regulations. (N) To provide for protection of the constitutional rights and obligations of all citizens within the county. (Ord. of 7-21-2021(4)) ARTICLE III. DEFINITIONS Sec. 3.1. Interpretation of certain terms and words. For the purpose of interpreting this Ordinance, certain words or terms used herein shall be defined as follows: Words used in the present tense include the future tense. Words used in the singular number include the plural, and words used in the plural include the singular. The word "person" includes a firm, association, organization, partnership, corporation, trust, and company as well as an individual. The word "lot" includes the word "plot" or "parcel." The word "shall" is always mandatory. The word "used" or "occupied" as applied to any land or building shall be construed to include the words "intended, arranged or designed to be used or occupied." The word "maps," "zoning map," or "Bartow County Zoning Map" means the "Official Zoning Maps, Bartow County, Georgia." (Ord. of 7-21-2021(4)) Sec. 3.2. Definitions. Except as specifically defined herein all words used in this ordinance shall carry their customary meaning as defined by a standard dictionary. See section 11.1 for additional definitions relating to signs. See section 12.2 for additional definitions relating to telecommunications towers. See Chapter 4 (Adult Establishments) of the Bartow County Code for additional definitions related to adult establishments. AGRICULTURAL AND ANIMAL-RELATED DEFINITIONS As a matter of convenience, the following definitions relating to agriculture and animals are grouped together. Definitions contained herein may reference terms defined below under "Additional Definitions" and vice versa. Agriculture: All agricultural practices, subdivided into two sub-classifications: 1) horticulture and 2) raising or keeping livestock. Horticulture: The raising of crops, flowers, fruit, produce, plants, turf, trees, shrubs, and the like for purposes other than personal consumption or use (i.e., for commercial or industrial purposes, scientific purposes, for sale or income, etc.). Examples include, but are not limited to, row crops, fruit orchards, sod farms, tree farms, hydroponic farms, and commercial greenhouses, and shall include all associated activities. Kennel: Any building, structure or facility, or any series of buildings, structures or facilities on one lot, where more than a total of eight (8) dogs are kept, raised, fed, sheltered or otherwise maintained, whether for personal, commercial or any other purposes. See Section 14-19 of the Bartow County Code for further regulations relating to dog enclosures, and for general regulations on keeping of dogs. Livestock: All animals of the equine (Family: Equidae), bovine (Family: Bovidae), or swine (Family: Suidae) type (or similar animals), including, but not limited to, goats, sheep, mules, horses, hogs, pigs, and cattle; all poultry, including chickens, roosters, hens and similar birds; other birds raised or kept such as pigeons; other grazing animals; all ratites, including, but not limited to, ostriches, emus, and rheas; non-traditional livestock including, but not limited to, bison, deer, buffalo, alpaca and llamas; and other similar animals raised for profit or use, but not including dogs or cats. Livestock shall also include, but not be limited to, definitions under O.C.G.A. § 4-4-1.1 for "livestock" and O.C.G.A. § 4-4-80 for "poultry." Livestock is not permitted in any district other than A-1, except for the limited horse exception in RE-1 and RE-2. The term livestock or livestock animal shall include insects being used for food, food product or fiber production, including but not limited to, honey bees. Livestock enclosure: Any structure, building, shelter, or other facility used for keeping, raising, feeding, sheltering or otherwise maintaining livestock. Fenced grazing land and fenced pasture for horses, cattle and other grazing animals shall not be included in this definition. Meat processing facility: A facility to process cattle, swine or other livestock (other than chicken) into meat products or carcasses for sale as food or feed; e.g., a slaughterhouse, rendering plant, or similar facility. Permitted in A-1 as conditional use or I-2. Chicken processing facilities are separate uses permitted only in I-2. Raising or keeping livestock: The raising or keeping of livestock for any purposes, commercial or personal. Examples include, but are not limited to, raising chickens or goats, CDA:7 Supp. No. 14 chicken coops or houses, hog pens, cattle barns, commercial stables, private stables, livestock enclosures, and cattle or sheep or other livestock grazing, and shall include all associated activities. ADDITIONAL DEFINITIONS Accessory dwelling unit: A detached dwelling unit (such as a guest house, pool house or garage apartment) located on the same lot with a single-family dwelling unit. The square foot area of a guest house may not exceed fifty (50) percent of the heated and finished floor area of the principal building or one thousand (1,000) square feet in heated floor area, whichever is less, and may be used only by family members or guests without payment or consideration. Accessory use: A use located on the same lot as the principal use, which is clearly incidental and secondary to the permitted use and which does not change the character of such use, including, but not limited to, private garages, bathhouses, greenhouses, tool sheds, storage buildings, or similar. Adult establishment: An "adult arcade," an "adult bookstore," an "adult motion picture theater," a "semi-nude lounge," or a "sex paraphernalia store" as those terms are defined in Chapter 4 (Adult Establishments) of the Bartow County Code. Alley: A minor way, public or private, used for service access to the back or side of properties otherwise abutting a street. Apartments: A multi-family residential use of five (5) or more attached dwelling units for which rent is paid and no fee title is conveyed. Assembly plant: A facility that performs the fitting together, or assembling of premanufactured parts into a complete article, sub-assembly, or product. A "heavy assembly plant" assembles products that exceed 200 pounds per unit (e.g. cars, motorcycles, etc.) or does not have a completely enclosed production line. These definitions shall not apply if a more specific use, term or definition is contained in this Ordinance. Block: A piece or parcel of land entirely surrounded by public highways or streets, other than alleys. Brewery: An establishment that manufactures malt beverages. Brewpub: Any restaurant in which beer or malt beverages are manufactured or brewed, subject to the requirements of O.C.G.A. §§ 3-5-35—3-5-38, except package sales do not count towards the required point of alcohol sales at said restaurant. Building: Any structure intended for shelter, housing, or enclosure of persons, animals, chattels or property, and usually having a roof supported by columns or by walls. Building, accessory: A detached structure designed for the use of which is clearly incidental to and subordinate to the principal structure or use of the land, and which is located on the same lot as the principal structure or use. Building, principal: A building in which is conducted the main use of the lot on which said building is located. Commercial or commercial operations: An activity undertaken for profit, income, or other business purposes, including sales or manufacture of goods or items; including sale of animals, and including boarding and breeding of animals, and similar activities. Commercial vehicle: A duly licensed and registered vehicle used to transport passengers or property to further a commercial enterprise. A commercial vehicle must not be used as an office nor have customer entry for a retail transaction. For purposes of this Ordinance the following are also commercial vehicles: vehicles of more than 10,000 pounds gross vehicle weight; vehicles with a manufacturer's rated load capacity of more than ton; vehicles registered as commercial vehicles, common carriers, motor common carriers, or classified as "for hire" by the State of Georgia, other States, or the ICC; or a freight trailer, semi-trailer, flatbed, tanker trailer, log trailer or other commercial trailer exceeding 12 feet in length. A recreational vehicle, farm machine or farm vehicle for agricultural uses is not a commercial vehicle. See Sec. 6.8 for further regulations. Conditional uses: A use not ordinarily permitted but which may be permitted upon the imposition of conditions related to the promotion of the public health, safety, morals or general welfare and designed to minimize the negative impact on surrounding lands. Such conditions may include, but are not limited to, restrictions on land use; height, setback and other non-use requirements; physical improvements to the property and infrastructure serving the property. A conditional use must be approved in the same manner as a rezoning request prior to the issuance of a permit. See Article XVI. Conditional zoning: The imposition of conditions in the grant of a rezoning application which are in addition to or different from the regulations set forth in this zoning ordinance and which are related to the promotion of the public health, safety, morals or general welfare and designed to minimize the negative impact on surrounding lands. Such conditions may include, but are not limited to, restrictions on land use, height, setbacks and other non-use requirements, physical improvements to the property and infrastructure serving the property. Condominium: Individual ownership units in a multi-family structure, combined with joint ownership of common areas of the building and grounds, or otherwise meeting the definition of Condominium in the Georgia Condominium Act, Title 44, Chapter 3, Article 3. Conventional single-family housing (site-built home): A dwelling unit constructed on the site from materials delivered to the site, constructed in accordance with the applicable Standard Building Codes. County: Bartow County, or the Commissioner of Bartow County, or the Commissioner's designee. CDA:9 Supp. No. 17 Craft distillery: An establishment where grains and/or fruits are distilled into spirituous liquor not to exceed 15,000 gallons per year, and which may include bottling, storage and aging facilities, as well as an area devoted to the sampling and sales of spirits and spirits-related products. Data center: Commercial activity center associated with technology, information systems, data infrastructure, data hosting and management activities, and similar new information age uses such as data processing, storage, and related services. Structures and land may be used for uses customarily incidental to the primary permitted use. The following development standards shall apply: 1. Buildings shall not exceed a height of seventy-five (75) feet, measured from structure pad level. Height limitations shall not apply to accessory structures such as water towers, conveyer belts, smokestacks and other incidental and uninhabited parts of industrial uses. 2. Front, Side, and Rear yard setback: Fifty (50) feet. 3. Minimum lot frontage: One hundred ten (110) feet adjoining a street. 4. Minimum lot width at building line: One hundred ten (110) feet. 5. Minimum lot acreage: Fifty (50) acres. 6. Minimum buffer requirements. In addition to required setbacks, buffers shall be required in accordance with the applicable zoning district. 7. Air conditioning units and HVAC systems. Air conditioning units and HVAC systems shall be thoroughly screened from view from the public right-of-way and from adjacent properties by using walls, fencing, roof elements, or landscaping. This requirement shall not apply where the equipment is more than 100 feet from adjacent property lines. 8. Front building facade. The front building facade of all principal buildings shall be oriented toward street fronts or adjacent arterial street fronts. This requirement shall not apply if the front of the building is greater than 500 feet from the public right-of-way or not visible from the public right-of-way. 9. Security fencing. Security fencing and walls shall not be located within the required buffer unless it complies with the general regulations pertaining to fencing. Fences and walls outside the required setback and buffer provided above shall not be subject to height limitations. 10. Accessory structures. Accessory structures shall be subject to the standards of the applicable zoning district. Notwithstanding other provisions of the code, guard houses and secured entry features shall be permitted at public road entrances. 11. Internal development roads may be public or private and are subject to the county engineering standards of the development regulations. 12. Exterior illumination shall be shielded, downcast, and of a luminosity designed to maintain the existing night sky darkness and to prevent light trespass onto adjacent properties. In order to obtain that objective, the following criteria shall be met: a. All fixtures shall be full cut-off type fixtures; b. Light poles shall be no taller than 25 feet in height; c. All light poles must be setback a minimum of 10 feet from any exterior property line; and d. Maximum foot-candles at the property line shall be 0.5. The zoning administrator may require a photometric lighting plan which shows conformity with these requirements as part of any building permit application. 13. In order to ensure that data centers do not contribute to noise pollution, all data centers shall be subject to the following standards: a. Data center operations shall not produce continuous sound that exceeds an average of 65 decibels over any 30-minute period from 8:00 a.m. to 6:00 p.m., measured at any adjacent property boundary between the data center site and a residential property. Nor shall data center operations produce continuous sound that exceeds an average of 55 decibels over any 30-minute period from 6:00 p.m. to 8:00 a.m., measured at any adjacent property boundary between the site and residential property. Violations of these sound levels may be prosecuted in the same manner as other zoning ordinance violations. b. After issuance of the Certificate of Occupancy for each data center building, the County may obtain sound studies or require the data center operator to provide a sound study to verify that the operation is in compliance with the requirements of paragraph (a) above. If a data center is found to be in violation of the requirements of paragraph (a) above, the County may issue a notice of violation, which may direct that the data center take appropriate steps to operate within the requirements of paragraph (a) above. The zoning administrator may require the data center operator to propose a solution and a time period for implementation. If the zoning administrator approves such a solution, and the data center fails to successfully implement that solution within the time approved, the violator shall be subject to a fine up to one thousand dollars ($1,000) for each day that the violation exists until full compliance is obtained. c. The data center operator shall continue to bear the costs of any sound test or study required to monitor violations in paragraph (b). Developer: The owner of, or person responsible for, a development. Development, or to develop: Subdividing a tract of land into three or more lots whether for sale or rental, whether for commercial, industrial, office or residential purposes, or some combination thereof. It shall also include redevelopment of existing development. It shall also include the construction of any commercial, industrial, multi-family or office building or CDA:11 Supp. No. 17 structure, even if on a single lot, and shall include the construction of a manufactured house park. In order that the purposes of this ordinance shall not be evaded by piecemeal development or subdivision, subdividing a tract of land existing on December 5, 2012 into two tracts shall not be a development, but any further split of either tract shall be a development. Distillery: An establishment that manufactures distilled spirits. Dwelling: A building or other structure designed, arranged, or used for temporary or permanent living quarters for one or more persons. Dwelling unit: A building or portion thereof, providing complete living facilities for one family. Easement: A grant by a property owner of the use of land for a specific purpose or purposes by the general public, a corporation, or a certain person or persons. Enclosure: A structure with four sides and a roof designed to enclose and shelter animals, persons or objects. Family: An individual or two (2) or more persons related by blood, marriage, or adoption living together in a dwelling unit; or a group of not more than six (6) persons who need not be related by blood, marriage, or adoption, living together in a dwelling unit. For purposes of this Ordinance, "a family" may include five (5) or fewer foster children placed in a family foster home licensed by the State of Georgia, but shall not include fraternities, sororities, nursing homes, or rest homes. Greenspace: Any parcel of land or water essentially unimproved and set aside, dedicated, designated, or reserved for public or private use or enjoyment, or for the preservation and protection of environmentally sensitive land areas or natural features. Excludes streets, drives, yard, and structures. Group home for persons with a disability: A residence in which three or more persons with a disability reside and which is licensed by the State Department of Human Resources as a personal care home under Title 31. See Sec. 9.1 for further regulations. Health department: The Bartow County Health Department, which reports to the Bartow County Board of Health. Home occupation: Limited commercial use in a residentially-zoned district in which the use is secondary to the residence, does not constitute a nuisance to adjacent or adjoining properties, and is subject to the regulations of Section 6.2. Hotel: Building(s) or structure(s) typically multi-story, providing multiple residential dwelling units for typically short-term rental (two weeks or less), with interior access to the units. Industrialized housing: A factory fabricated dwelling or commercial unit built in one or more sections designed to fit together on a foundation but which usually does not originally have wheels for movement and which is constructed in accordance with the Georgia Industrialized Building Act (O.C.G.A. § 8-2-110) and which bears the seal of approval issued by the Commissioner of Community Affairs. Industry, general: The manufacture, assembly, repair, processing, testing or packaging of finished products, predominantly from previously prepared materials or from raw materials; includes processing, fabrication, incidental storage, and distribution of such products. In general, such uses shall occur entirely or almost entirely within an enclosed structure. Without restricting the generality of the foregoing, this would include for example: assembly plants, feed processing plants, soft drink bottling and distribution plants, beer and liquor distribution plants, carpet manufacturing plants, and similar facilities. In cases of facilities not clearly falling into this definition, the Zoning Administrator shall determine whether a facility is general industry or heavy industry. Industry, heavy: A large-scale industrial manufacturing or processing activity, including especially the manufacturing or processing of raw materials for other industry, businesses or uses. Without restricting the generality of the foregoing, this would include for example: plants for the manufacture of petroleum products, pulp and paper products, stone, clay, and glass products, cement and lime products, fertilizers, animal by-products; and plants which will be engaged in the primary metal industry, metal processing, or the processing of natural gas or its derivatives. This would also include plants and facilities involved in the production (or processing) of intrinsically dangerous materials or products such as explosives, acids, and the like. In cases of facilities not clearly falling into this definition, the Zoning Administrator shall determine whether a facility is general industry or heavy industry. Institutional-residential uses: Uses that provide residential living space or dwelling units for persons in an institutional or group setting, whether for day care, 24-hour care or unassisted living, specifically defined as one of the following types: Assisted-Living Facility, Adult Day Care, Child Day Care, Homeless Shelter, Home for the Aged, Hospice, Nursery School, Nursing Home, Group Home, Protective Housing Facility, Rehabilitation/Treatment Facility, Residential Treatment Center, Rest Home, Retirement Home, and Shelter Care Facility. See Sec. 9.1 for further applicable regulations. Junk yard (salvage yard; scrap yard): Except for the use allowed under Section 7.12.8 (C), any use involving the storage or disassembly of wrecked automobiles, trucks, or other vehicles; storage, baling or otherwise dealing in bones, animal hides, scrap metal, commercial/ residential appliances, used paper, used cloth, used plumbing fixtures and used brick, wood, or other building materials. Such uses shall be considered junk yards whether or not all or part of such operations are conducted inside a building or in conjunction with, addition to, or accessory to, other uses of the premises. See Section 9.6 for additional regulations. Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land, but not including agricultural operations and forestry. CDA:13 Supp. No. 17 Land disturbance permit: A permit granted under the Bartow County Soil Erosion and Sedimentation Control Ordinance that provides the authorization necessary to conduct a land-disturbing activity under the provisions of that Ordinance and this Ordinance. Landfill: An area of land on which or an excavation in which solid waste is placed for permanent disposal. See Sec. 9.4 for further regulations. Lime Stabilization Organics Processing and Recycling Facility: A compact, enclosed processing facility through which organic, dewatered, wastewater biosolids are lime stabilized to produce Class A soil amendments. The site shall include an enclosed metal or clear span building housing lime stabilization equipment. The process incorporates quick lime at an average 10% rate to volume to treat organic materials to Class A material (EPD registration) for immediate discharge into trailers for transportation to agricultural fields as a registered soil amendment (Georgia Department of Agriculture). There shall be no process water discharge or treatment on site with the exception that Georgia EPD requires three day pretreatment storage capacity to assure safe operations. Outdoor storage must be located in a side or rear yard and screened from all rights-of-way and residential districts that adjoin the outdoor storage area. Future expansion can be considered in the initial design phase to assure available capacity could be added or scaled up to service potential future demand for services. Minimum lot size 10 acres required. All structures shall be setback at least 100 feet from all property lines and at least 1,000 feet from any existing single-family residence having a certificate of occupancy at the time of rezoning (or, if no rezoning required, at time of permitting) on adjacent and adjoining properties. Line, lot: The boundary line of a lot. Line, yard: A line drawn parallel to a lot line at a distance therefrom equal to the depth of the required setback. Lot: A developed or undeveloped tract of land having defined boundaries and legally transferable as a single unit of land; does not refer to public rights-of-way. Lot of record: A lot that was in compliance with ordinances and regulations in existence at the time the lot was created. Illegal lots that were created in violation of regulations existing at the time of creation are not lots of record. The following are lots of record: (A) Any lot described in a deed, survey, or final subdivision plat that was recorded in the office of the Bartow County Clerk of Court before September 22, 1993, the date of first adoption of a Zoning Ordinance in this County, and was not otherwise illegal at the time of creation. (B) Any lot described in a deed, survey, or final subdivision plat that was recorded after September 22, 1993 and before the date of adoption of this Ordinance, and which complied with the Zoning Ordinance in effect at the time of the lot's creation, even if it does not comply with the provisions of this Ordinance. (C) Any lot described in a deed, survey, or final subdivision plat that was recorded after the date of adoption of this Ordinance, and which complies with the requirements of this Ordinance. Lot, depth of: The mean horizontal distance between the front and rear lot lines, measured in the general direction of the side lot lines. Lot, width of: The distance between side lot lines. Manufactured house (mobile home): A detached, single-family dwelling unit designed for long-term occupancy and constructed in one or more units with wheels for movement (whether or not such wheels are later removed) and which has plumbing and electrical connections provided for attachment to outside systems, whether or not such unit is subsequently installed on a foundation or other internal or external changes are made. See Sec. 10.3 for further regulations. Manufactured house, multi-unit: A detached single-family dwelling unit constructed in two or more units with similar marriage walls with wheels for movement (whether or not such wheels are later removed) and which has plumbing and electrical connections provided for attachment to outside systems, whether or not such unit is subsequently installed on a foundation or other internal or external changes are made. Manufactured house park: A parcel of land which has been planned and improved for the placement of at least two manufactured houses for non-transient use. See Sec. 10.3 and the R-6 District (Sec. 7.8) for further regulations. Manufactured house stands: That area of a manufactured house lot which has been reserved for the placement of a manufactured house. Microbrewery: An establishment in which not more than fifteen thousand (15,000) barrels of beer or malt beverages are manufactured or brewed on the licensed premises in a calendar year and in which such manufactured or brewed beer or malt beverages may be sold for consumption on the premises and consumption off premises, subject to the limitations prescribed in O.C.G.A. § 3-5-24.1. As used in this definition, the term "barrel" shall be defined as set forth in O.C.G.A. § 3-5-1. Mining: The extraction of ore or minerals from the earth by various methods, including but not limited to blasting and excavating. For purposes of this ordinance, "mining" shall include all methods of drilling for oil, natural gas or other hydrocarbons, but not drilling for water. Motel: Building(s) or structure(s) of typically one or two stories height providing multiple residential dwelling units typically for short-term rental (two weeks or less), with adjacent parking and external access to each unit. Non-conforming use: A lawful use of or vested right to use any building, structure or land existing at the time of the adoption of this Ordinance or the adoption of any amendment thereto. See Section 6.1 for further regulations. CDA:15 Supp. No. 17 Open space: An area that is not used for or occupied by a driveway, an off-street parking area, a loading space, a yard, a refuse storage space, or a building. Ordinance: This Ordinance and all amendments thereto including the Official Zoning Maps of Bartow County. Place of worship: A structure which is intended for conducting organized religious services for organizations with tax-exempt status, with no overnight facilities. Secondary uses such as child care, senior services, professional counseling, hospices, schools, rehabilitation services, or similar uses are not included in the definition. A place of worship does not include organizations that violate federal, state, or city laws or codes. Planned unit development (PUD): A planned development on a minimum of 20 acres with a minimum lot size of 7,500 square feet and without regard to the segregation of housing types or uses and which may include multiple uses within the same tract. See Sec. 7.15 for further regulations. Plat: A map, plan or layout of a county, city, town, lot, section, subdivision or development indicating the location and boundaries of properties. Principal use: The specific, primary purpose for which land or a building is used. Public utility: A utility regulated by the Georgia Public Service Commission. Recreational vehicle: A boat, camper, camp trailer, travel trailer, house car, motor home, trailer bus, trailer coach or similar vehicle, with or without motive power, designed for human habitation for recreational or emergency occupancy. Where a recreational vehicle is on or attached to a trailer used to carry or tow said vehicle, they shall together be considered one recreational vehicle. A recreational vehicle shall not include a pickup truck used for transportation to which a camper shell has been attached. See Article VI for further regulations. Redevelopment: The process of developing property that has previously been developed. See "Development." Retail business: A business consisting primarily of buying merchandise or articles in gross and selling to general consumers in small quantities or broken lots or parcels and not in bulk and not for resale. Right-of-way line (also r/w): The dividing line between a lot, tract or parcel of land and a contiguous right-of-way. Setback: The open space between the lot line and the yard line, which shall be unobstructed by any structure other than as expressly permitted in this Ordinance. See Sec. 5.4. Where a distinction is made between an "external setback" and an "internal setback," "external setback" refers to the setback from external boundary lines and rights-of-way, and "internal setback" refers to spacing between multiple buildings on one larger lot (e.g., apartment buildings or townhomes). Sign: Any display of words, shapes or images designed to convey a message to the viewer, located on the exterior of any dwelling, building or structure, or located anywhere on a lot upon a dedicated supporting structure or device, including poles, banners, windows and similar devices. See Article XI for further sign regulations and definitions. Solar power generation facility: An assembly of equipment that converts sunlight into electricity and then stores and/or transfers that electricity. Solar power generation facilities are allowed as a primary use in the A-1, I-1 and I-2 districts, with the granting of a conditional use permit. Other solar power uses, such as panels on a residential or other primary structure, are allowed as an accessory use. Street: A way for vehicular traffic, whether designated as an avenue, road, boulevard, highway, expressway, lane, alley or other way. Structure: Anything constructed or erected, the use of which requires location on the ground, or attachment to something having location on the ground. Subdivision: A tract of land divided into three or more lots. Swimming pool: Any structure intended for swimming or recreational bathing that contains water over 36 inches deep. This includes in ground, above ground, and on ground swimming pools, but this definition does not include inflatable temporary pools. See Sec. 6.15 and the Bartow County Building Code Ordinance for additional regulations. Tiny house: A structure that is designed as a single-family residence less than 1,200 square feet in size, either permanently affixed or moveable. To subdivide: Dividing a tract of land into three or more lots. Townhouse: A multi-family residential use consisting of three (3) or more attached dwelling units for which fee simple title is conveyed and for which an incorporated mandatory homeowners' association is provided. Travel trailer/camper: See "Recreational Vehicle." Truck terminal: An area and building where trucks load and unload cargo and freight and where the cargo and freight may be broken down or aggregated into smaller or larger loads for transfer to other vehicles or modes of transportation. Truck stop/travel plaza: A mixed commercial use of property on one parcel providing facilities for the refueling, maintenance and/or servicing of heavy trucks and which may include related service facilities for such vehicles and their drivers, including but not limited to dispensing of motor fuels and petroleum products directly into motor vehicles, restaurants, lodging, shower and laundry facilities, truck service, overnight truck parking and/or storage, and a parking area of one (1) acre or more in association with the above services. Wholesale business: A business primarily engaged in the selling of goods or articles in gross to retailers or jobbers for resale and not to the ultimate consumer. CDA:16.1 Supp. No. 17 Yard: An open space on the same lot with a principal building open, unoccupied, and unobstructed by buildings or structures from ground to sky except where encroachments and accessory buildings are expressly permitted. Yard, front: An open, unoccupied space on the same lot with a principal building, extending the full width of the lot and situated between the street and the front line of the building projected to the side lines of the lot. Yard, rear: An open, unoccupied space on the same lot with a principal building, extending the full width of the lot and situated between the rear line of the lot and the rear line of the building projected to side lines of the lot. Yard, side: An open, unoccupied space on the same lot with a principal building, situated between the building and the side lot line of the lot and extending from the front yard to the rear yard. Any lot line not a rear line or a front line shall be deemed a side line. Zoning administrator: The Community Development Director of Bartow County, or a duly authorized representative. Zoning map(s): The Official Zoning Maps, Bartow County, Georgia. See Section 4.2. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), §§ I, II; Ord. of 3-16-2022(1), § I; Ord. of 8-9-2023, §§ II, III; Ord. of 1-8-2025(1), § I) ARTICLE IV. ESTABLISHMENT OF ZONING DISTRICTS Sec. 4.1. Division into districts. For the purpose of this Ordinance, Bartow County is divided into zoning districts designated as follows: • A-1 Agricultural District • RE-1 Rural Estate District (conventional or industrialized single-family) • RE-2 Rural Estate District (conventional, manufactured or industrialized singlefamily) • R-1 Residential District (conventional or industrialized single-family) • R-2 Residential District (conventional or industrialized duplexes, triplexes, or quadraplexes) • R-3 Residential District (multi-family conventional or industrialized housing) • R-4 Residential District (conventional, manufactured or industrialized single-family) • R-6 Manufactured Housing Parks District • O/I Office and Institutional District • C-N Neighborhood Business District • C-1 General Business District • I-1 General Industrial District • I-2 Heavy Industrial District • M-1 Mining District • PUD Planned Unit Development District • BPD Business Park District • R-7 Residential District (high-density multi-family housing) • R-8 Residential District (single-family housing) Special districts • Conservation Subdivision • Etowah Valley Historic District • Allatoona Overlay District Complete district regulations can be found in Article VII, and further applicable regulations can be found throughout this Ordinance. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § III) Sec. 4.2. District boundaries; official zoning maps. The boundaries of each district are as shown on a series of maps which collectively are entitled "Official Zoning Maps, Bartow County, Georgia" and certified by the Zoning Administrator. Said maps and all explanatory matter thereon are hereby made a part of and incorporated into this Ordinance by reference. Said maps shall be retained in the office of the Zoning Administrator of Bartow County and are available for public inspection during the business hours of the zoning office, which is located in the Frank Moore Administrative and Judicial Center, 135 W. Cherokee Avenue, Cartersville. (Ord. of 7-21-2021(4)) Sec. 4.3. Rules for determining boundaries. Where uncertainty exists with respect to the boundaries of any of the aforesaid districts as shown on the Zoning Maps or Future Land Use Map, the following rules shall apply: 4.3.1 Where district boundaries are indicated as approximately following the center lines of streets or highways, street lines, or highway rights-of-way lines, such center lines, street lines, or highway rights-of-way lines shall be construed to be such boundaries. 4.3.2 Where district boundaries are so indicated that they approximately follow lot lines, such lot lines shall be construed to be said boundaries. CDA:17 Supp. No. 16 4.3.3 Where district boundaries are so indicated that they are approximately parallel to the center lines of streets, highways, railroads, or rights-of-way of same, such district boundaries shall be construed as being parallel thereto and at such distance therefrom as indicated on the map. If no distance is given, such dimension shall be determined by the use of the scale shown on said map. 4.3.4 Where a district boundary line, as appearing on a map, divides a lot in single ownership at the time of this enactment into two or more classifications, the district requirements for the larger portion shall apply to the entire lot. 4.3.5 It is recognized that discrepancies or conflicts can occur between the official zoning maps and the official County Clerk's records (minutes) of actions taken by the Commissioner with respect to a specific parcel, either because of scriveners' errors or in amendment of the official maps. In the event such a discrepancy or conflict, the official County Clerk's records shall prevail. (Ord. of 7-21-2021(4)) Sec. 4.4. Future land use map. By this Section, the Future Land Use Map adopted by resolution of the Commissioner on December 6, 2006 and as thereafter amended, is established as the official policy of the county concerning proposed land uses, under which the unincorporated areas of the county are divided into land use categories. (Ord. of 7-21-2021(4)) Sec. 4.5. Future land use map distinguished from zoning. The Future Land Use Map does not alter or affect the existing zoning districts in the county, does not effectuate an amendment to the official zoning map, and does not itself permit or prohibit any existing land uses. However, it is the policy of the County to make every effort to keep zoning districts consistent with the Future Land Use Map classifications. (Ord. of 7-21-2021(4)) Sec. 4.6. Land use districts. The boundaries of the various land use districts are shown upon the future land use map and shall be used as a guide for decision making by the County. (Ord. of 7-21-2021(4)) Sec. 4.7. Interpretation of land use district boundaries. Where uncertainty exists as to the boundaries of any land use districts shown on the Future Land Use Map, the rules set forth in Section 4.3 shall apply. (Ord. of 7-21-2021(4)) Sec. 4.8. Relationship between land use categories and zoning districts. It is the goal of the County that the land use categories established by the Future Land Use Map are to be implemented with appropriate zoning classifications, and that rezonings should be kept consistent with the Future Land Use Map wherever possible. If a zoning district is not listed as permitted in a land use district, application should first be made to change the land use district prior to amending the zoning district. Such applications can proceed simultaneously, but it is the goal of the County that no property should be zoned to a classification inconsistent with its land use district. However, the County Commissioner has the power to grant rezonings inconsistent with the Future Land Use Map, which is only a policy guideline. The land use categories established by the Future Land Use Map are to be implemented by the establishment of appropriate zoning districts within each category. The following zoning districts are considered most compatible with the listed land use district: (A) Low density residential: A-1, R-1, R-4, R-8, RE-1 and RE-2. (B) Medium/high density residential: R-2, R-3, R-6, R-7. (C) Rural estate: RE-1, RE-2; also R-1 and R-4, excluding R-1 or R-4 subdivisions of three or more lots. (D) Residential/mixed use: Predominantly R-1, R-2, R-3, R-4, R-6, PUD; also allows C-1, C-N, O/I. (E) Commercial: C-1, C-N, O/I. (F) Commercial/mixed use: Predominantly C-1, C-N, O/I; also allows R-1, R-2, R-3, R-4, R-6, PUD. (G) Industrial: I-1, I-2, BPD. (H) Mining: M-1. (I) Agriculture: A-1; also R-1, R-4, RE-1, RE-2, excluding any R-1, R-4, or RE subdivisions of three or more lots. (J) Public/institutional: A-1, RE-1, RE-2, R-1, R-2, R-3, R-4, R-6, O/I, C-N, C-1, I-1, I-2, M-1. (K) Park/recreation/conservation: A-1, RE-1, RE-2, R-1, R-2, R-3, R-4, R-6. (L) Forestry: A-1; also R-1, R-4, RE-1, RE-2, excluding R-1, R-4 or RE subdivisions of three or more lots. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § IV) ARTICLE V. GENERAL REGULATIONS FOR LOTS Sec. 5.1. Use; applicable ordinances. 5.1.1 No building, structure, land, lot or portion of a lot shall hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected, constructed, CDA:19 Supp. No. 18 reconstructed, moved or structurally altered, unless the use or occupancy is in conformity with the codes and ordinances in effect in Bartow County at the time a permit is issued, or application made for a permit, and all of the regulations herein specified for the district in which it is located. Nonconforming uses are discussed in Sec 6.1. 5.1.2 There shall be only one principal use per lot. Based on the zoning district, however, there may be similar multiple users on a nonresidential property - examples would be multiple tenants in a commercial retail center and multiple tenants in an industrial warehouse/distribution facility. Only accessory uses that are accessory to that principal use shall be permitted. See also Sec. 5.3. 5.1.3 This Ordinance regulates zoning. The Bartow County Building Code Ordinance and the County Building Inspections Department should be consulted for applicable State Standard Minimum Codes applying to construction, repair and renovation. The Bartow County Board of Health and the Bartow County Health Department should be consulted for applicable health regulations relating to on-site sewage management systems (i.e., septic systems) and regulation for swimming pools, food service, tourist courts and other potentially applicable regulations. Development shall be in accordance with the Bartow County Development Regulations, and the Engineering Department should be consulted for those requirements. (Ord. of 7-21-2021(4)) Sec. 5.2. Yards. 5.2.1 Yards must remain open space, unobstructed by buildings or structures, except as otherwise permitted, such as accessory buildings in the rear or side yard. 5.2.2 No part of a yard, or other open space, or off-street parking or loading space required about, or in connection with, any building for the purpose of complying with this Ordinance, shall be included as part of a yard, open space, or off-street parking or loading space similarly required for any other building. (Ord. of 7-21-2021(4)) Sec. 5.3. Principal use; accessory buildings. 5.3.1 Only one principal use is permitted per lot or tract. Based on the zoning district, however, there may be similar multiple users on a nonresidential property - examples would be multiple tenants in a commercial retail center and multiple tenants in an industrial warehouse/distribution facility. 5.3.2 Every building or structure hereafter erected shall be located on a lot or tract as defined herein and there shall not be more than one principal building on one lot, plus its accessory buildings with the following exceptions: commercial, industrial, and multi-family zoned properties may have multiple buildings. 5.3.3 Accessory buildings and structures in residential zoning districts as well as A-1 zoned properties are permitted only in the side or rear yard and shall not be less than ten (10) feet from the side and rear property lines, and shall also meet all buffer requirements, if applicable, with the following exception: an accessory building (not an accessory dwelling unit) may be allowed in the front yard if 100 ft or greater from the front property line. On lots having frontage on more than one street in any district, the front setback figure shall apply to each street. No part of an accessory structure may be built closer to the street than the existing front building line of the principal structure unless the accessory structure is 100 ft or greater from the front property line. On lots of less than two (2) acres, there shall be no more than three (3) accessory buildings, including any detached garages. Accessory buildings are not permitted on residential lots or substandard (less than two acres in size) A-1 zoned properties without a primary structure. On lots less than two acres, no accessory structure shall exceed 75 percent of the size of the principal building or structure. Variance applications to allow front yard accessory buildings are discouraged, and in all cases an accessory building, if proposed in front of a residence in the front yard, must be a minimum of 50 ft from the front property line - this setback cannot be varied. 5.3.4 Temporary accessory structures (for example, mobile storage containers) may be located in any yard (including front yards) for no longer than fourteen (14) days. After that time period, any such structure must be removed. 5.3.5 Accessory Dwelling Units (such as a guest house, pool house or garage apartment) are allowed in residential zoning districts and A-1 zoned properties with the following standards: A. No more than one accessory dwelling unit per lot. A single-family principal dwelling unit must exist on the lot or have a building permit issued for a principal dwelling, which must have passed the rough-in/framing inspection. B. The structure shall be owner-occupied or by relatives or guests only, and cannot be used as rental property. C. Heated floor area shall not exceed 50 percent of the heated floor area of the principal building, or 1,000 square feet, whichever is less on lots less than one acre. Lots greater than one acre but less than ten acres are allowed 75 percent of the heated floor area of the principal building, or 1,500 square feet, whichever is less. D. The structure must meet all accessory building setbacks and not be located closer to the street than the principal building. E. The structure shall not exceed the height of the principal building on the lot. F. The accessory unit shall not be sold separately or be subdivided or otherwise segregated in ownership from the principal dwelling unit, or the land on which the principal dwelling unit is located. G. The unit must have a living or sleeping quarters and sanitation facilities. H. An accessory dwelling unit shall comply with the standard building codes as set forth in Section 18-31 of the Bartow County Building Code. CDA:21 Supp. No. 18 I. Recreational vehicles, manufactured homes, trailers, tiny homes, storage buildings, shipping containers and other non-residential buildings are not eligible to be considered accessory dwelling units. (Ord. of 7-21-2021(4); Ord. of 12-6-2023(4), § I; Ord. of 9-3-2025, §§ I—III) Sec. 5.4. Setbacks and rights-of-way. 5.4.1 No building or other structure may be erected in a front, side or rear setback, except for driveways, walkways, structural retaining walls, detention ponds, and patios (but not elevated decks, or cantilevered overhangs). Eaves and stairs may protrude no more than three feet into a setback. 5.4.2 On lots having frontage on more than one street in any district, the front setback figure shall apply to each street. 5.4.3 The Zoning Administrator shall be empowered to grant an administrative variance (under Sec. 14.1) to development setbacks for a maximum of twenty (20) percent. (Ord. of 7-21-2021(4)) Sec. 5.5. Lots; creation of illegal lots. 5.5.1 Lot reduction. It is not permitted to reduce an existing lot below minimum standards. Specifically, no lot shall be reduced in size so that the mandatory lot frontage or depth; front, side or rear yard; width at building line; or lot area are not maintained. Lots of record that do not meet existing standards may not be reduced. This section shall not apply when a portion of a lot is acquired for public purposes. 5.5.2 Illegal lots. It is not permitted to split or subdivide any lot if any of the resultant lots are under the minimum size lot allowed in the zoning district. Creation of a new lot under the minimum size requirement of the relevant zoning district is not permitted, nor is leaving a remnant under the minimum size requirement. It is not permitted to reduce an existing lot's size under the minimum size requirement. Any subdivision or creation of a substandard lot is illegal, and shall not create any vested right nor permit any non-conforming use. 5.5.3 Substandard single lots. Where the owner of a lot of record or his successor in title thereto does not own sufficient land to enable him to conform to the dimensional requirements of this Ordinance, such lot may be used as a building site for a conventional single-family residence in a district where residences are permitted. If a substandard A-1 lot is in a platted subdivision, the zoning administrator may determine if a non-conventional single-family residence (manufactured home) may be allowed. A determining factor for consideration is whether non-conventional single-family residences exist on at least eighty percent (80%) of the lots. 5.5.4 Substandard adjoining lots. If two or more adjoining lots with continuous frontage are in a single ownership at any time after September 22, 1993 (the date this provision was initially imposed) and such lots individually are too small to meet the yard, width, and area requirements of the district in which they are located, such groups of lots shall be considered as a single lot or several lots of minimum permitted size and the lot or lots in one ownership shall be subject to the requirements of this Ordinance. 5.5.5 The County reserves the right to take legal action to reverse illegal lot creations, illegal lot splits, or other actions in violation of this section, including creation of substandard-sized lots or remnants. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § V) Sec. 5.6. Road frontage restrictions; private driveways and easements. 5.6.1 No new lot shall be created, nor shall any principal building be erected, on any lot which does not have immediate frontage, of a minimum amount as specified below, on at least one existing public road (meaning a County road or State highway) or on a newly created internal street in a development. The only exception to this requirement is detailed below in Sec. 5.6.7. The minimum road frontage requirements are defined below based on the underlying zoning district. 5.6.2 A-1. For existing tracts of land zoned A-1, and located on existing public roads, a minimum of 150 feet of road frontage is required. For new developments in A-1 with internal streets, a minimum of 100 feet of road frontage is required, 50 feet on cul-de-sacs. For new proposals to subdivide land, each lot shall have public road frontage where possible - a back lot, or landlocked lot, shall not be proposed if the parent lot/tract/parcel has adequate public road frontage to be subdivided in which each lot would have public road frontage. Example: a proposed subdivision of land with 300 ft or more of public road frontage would have adequate road frontage for the parent lot/tract/parcel and the proposed sub-lot/tract/parcel. 5.6.3 R-1, R-2, R-3, R-4, R-7, R-8. For existing tracts of land zoned R-1, R-2, R-3, or R-4, and located on existing public roads, a minimum of 150 feet of road frontage is required. For new developments in R-1, R-3, and R-4 with internal streets, a minimum of 100 feet of road frontage is required, 25 feet on cul-de-sacs. For new developments in R-2 within internal streets, a minimum of 65 feet of road frontage for duplex is required; a minimum of 90 feet of road frontage for triplexes and/or quadplexes is required. For new developments in R-7, a minimum of 200 feet of road frontage is required. For new developments in R-8 with internal streets, a minimum of 50 feet of road frontage is required, 35 feet on cul-de-sacs. For new proposals to subdivide land, each lot shall have public road frontage where possible - a back lot, or landlocked lot, shall not be proposed if the parent lot/tract/parcel has adequate public road frontage to be subdivided in which each lot would have public road frontage. Example: a proposed subdivision of land with 300 ft or more of public road frontage would have adequate road frontage for the parent lot/tract/parcel and the proposed sub-lot/tract/parcel. 5.6.4 RE-1, RE-2. For existing tracts of land zoned RE-1 and RE-2, and located on existing public roads, a minimum of 150 feet of road frontage is required. For new developments in RE-1 and RE-2 with internal streets, a minimum of 100 feet of road frontage is required, 50 feet on cul-de-sacs. For new proposals to subdivide land, each lot shall have public road frontage where possible - a back lot, or landlocked lot, shall not be proposed if the parent CDA:23 Supp. No. 18 lot/tract/parcel has adequate public road frontage to be subdivided in which each lot would have public road frontage. Example: a proposed subdivision of land with 300 ft or more of public road frontage would have adequate road frontage for the parent lot/tract/parcel and the proposed sub-lot/tract/parcel. 5.6.5 O/I, C-N, C-1, I-1, I-2, BPD, M-1. Any new lot zoned O/I, C-N, C-1, I-1 and I-2, or any tract of land rezoned to O/I, C-N, C-1, I-1 or I-2, must have at least 100 feet of road frontage. For any lot zoned BPD, a minimum of 50 feet of road frontage is required. For any lot zoned M-1, a minimum of 200 feet of road frontage is required. 5.6.6 The Zoning Administrator has authority to administratively adjust the requirements in this Section under the procedures of Sec. 14.1, except that the maximum reduction granted may be up to 50% with the limitation that, where located on existing public roads, the maximum reduction could be from 150 ft to 100 ft by administrative adjustment. 5.6.7 Private Driveways and Easements. Multiple houses off private driveways and easements create public safety and road access problems. Therefore, no more than two lots or dwellings sharing one private easement or driveway shall be allowed. There shall only be one lot allowed to be subdivided from a parent parcel that does not have public road frontage, in which case this back lot, or landlocked tract, shall be a minimum of five (5) acres in size and shall have a minimum 30 feet in width access easement from the public road frontage property line to the back lot or landlocked tract. This easement shall be shown and noted on a proposed lot spit survey or subdivision plat. No further subdivision will be allowed unless a street is constructed to county standards, whether it remains private or dedicated to the county. Only one private easement is allowed per parent tract. Prior to full determination, the county engineer or his or her designee shall review the proposal based on the development regulations, which may apply and/or supersede the following standards. If the Board of Zoning Appeals grants additional lots in excess of two off of private easements or driveways, the following applies: a. The easement shall be at a minimum 30 feet in width, surfaced to a minimum of 6 inches of depth of crusher run stone, and the crusher run stone shall be at least 16 feet in width. The easement can be paved on top of the crusher run at the option of the applicant. The easement must meet this standard from the public street to the driveway of the newly created lot (however, if the driveway does not meet this standard, the Fire Department may not respond down the driveway). If the Board of Zoning Appeals grants additional lot(s) through approval of a variance, improvements shall be completed and inspected for approval by the community development director or his or her designee before issuance of a building permit. If the existing easement between the public street and the newly created lot does not meet this standard, it must be improved along the entire length to the newly created lot; and b. Any bridges or culverts along the length of the easement must be certified by an engineer to meet weight limits specified by the Fire Department to hold responding fire engines; or alternatively, the applicant shall note on the plat that any bridges or culverts do not meet Fire Department standards, and that the Fire Department will not respond over such substandard bridges or culverts; and c. If the easement dead ends into a lot, a sufficient turnaround for emergency vehicles shall be required, as specified by the Fire Department; and d. The plat must note that the easement is privately owned and maintained, and will not be maintained by Bartow County. The requirements in subsections (a), (b), (c) and (d) cannot be varied or reduced by the Zoning Administrator or the Board of Zoning Appeals. If the requirements cannot be met, no variance to create an additional lot shall be approved. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § IV) Sec. 5.7. Lot splits; subdivisions; recording of plats. A lot split is a tract of land divided into two lots. A lot split may be signed by the community development director or his or her designee, upon review as stated below. If, after December 5, 2012, either the parent parcel or the sub-parcel is proposed to be further split, this division shall follow the submittal process and requirements as found in appendix B (Development regulations). A subdivision is a tract of land divided into three or more lots. A subdivision of land divided into three or more lots shall follow the submittal process and requirements as found in appendix B (Development regulations). Existing subdivision lots that have been platted on a final plat in an existing common development, cannot be subdivided further. No plat proposing to subdivide/split, reconfigure, or combine a lot shall be recorded in the office of the Clerk of Superior Court of Bartow County without a signature of approval on the following signature block: This plat meets the requirements of the Bartow County Zoning Ordinance and Development Regulations and is authorized to be recorded. ______________________________________________________ ___________________________ Signature Date A boundary retracement survey that does not create a new lot and does not change existing property lines does not require review by community development staff. Such signature block shall only be signed by the community development director or his or her designee, upon review that the lots shown on the proposed plat meet the requirements for road frontage, minimum lot size, and all other applicable requirements of the Bartow County Code of Ordinances, appendix A (Zoning ordinance) and appendix B (Development regulations). Any plat recorded after the effective date of this amendment without such signature block shall be an illegal plat and shall vest no rights in the property owner. The CDA:25 Supp. No. 18 county reserves the right to take legal action to reverse illegal lot creations, illegal lot splits, or other actions in violation of this section, including creation of substandard-sized lots or remnants. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § V; Ord. of 9-3-2025, § IV) ARTICLE VI. REGULATION OF PROPERTY Sec. 6.1. Continuance of a non-conforming use. Any pre-existing lawful non-conforming use of or vested right to use any building, structure or land existing at the time of the adoption of this Ordinance (September 22, 1993), or the adoption of any amendment hereto, may be continued subject to the restrictions contained in this Ordinance, even though such use does not conform with the regulations of this Ordinance, except that: 6.1.1 A non-conforming use or structure shall not be changed to another non-conforming use. 6.1.2 A non-conforming use or structure shall not be expanded, extended, or enlarged beyond the area of use, size of operation, and/or the size of the structures existing at the time the use became non-conforming unless an applicant first obtains conditional use approval per Article XVI if it is determined by the Commissioner of Bartow County that said use will not be detrimental to the neighboring properties and is not contrary to the intent of this chapter. A non-conforming use cannot be expanded onto another parcel or tract of land. A non-conforming use on a portion of a single lot or tract of land may not be expanded even within that lot or tract of land to portions that were not in use at the time the use became non-conforming. For example, if a non-conforming junk yard (including all offices, junk cars, equipment and other piles of junk) was occupying 10 acres of a 50-acre tract of land when it became non-conforming, the use may not be expanded onto the other 40 acres. Similarly, no building containing a non-conforming use can be expanded or enlarged. 6.1.3 A non-conforming use or structure shall not be re-established after discontinuance for one year regardless of any reservation of an intent not to abandon. 6.1.4 A non-conforming use or structure shall not be rebuilt, altered, or repaired except as provided herein: (A) If the structure is altered or repaired, said alterations or repairs shall be in conformity with the building codes in force at the time of said alteration or repair; provided, however, that said alteration or repair shall not extend or enlarge the structure being altered or repaired except to bring the structure into conformity with the ordinance; (B) If the structure is totally rebuilt or replaced, the replacement structure shall conform to all the requirements of this ordinance with the following exception: if a conventional site-built single-family house is proposed on an existing lot of record one acre or less in size in a similar location to the previously demolished residence within one year of demolition, the zoning administrator, after obtaining input from the building official, may allow the house to be built back within the current required setbacks. 6.1.5 Non-conforming manufactured home parks may continue in existence, but all manufactured homes shall be maintained in safe and sanitary condition. It is the intent of this ordinance that non-conforming manufactured home parks should either be properly rezoned, if appropriate under the standards for the exercise of the zoning power, or they should be transitioned to a more appropriate use over time. Therefore, unless the property is properly rezoned and made conforming, no more manufactured homes shall be allowed in the non-conforming manufactured home park than when the park became non-conforming, and no existing manufactured home shall be replaced except in conformance with subsections 6.1.3 and 6.1.4 above. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § VI) Sec. 6.2. Home occupations. Unless specifically permitted as a use under the following provisions or other applicable provisions of Article VII, no business or commercial enterprise may operate in a residentiallyzoned district, including A-1 and any R district (R-1, R-2, etc.). A home occupation must be a use that is clearly incidental and secondary to the use of the residentially-zoned property for residential uses and does not change the character thereof or reveal from the road or adjoining properties that the property is being used for non-residential use purposes. At no time shall a home occupation become a nuisance or hazard to the county, including specifically, but not limited to, adjacent and adjoining properties. Nuisances shall be abated under the provisions of Section 6.18. The following provisions apply to home occupations: A. Dwelling. The occupation carried on within the dwelling unit shall not occupy an excess of 30 percent of the residence. The dwelling shall maintain its residential appearance. A home occupation must be a use that is clearly incidental and secondary to the use of the dwelling as a residence and does not change the character thereof or reveal from the exterior that the dwelling is being used in part for other than a residence. B. Accessory structure. If an accessory structure is used, the structure shall only be used for storage; an accessory structure on a residentially-zoned property is not authorized for commercial activities to occur within the structure. C. Employees. The occupation shall be conducted by full-time occupants of the residence and a maximum of one additional employee. D. External display and storage of products prohibited. There shall be no external display of products or storage of equipment or any other externally visible evidence of the occupation, business, or profession. CDA:27 Supp. No. 18 E. Nuisance. There shall be no emission of smoke, dust, odor, fumes, glare, noise, vibration, electrical or electronic disturbance detectable at the lot line or beyond. F. Prohibited equipment and materials. There shall be no chemical, mechanical or electrical equipment on the premises other than that normally found in a purely domestic residence. Chemical equipment shall also include any chemicals which are not normally found in a purely domestic residence. G. Parking and business-use/commercial vehicles. No on-street parking of business-use/ commercial vehicles shall be permitted at any time. The number of business-use/ commercial vehicles shall be limited to two. Examples of a business-use/commercial vehicle would include, but not be limited to, a heavy truck intended for the loading/hauling of materials; and a vehicle designed for towing semi-trailers (tractor-trailer trucks). A passenger vehicle such as a Ford F-150 truck; Honda Civic car; or Toyota RAV-4 sport utility vehicle would not count as a business-use/ commercial vehicle. H. Allowable home occupations. The following uses are examples of allowable home occupations: 1) Arts and crafts. 2) Attorneys, Accountants, Insurance agents, Real estate agents, and other office uses. 3) Contractor offices (i.e., painting, cleaning, yard maintenance, building) but not including outside storage of equipment, materials, or vehicles. 4) Counselors, psychological therapists, and similar uses. 5) Home marketing (e.g., Amway, Mary Kay, Tupperware, etc.), mail order marketing of items, and similar uses. 6) In-home childcare, but not more than six children at a time, including the caregiver's own preschool-aged children. 7) In-home retail operations for sales (typically online) in which sales activity on a daily basis does not occur at the residence. 8) Musician's and artist's studio. 9) Tutoring of all types, but limited to four pupils at one time. 10) Upholstery alterations and repair. 11) Other similar uses as approved by the zoning administrator or his/her designee. I. Occupations which are not allowed (prohibited). The following uses are examples of home occupations which are not allowed: 1) Animal grooming and similar pet related businesses on lots less than five acres. Kennels require a minimum of 15 acres and require conditional use approval. 2) Automobile sales, service, auctions, detailing, paint and body, repair, tire shops or scrap tire processing operations, and similar automotive related uses. 3) Dentists, medical doctors, chiropractors, or any practice of physical and/or medical application. 4) Junk yards, including automobile junk yards, scrap yards, salvage yards or other salvage operations. 5) Manufacturing, fabrication, processing, welding, metal forging, machine shops, or similar operations. 6) Massage therapy or similar services. 7) Retail sales of goods and/or services in which purchases and/or exchange of goods between buyer and seller occur on a daily basis at the residence. 8) Other similar uses determined by the zoning administrator or his/her designee to be not allowed (prohibited) based on the provisions of this section. (Ord. of 8-9-2023, § VII) Sec. 6.3. Reserved. Sec. 6.4. Reserved. Sec. 6.5. Residential living only permitted in permanent structures. No lot may be used for temporary or permanent residential living quarters unless a permanent dwelling unit has been lawfully erected on the lot, pursuant to the provisions of this Ordinance and applicable building and safety codes. Indications that a property is being used as temporary or permanent residential living quarters include actions such as spending significant time at the location on more than one day; repeated eating and sleeping at the location; performing other life activities at the location repeatedly; activating electrical, water, septic, and/or other utilities to serve a structure not allowed (prohibited) for everyday living. Tents, boats, RV campers, shipping containers, tiny houses, storage buildings, and other structures that are not permitted permanent dwelling units cannot be occupied either on a permanent or temporary basis on a residential lot, except that tents may be occupied for no more than three (3) days in any two-month period when erected in the rear yard of a permanent dwelling unit. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § VIII) CDA:29 Supp. No. 18 Sec. 6.6. Occupancy of recreational vehicles. No recreational vehicle shall otherwise be occupied as a temporary or permanent residential living quarter except in conformance with this Section or the provisions of the Bartow County Campground Standards Ordinance. Recreational vehicles can be occupied as temporary dwellings as a temporary accessory use, for no more than ten (10) days in any two-month period, only if there is a permanent dwelling unit as a principal use on the lot, and only if the vehicle is parked in conformance with this Ordinance. No more than one (1) recreational vehicle can be so occupied on the same lot. (Ord. of 7-21-2021(4)) Sec. 6.7. Recreational vehicle parking. Recreational vehicles, including but not limited to campers, all-terrain vehicles, boats, and other watercraft such as jet skis parked in any residential zone or residentially-used area shall not be permitted to be parked in any required setback or buffer area, nor in any front-yard area. Recreational vehicles on residential property shall only be parked in the side or rear yard, not within setbacks, although the Zoning Administrator may administratively vary this requirement if there is not sufficient room in or access to the rear or side yards. No more than two (2) recreational vehicles shall be parked on any single residential lot, although the Zoning Administrator may administratively vary this requirement if more than two (2) recreational vehicles may be parked in the side or rear yard of a lot in which the addition of more than two recreational vehicles does not create a public nuisance. Factors for consideration in determining whether more than two recreational vehicles may be acceptable include, but are not limited to, the size of lot; shape of lot; topography; etc. Recreational vehicles cannot be parked on any lot without a primary structure. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § VIII) Sec. 6.8. Commercial vehicle parking. 6.8.1 No more than two (2) commercial vehicles (trailers counted separately if separated from a tractor) shall be parked on any single residential lot, or on any lot in any residentially-zoned lot, including A-1 or any R district. Commercial vehicles may not be parked on any residential lot without an occupied single-family dwelling, and may not be parked on vacant residential lots. 6.8.2 On A-1 zoned property of over five (5) acres that contains a working agricultural business, commercial vehicles related to such business may be parked. 6.8.3 Commercial vehicles parked in any residential zone (including A-1) or residentiallyused area shall not be permitted to be parked in any required set-back or buffer area. Commercial vehicles on any lot under five (5) acres must be parked in the side or rear yard area. The Zoning Administrator shall be permitted to grant a hardship administrative variance to allow parking in a setback or front yard if no other room exists. 6.8.4 The Zoning Administrator shall be permitted to grant a hardship administrative variance to allow up to four (4) commercial vehicles to park on one (1) lot (for example, if four family members living there each drive a commercial vehicle home from work), but in no circumstance shall such variance be used to permit employees to report to a residential structure on a daily basis to pick up commercial vehicles for the company's operation. (Ord. of 7-21-2021(4)) Sec. 6.9. Use of vehicle or trailers for storage prohibited. Neither vehicles (whether operable or inoperable) nor trailers (whether on or off their axles) may be used as storage buildings. This shall apply to all vehicles and trailers, including commercial vehicles, recreational vehicles, panel vans, tractor-trailer rigs, railroad box-cars, shipping containers, and manufactured homes. However, tractor-trailer rigs and trailers may be used for temporary storage on property zoned C-1, I-1, I-2, BPD or M-1, only by businesses operating on the same property. Temporary storage means no particular trailer may remain longer than three (3) months. (Ord. of 7-21-2021(4)) Sec. 6.10. Outside sales, yard sales, open air markets. Outside sales are not permitted on any residentially-zoned or -used lot, except as provided in this section. Yard sales and garage sales (or carport sales) shall be permitted on any residential lot, no more frequently than once per calendar quarter. Such sale may not continue for more than 72 hours. Flea markets (i.e., where vendors other than the property owner sell goods) are not permitted in any zoning district in the County. (Ord. of 7-21-2021(4)) Sec. 6.11. Appearance of property. In order to preserve the aesthetic beauty of Bartow County, and protect against nuisances, hazards, vermin and odor, among other hazards, and to preserve the property values of surrounding property, all property in Bartow County shall be required to comply with the following provisions: 6.11.1 All property (other than where explicitly permitted, such as a junk yard or salvage yard) must be free of the following: scrap metal; junked, inoperative or broken appliances (including engines and vehicles or parts of vehicles); junked, inoperative or broken equipment (such as lawn mowers, bicycles, machines); construction or demolition debris; other waste, garbage or refuse such as old tires, discarded carpet, discarded household furniture, bottles, cans, or similar; stumps, branches, dirt, and other debris from land disturbance and grading (except incident to a permit under the Bartow County Soil Erosion and Sedimentation Ordinance for the subject property and/or pursuant to lawful construcAPPENDIX A—ZONING § 6.11 CDA:31 Supp. No. 18 tion on the subject property); and household trash (except in a trash container). Such items may be kept in an enclosed building or enclosed garage erected pursuant to a building permit or otherwise lawfully permitted, but may not be kept in the open. 6.11.2 All property, whether residential, commercial or industrial, containing a grass lawn (for example fescue, rye, bluegrass, bermuda, zoysia or similar grasses), landscaping strips, or other landscaping must be maintained so that the grass is kept cut below the height of 12 inches, and so that shrubbery, weeds and other landscaping is kept cut to the point where no windows or doors in a structure are obscured or blocked. This shall include landscaping on the right-of-way. Grass fields grown for grazing or other agricultural purposes and sod farms shall be exempt, except that in no event shall the front and side yards of a residentially-used structure be exempt. In order to prevent vacant and undeveloped lots from becoming a nuisance, all grass and vegetation within 25 feet of the back of the curb or edge of pavement of any vacant or undeveloped lot (whether residential, commercial or industrial), must be kept cut below a height of 12 inches, except for trees larger than two inches DBH which may be saved. This shall include vegetation on the right-of-way. 6.11.3 Storage of lumber, dumpsters, wood pallets, pipe, concrete blocks, other construction material, or other commercial material, or any commercial inventory (including products for sale, use or repair in off-site businesses), or materials associated with a commercial operation, shall be prohibited on residentially-zoned or residentially-used property, unless associated with or required by a permitted use on the property (including repair or construction of a structure that is itself a permitted use, e.g., construction of a single-family residence on said property). (Ord. of 7-21-2021(4)) Sec. 6.12. Junk, abandoned, inoperable or unregistered vehicles. 6.12.1 No automobile, vehicle (including but not limited to motorcycles, all-terrain vehicles, and campers), watercraft (including but not limited to boats and jet skis), or trailer of any kind or type, without a valid license plate attached thereto, shall be parked or stand on any residentially-zoned property or other zoned property unless it shall be in a completely enclosed building or on property properly zoned as a junk yard, or on property zoned under Section 7.12.8(C) of the Zoning Ordinance, except for such off-road vehicles which by law do not require a license plate, provided the same is in operating condition. 6.12.2 No automobile, vehicle or trailer of any kind or type, which shall be inoperative or in a junk condition, or abandoned, shall be parked or stand on any property unless: (A) it shall be in an enclosed building; (B) it shall be on the premises of a business enterprise operated in a lawful manner, when necessary to the operation of such business enterprise; or, (C) it shall be on property lawfully occupied and used for repair, reconditioning or remodeling of vehicles in conformance with the Zoning Ordinance of Bartow County. 6.12.3 A vehicle in inoperative or junk condition shall include, but shall not be limited to, any automobile, vehicle, trailer of any kind or type, or contrivance, or a part thereof, the condition of which is one or more of the following: 1) wrecked; 2) dismantled; 3) partially dismantled; 4) inoperative; 5) abandoned; 6) discarded; 7) scrapped; or 8) does not have a valid license plate attached thereto. 6.12.4 Nothing in this section shall authorize the maintenance of a public or private nuisance as defined under other provisions of law. 6.12.5 This section shall not be the exclusive regulation of abandoned, discarded, dismantled, wrecked, scrapped, ruined or junk motor vehicles, or contrivances, within the unincorporated limits of the County, but shall be supplemental to and in addition to other regulations and ordinances of the County and statutes or provisions of law heretofore and hereinafter enacted by the County, State or other legal entity or agency having jurisdiction. See also, Sec. 6.11. 6.12.6 In all instances where the owner of any abandoned, inoperative, or junk motor vehicle and/or trailer cannot be determined, or when such vehicle is abandoned on public property or a non-owner's property, such junk or abandoned motor vehicle and/or trailer shall be removed under the authority and provisions of Chapter 40-11 of the Georgia Code Annotated. If on public property, such vehicle may be removed after five days; if on private property, it may be removed after 30 days. 6.12.7 In all instances where the owner of any junk, inoperative, unregistered, or abandoned motor vehicle and/or trailer refuses to remove, enclose or register (or, if requested, refuses to give consent for the county to remove) any such vehicle or trailer currently in violation of this ordinance, the county shall be empowered to seek an order from a court of competent jurisdiction authorizing the county to remove and dispose of such vehicle or trailer. In addition, if the vehicle or trailer is determined to be a health hazard or a nuisance, the county shall be empowered to seek an order from a court of competent jurisdiction authorizing the county to remove and dispose of such vehicle. Such orders shall be authorized if the vehicle has been in violation of this ordinance for more than 20 days. 6.12.8 For purposes of repair or restoration, one inoperable and unregistered vehicle may be kept in the rear yard of a property, provided it is not visible from the street, is screened from all neighbors by a privacy fence in the rear yard, and is repaired or restored, removed, or placed in a fully enclosed building within six months. Such vehicle shall not be stored in any side yard or any setback or buffer area. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § VIII) Sec. 6.13. Storage of tires. The storage of new or used tires on any property is prohibited unless the same are stored within an enclosed building or garage. It is illegal to discard or abandon tires on any property other than a lawful landfill. (Ord. of 7-21-2021(4)) CDA:33 Supp. No. 18 Sec. 6.14. Sale of autos and vehicles. In a residential zoning district or residentially-used area, sales of autos and other vehicles from such property shall be limited to no more than six vehicles per year. No more than two such vehicles shall be parked in the front yard of any property at any one time. Any greater number of sales or vehicles displayed for sale shall constitute a commercial operation, which shall only be permitted in the C-1 commercial zoning district. (Ord. of 7-21-2021(4)) Sec. 6.15. Swimming pools. Swimming pools are permitted as accessory uses in residential zoning districts, including the A-1 district. Swimming pools are only permitted to be located in the side or rear yards of a property, with the following exception: for residential use properties of five (5) acres or larger, swimming pools may be in the front yard if located a minimum of 100 feet from the front property line. All portions of a swimming pool (including the pool itself, any recirculation pumps, sumps, heaters, filtration or treatment systems, chemical tanks, or pool-related machinery) shall be setback at least ten (10) feet from the side and rear property lines. Swimming pools shall further comply with applicable Board of Health regulations, and the Bartow County Building Code Ordinance. (Ord. of 7-21-2021(4)) Sec. 6.16. Timbering operations in non-residential zoning districts. Timbering operations (meaning cutting, hauling and/or harvesting timber) shall be a permitted activity in non-residential zoning districts (that is, C-1, C-N, O-I, I-1, I-2 and M-1) provided that no timbering operations shall be permitted in the area of any required buffer listed in the relevant zoning district. Crossing the buffer perpendicularly shall be permitted, but the buffer area shall otherwise remain undisturbed. Special buffer exemptions under Sec. 8.2.4(A) and (C) shall not apply. Sawmilling, including use of portable sawmills, is not permitted in non-residential zoning districts. Timbering operations are also subject to Chapter 68 of the Code of Bartow County. For timbering operations in the A-1 district, see Sec. 7.1. (Ord. of 7-21-2021(4)) Sec. 6.17. Mothballing vacant structures. 6.17.1 Purpose. In lieu of enforcement under other provisions of this Code, the owner(s) of a vacant structure may elect to close or "mothball" the structure if the structure is vacant and unfit for human habitation and occupancy, and it is not dilapidated, unsafe, unsanitary or in danger of structural collapse. Mothballing is defined as a method used to protect a vacant structure from weather damage and vandals while preserving the structure for future use. Prior to mothballing the property owner(s) must register the property with the zoning administrator and receive a permit to mothball. The property will be inspected for compliance upon completion. The mothballed property shall automatically have its certificate of occupancy revoked. 6.17.2 General procedures. The structure shall be required to have a weather-tight roof, with all missing shingles replaced. No tarps allowed. Windows and doors shall be covered on the exterior with high-grade plywood cut to fit within the window or door opening. Window or door coverings must be attached with screws, and shall be painted a flat color, either dark gray, black or a color that matches the building. Water shall be turned off and pipes drained. Electricity shall be turned off. Exterior walls must be sound and complete. 6.17.3 Time and Terms. The owner(s) shall have no more than 30 days from receipt of a permit to complete securing of the structure. Mothballing shall only be permitted for a period of six months from the date of the permit. Upon the expiration of six months, the owner shall have 60 days to receive a certificate of occupancy. Reoccupancy shall require compliance with applicable building codes and require the issuance of a certificate of occupancy prior to anyone occupying the structure. 6.17.4 Violations. Failure to secure a certificate of occupancy within the time required shall be a violation of this ordinance. In addition, such property that has passed its term shall be a nuisance, and subject to an action to have it declared a public nuisance. (Ord. of 7-21-2021(4)) Sec. 6.18. Nuisance abatement. a. Any owner of property who permits the same to become or remain in a condition prohibited under this Article may be notified in writing by the code enforcement officer to remove or remedy the condition within 15 calendar days of the date of such notification. b. Unless the condition complained of is removed, the county, at the expiration of such 15-calendar-day period shall be authorized to remove the condition or hire a private contractor to remove the condition. c. The cost of removal and abatement of the nuisance will be charged against the property and the property owner thereof, and it shall constitute a lien on the property which shall be recorded in the deed records of the County. d. In the event the costs of abating the nuisance are not paid, the lien recorded may be collected in the same manner as that provided by law for executions for ad valorem taxes due the county. e. In addition, the creation of a nuisance shall be deemed unlawful. f. The provisions of this section are cumulative and in addition to issuance of a citation, or other civil action to remedy a nuisance. (Ord. of 7-21-2021(4)) Sec. 6.19. Outdoor storage in commercial and industrial zones. Outdoor storage of inventory, supplies, materials, or goods shall be allowed only in the C-1, I-1, I-2, and BPD districts, under the following conditions. Outdoor storage must be located in a side or rear yard and screened from all rights-of-way, and residential districts that abut CDA:35 Supp. No. 18 the outdoor storage area. Such storage shall be screened either by opaque fencing or walls, other structures, or landscaping approved by the Zoning Administrator. This section does not apply to incidental outside storage on properties in residential districts. Retail products typically sold outdoors (for example, trailers or sheds) are exempt from this ordinance, unless the items violate other sections of the Zoning Ordinance (For example Sec. 6.11 Appearance of Property). This determination shall be made by the Zoning Administrator. The Zoning Administrator shall determine if outdoor storage on a particular lot is a nuisance to adjoining property owners when enforcing this ordinance. Outdoor storage of junk, trash or debris is not permitted unless specifically authorized for the use (for example, a junk yard or landfill). (Ord. of 7-21-2021(4)) Sec. 6.20. Temporary office trailers. The use of trailers or modular buildings for construction offices shall be allowed on a construction site only and must be removed within thirty (30) days of the issuance of a certificate of occupancy; the use of trailers or modular buildings for on-site real estate sales offices shall be allowed on a site for a period not to exceed thirty-six (36) months; the use of trailers or modular buildings for any other office use or commercial venture shall be allowed with the following condition: a. Temporary office trailers or modular buildings shall be allowed on a lot for a period not to exceed three (3) months. Upon expiration of the three-month period, the trailer or modular building must be removed from the property. The Zoning Administrator has authority to grant extensions of three months. (Ord. of 7-21-2021(4)) Sec. 6.21. Greenspace lots. Any lot or tract of land designated as Greenspace on a final plat of a subdivision or boundary survey is prohibited from any residential development. Greenspace lots should remain undisturbed from any land disturbance or structures, including the harvesting of timber. Limited disturbance for walking trails is allowed. (Ord. of 7-21-2021(4)) ARTICLE VII. USE REQUIREMENTS BY DISTRICTS; SPECIAL DISTRICTS The following districts designate certain uses and conditional uses within each district. A use not specifically named within a district is NOT permitted. Any question of interpretation as to the appropriate district for a use shall be determined by the Zoning Administrator. The minimum lot sizes, setbacks and other area and yard requirements for each district are provided both in each district and summarized in Article VIII of this Ordinance. Special districts for Conservation Subdivisions and the Etowah Valley Historic District are also contained herein. (Ord. of 7-21-2021(4)) Sec. 7.1. A-1 agriculture district. 7.1.1 Purpose. The A-1 agriculture district is established primarily to encourage the retention and development of suitable areas for common farm/agricultural practices and various compatible non-farm uses, preservation of open space, the conservation and management of soil, water, air, game and other natural resources and amenities, and to discourage the creation or continuation of conditions which could detract from the function, operation, and appearance of areas to provide food supplies and to prevent or minimize conflicts between common farm practices and non-farm uses. The A-1 district is also a residential district. 7.1.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the A-1 District: Minimum Lot Size: 2 acres. No new A-1 lot shall be created which is not at least two acres in area, and no lot of less than two acres may be split off from existing A-1 zoned property. No remnant of under two acres may be created by a lot split, nor shall any existing A-1 lot be reduced to less than two acres. Minimum Lot Width at Street R/W (on existing road): 200 feet. Minimum Lot Width at Street R/W (in new development): 100 ft.; 50 ft. on cul-de-sac. Front Yard Setback (from right-of-way): 40 feet; if an existing lot of record one acre or smaller, 25 feet. Side Yard Setback (from property line): 10 feet Rear Yard Setback (from property line): 25 feet Maximum Building and Structure Height: 50 feet Buffers: Special, see below. 7.1.3 Height exceptions. Buildings or structures essential to the operation of an agricultural operation, such as silos, granaries, windmills, and barns, may exceed the height limitation stated above. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.1.4 Accessory Structures. Accessory buildings and structures which are not intended for use or used for the housing of livestock or agricultural practices and are ancillary to the residential use (e.g., garage, pool) shall maintain the same front and side yards as the main structure; however, they shall not project beyond the established front building line with the following exception: for residential use properties, accessory structures may be in the front yard projecting beyond the front building line if located a minimum of 100 feet from the front property line. For such buildings and structures, side and rear yard setbacks shall be a minimum of ten feet. Silos, granaries, and similar accessory agricultural structures, on lots CDA:37 Supp. No. 18 10 acres or greater, shall be setback by a distance equal to the structure's height from any property line, and may be located in the front, side or rear yard. Silos, granaries, and similar accessory agricultural structures, on lots less than 10 acres, shall be setback by a distance of at least 25 feet from any property line, and shall be located in the rear yard. Accessory livestock structures must additionally meet special setback requirements under Sec. 7.1.8(B)(ii). Accessory structures on vacant lots 2 acres or greater may be constructed/ installed before a principle residence is present with the following limitations: minimum 100 ft front yard setback; side and rear yard setbacks shall be adhered to; and the structure cannot have living space/area. For vacant substandard A-1 lots less than 2 acres in size, a principal residence must be present on the property before an accessory structure may be constructed/installed. Variance applications to allow front yard accessory buildings are discouraged, and in all cases an accessory building, if proposed in front of a residence in the front yard, must be a minimum of 50 ft from the front property line - this setback cannot be varied. 7.1.5 Non-residential uses and associated accessory uses. Non-residential uses other than agricultural uses (e.g., bed and breakfast, airport, church) and associated accessory uses thereto shall be setback at least fifty (50) feet from the property line, shall be screened by a twenty-five (25) foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property, unless such requirements are waived or varied by the Zoning Administrator in hardship cases or cases where they are unnecessary to provide screening. Off-street parking/loading for all non-residential uses shall be provided in accordance with Bartow County Development Regulations. Other provisions of the Development Regulations may be applicable, and the Engineering Department should be consulted. Non-residential uses must meet special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. 7.1.6 Development in A-1. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. 7.1.7 Lot Restrictions in A-1. (A) Road frontage: No more than two lots sharing one private easement or driveway shall be allowed; see Section 5.6 for road frontage restrictions. (B) Subdivision lot restrictions: A subdivision is a tract of land divided into three or more lots. A subdivision of land divided into three or more lots shall follow the submittal process and requirements as found in appendix B (Development regulations). Any proposed further subdivision of an individual lot in an A-1 subdivision existing as of November 9, 2005, or created subsequent to that date, shall not be eligible to be further subdivided. 7.1.8 Permitted uses in A-1 district. Within the A-1 Agriculture district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Single-family dwellings (conventional, manufactured and/or industrialized houses) and customary accessory uses, including docks and boathouses on not less than a two (2) acre tract of land. For a substandard A-1 lot less than two (2) acres in size, manufactured homes are prohibited with the following exception: if a substandard A-1 lot is in a platted subdivision, the zoning administrator may determine if a non-conventional single-family residence (manufactured home) may be allowed. A determining factor for consideration is whether non-conventional single-family residences exist on at least eighty percent (80%) of the lots. See Sec. 10.3 for manufactured housing regulations. For a substandard A-1 residential use lot between one (1) and two (2) acres in size, a maximum of eight (8) hens (no roosters) shall be allowed. A single-family residence must first be on the lot. No other livestock animals are permitted. Hens shall be kept in an enclosure, whether fence, chicken coop, or other minor livestock enclosure, at least 25 ft from all property lines. The keeping of hens supports a local, sustainable food system by providing an affordable, nutritious source of fresh eggs. However, at no time shall hens on such a small lot become a nuisance. Hens shall not be allowed to roam/range on the private property of nearby residences. (B) Agricultural Uses subject to the following regulations: i. Fences. Any livestock shall not be able to roam off the property upon which it is kept, either being kept inside a properly fenced area (sufficient to restrain the animal) or kept contained in a livestock enclosure. ii. Livestock Enclosure Setback Provisions. Livestock enclosures (including but not limited to, cattle barns, stables, hog pens, and chicken houses or coops), and other buildings or structures which are intended for use or used for the housing or shelter of livestock animals, shall be located no closer than 50 feet from the property line on any parcel of less than or equal to 10 acres and no closer than 100 feet from the property line on any parcel of more than 10 acres. iii. Retail Sales. Retail selling of agricultural products shall be permissible provided that space necessary for the parking of customers' vehicles shall be provided off the public rights-of-way. Any structure constructed shall not exceed 1,500 square feet and must be at least 50 ft from all property lines. (C) Public safety structures and facilities. (D) Home occupations, see Sec. 6.4. CDA:39 Supp. No. 18 (E) Family plots (not in excess of 12 burial sites, on lots of at least five acres), see Sec. 9.7. (F) In-home nursery schools (child day cares) with no more than six (6) children at any one time; provided that they shall have at least thirty-five (35) square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet. (G) Group homes for persons with a disability, not exceeding six (6) residents, excluding resident staff, licensed by and in compliance with the applicable regulations of the Georgia Department of Human Resources; provided that: (i) There is no external signage or other evidence of the use of the dwelling as other than a residential dwelling unit; (ii) The dwelling shall maintain its residential appearance; (iii) There is adequate off-street parking for resident, staff and visitors' parking such that, except for planned special events, there are no vehicles parked on the street or road right-of-way; and (iv) Visitation hours are restricted so as to not create undue traffic congestion. (H) Timber production and forestry related uses, but not sawmills. See Sec. 7.1.9(R). (I) Fish hatcheries. (J) Marinas and associated accessory uses on Lake Allatoona, including commercial boat storage, boat docks, sale of fuel and incidental supplies for the boat owners, crews, and guests, on-site clubhouse/restaurant. Temporary or permanent housing associated with marinas, including house boats, lake cabin rentals and RV lots, are allowed with the granting of a Conditional Use Permit. (K) Political or religious gatherings, limited to not more than 14 days in duration per year, provided sufficient space is available to provide a buffer of 500 feet from adjoining property owners and off-street parking. (L) Vineyards (except wineries are conditional uses). (M) Resort communities. See Sec. 9.3. (N) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utility and service structures. (O) Special events. Maximum four (4) per calendar year - more than four on the same lot would be considered an event facility and would require a conditional use permit per section 7.1.9. Special events, for example, overland foot races, arts and crafts fairs, musical concerts, and other gatherings of a commercial nature (meaning admission is charged or goods or services are being sold) shall be permitted subject to the administrative approval of the zoning administrator. Special events under this subsection shall not exceed 72 hours in duration. The zoning administrator shall review the request under the following criteria: 1) whether the size and shape of the property sufficient to support the event; 2) whether the roads serving the property are adequate for the anticipated traffic; 3) whether the adjacent property owners and neighbors will be negatively impacted by the event; 4) whether the event is inconsistent with the surrounding property and uses; 5) whether the event is inconsistent with the intent of the zoning ordinance; 6) whether the event would create a nuisance; 7) whether the event would be harmful to the environment; 8) whether the event is consistent with other applicable laws and ordinances. The applicant shall submit information as required by the zoning administrator to review the event in accordance with the above criteria and shall submit information as to the purpose; size and dates of event; size and location of property; anticipated crowds; anticipated vendors and other commercial activity; whether a special event alcohol license will be sought; plans for parking, traffic control, sanitation, public safety and security for the event; and other such information as may be required by the zoning administrator. The zoning administrator may require notice to adjacent property owners and to review their comments. Application should be made at least 45 days prior to the event to ensure the timeliness of an appeal. The decision of the zoning administrator may be appealed to the commissioner. (P) Commercial greenhouses, with a minimum lot size of five acres and the greenhouses are set back at least 25 feet from the property lines. (Q) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. All such uses must meet off-street parking regulations, as required by the Bartow County Development Regulations. See subsection 7.1.5. 7.1.9 Conditional uses in A-1 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Country Clubs and Golf Courses, without residential lots. (B) Golf Course Communities and Country Club Communities; See Sec. 9.2. (C) Bed and breakfast inns, provided there is sufficient space to provide adequate parking and the rental is limited to temporary occupancy only. (D) Wineries, farm breweries and farm distilleries that are associated with an agricultural operation. A winery, farm brewery or farm distillery must grow, produce and harvest grains, hops, fruit and other agricultural products used to brew or distill the product, or incorporate the use of a spring or other natural resource. Production, manufacturing, shipping storage, and warehousing of the product is allowed. Tasting rooms and consumption are allowed, as is the direct sales of the product, in accordance with Georgia state law. Hours of operation are limited to 10 a.m. to 8 p.m. Sunday through Thursday, 10 a.m. to 10 p.m. Friday and Saturday. Special events (wedding, corporate retreat, etc.) are limited to the hours of operation. CDA:41 Supp. No. 18 (E) Water bottling plant, at natural spring locations, and limited truck and commercial traffic related thereto. Such plants must meet the I-1 District buffer and setback requirements, and may not operate (or generate or receive commercial vehicle traffic) between the hours of 7:00 p.m. and 7:00 a.m. (F) Privately owned historic sites, regularly open for public visitation, provided the same consist of ten (10) acres or more and is a component of the National Register of Historic Places and the Georgia Register of Historic Places; provided further, that any fees charged or revenue generated in connection with the site are used solely to offset the costs of restoring and maintaining the buildings and grounds of said site; provided further, that the only ancillary facilities permitted are a museum, restaurant and gift shop (which may contain a snack bar); provided further, that facilities for parking must be self-contained on the premises and shielded from public view. No activity which would cause sound to travel beyond the limits of the property is allowed. No activity not directly related to the historic nature of the property, shall be permitted. Overnight parking is prohibited. (G) Recreational vehicle/travel trailer parks and campgrounds; provided the park or campground shall consist of a minimum of twenty (20) acres and developed in accordance with the provisions of this Ordinance pertaining to campgrounds; provided further, the nearest parking space or campsite shall be located not less than 500 feet from any adjoining property line. See the Bartow County Campground Standards Ordinance. (H) Cemeteries, see Sec. 9.7. (I) Public airports, on at least 200 acres of land, and the boundary of the airport property may not be located within 2,000 feet of any residential dwelling. Private landing strips on at least 50 acres, with the runway not located within 1,000 feet of the nearest residence. Associated commercial uses, such as skydiving facilities, must be stated within the Conditional Use Permit application. Structures associated with the commercial use (hangars, sales office, maintenance facility, etc.) must be setback 200 feet off the property line. The applicant must present a site plan showing the location of the runway, drop zones, all proposed structures, access and parking, which shall become a zoning condition if the use is approved. Drop zones shall be unobstructed and follow the basic safety requirements set forth by the United States Parachute Association. The applicant must also state the number of aircraft that will use the private landing strip. The development must conform to Bartow County Development Regulations for non-residential uses in terms of parking, stormwater and other matters as set forth therein. All uses must meet Federal Aviation Administration guidelines and not interfere with operations at the CartersvilleBartow County Airport. (J) Sailport, ultralight landing strip, on at least 50 acres of land, not within 1,000 feet of any residentially-used property. (K) Bicycling, mountain bike course, outdoor recreation center, or other private recreational facility, or similar, for commercial purposes or organized events. Minimum lot size: 10 acres. (L) Motocross motorcycle track, dirt bike track, race track, auto racing, drag strip, other powered-vehicle race track. Fifty (50) acre minimum tract of land required, with minimum five hundred (500) foot buffer (complying with Sec. 8.2.5). No portion of the race track or any garage, staging or pit area, nor any parking area, may be located within one thousand five hundred (1500) feet of any residential dwelling. (M) Outdoor paintball game courses and facilities, or similar facilities, with a minimum area of 10 acres and no gaming to take place within 200 feet of any property line. Hours of permitted operation are 8:00 a.m. to 9:00 p.m. "Paintball" means any game or event that involves using guns or devices that shoot capsules of paint or dye. (N) Firing range facilities, outdoor. These are any facilities where outdoor firing of firearms is performed on a commercial basis (i.e., requires a fee or membership), including private gun clubs, target shooting ranges, etc. 1. Minimum lot size: 100 acres. 2. A 200-foot vegetated buffer shall be required for all sides of the property abutting residential or commercial zones, such buffer to be consistent with the buffer standards set forth in section 8.2 3. Firing ranges for rifles and pistols should be oriented so that firing is not directed towards any residential property within 2000 yards that is touching an arc width of 20 degrees, centered on the axis of firing (that is, within ten degrees of either side of said axis); ranges for sporting clays, skeet, trap and five stands are not subject to this requirement. 4. All portions of any firing range (for pistol and rifle ranges, this is defined as the area from the firing line to the target backstop or berm, for the width of the shooting lanes; for sporting clays, skeet, trap and five stands, this is defined as the area from the firing stations to a distance 100 yards from the firing stations in the direction of fire) must be located at least 1,000 feet from all property lines. 5. Hours of firing shall be limited to between 10:00 a.m. and 6:00 p.m., Monday to Saturday. No firing permitted on Sunday. 6. A site plan shall be submitted with the conditional use application showing all facilities and ranges, the direction of firing, all residential property within 2000 yards downrange, and all buffers and distances, plus such other information as is required by the Zoning Administrator to enforce this section. (O) Firing ranges facilities, indoor. These are facilities where all firing ranges are inside buildings. 1. Minimum lot size: 10 acres. CDA:43 Supp. No. 18 2. A 50-foot vegetated buffer shall be required for all sides of the property abutting residential or commercial zones, such buffer to be consistent with the buffer standards set forth in section 8.2. 3. No building containing a firing range may be located within one hundred feet (100') of the property boundary. 4. Building's housing firing ranges must be constructed to prevent the escape of bullets and also constructed with sound-proofing or setbacks such that no sound of the discharge of firearms is audible at the property line. 5. A site plan shall be submitted with the conditional use application showing all facilities, all buffers and distances, plus such other information as is required by the Zoning Administrator to enforce this section. (P) Existing firing ranges. Outdoor Firing Ranges in existence as of July 8, 2009 in Bartow County shall, commencing July 12, 2009, be subject to the following restriction: hours of operation shall be limited to Monday to Saturday, 10:00 a.m. to 7:00 p.m. No firing shall be permitted on Sunday. Note: The foregoing provisions concerning firing ranges (Sections 7.1.9 (N), (O), and (P)) shall not apply to property owned by the County or property owned entities exempt from county zoning including the U.S. Government, a municipality within the County, or an entity regulated by the Georgia Public Service Commission (i.e., a public utility). (Q) Only on former, abandoned mine property, shallow surface mining is permitted as a conditional use for rock and mineral removal, provided no explosive blasting nor digging is permitted. Neither strip mining nor open pit mining shall be permitted, nor shall any mining requiring heavy excavators or massive land disturbance. Shallow surface mining is limited to a depth below preexisting grade of ten (10) feet; deeper mining requires M-1 classification. A 100 foot undisturbed, vegetated buffer shall be required. The applicant shall be required to meet the buffer requirements of the M-1 district for surface mining. (R) Sawmills; provided that any sawmill must be located at least 500 feet from an adjoining property line; provided further that if said sawmill is located on property which adjoins property on which a dwelling is located, said sawmill must be located no less than 1,000 feet from the closest point to said dwelling. (S) Explosive storage, when accessory to a permitted use (except not permitted in conjunction with shallow surface mining, see below). (T) Telecommunications structures, subject to Article XII. (U) Chicken houses holding or designed to hold more than 500 chickens. Any such chicken house must be setback at least 150 feet from the property line and at least 500 feet from any existing residence (having a certificate of occupancy at the time of rezoning application) on adjoining property. Minimum lot size required: 20 acres. (V) Dog arenas, horse tracks, steeplechase tracks, similar animal race facilities; rodeo facilities; kennel clubs, dog clubs and similar facilities; catteries, cat breeding facilities, and similar facilities. Minimum lot size required: 20 acres. Any race facility must be set back at least 200 feet from the property lines. (W) Kennels. Minimum setback for kennels is 100 feet from property line and 200 feet for nearest non-owned residence. Higher setbacks may be required depending on the intensity of the use. The maximum number of dogs may be capped depending on the circumstances of the property. Minimum lot size required: 15 acres. (X) Meat processing facilities and temporary holding lot for livestock, with a 100-foot setback from the property line; but not chicken processing facility, see Sec. 7.13. Minimum lot size required: 15 acres. (Y) Event facility, for weddings, rehearsal dinners, corporate meetings, retirement functions and catering. Only limited overnight facility permitted; no hotel or motel operation shall be allowed. The facility may not operate a restaurant open to the general public; it may only hold previously scheduled and reserved events for specific group(s). Minimum lot size is 10 acres. Must have sufficient parking to satisfy Bartow County Development Regulations. No structure or parking may be located within 50 feet of property line. Further restrictions may be applied as zoning conditions. The facility cannot be expanded beyond what is approved in the original conditional use application without a further conditional use approval. (Z) Taxidermy facilities, on minimum of ten (10) acre lots. (AA) Outdoor dive training facility. A facility to offer outdoor scuba or dive training to members of the public and government entities, including incidental sales and rental of scuba/dive equipment. May include docks and no more than 2,500 square feet of heated space associated with the facility in one or more structures, plus accessory storage. Boat sales or marinas are not permitted. Sales or rental of boat slips are not permitted. (BB) Solar power generation facilities not accessory to a residential structure. Any such facilities and associated apparatus shall be set back at least 50 feet from the property lines. Sound barriers shall be required for noise mitigation around all inverter and transformer skid pads. Equipment shall be screened and fenced from adjacent property to restrict unauthorized access. Screening shall consist of a minimum 8-foot opaque fence with the addition of shrubbery, trees or an earthen berm. The applicant shall demonstrate that the proposal will not have an adverse effect on neighboring properties by providing aerials of the site, graphic renderings of the project, and/or pictures from the site of surrounding parcels demonstrating sight lines. Appropriate vegetated buffers and/or plantings may also be required to help limit the visual impact of the site and possible glare issues. (CC) Special events not meeting the criteria of section 7.1.8(P)—for example events seeking to exceed 72 hours in duration—may be sought as a special use permit. The applicant shall submit the information required for a review under section 7.1.8(P) and the zoning administrator shall make a recommendation to the commissioner. CDA:45 Supp. No. 18 (DD) Agricultural large-scale retail sales. The purpose of this conditional use is to permit agricultural operations to have large-scale retail sales in a structure larger than 1,500 square feet without the necessity of having to rezone a tract to commercial. On tracts of at least 10 acres, a property owner may apply to authorize construction or use of a building for sales of agricultural products grown on the property. The building must be set back at least 100 ft from all property lines. The applicant must present a concept site plan for review by county department representatives prior to a zoning case showing the location of the building, access and parking, which shall become a zoning condition if the conditional use is approved. The development must conform to Bartow County Development Regulations for non-residential uses in terms of parking, stormwater and other matters as set forth therein. At least 25 percent of the items sold must be agricultural products grown on the property. Up to 75 percent may be items associated with the sale of agricultural products or agricultural products grown elsewhere. (EE) Swine or hog farms with more than 200 swine/hogs. Any enclosure for swine or hogs must be setback at least 150 feet from the property line and at least 500 feet from any existing residence (having a certificate of occupancy at the time of rezoning application) on adjoining property. Minimum lot size required: 20 acres. (FF) Private subdivisions (see Development Regulation Sec. 5.33). Private subdivisions must have a gated entrance but the County Fire Department must be provided access satisfactory to the Fire Marshal. (GG) Lake cabin rentals, house boats, RV lots associated with marinas. See Sec. 7.1.8(J). (HH) Injection wells (including but not limited to Class I through VI) as defined and regulated by the Georgia Environmental Protection Division. Any such facilities and associated apparatus shall be set back at least 200 feet from the property lines. Equipment shall be screened and fenced from adjacent property to restrict unauthorized access. Screening shall consist of a minimum eight (8) feet tall opaque fence around the project area with the addition of shrubbery, trees, or an earthen berm. The applicant shall demonstrate that the proposal will not have an adverse effect on neighboring properties by providing aerials of the site, graphic renderings of the project, and/or pictures from the site of surrounding parcels demonstrating sight lines. Appropriate vegetated buffers and/or plantings may also be required to help limit the visual impact of the site. (II) Data centers, on a minimum of 200 acres. Data centers must meet all development standards set forth in the Article III of this Ordinance (see Definitions, Section 3.2, "data centers"). The data center must also maintain a 200-foot buffer, either undisturbed or improved as required by the Zoning Administrator to provide adequate visual screening for neighbors. Data centers are unique developments that sometimes do not require a traditional Industrially-zoned property, as they do not create a high amount of traffic, and require power infrastructure that may not be found in developed industrial areas. Applicants must describe in their application why the property in question is better served by being issued a Conditional Use in the A-1 District than rezoning to I-1, I-2, or BPD. The applicant should provide a utility inventory showing the power line easements as part of their Concept Plan submittal that exhibits why the site is suitable for a data center. The Planning Commission will consider if the issuance of the Conditional Use Permit will have any negative impacts on the surrounding area. The Planning Commission can place additional requirements as conditions, including increased setbacks, buffers, noise and lighting restrictions to limit the impact of a data center on neighboring residents. 7.1.10 Family exemption. In the A-1 zoning district, a property owner with at least five acres may convey to his or her child, stepchild, grandchild, step grandchild, mother, mother-in-law, father, father-in-law, grandmother, grandfather, grandparent (in-law), stepparent, brother, sister, brother-in-law, sister-in-law, stepbrother, stepsister, aunt, uncle, niece or nephew a building lot of at least one acre without having to rezone. The tract shall have at least 100 feet of road frontage and shall not violate the county's easement and driveway restrictions. The tract may not be split from an existing A-1 subdivision lot. Only one lot shall be split under this exemption, future splits shall meet the required two-acre minimum in the A-1 district or be rezoned. A plat or survey shall be prepared by a licensed land surveyor, with a note designating the tract is created under Section 7.1.10 of the Bartow County Zoning Ordinance. Only uses permitted in the R-1 district shall be allowed - as an example, manufactured homes are prohibited with newly created lots under the family exemption. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), §§ VI, VII; Ord. of 3-16-2022(1), § II; Ord. of 8-9-2023, §§ IX, X; Ord. of 12-6-2023(4), § II; Ord. of 7-10-2024, § I; Ord. of 9-3-2025, CDA:46.1 Supp. No. 18 Sec. 7.2. RE-1 rural estate district (conventional or industrialized single-family housing). 7.2.1 Purpose. The RE-1 rural estate district is established primarily to encourage the development of large lot rural estate type housing developments, for conventional or industrialized homes. The RE-1 district is a residential district. 7.2.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the RE-1 District: Minimum Lot Size: 3 acres. See Sec. 5.5. Min. lot width at street r/w (on existing road): 200 ft. Min. lot width at street r/w (in new development): 100 ft., 50 ft. on cul-de-sac. Front yard setback (from right-of-way): 40 feet Side yard setback (from property line): 10 feet Rear yard setback (from property line): 25 feet Maximum building and structure height: 50 feet Buffers: None. Special Agricultural Protection Buffers: See Sec. 8.2.3 for buffers required for homes built adjacent to existing agricultural activities. 7.2.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.2.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. 7.2.5 Non-Residential Uses and Accessory Uses. Non-residential uses and accessory uses shall be set back at least fifty (50) feet from all property lines, shall be screened by a twenty-five (25) foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all non-residential uses shall be provided in accordance with Bartow County Development Regulations. Other provisions of the Development Regulations may be applicable, and the Engineering Department should be consulted. Non-residential uses must meet special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. 7.2.6 Development in RE-1. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. CDA:47 Supp. No. 17 7.2.7 Permitted uses in RE-1 district. Within the RE-1 Rural Estate district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Conventional or industrialized single-family dwellings on a minimum lot size of three acres. Manufactured houses shall not be permitted. (B) On lots three acres or larger, stables and horses are permitted so long as said horses are owned by the property owner and the number of horses does not exceed one per whole acre of property; provided further that any barn or structure used to house said horses is located at least 100 feet from the adjoining property line and at least 200 feet from any dwelling located on adjoining property. Commercial operations are not permitted. A maximum of eight (8) hens (no roosters) shall be allowed. A single-family residence must first be on the lot. No other livestock animals are permitted. Hens shall be kept in an enclosure, whether fence, chicken coop, or other minor livestock enclosure, at least 25 ft from all property lines. The keeping of hens supports a local, sustainable food system by providing an affordable, nutritious source of fresh eggs. However, at no time shall hens on such a small lot become a nuisance. Hens shall not be allowed to roam/range on the private property of nearby residences. (C) Home occupations, see Sec. 6.4. (D) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utility and service structures. (E) In-home nursery schools (child day cares) with no more than six (6) children at any one time; provided that they shall have at least thirty-five (35) square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet. (F) Group homes for persons with a disability, all not exceeding six (6) residents, excluding resident staff, licensed by and in compliance with the applicable regulations of the Georgia Department of Human Resources; provided that: i. there is no external signage or other evidence of the use of the dwelling as other than a residential dwelling unit; ii. the dwelling shall maintain its residential appearance; iii. there is adequate off-street parking for resident, staff and visitors' parking such that, except for planned special events, there are no vehicles parked on the street or road right-of-way; and iv. visitation hours are restricted so as to not create undue traffic congestion. (G) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. All such uses must meet off-street parking regulations, as required by the Bartow County Development Regulations. See subsection 7.2.5. 7.2.8 Conditional uses in RE-1 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (Ord. of 7-21-2021(4); Ord. of 1-5-2022(1), § IV; Ord. of 8-9-2023, § XI) Sec. 7.3. RE-2 rural estate district (conventional, industrialized, or manufactured single-family housing). 7.3.1 Purpose. The RE-2 rural estate district is established primarily to encourage the development of large lot rural estate type housing developments, for conventional, industrialized or manufactured houses. The RE-2 district is a residential district. 7.3.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the RE-2 District: Minimum Lot Size: 3 acres. See Sec. 5.5. Min. Lot Width at Street R/W (on existing road): 200 ft. Min. Lot Width at Street R/W (in new development): 100 ft., 50 ft. on cul-de-sac. Front yard setback (from right-of-way): 40 feet Side yard setback (from property line): 10 feet Rear yard setback (from property line): 25 feet Maximum building and structure height: 50 feet Buffers: None. Special agricultural protection buffers: See Sec. 8.2.3 for buffers required for homes built adjacent to existing agricultural activities. 7.3.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.3.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. 7.3.5 Non-residential uses and accessory uses. Non-residential uses and accessory uses shall be set back at least fifty (50) feet from all property lines, shall be screened by a CDA:49 Supp. No. 17 twenty-five (25) foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all non-residential uses shall be provided in accordance with Bartow County Development Regulations. Other provisions of the Development Regulations may be applicable, and the Engineering Department should be consulted. Non-residential uses must meet special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. 7.3.6 Development in RE-2. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. 7.3.7 Permitted uses in RE-2 district. Within the RE-2 Rural Estate district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Conventional, industrialized or manufactured single-family dwellings on a minimum lot size of three acres. See Sec. 10.3 for manufactured housing regulations. (B) On lots three acres or larger, stables and horses are permitted so long as said horses are owned by the property owner and the number of horses does not exceed one per whole acre of property; provided further that any barn or structure used to house said horses is located at least 100 feet from the adjoining property line and at least 200 feet from any dwelling located on adjoining property. Commercial operations are not permitted. No other livestock is permitted. (C) Home occupations, see Sec. 6.4. (D) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utility and service structures. (E) In-home nursery schools (child day cares) with no more than six (6) children at any one time; provided that they shall have at least thirty-five (35) square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet. i. Group homes for persons with a disability, all not exceeding six (6) residents, excluding resident staff, licensed by and in compliance with the applicable regulations of the Georgia Department of Human Resources; provided that: ii. there is no external signage or other evidence of the use of the dwelling as other than a residential dwelling unit; iii. the dwelling shall maintain its residential appearance; iv. there is adequate off-street parking for resident, staff and visitors' parking such that, except for planned special events, there are no vehicles parked on the street or road right-of-way; and v. visitation hours are restricted so as to not create undue traffic congestion. (F) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. All such uses must meet off-street parking regulations, as required by the Bartow County Development Regulations. See subsection 7.3.5. 7.3.8 Conditional uses in RE-2 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (Ord. of 7-21-2021(4); Ord. of 1-5-2022(1), § IV) Sec. 7.4. R-1 residential district (conventional or industrialized single-family housing). 7.4.1 Purpose. The R-1 residential district is established primarily to encourage the development of smaller lot single-family developments, for conventional or industrialized homes. The R-1 district is a residential district. 7.4.2 Area, yard, height and buffer requirements. The following requirements apply in the R-1 District: Minimum Lot Size: 15,000 square feet with sewer; if on septic, 26,000 square feet or greater as required by County Health Department. See Sec. 5.5. See also section 7.4.9 for mandatory development standards. Min. lot width at street r/w (on existing road): 200 feet. Min. lot width at street r/w (in new development): 75 feet, 25 ft. on cul-de-sac. Front yard setback (from right-of-way): 25 feet Side yard setback (from property line): 10 feet Rear yard setback (from property line): 25 feet Maximum building and structure height: 50 feet Buffers: None. Special agricultural protection buffers: See Sec. 8.2.3 for buffers required for homes built adjacent to existing agricultural activities. 7.4.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.4.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. CDA:51 Supp. No. 17 7.4.5 Non-residential uses and accessory uses. Non-residential uses and accessory uses shall be set back at least fifty (50) feet from all property lines, shall be screened by a twenty-five (25) foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all non-residential uses shall be provided in accordance with Bartow County Development Regulations. Other provisions of the Development Regulations may be applicable, and the Engineering Department should be consulted. Non-residential uses must meet special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. 7.4.6 Development in R-1. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. 7.4.7 Permitted uses in R-1 district. Within the R-1 residential district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Conventional or industrialized single-family dwellings. Manufactured homes shall not be permitted. On any lot that is single-family residential use and between one and two acres, a maximum of eight (8) hens (no roosters) shall be allowed. A single-family residence must first be on the lot. No other livestock animals are permitted. Hens shall be kept in an enclosure, whether fence, chicken coop, or other minor livestock enclosure, at least 25 ft from all property lines. The keeping of hens supports a local, sustainable food system by providing an affordable, nutritious source of fresh eggs. However, at no time shall hens on such a small lot become a nuisance. Hens shall not be allowed to roam/range on the private property of nearby residences. (B) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utility and service structures. (C) In-home nursery schools (day cares) and kindergartens with no more than 6 children at any one time; provided that they shall have at least thirty-five (35) square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet. (D) Home occupations, see Sec. 6.4. (E) Group homes for persons with a disability, all not exceeding six (6) residents, excluding resident staff, licensed by and in compliance with the applicable regulations of the Georgia Department of Human Resources; provided that: i. There is no external signage or other evidence of the use of the dwelling as other than a residential dwelling unit; ii. The dwelling shall maintain its residential appearance; iii. There is adequate off-street parking for resident, staff and visitors' parking such that, except for planned special events, there are no vehicles parked on the street or road right-of-way; and iv. Visitation hours are restricted so as to not create undue traffic congestion. (F) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. All such uses must meet off-street parking regulations, as required by the Bartow County Development Regulations. See subsection 7.4.5. 7.4.8 Conditional uses in R-1 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (B) Private subdivisions (see Development Regulation Sec. 5.33). Private subdivisions must have a gated entrance but the County Fire Department must be provided access satisfactory to the Fire Marshal. (C) Residential infill/redevelopment. An applicant may apply for conditional use approval for single-family homes on smaller lot sizes in infill/redevelopment areas where existing infrastructure is present - sewer is required. An applicant must obtain a water and sewer letter from the provider confirming availability and capacity. A civil engineer must prepare a concept site plan to be submitted with the conditional use application, noting at a minimum the lot size, setbacks, and building footprints for the proposed lots. The applicant must submit the concept site plan to the zoning administrator and county engineer for review comments prior to submittal of a conditional use application. Maximum three (3) acres development area for zoning case (conditional use) for a proposed residential infill/redevelopment project. Minimum lot size shall be 5,000 square feet. Minimum lot width at street right-of-way 45 ft, 25 ft on cul-de-sac. Minimum setbacks measured from property lines shall be 20 ft front, 5 ft sides, and 15 ft rear. CDA:53 Supp. No. 17 7.4.9 Development standards for subdivisions. For any subdivision in the R-1 zoning district where no certificate of occupancy has been issued for a home as of April 11, 2018, each home thereafter constructed shall be constructed with the following features. These requirements shall not apply to single lots not part of a larger development. a. Architectural Elements. The front of each residence shall exhibit a variety of color, material and texture, with a variety of architectural elements. The front of each residence shall exhibit at least two of the following features: i. Shutters on at least two front windows, or other window accents; ii. An architectural 6-panel door with at least one side light; iii. Covered entry-way or porch; iv. Arches, columns, gables or cornices; v. Architectural shingles. b. Each side of a home shall have at least one window. c. On the front and sides of a home, the first three feet of the structure, measured from the ground level, shall be stone or brick; the remainder may be brick, stucco, stone, fiber-cement product; treated wood or other similar durable material. In the alternative, the same amount of square footage of stone or brick as equals this requirement may be used as an architectural element on the front of the home. d. The following materials are prohibited for exterior walls and finishes. i. Vinyl siding. ii. Mill finish (i.e., silver) aluminum extrusions for windows and doorways. iii. Unfinished cinder blocks. iv. Metal siding (e.g., corrugated steel, tin). Metal roofs are permitted. e. The developer shall provide a landscape plan as part of the civil plans which includes native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. f. For any development of more than 50 homes, a homeowners association and a playground or recreational area of at least 30,000 square feet shall be provided. g. Multiple architectural plans and designs shall be used so that each residence has a distinct visual character from the other homes in the development when viewed from the public right-of-way. The developer shall submit information as may be required by the Zoning Administrator to satisfy compliance with this section, including representative elevations of homes, prior to issuance of any building permits. (Ord. of 7-21-2021(4); Ord. of 1-5-2022(1), § II; Ord. of 8-9-2023, §§ XII, XIII; Ord. of 11-13-2024(2), § I) Sec. 7.5. R-2 residential district (conventional or industrialized duplex, triplex, or quadraplex housing). 7.5.1 Purpose. The R-2 residential district is established primarily to accommodate the development of conventional or industrialized duplexes, triplexes, and quadraplexes (aka fourplex). The R-2 district is a residential district. 7.5.2 Area, yard, height and buffer requirements. The following requirements apply in the R-2 district: Minimum lot size: On sewer: 8,000 square feet for duplex, 12,000 square feet for triplex and 16,000 square feet for quadplex. On septic, 26,000 square feet or greater as required by the health department. Minimum lot width at street R/W (on existing road): 150 feet. Minimum lot width at street R/W (in new development): 65 feet for duplex, 90 feet for triplex or quadplex; reduce by half () for cul-de-sac lot. Front yard setback (from right-of-way): 25 feet. Side yard setback (from property line): 10 feet. Rear yard setback (from property line): 25 feet. Maximum building and structure height: 50 feet. Buffers: 15 feet adjoining single-family residential use property. See section 8.2. Special Agricultural Protection Buffers: See section 8.2.3 for buffers required for homes built adjacent to existing agricultural activities. 7.5.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see article XI. 7.5.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. 7.5.5 Non-residential uses and accessory uses. Non-residential uses and accessory uses shall be set back at least 50 feet from all property lines, shall be screened by a 25-foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all CDA:55 Supp. No. 17 non-residential uses shall be provided in accordance with the county development regulations. Other provisions of the development regulations may be applicable, and the engineering department should be consulted. Nonresidential uses must meet special building code requirements, and the county building inspections department and the county building code ordinance should be consulted. 7.5.6 Development in R-2. Application for rezoning to this zoning district shall require submission of a site plan, including parking, landscaping and amenities, as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed development. Development must be in accordance with the county development regulations. The engineering department should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. 7.5.7 Permitted uses in R-2 district. Within the R-2 residential district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is not permitted: (A) Conventional or industrialized duplexes, triplexes, and quadraplexes are permitted. Separate bath/toilet facilities and kitchen/dining areas shall be provided for each dwelling unit. (B) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utility and service structures. (C) In-home nursery schools (day cares) and kindergartens with no more than six children at any one time; provided that they shall have at least 35 square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six feet. (D) Home occupations, see section 6.2. (E) Group homes for persons with a disability (for up to six residents not counting resident staff), licensed by and in compliance with the applicable regulations of the state department of human resources. (F) A vacant lot zoned R-2 may be used for one conventional single-family residence. Manufactured homes are prohibited. Property shall not be rezoned to R-2 for this purpose. (G) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. 7.5.8 Conditional uses in R-2 district. The following are permitted only with the grant of a conditional use permit under the requirements of article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to article XII. 7.5.9 Design standards for R-2 Housing Developments of 25 Units or Greater. (A) At least thirty-three percent (33%) of the building materials used for the total exterior façade must be brick or stone. Brick or stone materials shall wrap around at outside building corners of at least 3 feet height (water table). The remainder may be wood, hard-coat stucco, board and batten, cedar shakes, and fiber cement siding (hardi-board). Vinyl siding and External Insulation and Finishing Systems (EIFS) are prohibited. (B) Garages are required for each unit, unless shared central parking is provided. Doors shall be architectural in style. Standard panel doors are not permitted. Garage doors shall be recessed a minimum of 12 inches from the front façade. (C) Front facades shall have at least one of the following: front porch, stoop or balcony. (D) Units should be designed to provide a variety of facades. This can be achieved by changes in brick/stone color and materials, projection or recess of architectural features, or varied roof lines. Dormers or gable pediments shall be incorporated into minimum 25 percent of units. (E) Each unit shall have an architectural 6-panel door and window accents on all front windows, or similar features as approved by the zoning administrator. Each exterior wall shall have at least one window - at least one window on each side shall be minimum two feet in width by three feet in height. (F) The developer shall provide a landscape plan as part of the civil plans which includes native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. The landscape plan shall show and note at least one tree and bush for each residential lot or unit. (G) At least three (3) architectural plans and designs showing all sides of proposed units shall be submitted for review to the zoning administrator for approval before issuance of building permits. (H) A minimum of ten percent (10%) of any housing development shall be set aside as open space. Parking lots, streets, setback areas, buffers, stormwater control measures, detention facilities, and so forth shall not count towards this requirement. Long, narrow strips of land shall not count towards this requirement. As part of the open space, an amenity tract of at least 20,000 square feet shall be located to be readily accessible to residents and shall contain some combination of sports fields, playgrounds, CDA:57 Supp. No. 17 walking trails, pools, gazebos and similar facilities. At least one significant amenity feature (sport court, playground, walking trail, pool, etc.) or two smaller amenities (gazebo, fire pit, pergola, etc.) shall be included in the amenity tract and shall be noted on the site plan. The open space and amenity plan shall be reviewed and approved by the Zoning Administrator for compliance prior to the application for rezoning advancing. (I) This section shall apply to any development that has not obtained a land disturbance permit at the time of adoption of this ordinance. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § VIII; Ord. of 1-5-2022(1), § IV; Ord. of 8-9-2023, §§ XIV, XV; Ord. of 7-10-2024, § II) Sec. 7.6. R-3 residential district (multi-family housing). 7.6.1 Purpose. The R-3 residential district is established primarily to encourage the development of multi-family housing such as apartments, condominiums and townhomes. The R-3 district is a residential district. 7.6.2 Area, yard, height and buffer requirements. The following requirements apply in the R-3 district: Minimum development size: three acres on sewer. Septic not permitted. Maximum density for apartments, condominiums, and condo-style townhomes: 16 dwelling units per acre in all cases, regardless if lot size minimums allow greater density. Minimum lot size for townhomes: 1,200 square feet Minimum tract/lot width at street R/W: 100 ft for new developments on existing streets. 25 feet for townhomes on internal streets. Front yard setback (from right-of-way): 25 feet unless otherwise specified. Side yard setback (from property line): 10 feet. Rear yard setback (from property line): 25 feet. Maximum building and structure height: 60 feet or four stories. Buffers: 25 feet of undisturbed (if sufficiently dense) or vegetated buffer is required when adjacent to single-family residential use. See section 8.2. Special Agricultural Protection Buffers: See section 8.2.3 for buffers required for homes built adjacent to existing agricultural activities. 7.6.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see article XI. 7.6.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. 7.6.5 Non-residential uses and accessory uses. Non-residential uses and accessory uses shall be set back at least 50 feet from all property lines, shall be screened by a 25-foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all non-residential uses shall be provided in accordance with the county development regulations. Other provisions of the development regulations may be applicable, and the engineering department should be consulted. Non-residential uses must meet special building code requirements, and the county building inspections department and the county building code ordinance should be consulted. 7.6.6 Development in R-3. Application for rezoning to this zoning district shall require submission of a site plan, including parking, landscaping and amenities, as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed development. Development must be in accordance with the county development regulations. The engineering department should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. 7.6.7 Permitted uses in R-3 district. Within the R-3 residential district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is not permitted: (A) Apartment developments. "Apartment" means a multi-family residential use of five or more attached dwelling units per building, which units are leased or rented and no fee title is conveyed; the entire development must stay in common ownership, with all buildings owned by the same entity that owns the common space, amenities, drives and parking areas. Apartment developments which comply with the following standards are permitted: 1. Maximum density 16 dwelling units per acre. Each dwelling unit shall have separate bath/toilet and kitchen/dining areas. 2. Buildings may have exterior access to apartments (i.e., garden-style) or internal access hallways. 3. Internal setbacks. Buildings shall be spaced at least 20 feet apart. The front of one building shall not face the rear of another building on the site. 4. External setbacks. All buildings must maintain a setback of 25 feet from all external property boundary lines and any rights-of-way. CDA:59 Supp. No. 17 5. At least one refuse collection station shall be provided for each 30 families or fraction thereof which shall be located not more than 50 feet from any dwelling unit. (B) Townhome developments. "Townhome" means a multi-family residential use consisting of three or more attached dwelling units for which fee simple title is conveyed and for which an incorporated mandatory homeowners' association is provided. Fee simple townhome developments which comply with the following standards are permitted: 1. Minimum lots 1,200 square feet on sewer. 2. Two off-street parking spaces shall be provided on site for each dwelling unit. 3. Each townhome shall have a minimum heated area of 1,200 square feet. 4. Internal setbacks. Buildings shall be spaced at least 20 feet apart. The front of one building shall not face the rear of another building on the site. 5. External setbacks. All buildings must maintain a setback of 25 feet from all external property boundary lines and any rights-of-way. 6. At least one refuse collection station shall be provided for each 30 families or fraction thereof which shall be located not more than 50 feet from any dwelling unit. 7. A homeowners association shall be created for the development with joint ownership of common areas of the grounds and/or buildings including but not limited to amenity structures, if individual lots and yards are not conveyed fee simple. (C) Condominiums. "Condominium" means individual ownership units in a multifamily structure with joint ownership of common areas of the grounds and/or buildings, or otherwise meeting the definition of condominium in the Georgia Condominium Act, O.C.G.A. Title 44, Chapter 3, Article 3. Requirements of section 7.6.7(B)(1—7) apply. (D) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utilities and service structures. (E) In-home nursery schools (day cares) and kindergartens with no more than six children at any one time; provided that they shall have at least 35 square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six feet. (F) Home occupations. See section 6.2. (G) Group homes for persons with a disability (for up to six residents excluding resident staff), licensed by and in compliance with the applicable regulations of the state department of human resources. (H) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. (I) A vacant lot zoned R-3 may be used for one conventional single-family residence. Manufactured homes are prohibited. Property shall not be rezoned to R-3 for this purpose. 7.6.8 Conditional uses in R-3 district. The following are permitted only with the grant of a conditional use permit under the requirements of article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to article XII. (B) Mixed Residential Common Developments. "Mixed Residential Common Developments" means a multi-family residential use of five or more attached or detached dwelling units per development, which units are leased or rented and no fee title is conveyed; the entire development must stay in common ownership, with all buildings owned by the same entity that owns the common space, amenities, drives and parking areas. Mixed residential common developments may consist of conventional site-built detached individual units, duplexes, triplexes, quadplexes, condos, townhomes, apartments, or a mixture thereof. As part of a conditional use application, a site plan and letter of intent shall be submitted stating the proposed number of units, types of units, and density in addition to the application requirements of section 7.6.6. Mixed residential common developments which comply with the following standards are permitted: 1. Maximum density 16 dwelling units per acre. Two off-street parking spaces shall be provided on site for each dwelling unit. Each dwelling unit shall have separate bath/toilet and kitchen/dining areas. 2. External setbacks. All buildings must maintain a setback of 25 feet from all external property boundary lines and any rights-of-way. 3. No residences shall be constructed on a lot or tract of land unless connected to sewer. 4. At least one refuse collection station shall be provided for each 30 families or fraction thereof which shall be located not more than 50 feet from any dwelling unit unless each unit is served by an individual refuse receptacle. 5. Design requirements of section 7.6.9 shall apply. 7.6.9 Design standards for Townhomes, Condominium and Apartment Developments. (A) Townhome and Condominium Design Standards. 1. At least thirty-three percent (33%) of the building materials used for the total exterior façade must be brick or stone. Brick or stone materials shall wrap around at outside building corners of at least 3 feet height (water table). The CDA:61 Supp. No. 17 remainder may be wood, hard-coat stucco, board and batten, fiber cement siding and cedar shakes. Vinyl siding and External Insulation and Finishing Systems (EIFS) are prohibited. 2. Garages are required for each unit. Doors shall be architectural in style. Standard panel doors are not permitted. Garage doors shall be recessed a minimum of 12 inches from the front façade. 3. Front facades shall have at least one of the following: front porch, stoop or balcony. 4. No more than six units can be attached. 5. Units should be designed to provide a variety of facades. This can be achieved by changes in brick/stone color and materials, projection or recess of architectural features, or varied roof lines. Dormers or gable pediments shall be incorporated into 25 percent of units. 6. Each unit shall have an architectural 6-panel door and window accents on all front windows, or similar features as approved by the zoning administrator. Each exterior wall shall have at least one window - at least one window on each side shall be minimum two feet in width by three feet in height. 7. Front setbacks are a minimum 20 feet from the edge of pavement of internal streets in the development. 8. The developer shall provide a landscape plan as part of the civil plans to include native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. The landscape plan shall show and note at least one tree and bush for each residential lot or unit. 9. At least three (3) architectural plans and designs showing all four sides of proposed units or buildings shall be submitted for review to the zoning administrator for approval before issuance of building permits. 10. A minimum of ten percent (10%) of any housing development shall be set aside as open space. As part of the open space, an amenity tract of at least 20,000 square feet shall be located to be readily accessible to all residents and shall contain some combination of sports fields, playgrounds, walking trails, pools, gazebos and similar facilities. At least one significant amenity feature (sport court, playground, walking trail, pool, etc.) or two smaller amenities (gazebo, fire pit, pergola, etc.) shall be shown and noted on the site plan. Parking lots, streets, setback areas, buffers, stormwater control measures, detention facilities, and so forth shall not count towards this requirement. Long, narrow strips of land shall not count towards this requirement. The open space and amenity plan shall be reviewed and approved by the Zoning Administrator for compliance prior to the application for rezoning advancing. 11. This section shall apply to any development that has not obtained a Land Disturbance Permit at the time of adoption of this ordinance. (B) Apartment Design Standards. 1. At least thirty-three percent (33%) of the building materials used for the total exterior façade must be brick or stone. Brick or stone materials shall wrap around at outside building corners of at least 3 feet height (water table). The remainder may be wood, hard-coat stucco, board and batten, fiber cement siding and cedar shakes. Vinyl siding and External Insulation and Finishing Systems (EIFS) are prohibited. 2. Variation of materials shall be used to vary external wall surfaces, as well as varied roof lines. The building shall be designed that a variation of setback of at least 2 feet is required for every 100 feet of building length. 3. The developer shall provide a landscape plan as part of the civil plans to include native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. The landscape plan shall show and note at least one tree and bush for each residential lot or unit. 4. At least three (3) architectural plans and designs showing all four sides of proposed units or buildings shall be submitted for review to the zoning administrator for approval before issuance of building permits. 5. A minimum of ten percent (10%) of any housing development shall be set aside as open space. As part of the open space, an amenity tract of at least 20,000 square feet shall be located to be readily accessible to all residents and shall contain some combination of sports fields, playgrounds, walking trails, pools, gazebos and similar facilities. At least one significant amenity feature (sport court, playground, walking trail, pool, etc.) or two smaller amenities (gazebo, fire pit, pergola, etc.) shall be shown and noted on the site plan. Parking lots, streets, setback areas, buffers, stormwater control measures, detention facilities, and so forth shall not count towards this requirement. Long, narrow strips of land shall not count towards this requirement. The open space and amenity plan shall be reviewed and approved by the Zoning Administrator for compliance prior to the application for rezoning advancing. 6. This section shall apply to any development that has not obtained a Land Disturbance Permit at the time of adoption of this ordinance. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § IX; Ord. of 1-5-2022(1), § IV; Ord. of 8-9-2023, §§ XVI, XVII; Ord. of 7-10-2024, § III) CDA:63 Supp. No. 17 Sec. 7.7. R-4 residential district (conventional, industrialized or manufactured single-family housing). 7.7.1 Purpose. The R-4 residential district is established primarily to encourage the development of smaller lot single-family developments, for conventional or industrialized homes. The R-4 district is a residential district. 7.7.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the R-4 District: Minimum Lot Size: 15,000 square feet with sewer; if on septic, 26,000 square feet or greater as required by County Health Department. See Sec. 5.5. Min. Lot Width at Street R/W (on existing road): 200 feet. Min. Lot Width at Street R/W (in new development): 100 ft., 25 ft. on cul-de-sac. Front yard setback (from right-of-way): 25 feet Side yard setback (from property line): 10 feet Rear yard setback (from property line): 25 feet Maximum building and structure height: 50 feet Buffers: None. Special agricultural protection buffers: See Sec. 8.2.3 for buffers required for homes built adjacent to existing agricultural activities. 7.7.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.7.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. 7.7.5 Non-residential uses and accessory uses. Non-residential uses and accessory uses shall be set back at least fifty (50) feet from all property lines, shall be screened by a twenty-five (25) foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all non-residential uses shall be provided in accordance with Bartow County Development Regulations. Other provisions of the Development Regulations may be applicable, and the Engineering Department should be consulted. Non-residential uses must meet special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. 7.7.6 Development in R-4. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. 7.7.7 Permitted uses in R-4 district. Within the R-4 residential district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Conventional, manufactured, or industrialized single-family dwellings. See Sec. 10.3 for manufactured housing regulations. (B) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utility and service structures. (C) In-home nursery schools (day cares) and kindergartens with no more than 6 children at any one time; provided that they shall have at least thirty-five (35) square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet. (D) Home occupations, see Sec. 6.4. (E) Group homes for persons with a disability, all not exceeding six (6) residents, excluding resident staff, licensed by and in compliance with the applicable regulations of the Georgia Department of Human Resources; provided that: i. There is no external signage or other evidence of the use of the dwelling as other than a residential dwelling unit; ii. The dwelling shall maintain its residential appearance; iii. There is adequate off-street parking for resident, staff and visitors' parking such that, except for planned special events, there are no vehicles parked on the street or road right-of-way; and iv. Visitation hours are restricted so as to not create undue traffic congestion. 7.7.8 Conditional uses in R-4 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (B) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. All such uses must meet off-street parking regulations, as required by the Bartow County Development Regulations. See subsection 7.7.5. (Ord. of 7-21-2021(4); Ord. of 1-5-2022(1), § IV) Sec. 7.8. R-6 residential district (manufactured house parks). 7.8.1 Purpose. The R-6 residential district is established primarily to allow development of manufactured house parks. The R-6 district is a residential district. CDA:65 Supp. No. 17 7.8.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the R-6 District: Minimum park size: 10 acres; minimum lot size in parks: 4,000 square feet. Minimum park width: 400 feet; minimum lot width in parks: 50 feet. Minimum density of park: 8 units per acre. Front yard setback individual lots (from right-of-way): 40 feet Side yard setback individual lots (from property line): 10 feet Rear yard setback individual lots (from property line): 25 feet Special right-of-way setback: no individual manufactured house may be located closer than 40 feet to any road right-of-way, whatever side of the house. Maximum building and structure height: 50 feet Buffers: Special, see below. 7.8.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.8.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. 7.8.5 Non-residential uses and accessory uses. Non-residential uses and accessory uses shall be set back at least fifty (50) feet from all property lines, shall be screened by a twenty-five (25) foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all non-residential uses shall be provided in accordance with Bartow County Development Regulations. Other provisions of the Development Regulations may be applicable, and the Engineering Department should be consulted. Non-residential uses must meet special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. 7.8.6 Development in R-6. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. 7.8.7 Manufactured house parks. Manufactured house parks are the only uses permitted in R-6 districts, and are only authorized in this district. Manufactured house parks as defined in this Ordinance must adhere to the following conditions: (A) No manufactured house park shall be constructed or maintained on a lot or a total area of less than ten (10) acres, having a width of not less than 400 feet. This ten (10) acre minimum must be adhered to throughout the existence of the manufactured house park. (B) Each manufactured house space shall be at least fifty (50) feet in width and shall provide a minimum of 4,000 square feet. In cul-de-sac or curved street design, the width of the manufactured house space shall be at least fifty (50) feet at the location of the center of the manufactured house unit. Notwithstanding the foregoing, the maximum density of units on any one acre in any park shall not exceed eight (8) units. Manufactured house parks are not allowed except on public sewer. No individual or group septic systems are permitted for manufactured house parks. (C) A manufactured house shall be allowed in any park in this county so long as it is constructed at least in conformity with the requirements of the DCA, the Federal Manufactured Home Construction and Safety Standards Act (42 USC 5401 et seq.) and the regulations of the U. S. Department of Housing and Urban Development (HUD), and conforms to all other applicable regulations in this Ordinance. (D) A minimum of ten percent of the total usable area of any park shall be set aside and designated for recreational purposes. (E) The manufactured house park site plan including recreational plans and all proposed commercial uses, shall be submitted to the Bartow County Zoning Administrator for approval. (F) Each manufactured house site shall be provided with drives connecting with the interior drive and sufficient to provide two off-street parking spaces. In addition, driveways at least eighteen feet wide shall be provided to service buildings. Streets are required to be constructed according to minimum requirements provided in Bartow County Development Regulations. (G) One refuse collection station shall be provided for each twenty (20) families or fraction thereof. It shall be conveniently located for collection not more than 200 feet from any manufactured house served. If individual refuse containers are used on manufactured house sites, stands must be provided to hold the cans and screen them from public view. (H) A buffer strip at least twenty-five (25) feet wide shall be located adjacent to each exterior property line of the manufactured house park and shall not be included within any individual manufactured house lot. This buffer applies no matter what the zoning on adjacent property, except it shall be increased to a width of fifty (50) feet when located adjacent to single-family zoning districts. In the event the park is located next to a commercial or industrial district also requiring a buffer when adjacent to residential, then that parcel shall also contain the required buffer. The buffer strip in the R-6 district shall be densely planted with fast growing evergreen shrubs or trees (such as are at least six feet tall within one year). (I) An opaque wood fence at least six feet high must be erected all along the property line of the park, except along road frontage. The park owner must maintain the fence in good repair and appearance. CDA:67 Supp. No. 17 (J) No manufactured house shall be located within ten (10) feet of its individual lot line or forty (40) feet from any public road right-of-way. 7.8.8 Permitted uses in R-6 district. Within the R-6 district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Individual manufactured houses, provided they are located in a manufactured house park which meets the requirements in Sec. 7.8.7. (B) Manufactured house parks subject to the requirements in Sec. 7.8.7. (Ord. of 7-21-2021(4)) Sec. 7.9. O/I office and institutional district. 7.9.1 Purpose. The O/I residential district is established primarily to encourage the development of office and institutional type uses. 7.9.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the O/I District: Minimum lot size: 26,000 square feet Minimum lot width at street r/w: 100 feet. Front yard setback (from right-of-way): 40 feet Side yard setback (from property line): 20 feet Rear yard setback (from property line): 20 feet Maximum building and structure height: 50 feet Buffers: 25 feet when adjacent to a single-family residential district or use; 50 feet when adjacent to residential district if O/I development exceeds 10,000 square feet. 7.9.3 Buffers. Buffer standards, and regulations regarding use and crossing of buffers, are located in Section 8.2. 7.9.4 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.9.5 Building exterior finish. A metal panel exterior finish product shall not be allowed on metal buildings exceeding one hundred fifty (150) square feet in gross floor area constructed or placed on lots within the O-I district, unless finished with a product consisting of brick, stone, or hard-coat stucco, with the following exception: the rear wall of a metal building may be allowed to be finished with a metal panel if it is not visible from a public road or right-of-way. All commercial and retail operations in the O/I district must occupy a structure, of a minimum of 500 square feet. The total ground floor area of all structures on the lot shall not exceed 50 percent of the lot. 7.9.6 Development Plans and Site Lighting. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. Uses in this district are subject to special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. All site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas. Light fixture poles cannot exceed forty (40) feet in height. Outdoor lighting fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps must be positioned no higher than 45 degrees above straight down (halfway between the vertical and the horizontal) when the source is visible from any off-site residential property or public roadway. These requirements apply to new developments as well as expansion by fifty percent (50%) or more in terms of additional parking spaces or gross floor area for existing developments or buildings, in which case the new area would need to comply with these standards. For any project that requires submittal of building plans, an applicant must first submit to the zoning administrator a site plan and/or structural exterior plan demonstrating compliance with these lighting standards prior to issuance of a building permit. 7.9.7 Permitted uses in O/I district. Within the O/I district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Offices. (B) Cultural facilities, including art galleries, museums, legitimate theaters, libraries, and other uses similar in character to those listed. (C) Offices of health service practitioner, including physicians, surgeons, dentists, and dental surgeons, osteopathic physicians, chiropractors, and other licensed practitioners similar to those listed. (D) Health service clinics, including a pharmacy as an accessory use. (E) General office uses, including sales representatives, legal services, engineering, architectural, accounting, auditing, bookkeeping, finance, real estate, insurance, and others similar in character to those listed. (F) Churches, synagogues and similar places of worship and their customary related uses. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. All such uses must meet off-street parking regulations, as required by the Bartow County Development Regulations. CDA:69 Supp. No. 17 7.9.8 Conditional uses in O/I district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (Ord. of 7-21-2021(4); Ord. of 1-8-2025(1), § II) Sec. 7.10. C-N neighborhood business district. 7.10.1 Purpose. The C-N district is established primarily to encourage the development of smaller commercial uses that serve nearby neighborhoods. Such uses are intended to be consistent with the surrounding residential development in form, mass and design. 7.10.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the C-N District: Minimum lot size: 26,000 square feet Minimum lot width at street r/w: 100 feet. Front yard setback (from right-of-way): 40 feet Side yard setback (from property line): 20 feet Rear yard setback (from property line): 20 feet Maximum building and structure height: 50 feet Buffers: 25 feet where adjacent to any single-family residential district or use. 7.10.3 Buffers. Buffer standards, and regulations regarding use and crossing of buffers, are located in Section 8.2. 7.10.4 Height Exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.10.5 Building exterior finish. A metal panel exterior finish product shall not be allowed on metal buildings exceeding one hundred fifty (150) square feet in gross floor area constructed or placed on lots within the C-N district, unless finished with a product consisting of brick, stone, or hard-coat stucco, with the following exception: the rear wall of a metal building may be allowed to be finished with a metal panel if it is not visible from a public road or right-of-way. All commercial and retail operations in the C-N district must occupy a structure, of a minimum of 500 square feet. Uses in the C-N district shall be consistent with any adjacent residential property in scale and size. 7.10.6 Development Plans and Site Lighting. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. Uses in this district are subject to special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. All site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas. Light fixture poles cannot exceed forty (40) feet in height. Outdoor lighting fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps must be positioned no higher than 45 degrees above straight down (halfway between the vertical and the horizontal) when the source is visible from any off-site residential property or public roadway. These requirements apply to new developments as well as expansion by fifty percent (50%) or more in terms of additional parking spaces or gross floor area for existing developments or buildings, in which case the new area would need to comply with these standards. For any project that requires submittal of building plans, an applicant must first submit to the zoning administrator a site plan and/or structural exterior plan demonstrating compliance with these lighting standards prior to issuance of a building permit. 7.10.7 Permitted uses in C-N district. Within the C-N district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Strip shopping centers of no more than 20,000 square feet. (B) Retail stores and shops, including the incidental sale of motor fuels on lots not exceeding one acre, and no more than six gas pumps (i.e., fueling stations for six vehicles). (C) Banks. (D) Grocery stores and markets, not exceeding 20,000 square feet. (E) Churches, synagogues and similar places of worship and their customary related uses, not exceeding 20,000 square feet of total heated space. (F) Nursery schools, adult and child day care centers and kindergartens; provided that they shall have at least thirty-five (35) square feet of indoor space for each child or supervised adult and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet. (G) Restaurants, coffee shops. 7.10.8 Conditional uses in C-N district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (Ord. of 7-21-2021(4); Ord. of 1-8-2025(1), § III) CDA:71 Supp. No. 17 Sec. 7.11. C-1 general business district. 7.11.1 Purpose. The C-1 district is established primarily to encourage the development of general commercial uses. 7.11.2 Area, yard, height and buffer requirements. The following requirements apply in the C-1 District: Minimum lot size: 26,000 square feet Minimum lot width at street r/w: 100 feet. Front yard setback (from right-of-way): 40 feet Side yard setback (from property line): 20 feet Rear yard setback (from property line): 20 feet Maximum building and structure height: 75 feet Buffers: 50 feet when adjacent to single-family residential district or use. 7.11.3 Buffers. Buffer standards, and regulations regarding use and crossing of buffers, are located in Section 8.2. 7.11.4 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.11.5 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setback shall be 10 feet. If the property is abutting the same zoning district, side and rear setbacks shall be zero, but fire code regulations must still be met. 7.11.6 Building exterior finish. A metal panel exterior finish product shall not be allowed on metal buildings exceeding one hundred fifty (150) square feet in gross floor area constructed or placed on lots within the C-1 district, unless finished with a product consisting of brick, stone, hard-coat stucco, or other appropriate product as approved by the zoning administrator or his/her designee. All commercial and retail operations in the C-1 district must occupy a structure of a minimum of 500 square feet. 7.11.7 Development and Site Lighting. Application for rezoning to this zoning district shall require submission of a site plan as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed development. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. Uses in this district are subject to special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. All site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas. Light fixture poles cannot exceed forty (40) feet in height. Outdoor lighting fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps must be positioned no higher than 45 degrees above straight down (halfway between the vertical and the horizontal) when the source is visible from any off-site residential property or public roadway. These requirements apply to new developments as well as expansion by fifty percent (50%) or more in terms of additional parking spaces or gross floor area for existing developments or buildings, in which case the new area would need to comply with these standards. For any project that requires submittal of building plans, an applicant must first submit to the zoning administrator a site plan and/or structural exterior plan demonstrating compliance with these lighting standards prior to issuance of a building permit. 7.11.8 Permitted uses in C-1 district. Within the C-1 district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Retail business or service establishments including restaurants. (B) Offices, banks, and theaters. (C) Hotels, motels. (D) Loft condos/apartments, where the residential single-family living space is located above retail space. The residential areas cannot exceed fifty percent (50%) of the structure. Existing developments cannot be converted to this use, unless the entire property is redeveloped. The development must comply with the provisions of Sec. 7.5.7(B)(i) through (vii). (E) Institutional-Residential Uses: Hospitals, group homes for persons with a disability, group homes (non-disability) clinics, nursing homes, assisted living facilities, adult day cares, child day cares, kindergartens, retirement homes, shelter care facilities, rehabilitation and treatment facilities, residential treatment centers, hospices, and related facilities. See Sec. 9.1 for further regulations. (F) Funeral parlors and mortuaries provided any such use shall be located on a major street. (G) Veterinary clinics, kennels, and/or animal hospitals, provided no part of any building, structure, pen, or enclosure is located closer than fifty (50) feet to any property line. CDA:73 Supp. No. 17 (H) Churches, synagogues and similar places of worship and their customary related uses. (I) Nursery schools, day care centers, and kindergartens; provided that they shall have at least thirty-five (35) square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet. (J) Private schools offering general education courses for more than one grade. (K) Newspaper offices and printing establishments. (L) Public buildings, structures and land, including public safety structures and facilities. (M) Public utility and service structures. (N) Tennis/racquetball courts/clubs, or similar facilities. (O) Bicycling, mountain bike course, hippodrome, with a minimum of two acres. (P) Indoor paintball and laser tag facilities and game centers. (Q) Outdoor paintball game courses and facilities, or similar facilities, with a minimum area of 10 acres. Hours of permitted operation are 8:00 a.m. to 9:00 p.m. "Paintball" means any game or event that involves using guns or devices that shoot capsules of paint or dye. (R) Theme or amusement park, provided the parcel is at least 100 acres in size; a 100-foot buffer from all adjacent property, meeting the requirements of Section 8.2.5, shall be required. (S) Welding shop, metal forging shop, both under 10,000 square feet. (T) Machine shop. (U) Reserved. (V) Propane storage tanks with individual tank capacities of no more than 15,000 gallons and no more than four tanks, on property of at least five acres. All tanks shall be setback at least 100 feet from the property line, and at least forty (40) feet from any building or structure. (W) Wholesale Establishments, Distribution Centers, and Office/Warehouses (excluding processing, fabrication, or manufacturing) on lots no larger than 30 acres. (X) Reserved. (Y) Automobile service stations, provided that all structures and buildings, except principal use signs, and including storage tanks, shall be placed not less than twenty-five (25) feet from any side or rear property line except where such side or rear property line abuts a street, in which case the setback shall be that required for such streets measured from the right-of-way. All buildings or structures including gas pumps and storage tanks, except principal use signs, shall comply with the setback requirements of any abutting street. No vehicles shall remain unattended on the premises for more than 72 hours except vehicles owned by the business, those vehicles on which active repair by the business is underway, and those held for lease or rental. (Z) Self service or automated car wash facility; when such facility is adjacent to existing residential use, an 8-foot opaque wooden fence shall be required along the property line. (AA) Automobile parking lots and garages of one acre or less provided said uses must be surrounded by a fence meeting the requirements of Section 8.2.5. (BB) Automobile sales and service; auto auctions. (CC) Truck stop. When adjacent to residential districts, buffer width increases to 100 feet. (DD) Bus terminals. (EE) Microbreweries, craft distilleries and brewpubs. Production is limited to an enclosed structure of 10,000 square feet. (FF) Other private outdoor recreational facilities not specifically listed in this subsection. 7.11.9 Conditional uses in C-1 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (B) Indoor Firing Ranges. Any firing range must be located entirely inside a structure, and the structure must be sound-proofed such that no sound of the discharge of firearms is discernable at the property line. The structure must be designed and constructed with sufficient precautions to prevent stray bullets from escaping. This provision shall not apply to property owned by the County or property owned entities exempt from county zoning including the U.S. Government, a municipality within the County, or an entity regulated by the Georgia Public Service Commission (i.e., a public utility). (C) Storage Facilities. "Storage facilities" shall mean mini-warehouses and storage yards, including building materials, timber and lumber, and shall include storage yards for boats, RVs, and self-service storage facilities. Commercial vehicle parking, including tractor-trailer parking, where there is no primary structure and parking is the primary use of the lot, is also classified as a storage facility. Self-service storage facility is defined as a fully enclosed facility containing independent bays, which are leased to individuals exclusively for storage of goods or personal property. In addition to standard commercial buffers, a 75-foot landscaped strip fronting the right-of-way shall be required. If abutting a commercial or industrial zoned property, the property shall include a 20-foot landscaped strip in the side and rear lot. All landscape strips shall have one tree planted every 20 feet, at CDA:75 Supp. No. 18 least five-foot tall at time of planting. If abutting residential districts, a 75-foot buffer applies and shall remain undisturbed, in addition to a six-foot fence to be installed at the buffer. Buildings may only take up 30 percent of the ground area of the lot. When filing for the Conditional Use Permit, the applicant shall submit a site plan showing all standard buffers and proposed landscaping, including types of trees to be used. In addition to a site plan, an artistic rendering of the landscape strip from ground view must be submitted. The Planning Commission or County Commissioner may condition the application to increase buffers, setbacks, landscaping or other items. Existing storage facilities are made nonconforming by this provision and therefore shall need to file a conditional use application to expand. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, §§ XVIII, XIX; Ord. of 1-8-2025(1), § IV; Ord. of 9-3-2025, § VIII) Sec. 7.12. I-1 general industrial district. 7.12.1 Purpose. The I-1 district is established primarily to encourage the development of general industrial uses, as distinct from heavy industrial uses. 7.12.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the I-1 District: Minimum lot size: 1 acre, or as required to meet buffers. Minimum lot width at street r/w: 100 feet. Front yard setback (from right-of-way): 40 feet Side yard setback (from property line): 20 feet Rear yard setback (from property line): 20 feet Maximum building and structure height: 75 feet Buffers: 200 feet when adjacent to residential districts or the C-N or O/I District. 50 feet when adjacent to the C-1 district. 7.12.3 Buffers. Buffer standards, and regulations regarding use and crossing of buffers, are located in Section 8.2. 7.12.4 Height Exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.12.5 Building Area. All industrial operations in the I-1 district must occupy a building or structure, of a minimum of 800 square feet. 7.12.6 Development and Site Lighting. Application for rezoning to this zoning district shall require submission of a site plan as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed development. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. Uses in this district are subject to special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. All site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas. Light fixture poles cannot exceed forty (40) feet in height. Outdoor lighting fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps must be positioned no higher than 45 degrees above straight down (halfway between the vertical and the horizontal) when the source is visible from any off-site residential property or public roadway. These requirements apply to new developments as well as expansion by fifty percent (50%) or more in terms of additional parking spaces or gross floor area for existing developments or buildings, in which case the new area would need to comply with these standards. For any project that requires submittal of building plans, an applicant must first submit to the zoning administrator a site plan and/or structural exterior plan demonstrating compliance with these lighting standards prior to issuance of a building permit. 7.12.7 Permitted uses in I-1 district. Within the I-1 district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) General industry, plants and facilities. (B) Any retail or service establishment dependent upon or closely related to industry. (C) Assembly plant. (D) Feed processing plant. (E) Fertilizer plant, mixing plant. (F) Carpet manufacturing plants. (G) Concrete plant. (H) Tire, rubber processing plant (not recycling facilities, see Sec. 9.5). (I) Soft drink bottler/distribution; beer and liquor distribution, distillery. (J) Water bottling plant. (K) Manufactured or portable building manufacturers. (L) Welding shop, metal forging shop. CDA:77 Supp. No. 18 (M) Wholesaling and warehousing. (N) Mini-warehouses and self-storage facilities. Self-service storage facility is defined as a fully enclosed facility containing independent bays, which are leased to individuals exclusively for storage of goods or personal property. The front façade shall be finished with a product of brick, stone, stucco or other approved masonry. The sides and rear of the structure may be a metal-panel exterior finish. In addition to standard I-1 buffers, a 40 foot landscaped strip fronting the right-of-way shall be required. The landscape strip shall have one tree and five shrubs planted every 20 feet. Trees shall be at least 5-foot tall at the time of planting. If fronting a U.S. Highway, the landscape strip shall be 60 feet. Chain link fencing is prohibited along any road frontage. (O) Automobile service stations meeting the requirements of Sec. 7.11.8(Y). (P) Truck terminals. (Q) Storage yards, including building materials yards, lumber yards, and saw mills, but not junk yards or automobile junk yards, provided any such use is screened from view by a fence as set out in Section 8.2.5 of this Ordinance. (R) Storage tanks of under 50,000 gallons, for chemicals and other industrial substances, provided all such tanks are located at least 200 feet from the property line. (S) Propane storage tanks, of any size, located at least 40 feet from the property line. (T) Theme or amusement park. (U) Public or private utility service structures, including substations. (V) Crematories. All structures must be set back at least fifty (50) feet from property lines, and the property containing the crematory must be located at least onethousand feet (1,000 ft) from the property line of any residentially-zoned or residentially-used property. (W) Medical, dental, laboratory or research facility (except any facility with Class IV biohazard containment facility or experimenting with chemical warfare or nerve agents shall require a conditional use permit). (X) Adult establishments in accordance with the requirements of appendix A. (Y) Places of worship and accessory uses. (Z) Auto parts and repair businesses, including towing companies, with associated recycling/salvage operations, on lots not larger than five (5) acres. No recycled or salvaged cars may be kept on site for more than 120 days; no long-term storage of junk cars shall be permitted. The premises must contain an enclosed building. All temporary storage of vehicles outside of buildings must be in the rear of any buildings on the property, and screened from view from the street and adjacent property by a combination of the buildings, opaque fencing and/or landscaping. (AA) Solid waste collections operations, limited to fleet maintenance and storage, and rolloff/dumpster storage, but not a solid waste transfer station. Storage of solid waste is prohibited. See Section 9.5 of the Zoning Ordinance. (BB) Lime Stabilization Organics Processing and Recycling Facility. Minimum lot size 10 acres required. All structures shall be setback at least 100 feet from all property lines and at least 1,000 feet from any existing single-family residence having a certificate of occupancy at the time of rezoning (or, if not rezoning required, at time of permitting) on adjacent and adjoining properties. (CC) Indoor recreation facility. 7.12.8 Conditional uses in I-1 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (B) Solar power generation facilities. Sound barriers shall be required for noise mitigation around all inverter and transformer skid pads. Equipment shall be screened and fenced from adjacent property to restrict unauthorized access. Screening shall consist of a minimum 8-foot opaque fence with the addition of shrubbery, trees or an earthen berm. The applicant shall demonstrate that the proposal will not have an adverse effect on neighboring properties by providing aerials of the site, graphic renderings of the project, and/or pictures from the site of surrounding parcels demonstrating sight lines. Appropriate vegetated buffers and/or plantings may also be required to help limit the visual impact of the site and possible glare issues. (C) Online wholesale and retail sale and auction of used and damaged operable and inoperable automobiles, trucks, trailers, watercraft, power sports, industrial and construction equipment, and other vehicles (collectively "Vehicles"), where such vehicles remain on the property for 100 days or less, with the following restrictions: 1. Such use shall not adjoin a residential district; 2. There shall be no dismantling, crushing, or stacking of or draining fluids from vehicles; 3. Screening shall be installed from any public right-of-way which shall include a solid opaque fence or existing natural screen at least eight (8) feet in height, as well as additional screening as required by the Zoning Administrator; 4. The buffer between said use and any other Zoning District, except I-1 and I-2, shall be at least 100 feet, and such buffer area may include a berm at such height as required by the Zoning Administrator for proper screening; 5. Such use shall be on property no less than fifty (50) acres in size; CDA:79 Supp. No. 18 6. Any inoperable vehicles shall be no more than forty (40) percent of the total vehicles stored on site. For purposes of this section, "inoperable vehicles" shall mean the inability of a vehicle to start or move under its own power; 7. All lights on site shall be downward firing and shielded; 8. Hours of operation shall be no greater than 8:00 a.m. to 6:00 p.m., Monday through Saturday, with no operations on Sunday; and 9. No onsite auctions shall occur on the property. 10. Additional storage time beyond 100 days shall be allowed for vehicles subject to a court order requiring additional storage time or where there is a delay in the title transfer process not caused by the property owner. 11. The following accessory uses shall be allowed: office, temporary inventory storage, shipping/receiving and customer parking. (D) Commercial mulching operations and similar uses. (E) Reserved. (Ord. of 7-21-2021(4); Ord. of 3-16-2022(1), § III; Ord. of 8-9-2023, § XX; Ord. of 12-6-2023(4), § III; Ord. of 12-4-2024(1); Ord. of 1-8-2025(1), § V) Sec. 7.13. I-2 heavy industrial district. 7.13.1 Purpose. The I-2 district is established primarily to encourage the development of heavy industrial uses, as distinct from general industrial uses. 7.13.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the I-2 District: Minimum lot size: 1 acre, or as required to meet buffers. Minimum lot width at street r/w: 100 feet. Front yard setback (from right-of-way): 40 feet. Side yard setback (from property line): 20 feet. Rear yard setback (from property line): 20 feet. Maximum building and structure height: 75 feet. Buffers: 500 feet when adjacent to residential districts or the C-N or O/I District. 100 feet when adjacent to the C-1 district. 50 feet when adjacent to the I-1 District. Special setbacks and buffers: Due to the risk of explosion and damage to surrounding property, any chemical plant, petroleum refinery or petroleum processing plant, bulk storage tank farm, fertilizer plant or explosives plant, or similar use posing risk of explosion, shall be set back from the property line by at least 1,000 feet, including all structures and facilities except for parking areas, storm water and detention facilities, fencing and checkpoints, rail lines and related appurtenances. Any loading or unloading area must meet the setback. Any use specified in the paragraph shall require a 500 foot buffer for all adjacent property, no matter what the zoning district, and at least 200 feet of such buffer must be wooded, or planted with at least six rows of varying trees (tree plan to be approved by the zoning administrator to provide visual screening and some blast protection). 7.13.3 Buffers. Buffer standards and regulations regarding use and crossing of buffers, are located in Section 8.2. 7.13.4 Height Exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.13.5 Building Area. All industrial operations in the I-2 district must occupy a building or structure, of a minimum of 800 square feet. 7.13.6 Development and Site Lighting. Application for rezoning to this zoning district shall require submission of a site plan as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed development. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. Uses in this district are subject to special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. All site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas. Light fixture poles cannot exceed forty (40) feet in height. Outdoor lighting fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps must be positioned no higher than 45 degrees above straight down (halfway between the vertical and the horizontal) when the source is visible from any off-site residential property or public roadway. These requirements apply to new developments as well as expansion by fifty percent (50%) or more in terms of additional parking spaces or gross floor area for existing developments or buildings, in which case the new area would need to comply with these standards. For any project that requires submittal of building plans, an applicant must first submit to the zoning administrator a site plan and/or structural exterior plan demonstrating compliance with these lighting standards prior to issuance of a building permit. CDA:81 Supp. No. 18 7.13.7 Permitted uses in I-2 district. Within the I-2 district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Any use permitted in an I-1 general industrial district, including general industry, plants and facilities. (B) Heavy industry, plants and facilities. (C) Assembly plant, and heavy assembly plant. (D) Asphalt plant. (E) Chemical plants. (F) Petroleum refinery/processing plant. (G) Petroleum, natural gas, or liquid propane (or similar flammable substance) substation or transfer station. (H) Bulk storage tanks (flammable or non-flammable); all tanks must be surrounded by spill-control dikes and other measures; flammable tanks must be kept at least 1,000 feet from property line. Bulk storage exceeds 50,000 gallons. (I) Steel plant, metal smelting, mini-mill, electric arc furnace and integrated steel mills. (J) Paper or pulp mills. (K) Scrap tire processing plants. (L) Brick or masonry plants. (M) Commercial mulching operations, and similar uses. (N) Chicken or meat processing plants. (O) Tannery, leather processing facility. (P) Railroad yards, switching yards, depots. (Q) Public utility service structures including substations. (R) Adult establishments in accordance with the requirements of appendix A. (S) Places of worship and accessory uses. 7.13.8 Conditional uses in I-2 district. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (B) Landfills. See Sec. 9.4 for further regulations. (C) Recovered Material Processing Facilities and Solid Waste Handling Facilities, including Indoor Trash Transfer Stations. See Sec. 9.5. for further regulations. (D) Composting facility (see Sec. 9.5 for further regulations). (E) Junk yards, including automobile junk yards, and scrap yards, salvage yards or other salvage operations, conditioned upon the same being compatible with the existing heavy industry and not being distracting from the surrounding area and further conditioned upon such use being completely screened from view by a solid opaque wall, or existing natural screen at least eight (8) feet in height. Such junkyard shall comply with all setback requirements for this district and shall contain at least twenty (20) acres and not adjoin a residential area. The buffer between said use and another use permitted in this district or any other district shall be at least 500 feet at all points around the property line. (F) Explosives plant and explosives storage. (G) Public or private utility generation facilities; power plants (except nuclear power which is not permitted); solar power generation facilities; wind power generation facilities; public utility service structures including substations. For solar power generation facilities, sound barriers shall be required for noise mitigation around all inverter and transformer skid pads. Equipment shall be screened and fenced from adjacent property to restrict unauthorized access. Screening shall consist of a minimum 8-foot opaque fence with the addition of shrubbery, trees or an earthen berm. The applicant shall demonstrate that the proposal will not have an adverse effect on neighboring properties by providing aerials of the site, graphic renderings of the project, and/or pictures from the site of surrounding parcels demonstrating sight lines. Appropriate vegetated buffers and/or plantings may also be required to help limit the visual impact of the site and possible glare issues. (H) Trash transfer stations, provided that operations are in an enclosed facility and not within 1,000 feet of residentially-zoned or residentially-used property. Outdoor facilities must meet regulations of Sec. 9.5 (I) Reserved. (Ord. of 7-21-2021(4); Ord. of 12-6-2023(4), § IV; Ord. of 1-8-2025(1), § VI) Sec. 7.14. M-1 mining district. 7.14.1 Purpose. The M-1 district is established primarily to permit the mining of property. The permitting and regulation of the mining industry falls upon one or more of the following federal or state authorities: a) federal - U.S. Department of Labor, Mine Safety and Health Administration, Environmental Protection Agency; b) state - Georgia Department of Natural Resources, Environmental Protection Division. 7.14.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the M-District: Minimum lot width at street r/w: 200 feet. Front yard setback (from right-of-way): 150 feet. Side yard setback (from property line): 50 feet (none if abutting M-1). CDA:83 Supp. No. 18 Rear yard setback (from property line): 50 feet (none if abutting M-1). Maximum building and structure height: 75 feet. Buffers: Buffer shall be either 100, 500 or 1,200 feet in width, depending on use or type of mining. See below. 7.14.3 Special Buffer Provisions. (A) Mining involving blasting or using of explosives (e.g., granite and limestone quarrying) and related disruptive activities (such as crushing), or drilling for oil or natural gas or other hydrocarbons, shall require a 1,200-foot buffer when abutting a different district. No drilling shall be conducted within 1,200 feet of a preexisting well supplying drinking water. (B) Mining not involving blasting or use of explosives, but involving heavy excavators and large excavations or removal of overburden (e.g., strip mining, open pit mining, and some subsurface mining), shall require a 500-foot buffer when abutting a different district. (C) Shallow surface mining (mining on the surface not exceeding a depth below preexisting grade of ten feet) is permitted with a 100-foot vegetated buffer, when abutting a different district. (D) Any question of the appropriate buffer width shall be left to the interpretation of the Zoning Administrator, who shall be provided site plans and operational descriptions as required to make the necessary determination. (E) Other non-mining uses in the M-1 district shall require a 100-foot buffer when abutting a different district. (F) Buffer standards and regulations regarding use and crossing of buffers, are located in Section 8.2. The buffer shall be maintained by the property owner. 7.14.4 Height Exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.14.5 Development Plans. Development must be in accordance with the Bartow County Development Regulations. The engineering department should be consulted. Uses in this district are subject to special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. 7.14.6 Permitted Uses in M-1 District. Within the M-1 district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is NOT permitted: (A) Mining and quarrying; extraction of natural resources from the earth; drilling for oil, gas or other hydrocarbons. (B) Activities directly related to, and in the support of, the excavation of minerals or rock materials which are beneficial and sold for profit. Such activities may be surface, underground, subaqueous, or solution in nature. (C) Public utility and service structures. (D) Concrete plant, masonry plant, brick plant. (E) Fertilizer plant. (F) Inert waste landfills. See Section 9.4. 7.14.7 Conditional Uses in M-1 District. The following are permitted only with the grant of a conditional use permit under the requirements of Article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to Article XII. (B) Explosives plant and explosives storage, when accessory to mining operations. 7.14.8 Application requirements. Any application for rezoning to the M-1 district shall be accompanied by the following: (A) A detailed site plan; at a minimum, the site plan shall indicate the following: proposed location of phased mining operations; proposed locations or disposition of topsoil, overburden, and byproducts, on- or off-site. Buffers shall be shown to confirm compliance with Sections 7.14.2 and 7.14.3. (B) A letter of intent including, but not limited to, an operations plan describing the date proposed for the commencement of operations, expected durations, and proposed hours and days of operation. Said letter shall also describe the nature of mining operations, minerals or materials to be extracted, method(s) of extraction, and equipment and materials (e.g., explosives) to be used. The letter of intent shall affirm that the operation will comply with the applicable buffer requirements in this ordinance, any conditions imposed by the State as part of a permitting process, and the following: operations shall not be permitted on Sundays and holidays. (C) An impact study that addresses the impact of the proposed mining operation on abutting and nearby properties and buildings, including their uses and economic values, which study shall be prepared by (and where appropriate signed and sealed by) one or more appropriately qualified and licensed professionals. The impact study shall address those external effects likely to exist if said use is established, including but not limited to electromagnetic interference, noise, vibration, fumes, odors, dust and air particulates, illumination, truck traffic, and risk to water tables and water CDA:84.1 Supp. No. 18 quality (including aquifers and wells). The impact study shall recommend specific measures to mitigate such impacts and provisions for monitoring and enforcing mitigation measures, and, if approved, the recommendations of the impact study shall be considered conditions of approval unless otherwise specified by the Commissioner. At the option of Commissioner and at the applicant's expense, an independent impact statement may be secured prior to the Commissioner taking action on a rezoning request for M-1 district to review the impact study submitted by the applicant or to otherwise address probable adverse impacts of the proposed development; provided that an application process for rezoning to M-1 shall be extended no more than 90 days beyond normal processing times for the purposes of securing an independent impact statement. (D) If the rezoning application is granted, the compliance with the terms of the letter of intent, site plan, and the impact statement shall be considered a condition of zoning which runs with the land. Mining activities performed subsequent to the rezoning shall be consistent with the mining operation, methods and equipment stated in the letter of intent and any other conditions of zoning imposed as part of the rezoning. The letter of intent and any other conditions of zoning can be modified in the same manner as other conditions of zoning after compliance with the applicable process for zoning decisions. (E) If the applicant is a holder of mineral rights, but not the subject property's fee owner, the letter of intent shall explain how the operation will affect the property owner's use of the property, and shall be served on the property owner at the time the application is filed by personal service or certified mail, return receipt requested, at that address that the property owner has provided to the County tax assessor's office or its registered agent. The return receipt or affidavit of service shall be filed with the zoning file prior to any final zoning decision on the application. (Ord. of 7-21-2021(4); Ord. of 12-3-2025, § I) Sec. 7.15. PUD planned unit development district. 7.15.1 Purpose. The PUD district is established to encourage the development of master planned communities that may contain one or more uses within the development. The PUD district is intended to encourage flexible and creative concepts in site planning while providing a development compatible with surrounding residential areas. 7.15.2 Area, Yard, Height and Buffer Requirements. The following requirements apply in the PUD District: Minimum Lot Width at Street R/W for individual lot: As specified on the concept site plan. If not specified, 50 ft., 25 ft. on cul-de-sac. Setbacks for individual lots: As specified on the concept site plan with the exception that proposed single-family detached home lots cannot have smaller than 5 feet side setbacks. If not specified, based on the applicable zoning district for the proposed use. External Setback: 25 feet (i.e., all buildings to be at least 25 feet from external boundaries of PUD development). Maximum Building and Structure Height: As specified on the concept site plan. If not specified, based on the applicable zoning district for the proposed use. In all cases, maximum 75 ft. Buffers: Buffers in PUD districts shall be set according to the zoning district that corresponds to the proposed use and density. Buffers shall be shown on the concept site plan. Minimum lot size and unit size per dwelling unit: 1. Single-family detached. As specified on the concept site plan. If not specified, based on the applicable zoning district for the proposed use. In all cases, minimum 5,000 sqft lot size and minimum 1,200 sqft heated area with minimum 5:12 roof pitch. 2. Minimum lot size and unit size for townhomes: As specified on the concept site plan. If not specified, based on the R-3 district standard. In all cases, minimum 1,200 sqft lot size and minimum 1,200 sqft heated area per townhome. Maximum density for apartments, condominiums, and condo-style townhomes: 16 dwelling units per acre. 7.15.3 Height Exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see Article XI. 7.15.4 Accessory Structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. Nonresidential accessory uses shall be set back at least fifty (50) feet from the property line, shall be screened by a twenty-five (25) foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property, or as otherwise required by the Zoning Administrator during the review process. Off-street parking/loading for all non-residential uses shall be provided in accordance with Bartow County Development Regulations. 7.15.5 Development and Site Lighting. Application for rezoning to this zoning district shall require submission of a site plan as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed development. Development must be in accordance with the Bartow County Development Regulations. The Engineering Department should be consulted. Uses in this district are subject to special building code requirements, and the Bartow County Building Inspections Department and the Bartow County Building Code Ordinance should be consulted. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact CDA:84.3 Supp. No. 18 study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. All site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas. Light fixture poles cannot exceed forty (40) feet in height. Outdoor lighting fixtures must be located, aimed or shielded to minimize glare and stray light trespassing across lot lines and into the public right-of-way. Flood or spot lamps must be positioned no higher than 45 degrees above straight down (halfway between the vertical and the horizontal) when the source is visible from any off-site residential property or public roadway. These requirements apply to new developments as well as expansion by fifty percent (50%) or more in terms of additional parking spaces or gross floor area for existing developments or buildings, in which case the new area would need to comply with these standards. For any project that requires submittal of building plans, an applicant must first submit to the zoning administrator a site plan and/or structural exterior plan demonstrating compliance with these lighting standards prior to issuance of a building permit. 7.15.6 Applicable standards. A planned unit development district shall be located only in an area where adequate water and sewer services are available. Said district may consist of various residential dwellings, commercial or industrial sites or combinations thereof. In the event that there are proposed significant changes to an existing property zoned PUD, including but not limited to change in one or more uses or a change in the number of units by twenty five percent (25%) or more, a zoning application to amend the zoning conditions shall be required, which shall include submittal of a revised site plan, letter from the water/sewer authority confirming availability, and other information as may be required by the zoning administrator. 7.15.7 Application. The following shall be filed with the application for rezoning, in addition to any information otherwise required of all rezoning applications. A concept site plan shall be submitted to the zoning administrator at the time of filing for rezoning and the PUD must be conditioned to the concept site plan at the rezoning hearing. Concept site plans shall include all of the following: (A) The proposed name of the PUD; (B) An aerial photograph of the area and vicinity; (C) A complete and accurate legal description of the proposed PUD property; (D) Minimum lot width at street right-of-way, minimum setbacks, and minimum lot sizes; (E) Maximum building and structure height; (F) Buffers shown according to the zoning district that corresponds to the proposed use and density, or as otherwise proposed; (G) A tabulation of total acreage of the site designated for various uses; (H) Proposed lots in the PUD and proposed densities (units per acre); (I) Proposed circulation pattern of the public streets and private driveways; (J) Parking layout; (K) All access points to streets to be located and which shall have been reviewed by the county engineer and/or the Georgia Department of Transportation; (L) Minimum of ten percent (10%) of the PUD to be set aside as contiguous greenspace, at least 100 feet in width, which may include amenities and recreational purposes. The greenspace shall be directly accessible to the largest practical number of lots within the development. The greenspace should adjoin any neighboring areas of open space, other protected areas, and nonprotected natural areas that would be candidates for inclusion as part of a future area of greenspace. Greenspace cannot be entirely along the perimeter of the development. An amenity tract of at least 20,000 square feet shall be located to be readily accessible to residents. At least one significant amenity feature (sport court, playground, walking trail, pool, etc.) or two smaller amenities (gazebo, fire pit, pergola, etc.) shall be shown and noted on the site plan. Proposed amenities may include walking trails, water features, pedestrian plazas, playground equipment, and other recreational facilities. Parking lots, streets, setback areas, stormwater control measures, and detention facilities shall not count toward this requirement. (M) In addition to the concept site plan, the following shall be submitted: 1. Utility availability letter from the water and sewer provider(s). 2. Letter of explanation providing an overview description of the project. 3. Example architectural renderings of proposed residential structures. 7.15.8 Permitted uses in the PUD district. Residential, commercial, and industrial uses are permitted in the PUD District. Proposed uses shall be listed on the concept site plan and applicable zoning districts shall be determined by the zoning administrator at time of zoning. The architectural standards for the applicable districts shall be adhered to as part of the development process. 7.15.9 Consideration of the application for a PUD shall be in accordance with the procedures set forth in Article XV of this Ordinance, provided, however, the applicant may request, at the time of filing the application, an extended presentation time. 7.15.10 Except as otherwise expressly provided herein, the PUD shall comply with all the requirements of this Ordinance. 7.15.11 Conditional uses in PUD district. Telecommunications structures may be permitted as conditional uses in the PUD District, subject to Article XII of this Ordinance. CDA:84.5 Supp. No. 18 7.15.12 Design standards for PUD developments. (A) At least fifty percent (50%) of the building materials used for the total exterior façade must be brick or stone. Brick or stone materials shall wrap around at outside building corners of at least 3 feet height (water table). The remainder may be wood, hard-coat stucco, board and batten, fiber cement siding and cedar shakes. Vinyl siding and External Insulation and Finishing Systems (EIFS) are prohibited. (B) Garages are required for each townhome and home. Doors shall be architectural in style. Standard panel doors are prohibited. Garage doors shall be recessed a minimum of 12 inches from the front façade. (C) Front facades for each townhome and home shall have at least one of the following: front porch, stoop, or balcony. (D) For townhomes, no more than six units can be attached. (E) For townhomes and homes, units should be designed to provide a variety of facades. This can be achieved by changes in brick/stone color and materials, projection or recess of architectural features, or varied roof lines. Dormers or gable pediments shall be incorporated into 25 percent of units. (F) Each residence shall have at least one window on all sides - at least one window on each side shall be minimum two feet in width by three feet in height. (G) Nonresidential development design. A metal panel exterior finish product shall not be allowed on metal buildings exceeding one hundred fifty (150) square feet in gross floor area constructed or placed on lots within the PUD district, unless finished with a product consisting of brick, stone, hard-coat stucco, or other appropriate product as approved by the zoning administrator or his/her designee. Refuse areas (dumpsters) shall be placed in the least visible location from public streets and shall be enclosed on three (3) sides with opaque walls, with the fourth side being an opaque closing gate. Height of an opaque wall shall be at least one foot higher than the receptacle. All site lighting shall be directed onto the site. (H) At least three (3) architectural plans and designs showing all four sides of proposed units or buildings shall be submitted for review to the zoning administrator for approval before issuance of building permits. (I) The developer shall provide a landscape plan as part of the civil plans which includes native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. The landscape plan shall show and note at least one tree and bush for each residential lot or unit. (J) This section shall apply to any development that has not obtained a Land Disturbance Permit at the time of adoption of this ordinance. (Ord. of 7-21-2021(4); Ord. of 1-5-2022(1), § III; Ord. of 8-9-2023, § XXI; Ord. of 7-10-2024, § IV; Ord. of 1-8-2025(1), § VII) Sec. 7.16. Conservation subdivision (special district). 7.16.1 Purpose. It is the purpose and intent of Bartow County in enacting these regulations to provide for increased greenspace in Bartow County, and to preserve open land in perpetuity for future generations, while not increasing the overall development levels for the County. The purpose is further to increase the aesthetic beauty of the County, improve the value of adjacent property, and generally serve to enhance the public health, safety and welfare of the citizens of Bartow County. 7.16.2 Procedure. A conservation subdivision allows increased residential density in conjunction with the fee simple grant of undeveloped and undisturbed greenspace to the County or to such land trust as the County may designate. The applicant seeking to develop CDA:84.7 Supp. No. 18 a conservation subdivision must meet with the Zoning Administrator and provide a survey of the entire tract, prior to placement of lots and roads. The County and the applicant shall then agree upon the tract to be donated. Where possible, the tract to be donated should link up with other greenspace tracts or trails. A minimum of one-half of the total acreage of the parcel must be donated to qualify for a conservation subdivision. Alternative greenspace arrangements are also available. See Section 7.16.9. 7.16.3 Applicable districts. A conservation subdivision is permissible in the following zoning districts: R-1, R-2, R-4, RE-1, and RE-2. 7.16.4 Development regulations. In a conservation subdivision, the following development standards shall apply. (A) Minimum lot size is reduced by 50% from the existing minimum residential lot size under that zoning classification, if sewer is available. For example, in authorized "R" districts, minimum lot size reduces to 7,500 square feet. In "RE" districts, minimum lot size becomes 1.5 acres. If sewer is not to be used for waste disposal, the minimum lot size shall be 50% of the existing minimum, or the amount required by the health department, whichever is greater. (B) The overall density of lots shall not exceed that number which would be permissible under the normal development standards; gross density shall not be increased, except as provided in subparagraph (C) below. (C) Curb and gutter shall not be required in conservation subdivisions in RE-1 and RE-2 districts. In RE-1 and RE-2 districts only, a twenty percent (20%) density bonus shall be granted if the developer chooses to install curb and gutter, and the lot size shall be reduced sufficiently to grant this bonus; however, health department regulations shall still apply. (D) In the R-1, R-2, and R-4 districts, front setbacks are reduced to 15 feet, and rear setbacks are reduced to 20 feet. The minimum width at the building line is reduced to 60 feet. The setbacks and minimum building line width for RE-1 and RE-2 are not changed. 7.16.5 Greenspace Areas. Greenspace areas shall include, but not be limited to, wetlands, river buffer zones, woodlands, wildlife corridors, pastures, meadows, and similar natural property. Greenspace areas shall be contiguous on the parcel. Greenspace shall be contiguous to other greenspace parcels, county parks, Corps of Engineer property, national parks, and similar preserved land where possible. Greenspace land shall be undisturbed and undeveloped. Greenspace must be accessible by a county or state road, or by easement. Hunting shall not be permitted in greenspace areas and any deed of conveyance of greenspace to the County or land trust shall contain a deed restriction to that effect. 7.16.6 Standards. Approval of a conservation subdivision shall be granted or denied by the Zoning Administrator. The Zoning Administrator shall consider the following factors: (A) Whether the applicant has designated and offered to dedicate appropriate amounts and locations of greenspace. CDA:85 Supp. No. 15 (B) Whether the conservation subdivision would be detrimental to the surrounding uses. (C) Whether the terrain or location of the property is not suitable for a conservation subdivision, or is not desirable as greenspace. (D) Whether the area remaining after dedication of greenspace is suitable for development at the proposed density. 7.16.7 Approval, post-approval procedure. The Zoning Administrator shall issue written approval or denial of the conservation subdivision. Upon approval of the conservation subdivision, the applicant shall cause a survey and legal description to be prepared of the greenspace. Greenspace shall be clearly identified on all preliminary plans and all development plans. Greenspace shall be dedicated to a land trust as the developer may designate, the County, or to the Home Owners' Association prior to approval of the final plat, by fee simple deed, to be preserved in perpetuity as greenspace. Appeal of the approval of a conservation subdivision must be initiated within thirty (30) days of written approval by the Zoning Administrator of the conservation subdivision. If an appeal is initiated, the applicant may withhold dedication until the appeal is completed. 7.16.8 Appeal. Appeal of the Zoning Administrator's decision to approve or deny a conservation subdivision can be taken by the applicant or any aggrieved citizen by filing a notice of appeal within thirty days with the Zoning Administrator, who shall forward the appeal directly to the Board of Appeals. The Board of Appeals shall hear the appeal at the next available hearing. Appeals from the Board of Appeals shall be to the Commissioner pursuant to Article XIV. 7.16.9 Alternative greenspace. In a conservation subdivision, the applicant may propose alternatives from the standard requirement. The applicant may propose purchasing an equivalent amount of greenspace adjacent and contiguous to existing county greenspace elsewhere in the County; the applicant may propose donating an equivalent amount of greenspace to an approved land trust; or the applicant may propose submitting funds to purchase an equivalent amount of greenspace, to be paid into a County greenspace bank for future purchase of greenspace at the County's discretion. Such dollar amounts would be based on appraisals approved by the Zoning Administrator, at pre-development values. Payment or contribution of land shall occur prior to approval of the final plat. Any alternative greenspace arrangement must be approved by the Commissioner. Alternative greenspace arrangements require the voluntary cooperation of the applicant; otherwise, the standard requirement shall apply. (Ord. of 7-21-2021(4); Ord. of 3-16-2022(1), § IV) Sec. 7.17. Etowah Valley historic district (special district). 7.17.1 Purpose. It is the purpose and intent of Bartow County in enacting these regulations to provide for the identification of and protection of historical and cultural artifacts and sacred locations of the Muscogee (Creek) Nation and the Eastern Band of the Cherokee Nation, which are two Native American Nations that are historically connected to the Etowah River Valley (referred to collectively as "Native American Nations"). The identification and protection of such artifacts and locations is of great benefit to the public welfare, in that it preserves and promotes understanding of the County's and the nation's history, enhances the aesthetic environment, encourages proper economic development, provides tourism opportunities, and benefits all citizens. This Ordinance further honors the agreement made with the Nations by Bartow County. Property in the Etowah Valley Historic District is subject to additional procedures prior to rezoning or development, in order to achieve these purposes. 7.17.2 District established. The Etowah Valley Historic District is an overlay district, the boundaries of which are depicted on the map described in Section 7.17.3. All provisions of the underlying zoning district shall continue to apply in addition to the requirements of this Section. In cases of conflict, the stricter requirement shall control. 7.17.3 District boundaries. The boundaries of the Etowah Valley Historic District shall be as depicted on the map designated "Bartow County Etowah Valley Historic District," dated August 6, 2003, which map is incorporated into this Ordinance by reference, and which map shall be kept in the office of the Zoning Administrator and shall be available for public inspection at all times. 7.17.4 Rezoning; land use map change. Application for Rezoning or Land Use Map Amendment; Notification: (A) Any applicant seeking an amendment to the land use map, or seeking a rezoning for any property located in the Etowah Valley Historic District shall, prior to filing an application, send notice to the Native American Nations at the address given in Section 7.17.8. The notice provided to the Nations must contain a copy of the proposed application. The notice shall also state that the Nations have thirty days to respond and comment on the application, from the date of their receipt, and that all such comments shall be sent to both the applicant and the Bartow County Zoning Administrator, at 135 W. Cherokee Avenue, Cartersville, Georgia 30120. (B) Notices shall be sent certified mail, return receipt requested, to the addresses listed in Sec. 7.17.8. Copies of the notices shall be filed with the application. The return receipt of all notices shall be filed with the Zoning Administrator within thirty days of the application being filed. (C) No Planning Commission hearing can be held on any application falling under this section until at least thirty days after the date of the last return receipt indicating notice to the Nations. Any comments received shall be included in the file for review by the Planning Commission and Bartow County Commissioner. 7.17.5 Development; land disturbance permit. Application for Development or Land Disturbance; Survey Required; Notification: (A) Any applicant seeking a permit or approval for any development (as defined in the Bartow County Zoning Ordinance) or land disturbance permit in the Etowah Valley Historic District, other than one seeking to erect a single-family residence on a single lot, shall commission an archaeological survey for any property or portion of property CDA:87 Supp. No. 14 within the boundaries of the District. The survey shall be conducted by a qualified archaeologist, as defined in Sec. 7.17.10. No application will be accepted by the County without a completed archaeological survey. (B) The Native American Nations shall be notified prior to the commencement of the archaeological survey by notice stating that a survey is being commenced and describing the subject property, and identifying the archaeologist. (C) The Nations shall also be notified of the completion of the archaeological survey and shall be sent a copy of the completed survey and the application (including site plan), prior to submission to Bartow County. This notice shall state that the Nations have thirty days to respond and comment on the application and survey, from the date of their receipt, and that all such comments shall be sent to both the applicant and the Bartow County Zoning Administrator, at 135 W. Cherokee Avenue, Cartersville, Georgia 30120. (D) All notices shall be sent to the addresses listed in Sec. 7.17.8, via certified mail, return receipt requested. Copies of all notices sent shall be filed with the application. The return receipt cards of all notices must be filed with the Zoning Administrator within thirty days of the application being filed. (E) If the Nations desire to dispute the recommendation of the applicant's archaeological survey regarding the subject property, they shall be required to submit their own survey and/or recommendation from a qualified archaeologist, as defined in Sec. 7.17.10. Each Nation may submit its own survey. Any survey shall be prepared to the standards of Sec. 7.17.6. The Nations shall submit such survey or recommendation to the applicant and the Zoning Administrator within thirty days of receipt of the application. If no survey is submitted, the Nations' archaeologist shall at least make a recommendation, consistent with his or her best professional judgment, as to what action should be taken on the site, e.g.: further survey, removal, avoidance, mitigation, preservation in place, data recovery, or other actions. 7.17.6 Archaeological survey standards. (A) Archaeological surveys shall be prepared by a qualified archaeologist, as defined in Section 7.17.10. Archaeological surveys shall be prepared pursuant to the standards contained in the Archaeological Assessment Report Guidelines and Components, produced by the Georgia Department of Natural Resources, Historic Preservation Division ("HPD"). Surveys shall be "Intensive Level Surveys" as defined in that document. Surveys shall identify any Significant sites, historic sites or artifacts, or prehistoric sites or artifacts on the property. A "Significant" site is a site that is listed, or potentially would be eligible for listing, in the National Register for Historic Places. (B) If any archaeological survey reveals any Significant sites, historic sites or artifacts, or prehistoric sites or artifacts, the archaeologist preparing the survey shall make a recommendation, consistent with his or her best professional judgment, as to what action should be taken on the site, e.g.: further survey, removal, avoidance, mitigation, preservation in place, data recovery, or other actions. If the survey reveals no Significant sites, historic sites or artifacts, or prehistoric sites or artifacts, the archaeologist shall so state. (C) The survey shall also include a resume, CV, or other documents demonstrating that the author is a qualified archaeologist as defined in Section 7.17.10. (D) Potential applicants are advised, but not required, to commission a "Reconnaissance Level Survey" well in advance of significant development expenditures, to identify issues as early as possible. Neither notice nor filing of that report is required. 7.17.7 Survey review and decisions; referral to state historic preservation division. (A) The "Intensive Level" archaeological survey shall be submitted with the application for development permits, and shall be available to the public. Comments shall be accepted from the Native American Nations and any other party wishing to comment, in written form. The Nations may also submit a survey or recommendation from a qualified archaeologist, as discussed in Sec. 7.17.5, above. Each nation may submit its own recommendation. The Zoning Administrator shall have the longer of sixty (60) days from the date of filing of the application and survey, or thirty (30) days from the date of receipt of the last certified mail "return receipt" indicating notice to the Nations, or thirty (30) days from the receipt of the Nations' survey or comments, for initial review of the archaeological survey. One extension of up to sixty (60) days may be granted of this period at the discretion of the Zoning Administrator. (B) In regards to whether any Significant historic or prehistoric sites or artifacts exist, and what action if any should be taken with such sites or artifacts, the County shall follow the recommendation of the applicant's qualified archaeologist, unless the Nations submit a different recommendation from their own qualified archaeologist. (C) In the event there is a dispute between the applicant's archaeologist and the Nations' archaeologist over the existence of Significant historic or prehistoric sites or artifacts, or a dispute over what action should be taken with such sites or artifacts, the surveys and recommendations from both the applicant and the Nations shall be submitted to the Georgia Department of Natural Resources, Historic Preservation Division ("HPD"), at 156 Trinity Avenue, SW, Suite 101, Atlanta, GA 30303-3600, with a request for technical resource assistance, and a recommendation on action to take. The HPD shall be informed in the request that if no recommendation is received within sixty (60) days from the date the request is mailed, the recommendation of the applicant's archaeologist shall be accepted. (D) In the event assistance is requested from the Historic Preservation Division, the County shall await the HPD's recommendation, and shall refer to and rely upon the HPD's comments, and implement the HPD's recommendation. If no response is received from the HPD within sixty (60) days from the date the request is mailed, the recommendation of the applicant's archaeologist shall be accepted. CDA:89 Supp. No. 14 (E) All other provisions of applicable County ordinances must also be satisfied prior to permits being issued. 7.17.8 Native American Nations; notification addresses. The terms "Native American Nations" and "Nations," as used in this Ordinance, refer exclusively to the Muscogee (Creek) Nation and the Eastern Band of the Cherokee Nation. Any required notice shall be sent to the Nations at the following addresses: For the Muscogee (Creek) Nation: Attn: Joyce A. Bear or successor Cultural Preservation Office Muscogee (Creek) Nation P.O. Box 580 Okmulgee, OK 74447 (918) 756-8700 ext. 603; email: cultural@ocevnet.org For the Eastern Band of the Cherokee Nation: Attn: Lee Clauss or successor Cultural Resources/THPO Eastern Band of Cherokee Indians P.O. Box 455 Cherokee, NC 28719 (828) 497-1589 or -1594; email: leeclauss@nc-cherokee.com 7.17.9 Human Remains, Cemeteries and Burial Grounds. No known cemetery, burial ground, human remains, or burial object (as those terms are defined in O.C.G.A. § 36-72-2) shall be knowingly disturbed by the owner or occupier of the land on which the cemetery or burial ground is located for the purposes of developing or changing the use of any part of such land unless a permit is first obtained from Bartow County pursuant to the provisions of O.C.G.A. § 36-72-1 et seq., which are incorporated herein by reference. Any discovery of any human remains, cemetery, burial ground or burial object must be reported to the Zoning Administrator and the Native American Nations. 7.17.10 Qualifications for Archeologist. A "qualified archaeologist" is an archaeologist who meets the U.S. Department of the Interior, National Park Service professional qualification standards for archaeologists, as published in the Code of Federal Regulations, 36 CFR Part 61, as follows: (A) The minimum professional qualifications in archaeology are a graduate degree in archaeology, anthropology, or closely related field plus: (i) At least one year of full-time professional experience or equivalent specialized training in archaeological research, administration or management; (ii) At least four months of supervised field and analytical experience in general North American archaeology; and (iii) A demonstrated ability to carry research to completion. (B) In addition to those minimum qualifications, a professional in prehistoric archeology shall have at least one year of full-time professional experience at a supervisory level in the study of archaeological resources of the prehistoric period. A professional in historic archeology shall have at least one year of full-time professional experience at a supervisory level in the study of archaeological resources of the historic period. 7.17.11 Fees. A surcharge fee for review of an application for a land use map amendment, rezoning or any development in the Etowah Valley Historic District shall be charged, in the amount of $150. This fee shall be in addition to the normal fee, and relates to the costs of additional administration and review. 7.17.12 Appeals. Any aggrieved party shall have fifteen days from the date of the Zoning Administrator's decision to file an appeal of the Zoning Administrator's decision, which shall be heard by the Board of Appeals. Appeal shall be initiated by filing a written appeal stating the grounds with the Zoning Administrator. The Board of Appeals shall hear the appeal within forty-five (45) days of the date of appeal. (Ord. of 7-21-2021(4)) Sec. 7.18. Business park district. 7.18.1 Purpose. The purpose of the Business Park District is to provide uniform regulations for a joint City of Cartersville-Bartow County industrial/business park, a portion of which is located in each jurisdiction. To provide consistency for property owners and future uses, and to benefit the public health, safety and welfare, the City and County have adopted identical regulations as follows. The Business Park District, where applied via amendment to the Official Zoning Maps of the participating government, shall control over inconsistent regulations contained in other ordinances and the Code of Ordinances of each jurisdiction, whether or not the provisions herein are stronger or weaker restrictions. The purpose of this district is also to provide consistent development standards for other industrial and business parks located in the vicinity of the joint City-County park, so that the area is developed consistently and without incompatible uses or negative impacts on infrastructure, public health, safety or welfare. This District may also in the future be applied to other areas of the County. The provisions of this section control over inconsistent provisions in other sections of this Ordinance or other portions of the Code of Bartow County. 7.18.2 General Area, Height and Setback Regulations. Minimum lot size: 1 acre Maximum lot coverage (impervious surface limitation): 75% Required lot width at street right-of-way: 50 feet (25 feet in cul-de-sac) Front setback: 40 feet Side setback: 15 feet Rear setback: 20 feet CDA:91 Supp. No. 14 Maximum building height (see below): 75 feet Buffers (see below): 50 feet except as noted. (A) The County or City Zoning Administrator dependent upon jurisdiction may grant an administrative variance of up to 20 percent to any of the general area, height and setback regulations listed above. Additionally, they may grant an administrative variance on the undisturbed buffer requirements, if the proposed landscaping and screening in the buffer enhances the screening of the adjacent property. (B) Building height. With the approval of the County or City Zoning Administrator dependent upon jurisdiction, maximum height may be increased by administrative variance. Building height limitations shall not apply to accessory structures such as water towers, conveyer belts, smoke stacks and other incidental and uninhabited parts of industrial uses. (C) Buffers. A 50-foot buffer shall apply adjacent to all land uses, except that no buffers shall be required from industrial to industrial. Further, there shall be a 200-foot buffer required where shown on the overlay district map adjacent to existing residential uses as of the date of adoption of the overlay district. When any of the existing residential uses are rezoned to a non-residential zoning classification, the buffer adjacent to that property shall be reduced to 50 feet, unless it is a similar zoning classification, in which case the buffer requirement shall not apply. Buffers shall be undisturbed, except that, if the buffer is adjacent to a residential use, and is insufficiently dense to be opaque to vision year round, the Zoning Administrator may require that the buffer shall be planted with sufficient vegetation so that it is opaque year-round, to a depth of at least twenty-five feet. Buffers may be used for perpendicular crossing by access roads and utilities, but not for lateral roads or parking. Buffers may be used for detention ponds, provided that vegetative screening remains or is planted between the pond and the property line. The County or City Zoning Administrator dependent on jurisdiction shall approve buffer plans and plantings. (D) Setbacks shall be measured from the property or lot line. As setback exceptions, the following may intrude into the setback zone: unsupported roof overhangs, steps, walkways and access roads, landscaping and irrigation systems, planters, architectural fences and walls not exceeding 42 inches, and underground utilities and sewers. (E) Development. Application for rezoning to this zoning district shall require submission of a site plan as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed development. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. 7.18.3 Permitted uses. The following uses are permitted in the Business Park District. Any use not specifically listed is prohibited, except as permitted by Section 7.18.4. Business offices Call center Data Center Distribution facilities Education and Training Facilities Light Industrial uses which may include manufacturing, fabricating, processing (excluding chicken or meat processing) or assembling of product and equipment which are housed within a building Manufactured or portable building manufacturers Manufacturing, except explosives or fireworks Outdoor Storage (as an accessory use) Public Utility Facilities Radio, TV and other communication towers Research and Development Facilities Research laboratories and biomedical laboratories Retail or services uses Telecommunication structures Warehousing Wholesale trade and distribution 7.18.4 Conditional industrial uses. Any industrial use not listed above, and otherwise permitted either as a permitted or conditional use in the Bartow County General Industrial District or the Bartow County Heavy Industrial District, may be permitted, upon grant of a conditional use permit. The applicant shall submit an application for a conditional use subject to the standards, regulations and criteria contained in this Ordinance and the application shall proceed as a conditional use permit pursuant to the applicable provisions (Article XVI). Bartow County shall be empowered to impose conditions on the approval to ameliorate any negative impacts of the proposed use, including restrictions on noise, vibration, light or glare, hours of operation, additional buffering and any other appropriate condition. CDA:93 Supp. No. 14 7.18.5 Prohibited uses. Notwithstanding the foregoing, any uses listed herein shall be prohibited and may not be approved for the district, even as a conditional use: (1) Airports and landing fields; (2) Coal Burning Facilities; (3) Paper and pulp manufacturers; (4) Explosives, including fireworks manufacture or storage in bulk quantities; (5) Garbage, offal, dead animal reduction or dumping; (6) Mining and related activity; (7) Quarrying and related activity; (8) Stock yards, commercial; (9) Conversion of energy by nuclear fusion or fission; (10) Blasting. 7.18.6 Landscaping requirements. All developments shall comply with the following minimum landscape requirements: Border landscaping—building: 5 ft. wide (none between building and truck courts) Border landscaping—vehicular use area: 5 ft. wide Trees along vehicular use area: 1 per 75 ft. Border landscaping—road ROW: 1 per 30 ft., 10 feet wide Parking lot landscaping islands: 160 sq. ft., req. at end of each row; i.e. 320 sq. ft. for double ROW. Parking lot landscaping—trees: 1 tree per island Parking lot landscaping—spaces: 1 island per 12 spaces New plant materials—trees: 8 ft. height at planting, 15 ft. at maturity (A) Parking lot terminal island design. Each single and double row of parking spaces shall be terminated by landscaped islands, no less than 9 feet in width and no less than 15 feet in length and shall include at least one tree having no branches maintained below five feet in height for visibility. The remainder of the island shall be adequately landscaped with shrubs and ground cover with a height of no more than three feet at maturity. Islands may contain no curbs, elevated curbs or depressed curbs. (B) Parking lot interior island design. A minimum of one interior island shall be provided for every 15 parking spaces or fraction thereof. One tree required per island having no branches maintained below five feet in height for visibility. The remainder of the island shall be adequately landscaped with shrubs and ground cover with a height of no more than three feet at maturity. Islands may contain no curbs, elevated curbs or depressed curbs. (C) New Plant Materials. Trees—A tree shall attain an average crown spread over 15 feet at maturity. Trees having an average crown spread of less than 15 feet may be substituted by grouping the same so as to create the equivalent of a 15-foot crown spread. All trees shall be of a species which can be maintained with a minimum of five feet of trunk height. New trees shall have a minimum of 2.5 inches diameter at breast height (DBH) measured 4.5 feet above ground and shall be a minimum of 8 feet in overall height immediately after planting. Shrubs—Shrubs shall be a minimum of one foot in height when measured at the time of planting. 7.18.7 Street design standards. Streets in this overlay district shall be paved to minimum twenty-eight (28) foot width, with a section of 8" GAB, 3" Binder and 1.5" surface course. 7.18.8 Signs. The following signs are permitted: 1. Ground signs. One monument-style brick or masonry sign for each individual building in the park. Maximum area of each sign is 60 square feet. Maximum height is 6 feet. The sign may be double-sided. One additional monument-style brick or masonry sign of no more than 60 square feet and six feet in height shall be permitted if the building has more than one access point. 2. Window signs. Total signage per business not to exceed 25% of the area of windows facing road frontage. 3. Wall signs. Total area of all signs is not to exceed 10% of the gross floor area of the building. No more than four wall signs per business are permitted and no single wall sign shall exceed 250 square feet. 4. Entrance signs. Two monument-style brick or masonry entrance signs at each entrance to the business park. Maximum area of each sign is 100 square feet. Entrance signs may only be single-sided, unless only one is erected at an entrance, in which case it can be double-sided. Entrance signs only permitted at the entrance to the planned center. Entrance signs must be setback from the right-of-way a distance equal to their height plus one foot for safety reasons, and cannot block traffic sight lines. Maximum height is 10 feet. (Ord. of 7-21-2021(4)) Sec. 7.19. R-7 residential district (multi-family housing). 7.19.1 Purpose. The R-7 district is established primarily to encourage the development of high-density apartments or condominiums. The R-7 district is a residential district. CDA:95 Supp. No. 17 7.19.2 Area, yard, height and buffer requirements. The following requirements apply to the R-7 district: Minimum development size: 3 acres with sewer; septic not permitted. Minimum development width at street R/W: 200 feet. Maximum density: 40 dwelling units per acre. Front yard setback (from right-of-way): 25 feet. Side yard setback (from property line): 10 feet. Rear yard setback (from property line): 25 feet. Internal setback (minimum distance between buildings): 20 feet. Maximum building and structure height: 60 feet or four stories, whichever is higher. Buffers: 25 feet of undisturbed (if sufficiently dense) or vegetated buffer is required when adjacent to any property with single-family residential use. See section 8.2. 7.19.3 Development in R-7. Development must be in accordance with the county development regulations. The engineering department should be consulted. Application for rezoning to this zoning district shall require submission of a site plan as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed density. All developments must be served by sewer. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. 7.19.4 Permitted uses in R-7 district. Within the R-7 district, land and structures shall be used in accordance with standards herein. Any use not specifically designated as a permitted use in this section shall be prohibited. (A) Apartments or condominium development which comply with the following: 1. Maximum density 40 dwelling units per acre. Each dwelling unit shall have separate bath/toilet and kitchen/dining areas. 2. Buildings may not have exterior access to apartments (i.e., garden-style). Developments in this district shall have central entrance points and shall have internal access hallways for individual units. 3. Internal setbacks. Buildings shall be spaced at least 20 feet apart. The front of one building shall not face the rear of another building on the site. 4. External setbacks. All buildings must maintain a setback of 25 feet from all external property boundary lines and any rights-of-way. 5. No development shall be constructed on a lot or tract of land unless connected to sewer. 6. Signage shall be as permitted in the R-3 zoning district. 7. Condominiums must meet the definition of condominium in the Georgia Condominium Act, O.C.G.A. Title 44, Chapter 3, Article 3. 7.19.5 Design standards for Condominium and Apartment Developments. 1. At least fifty percent (50%) of the building materials used for the total exterior façade must be brick or stone. Brick or stone materials shall wrap around at outside building corners of at least 3 feet height (water table). The remainder may be wood, hard-coat stucco, board and batten, fiber cement siding and cedar shakes. Vinyl siding and External Insulation and Finishing Systems (EIFS) are prohibited. 2. Variation of materials shall be used to vary external wall surfaces, as well as varied roof lines. The building shall be designed that a variation of setback of at least 2 feet is required for every 100 feet of building length. 3. The developer shall provide a landscape plan as part of the civil plans to include native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. The landscape plan shall show and note at least one tree and bush for each residential lot or unit. 4. At least three (3) architectural plans and designs showing all four sides of proposed units or buildings shall be submitted for review to the zoning administrator for approval before issuance of building permits. 5. A minimum of ten percent of any housing development shall be set aside as open space. As part of the open space, an amenity tract of at least 20,000 square feet shall be located to be readily accessible to all residents and shall contain some combination of sports fields, playgrounds, walking trails, pools, gazebos and similar facilities. At least one significant amenity feature (sport court, playground, walking trail, pool, etc.) or two smaller amenities (gazebo, fire pit, pergola, etc.) shall be shown and noted on the site plan. Parking lots, streets, setback areas, buffers, stormwater control measures, detention facilities, and so forth shall not count towards this requirement. Long, narrow strips of land shall not count towards this requirement. The open space and amenity plan shall be reviewed and approved by the Zoning Administrator for compliance prior to the application for rezoning advancing. 6. This section shall apply to any development that has not obtained a Land Disturbance Permit at the time of adoption of this ordinance. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, §§ XXII, XXIII; Ord. of 7-10-2024, § V) CDA:97 Supp. No. 17 Sec. 7.20. R-8 residential district (single-family housing). 7.20.1 Purpose. The R-8 residential district permits the development of conventional single-family housing on smaller lots than the R-1 district. The R-8 district is a residential district. 7.20.2 Area, yard, height and buffer requirements. The following requirements apply in the R-8 district: Minimum development size: 1 acre. Minimum lot size: 8,000 square feet with sewer; septic not permitted. Minimum lot width at street R/W (in new development): 50 feet, 25 feet on cul-de-sac. Front yard setback (from right-of-way): 20 feet. Side yard setback (from property line): 10 feet. Rear yard setback (from property line): 20 feet. Maximum building and structure height: 50 feet. Buffers: None. Special agricultural setbacks: See subsection 8.2.3 for setbacks required for homes built adjacent to existing agricultural structures. 7.20.3 Height exceptions. The height limitation does not apply to structures such as unoccupied and inaccessible architectural features on non-residential buildings (e.g., church spires, belfries, cupolas and domes), monuments, government-owned observation towers, water towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements apply to signs and structures containing signs; see article XI. 7.20.4 Accessory structures. Accessory buildings and structures shall maintain the same front and side yards as the main structure; however, they will not project beyond the established building line. Rear yard setbacks shall be a minimum of ten feet. 7.20.5 Non-residential uses and accessory uses. Non-residential uses and accessory uses shall be set back at least 50 feet from all property lines, shall be screened by a 25-foot vegetative buffer, and shall also have a six-foot wooden fence on the inner or outer boundary of the buffer where adjacent to residentially-used property. Off-street parking/loading for all non-residential uses shall be provided in accordance with the county development regulations. Other provisions of the development regulations may be applicable, and the engineering department should be consulted. Non-residential uses must meet special building code requirements, and the county building inspections department and the county building code ordinance should be consulted. 7.20.6 Permitted uses in R-8 district. Within the R-8 residential district, no building, structure, land, or water shall be used except with one or more of the following uses. A use not specifically named within a district is not permitted: (A) Conventional or industrialized single family homes. Manufactured houses shall not be permitted. (B) Municipal, county, state, federal and other public uses, including parks and playgrounds; public utilities and service structures. (C) Home occupations. See section 6.4. (D) Group homes for persons with a disability (for up to six residents excluding resident staff), licensed by and in compliance with the applicable regulations of the state department of human resources. (E) Churches, synagogues and similar places of worship. Accessory uses for churches and places of worship, such as schools, day cares, hospices, and similar facilities, are permitted. 7.20.7 Conditional uses in R-8 district. The following are permitted only with the grant of a conditional use permit under the requirements of article XVI. All such uses must likewise meet all requirements of this zoning district. (A) Telecommunications structures, subject to article XII. 7.20.8 Development and Design Standards in R-8. Development must be in accordance with the county development regulations. The engineering department should be consulted. Application for rezoning to this zoning district shall require submission of a site plan as well as an accompanying letter from the issuing water/sewer authority stating there is adequate water/sewer availability for the proposed density. In the event that a State Development of Regional Impact (DRI) review is required, a traffic impact study shall be required to be submitted to the county engineer for review before rezoning or conditional use. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. The county engineer shall submit comments to be reviewed by the Planning Commission and Commissioner as part of the zoning application. (A) Each residence shall exhibit at least four of the following features: 1. Shutters on at least two front windows, or other window accents as approved by the zoning administrator or his/her designee. 2. An architectural 6-panel door with at least one side light. 3. Covered entry-way, stoop, or porch. 4. Arches, columns, gables or cornices. 5. Architectural shingles. CDA:99 Supp. No. 17 6. Eaves on sloped roofs that extend a minimum of 12 inches from the face of the building. Roof overhangs at gables that extend a minimum of six inches from face of the building. 7. Appropriate similar feature as approved by the zoning administrator or his/her designee. (B) Each exterior wall shall have at least one window - at least one window on each side shall be minimum two feet in width by three feet in height. (C) Vinyl siding and External Insulation and Finishing Systems (EIFS) are prohibited as an exterior finish material. At least thirty-three percent (33%) of the exterior finish shall be brick or stone. The remainder may be wood, hard-coat stucco, board and batten, cedar shakes, and fiber cement siding. (D) At least three (3) architectural plans and designs showing all four sides of proposed units or buildings shall be submitted for review to the zoning administrator for approval before issuance of building permits. (E) The developer shall provide a landscape plan as part of the civil plans which includes native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. (F) A minimum of ten percent (10%) of any housing development shall be set aside as open space. As part of the open space, an amenity tract of at least 20,000 square feet shall be located to be readily accessible to all residents and shall contain some combination of sports fields, playgrounds, walking trails, pools, gazebos and similar facilities. At least one amenity shall be shown in the open space on the site plan. Parking lots, streets, setback areas, buffers, stormwater control measures, detention facilities, and so forth shall not count towards this requirement. Long, narrow strips of land shall not count towards this requirement. The open space and amenity plan shall be reviewed and approved by the Zoning Administrator for compliance prior to the application for rezoning advancing. (G) This section shall apply to any development that has not obtained a Land Disturbance Permit at the time of adoption of this ordinance. 7.20.9 Optional Density Bonus. Proposed developments may contain lots with minimum areas of 6,000 square feet if all of the following items are met. (A) At least fifty percent (50%) of the building materials used for the total exterior façade must be brick or stone. Brick or stone materials shall wrap around at outside building corners of at least 3 feet height (water table). The remainder may be wood, hard-coat stucco, board and batten, fiber cement siding and cedar shakes. Vinyl siding and External Insulation and Finishing Systems (EIFS) are prohibited. (B) Garages are required for each unit, unless shared central parking is provided. Doors shall be architectural in style. Standard panel doors are not permitted. Garage doors shall be recessed a minimum of 12 inches from the front façade. (C) Front facades shall have at least one of the following: front porch, stoop or balcony. (D) Units should be designed to provide a variety of facades. This can be achieved by changes in brick/stone color and materials, projection or recess of architectural features, or varied roof lines. Dormers or gable pediments shall be incorporated into 25 percent of units. (E) Each unit shall have an architectural 6-panel door and window accents on all front windows, or similar features as approved by the zoning administrator. Each exterior wall shall have at least one window - at least one window on each side shall be minimum two feet in width by three feet in height. (F) The developer shall provide a landscape plan as part of the civil plans to include native species trees, shrubs, and/or bushes showing and noting the types of landscaping, including type of ground cover to be used, in common spaces such as the amenities area, mail kiosk area, development entrance, etc. There shall be a required minimum 25 feet wide landscape strip along all existing public road frontages that shall be separate from residential lots. The landscape plan shall show and note at least one tree and bush for each residential lot or unit. (G) At least three (3) architectural plans and designs showing all four sides of proposed units or buildings shall be submitted for review to the zoning administrator for approval before issuance of building permits. (H) A minimum of twenty percent (20%) of any housing development shall be set aside as open space. Parking lots, streets, setback areas, buffers, stormwater control measures, detention facilities, and so forth shall not count towards this requirement. Long, narrow strips of land shall not count towards this requirement. As part of the open space, an amenity tract of at least 20,000 square feet shall be located to be readily accessible to all residents and shall contain some combination of sports fields, playgrounds, walking trails, pools, gazebos and similar facilities. At least one significant amenity feature (sport court, playground, walking trail, pool, etc.) or two smaller amenities (gazebo, fire pit, pergola, etc.) shall be shown and noted on the site plan. The open space and amenity plan shall be reviewed and approved by the Zoning Administrator for compliance prior to the application for rezoning advancing. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § X; Ord. of 8-9-2023, §§ XXIV, XXV; Ord. of 7-10-2024, § VI) Sec. 7.21. Allatoona overlay district. 7.21.1 Title. This Section shall be known as the "Allatoona Overlay" or may be internally cited as "this overlay." CDA:101 Supp. No. 17 7.21.2 General purpose. Recognizing that the Allatoona Lake is a precious environmental resource that also generates hundreds of thousands of annual visitors to the County, and that the area adjacent to the Lake and especially Interstate 75 is subject to considerable traffic and other development pressures, the purpose of this overlay is to enable and support the implementation of the following policies: that the harmonious and orderly development and redevelopment of the Allatoona Lake area should be secured through these regulations; and that the overlay area be a focal point for high-quality development and redevelopment. 7.21.3 Applicability. (A) This overlay applies within the area be shown on the Map labeled "Allatoona Overlay District" which is adopted herewith, and shall be signed by the Zoning Administrator, dated July 10, 2019 and kept in the offices of the Zoning Administrator and accessible to the public. Such map is incorporated by reference as if set forth fully herein. An additional official copy shall be spread upon the minutes of the County Clerk. (B) Parcels within this overlay shall be subject to both the requirements of this Section and the requirements of their underlying zoning district, subject to the conflict provisions in paragraph (C) immediately below. (C) When requirements of this overlay conflict with any requirement of the underlying zoning or any other provision of the Zoning Ordinance, the requirements of this overlay shall prevail. 7.21.4. Conformance requirements. (A) All buildings, structures or land, in whole or in part, must be used or occupied, in conformance with this overlay. All buildings or structures, in whole or in part, must be erected, constructed, moved, enlarged or structurally altered in conformance with this overlay. (B) Nothing in this overlay shall require any change in the plans, construction or intended use of a building or structure for which a lawful permit has been issued or a lawful permit application has been accepted before the effective date of this overlay, provided that the construction under the terms of such permit is diligently followed until its completion. 7.21.5 Conflicting provisions. (A) It is not the intent of this overlay to interfere with or abrogate or annul any easements, covenants or other agreements between parties; provided, however, that where this overlay imposes a greater restriction upon the use of property, or requires more space than is imposed or required by other resolutions, rules or regulations, or by easements, covenants or agreements, the provisions of this overlay shall govern. (B) Nothing herein shall be construed as repealing or modifying the conditions of operation or conditions of site development accompanying those zoning approvals, variances, or use permits issued prior to the existence of this overlay; however, modification or repeal of these past conditions of approval may be accomplished through a zoning change. 7.21.6 Use restrictions. For parcels zoned C-1 general business in this overlay, the only uses permitted as of right shall be those listed in the following subsections of Section 7.11.8 of the Zoning Ordinance (A), (B), (C), (D), (E), (H), (L), (M), and (N). Any other use listed in Section 7.11.8 shall be treated as a conditional use and require an application. Any use listed in Section 7.11.9 shall remain a conditional use. 7.21.7 Development requirements. (A) Any undeveloped C-1 lots shall be developed with sidewalks, as set forth in the Standard Details of Bartow County. (B) Any C-1, CN, O-I, I-1 or I-2 lot to be developed shall have a minimum of 20 foot landscaped buffer strip paralleling road frontage. Minimum one tree and four shrubs per 40 feet of road frontage. All parking areas shall be to the rear of the primary structure and screened from the right of way. (C) Non-conforming A-1 lots that have frontage on Glade Road, Red Top Mountain Road, New Hope Church Road, and Kings Camp Road must put up a masonry or ornamental steel fence with post lighting to place or replace a manufactured home, whether on an individual lot or an existing nonconforming mobile home park. This requirement can also be satisfied by a 20 foot landscaped buffer, designed to be opaque year-round. Non-conforming lots rezoned to R-1 are exempt from this requirement, granted the home is built to the architectural requirements of Section 7.4.9. (D) R-1 zoning district area and frontage requirements shall not apply for nonconforming A-1 lots seeking to apply to rezone to R-1. (E) The following materials are prohibited for new main/primary/principle residential structures (including single-family homes, multi-family homes, modular homes and manufactured homes): vinyl siding, unfinished cinder blocks, metal siding, aluminum siding. (Ord. of 8-9-2023, § XXVI) Sec. 7.22. Planned greenspace and development district (PGDD). 7.22.1 Title. This Section shall be known as and contain the regulations for the "Planned Greenspace and Development District" or PGDD. 7.22.2 General Purpose. The purpose of the PGDD district is to encourage flexibility in land planning and phased development that will best lead to addressing the county's needs and opportunities identified in the comprehensive development plan, primarily the preservation and expansion of greenspace including natural resources, scenic features and open space but also to address the needs and opportunities identified in the comprehensive development plan for economic development, housing, transportation, land use, and community facilities CDA:103 Supp. No. 17 and service; further address improved design, character, and quality of new housing of different types and densities and of compatible commercial, industrial, retail, and hospitality developments; promote the most appropriate use of land; and facilitate the provision of streets and utilities. 7.22.3 Applicability. The PGDD is an overlay zoning district. The regulations of this PGDD apply within all areas delineated and labeled on the official zoning map "PGDD". The regulations of this PGDD are as follows: A. The existing zoning map and the underlying zoning regulations and entitlements governing all properties within the PGDD shall remain in full force and effect. Such map is made a public record and kept in the office of the zoning administrator and accessible to the public. Such map is incorporated herein by reference as if set forth fully herein. B. The regulations and entitlements contained within this section shall be overlaid upon, and shall apply in addition to, or in lieu of, as the case may be, said existing zoning regulations. C. Underlying zoning regulations and other land use and development regulations shall apply unless expressly modified by the sections of this ordinance pertaining to the PGDD district or by an approved PGDD concept plan. 7.22.4 Eligibility. To be eligible for consideration for adoption of a PGDD overlay, the following two criteria apply: A. Acreage. A minimum of ten thousand (10,000) contiguous acres of land, five thousand (5,000) acres of which must be reserved, proposed or developed as Greenspace, shall be required in order to be considered for the PGDD zoning overlay. Greenspace shall be approved and developed through subsequent applications to the county as per a developed master plan. Greenspace shall include property previously zoned agricultural; industrial or mining lands that during the master plan phasing will be set aside; wildlife management areas; lakes, streams, and other water features; trails; undisturbed buffers; developed open spaces, buffers and nonresidential building setbacks including those required by zoning; recreation areas and parks; civic and education sites excluding structures; wetlands and/or, similar spaces. Greenspace also includes land leased, licensed, donated or sold to qualified non-profit trust(s), the state or Bartow County for recreational purposes. Greenspace also includes land on to which the property owner either directly or indirectly invites or permits without charge any person to use the property for recreational purposes. Land means land, roads, water, watercourses, private ways and buildings, structures, and machinery or equipment when attached to realty. Recreational purpose includes, but is not limited to, any of the following or any combination thereof: hunting, fishing, swimming, boating, camping, picnicking, hiking, pleasure driving, aviation activities, nature study, water skiing, winter sports, and viewing or enjoying historical, archeological, scenic, or scientific sites. The PGDD concept plans shall identify at least 5,000 acres of greenspace, provided that the Commissioner may, at his discretion, waive by 10% one or both of the acreage requirements of this paragraph upon a finding that the proposed concept plan would meet the general purpose of the PGDD; and B. Ownership. All property shall be under single ownership at the time of the PGDD overlay adoption, or if in multiple ownership, then by written consent of all owners who agree to be bound by the district designation and regulations. C. Expansion of boundary. Additional land may be added to an adopted PGDD overlay district through the amendment process set forth in Section 7.22.6. 7.22.5 Plans. In the PGDD, there are two types of plans and one type of permit: A. Concept Plan. The concept plan is the single guiding plan for the entire PGDD as a whole and is adopted at the time of applying the PGDD overlay. However, it does not authorize any land disturbing or building activity. Rather, the concept plan divides land within the PGDD by permitted use type such as residential, commercial, industrial, mining activities and Greenspace. The concept plan also specifies approximate development yields for each use type. For example, 1 unit of residential per gross acre; 1,000 SF of industrial uses per gross acre; 1,000 SF of commercial use per gross acre. Minimum greenspace location and acreage and the methods of preservation and proposed uses shall be identified on the concept plan. Any substantive change in concept plan requires approval of the Commissioner. B. Master Plans. The master plans are the guiding plans at the development site/tract(s) level of the PGDD, and shall be submitted from time to time as specific projects are proposed, and are approved administratively. Approved master plans evidence zoning compliance and authorization for a proposed development, including but not limited to lot size, density, height, building setbacks, buffers and parking, but do not authorize any land disturbance or construction activity. Proposed developments shown on master plans must be consistent with the concept plan. Any change in a master plan requires approval of the zoning administrator. Approved master plans shall identify the proposed portion of the Greenspace consistent with the established acreage in the concept plan inclusive of the specific open space zoning requirements attributable to each master plan application. After the approval of a master plan, if property that is shown on that plan is put to a use that is inconsistent with the approved master plan, then no other development pursuant to the master plan shall be authorized until the inconsistency is brought into compliance with the master plan. C. Development Permits. Development permits authorize land disturbing and construction activity for development approved in a master plan. Development permit applications may be submitted concurrently with a corresponding master plan application but shall not be approved until approval of the corresponding master plan. Approved development permits evidence compliance with all applicable state and local regulations. CDA:104.1 Supp. No. 17 7.22.6 Procedures to Adopt the Planned Greenspace Development District Overlay. A. Adoption of the PGDD overlay shall follow the applicable procedure and requirements for zoning amendments set forth in Article XV, except as modified in this Section 7.22.6. 1. Application. An application to adopt the PGDD overlay district shall be processed as an amendment to the official zoning map. Future land use maps may be updated by the county after the adoption of the PGDD overlay. The application shall be in the form required by the county and should contain a narrative statement as to the goals of development and a justification of why a PGDD designation is appropriate, a legal description or boundary depiction of the property proposed for the PGDD overlay adoption, and if in multiple ownership, the written consent of all owners who agree to be bound by the district designation and regulations. Because of the conceptual plan nature of the PGDD overlay, the application need not include the information set forth in Sec. 15.2.6(B), (D), (G), (H), (J) and (K). Pursuant to Sec. 15.2.6, the zoning administrator may waive additional requirements he deems unnecessary. Additionally, because of the minimum acreage eligibility requirement for the adoption of the PGDD overlay, the requirement of Sec. 15.3.3 shall not apply. 2. Concept Plan. The concept plan shall contain, notwithstanding anything to the contrary in section 15.2.6(K): i. The types of uses proposed, either specifically or generally; ii. The maximum yields proposed for each type of use. At a minimum, the concept plan shall propose 5,000 acres of Greenspace, unless waived pursuant to Section 7.22.4(A). Greenspace shall be identified and approved under subsequent master plans consistent with the concept plan. 3. Open houses. The applicant for the initial PGDD overlay zoning district shall conduct two public open houses at least two hours in duration prior to the Planning Commission's public hearing. The open houses may be coordinated through county staff and may be conducted before the application is filed. At least one of the open houses shall be started after 4:00 P.M. on a weeknight. 4. Review and Recommendation by Planning Commission. The Planning Commission shall review the application, concept plan, and the zoning administrator's report and, based on the approval criteria of this ordinance and the standards for the exercise of the zoning power, recommend that the County Commissioner approve, approve with conditions, or deny the application. 5. Review and Decision by the Commissioner. The Commissioner will consider the application, concept plan, and recommendations from the Planning Commission. The Commissioner may require submission of additional maps, data or proposed methods of addressing other pertinent matters relative to the development that are reasonably available and where, owing to the nature, size and location of the proposed development, particular elements critical to the health, safety and welfare of the community and its citizens. 6. The concept plan should identify the minimum amount of development, preservation, conservation of Greenspace, and provide in narrative form the conditions for its use. Greenspace which counts toward the minimum greenspace acreage required by this ordinance must be accessible by public road or recorded easement. B. Approval Criteria. In addition to the standards set forth in Section 15.9, the following shall be considered by the Planning Commission and the Commissioner: 1. The extent to which the PGDD designation will address a unique situation or represents a substantial benefit to the county, compared to what could have been accomplished through strict application of otherwise applicable zoning district standards; and 2. The extent to which the concept plan complies with the standards in this Section 7.22. 3. The extent to which the property can be used or developed under its underlying zoning classification(s). C. Effect of Approval. Upon approval by the Commissioner of the application, development within the PGDD shall be in accordance with the concept plan and subsequently approved master plan(s). It is the intent of this district to provide areas of the County that are not simply reserved from development, but which provide an amenity to the residents of the County. Therefore, the Greenspace shall be preserved in the form of an easement, lease, license, donation, sale or other permission in favor of a qualified non-profit land trust(s), the state and/or Bartow County which allows for both public and private use and enjoyment of the natural environment. Execution and acceptance of the easement, lease, license, donation, sale or other permission shall be a condition of applying the PGDD overlay and shall occur prior to or concurrent with the first certificate of occupancy for development within the PGDD. D. Changes to Concept Plan. Because the concept plan is part of the ordinance approving the adoption of the PGDD overlay by the Commissioner, any amendment to the concept plan shall require approval by the Commissioner. An application to amend the concept plan shall be required and shall follow the procedural requirements of section 7.22.6. The Commissioner shall consider and decide the application to amend the concept plan based on the standards set forth in this section 7.22 and the standards for the exercise of the zoning power. 7.22.7 Specific Requirements. A. Development in Areas Zoned PGDD: 1. The adoption of a PGDD overlay shall not entitle an owner of the affected property any right to develop or engage in any land use or land disturbing CDA:104.3 Supp. No. 17 activity, other than that in lawful existence at the time of the adoption of the PGDD. In addition, uses permitted by right by the prior zoning may be initiated and continued until superseded by a new use commenced pursuant to approval of a master plan for such area of use. 2. To engage in development or any land use or land disturbing activity other than that as set forth above, a master plan and development permit must be approved for the areas to be developed or engaged in land disturbing activity. A PGDD overlay is not deemed by Bartow County to constitute the commencement of activity or use that would abrogate exemptions, tax or otherwise, attendant to silviculture activities. B. Sale or Transfer within PGDD. The owner of a PGDD may sell or transfer ownership of development tracts within a PGDD in accordance with the following procedures and provisions: 1. The owner must submit and have secured approval of a concept plan for the PGDD; 2. Property covenants and restrictions must accompany the transfer of any development tract within the approved PGDD restricting the new owner to the development type and yields indicated on the approved concept plan as well as any road network, water, or sewer approach, if any, indicated on the approved concept plan; 3. The owner must submit a sworn affidavit to the county from the prospective purchaser of a development tract, wherein the purchaser waives rights to the guarantee of the installation of required improvements afforded through this Ordinance for the subdivision of land, and further acknowledges and agrees that an initial master plan and final development permit must be submitted, and approved, prior to commencement of any development on the tract; 4. The developer must submit a plat suitable for certification by zoning administrator authorizing the developer to record such plat with the clerk of court, including submissions in digital format and subsequently record such plat prior to the sale or transfer of any development tract or phase; and 5. This procedure will not be required for the sale or transfer of an individual single-family lot or group of lots intended for construction of one single-family dwelling. 7.22.8 Master Plans. A. Applicability. A master plan shall be required for all or any portion of the PGDD property to be developed that would require a land disturbance permit. The master plan, as well as any fee as may be established by the county, shall be submitted to the zoning administrator for administrative review and approval. B. Minimum requirements for master plan. The minimum requirements of the master plan include: 1. Master plan in pdf format; 2. Proposed arrangement of land uses, including land for public facilities, approximate acreage of each use area or tract, type of use and density (residential use tracts). All specified densities will be construed as maximums, with acceptance of the maximums subject to satisfaction of other provisions within the PGDD overlay ordinance; 3. The proposed name of the development and the names and addresses of the owner(s) of record, and the applicant, if different from the owner(s), with proof of authority to submit and process the application; 4. Type of land use of all parcels contiguous to the development property; 5. A map or site plan showing: i. Identify existing watercourses and drainage structures within the tract or on contiguous tracts; ii. Location of municipal limits or county lines, and district boundaries, if they traverse the tract, form part of the boundary of the tract, or are contiguous to such boundary; iii. Vicinity map or sketch showing the general relationship of the proposed development to the surrounding areas with access roads referenced to the intersection of the nearest state primary or secondary paved roads; iv. Topographic survey based on county/municipal LIDAR records of the area being applied for; v. The location, dimensions, name and description of all existing or recorded streets, alleys, reservations, easements or other public rights-of-way within the tract intersecting or contiguous with its boundaries or forming such boundaries; vi. The location, dimensions, name and description of all existing or recorded residential lots, parks, public areas, permanent structures and other sites within or contiguous with the tract; vii. The proposed location, dimensions and description of land(s) for public facilities; and viii. Proposed conceptual street system layout, vehicular and pedestrian, with the written comments of the County Engineer or designated Engineer. 6. Traffic impact analysis, if required, as set forth and a statement of need for mitigation (if any). If mitigation is required, a statement of proposed mitigation; 7. Preliminary Master Drainage Plan and Master Water and Sewer Plan with the written comments of the County's Engineer or designated Engineer; CDA:104.5 Supp. No. 17 8. Where applicable, surveyed line delineating the extent of any special district boundary on the development property limited to roadways and traffic study analysis as required. 9. Preliminary comments from affected agencies having approval or permitting authority over elements related to the proposed development, or evidence that a written request for such comments was properly submitted to the agency and a reasonable period of time has elapsed without receipt of such comments. 10. A narrative addressing: i. The proposed ownership and maintenance of streets, drainage systems, water and sewer systems, open space areas, parking areas, and other proposed amenities and improvements; and when any are to be privately owned, a description of the governance, operation and financial structure to be used to secure their maintenance management and long-term improvements; ii. Proposed phasing and time schedule if development is to be done in phases; iii. Proposed phasing and time schedule for lands to be dedicated for public facilities; iv. Proposed internal site planning standards such as typical lot sizes and widths, and setbacks and buffers aimed at addressing potential incompatibility between adjacent land uses and activities; v. Letters of capability and intent to serve community water supply or sewage disposal service from the affected agency or entity, where applicable; vi. A statement describing the character of, and rationale for, the proposed master plan; and vii. Other information or descriptions deemed reasonably appropriate by staff for review. C. Waiver of master plan minimum requirements. The zoning administrator may, in his sole discretion, accept a master plan application which does not include all of the above elements for processing and consideration upon a showing by the applicant why such information is unavailable or impractical to provide. D. Master Plan Review and Approval. The zoning administrator shall review the master plan for conformance with the concept plan. The zoning administrator may request such additional information as it may deem reasonably necessary to evaluate the master plan prior to approval. A master plan that proposes use(s) and/or densities defined by state regulation as a development of regional impact shall be reviewed as such prior to a decision by the zoning administrator on whether to approve the master plan. 1. Upon review of the proposed master plan, the zoning administrator shall approve the master plan if it meets the requirements of this section and shall deny the master plan if it does not meet the requirements of this section. 2. Any master plan reviewed and approved shall not be recordable with the clerk of court for the purpose of sale of any lots or parcels of land, and no land use or land disturbance activity, other than that in existence as of the time of the master plan approval, shall be permitted unless and until the applicant has secured the corresponding development plan permit approval. 3. Plats, surveys and other information suitable for submission in digitized format for approved master plans shall be submitted to the County in both paper and digitized format, in accordance with adopted County procedures. 4. All phases of the PGDD will be required to adhere to the latest version of the following standards at the time of development permit application submittal: i. All sections of non-zoning general development standards. ii. Environmental quality standards. iii. County fees. iv. Impact fees (if any) E. Changes to Approved Master Plans. 1. Minor Change. Changes to a previously approved master plan may be approved by the zoning administrator without requiring a full master plan application submittal for the following minor changes: i. the location of roads or widths of streets or rights-of-way within the Master Plan; ii. the allocation of housing density within the master plan so long as the overall approved density of the master plan is not increased; and iii. the proposed build-out and phasing schedule. 2. Major Change. Proposed changes to a previously approved master plan may be approved by the zoning administrator only upon the filing of a master plan major-change application for the following. i. re-designation of land uses within a development area or phase, so long as uses are consistent with the Concept Plan; ii. increases in building heights, or decreases in setbacks, and buffers indicated on the master plan; iii. major changes in the location of roads or widths of streets or rights-of-way within the Master Plan; iv. major changes in the allocation of housing density within the master plan, and any proposed increase in density of the master plan; and/or v. lot sizes and dimensions 7.22.9 Permitted Uses. Subject to the concept plan's locational delineation of use type and sub-use type, uses permitted in the A-1, RE-1, R-1, R-2, R-3, O/I, C-N, C-1, I-1, M-1, BPD, and PUD districts by right are permitted by right in the PGDD overlay district. Uses CDA:104.7 Supp. No. 17 permitted by right in other zoning districts, or by conditional use permit, where not expressly designated on the approved concept plan, shall be reviewed and approved or denied consistently with the process for conditional use permit approval. 7.22.10 Notice of applications to the zoning administrator under section 7.22.8 shall be provided in the same manner as variances under Section 14.5 of this zoning code. In addition, the zoning administrator shall post notice on the County's website and also establish a list of interested parties who shall be notified of any application by email at least 30 days prior to the decision. Any interested party may request in writing with the zoning administrator to be placed on such list. The emailed notice shall include the application filed and give notice of any hearing or anticipated date of decision, and how comments on the application may be submitted by interested parties. 7.22.11 Appeals. Any decision of the zoning administrator under section 7.22.8 may be appealed directly to the Commissioner by filing a request for appeal with the zoning administrator within 30 days of the date of the zoning administrator's decision. The appeal shall be processed in the same manner as other administrative appeals, except that the matter will go directly to the Commissioner. (Ord. of 3-8-2023, § I; Ord. of 1-8-2025(2), § I) ARTICLE VIII. AREA, YARD, HEIGHT AND BUFFER REQUIREMENTS (Ord. of 7-21-2021(4)) Sec. 8.1 Area, yard and height requirements. 8.1.1 Table. The following table summarizes area, yard and height requirements as stated in each individual zoning district in Article VII. In the event of a conflict, the requirements stated in Article VII shall control. All units in feet unless otherwise indicated. See the applicable zoning district regulations for further information. See Sec. 8.2 for transitional buffer requirements between dissimilar zoning districts. Notes: "Width at street R/W" refers to the width of the lot at the street right-of-way line; i.e., the frontage of the lot. Two values are given, one for lots on existing County roads, and one for lots in newly created developments or subdivisions. Cul-de-sacs are special, see footnote 1 to the table. "Front setback from R/W" means the front setback is measured from the right-of-way line, not the street or back of curb. District Area Width at Street R/W (existing road/new devt) Front setback (from property line) Side setback Rear setback Max building height2 A-1 2 acres 150/1001 40 10 25 50 RE-1 3 acres7 150/1001 40 10 25 50 RE-2 3 acres7 150/1001 40 10 25 50 R-1 15,000 sqft3,7 150/751 258 10 258 50 R-2 15,000 sqft3,7 150/Sec. 7.5.2 25 10 25 50 District Area Width at Street R/W (existing road/new devt) Front setback (from property line) Side setback Rear setback Max building height2 R-3 15,000 sqft3 1001 25 10 25 60 R-4 15,000 sqft3,7 150/1001 258 10 258 50 R-6 10 acres9 Sec. 7.8 256 106 256 50 O/I 26,000 sqft 100 40 20 20 50 C-N 26,000 sqft 100 40 20 20 50 C-1 26,000 sqft 100 40 20 20 75 I-1 1 acre5 100 40 20 20 75 I-2 1 acre5 100 40 20 20 75 M-1 100 acres 200 150 50 50 75 PUD NA9 50 25 10 25 50 BPD 1 acre 501 40 15 20 75 R-7 3 acres 200 25 10 25 60 R-8 3 acres (7,000 sqft lots) 501 20 10 20 50 Footnotes for Table 8.1.1: 1 Except on cul-de-sac lots; on such lots, the minimum width of frontage at the street right-of-way line is 50 feet in A-1, RE-1 and RE-2, 25 feet in R-2, R-3 and R-4; and 25 feet in R-1, R-8, and Business Park District. Buildings on cul-de-sac lots must meet setbacks. 2 Specific height requirements apply to signs, see Article XI. Special signage requirements apply to the Business Park District, see Sec. 7.18.8. The height limitations do not apply to structures such as unoccupied and inaccessible architectural features on commercial or institutional buildings (e.g., church spires, church belfries, cupolas and domes on commercial buildings), monuments, silos (in the A-1 district), government-owned observation towers, water towers, chimneys, smokestacks (in industrial districts), conveyors (in industrial districts), flag poles, masts, aerials, and similar structures, except that none of the above shall, within a three (3) mile radius of the Cartersville-Bartow County Airport, exceed a height above the "clear zone" required for a safe approach to said airport as set forth by the Federal Aviation Administration. Furthermore, any said structure containing a sign shall be subject to the height requirements of Article XI. 3 If the lots use sewer for waste disposal; if sewer is not available, the minimum shall be 26,000 square feet or as specified by the health department, whichever is greater. 4 When abutting a different district, a side & rear yard shall be provided as stated. When abutting an area zoned the same as the subject property, no side or rear yard shall be required, except that minimum fire code requirements shall in all cases be met. 5 If no transitional buffers (i.e., buffers between differing zoning districts) required. If transitional buffers (see Sec. 8.2) are required, the minimum lot size shall be an amount sufficient to accommodate all required buffers, plus one acre in Business Park, I-1 or I-2 properties, or plus 15,000 sq. ft. in C-1, C-N, and O/I parcels. CDA:104.9 Supp. No. 17 6 Setbacks apply to district in general; setbacks and yard areas for individual lots in R-6 governed by Section 7.8. 7 In Conservation Subdivisions (See Sec. 7.16), minimum lot size is 50% of the existing minimum lot size: R-1, R-2, and R-4 reduce to 7,500 sq. ft; RE-1 and RE-2 reduce to 1.5 acres. However, if sewer is not used, the minimum lot size is either 50% of the existing minimum, or the minimum amount required by the health department, whichever is greater. 8 In Conservation Subdivisions (Sec. 7.16), for "R" districts, the minimum front setback is reduced to 15 feet, the minimum rear setback is reduced to 20 feet, and the minimum width at the building line is reduced to 50 feet. 9 Minimum size for development; minimum lot size governed by Sec. 7.8 and 7.15 respectively. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § XXVII) Sec. 8.2. Required buffers. 8.2.1 Buffers. A buffer area shall be defined as that portion of a lot set aside for separation or screening purposes, pursuant to the applicable provisions of this Ordinance, to separate different use districts and or uses on one property from uses on another property of the same use district or a different use district. Transitional buffers are buffers required between dissimilar zoning districts. 8.2.2 Buffer requirements. Mandatory buffer widths are listed under each individual zoning district. 8.2.3 Special Agricultural Protection Buffer. In order to protect existing agricultural uses from encroachment by new development, any new residential development seeking rezoning next to an existing agricultural business or commercial farm must propose an appropriate buffer for portions of the residential development that adjoin the agricultural business or commercial farm. This provision is intended to apply to farms of at least 20 acres that are run for commercial purposes, such as chicken breeding operations with large chicken houses, cattle farms, row crops, sod farms and similar commercial operations that have business licenses, are licensed by the Department of Agriculture if applicable, and generate more than $10,000 revenue from farm operations; this is not intended to apply to hobby farms or property with a few horses or chickens. Due to the variety of circumstances, the nature of the proposed buffer shall be determined by the zoning administrator prior to the Planning Commission hearing the rezoning application. The Planning Commission can make different recommendations from what is proposed by the staff and/or the developer. As in any rezoning, the Commissioner is empowered to impose whatever buffer and other zoning conditions are appropriate in the discretion of the Commissioner to ameliorate negative impacts on the neighbors. 8.2.4 Special exemptions. The following special exceptions apply to buffers and control over general buffer provisions: (A) When property zoned C-1, C-N or O/I is separated by a county or state road or federal highway from residentially-zoned property, no buffer shall be required. (B) When property zoned I-1 is separated from property in a different zoning classification by a state or federal highway right-of-way of at least 100 feet in width, the required buffer for the I-1 property along such right-of-way shall be reduced to fifty (50) feet. (C) When property zoned C-1 or C-N is located adjacent to property zoned A-1 and containing a non-residential use, no buffer shall be required. 8.2.5 Buffer standards. Buffers should be sufficient to provide some screening or protection to neighboring uses, where required by the use and nature of the surrounding CDA:105 Supp. No. 14 area. The particular standards for a specific buffer depend on the nature of the proposed use, and the character of the surrounding area. The Zoning Administrator shall make a determination as to the type of buffer required, following the procedure of Sec. 8.2.6. (A) The Zoning Administrator shall have the following discretionary options regarding the standards imposed on a particular buffer, and may impose some or all of the following requirements: i. Buffers may be required to be left in their natural state with the preexisting vegetation intact. ii. Buffers may be required to be planted or vegetated with fast growing trees and shrubs (for some or all of the width of the required buffer), in species and quantities to be determined by the Zoning Administrator. iii. Open field buffers may be left as open space. iv. Roads, right-of-way and streams may be counted towards buffer requirements, or may be left as open space. v. The Zoning Administrator may, in addition or in lieu of other requirements, require a fence be erected. (B) Buffers shall be undisturbed, except that buffer areas may be used for sewer and other utility easements, detention ponds, access roads and fences may be erected in buffer areas. (C) No structures may be erected in buffers, and buffers areas shall be graded or disturbed only when absolutely necessary. Buffers shall be crossed in such a fashion to minimize incursion into the buffer (i.e., close to perpendicularly). Where possible, buffers shall be restored to an opaque standard after being crossed, and BMPs, as required by the Bartow County Development Regulations (and Soil Erosion and Sedimentation Control Ordinance), shall be followed at all times. (D) If a fence is required by the Zoning Administrator, it shall be eight (8) feet high, wooden, stone or masonry, and shall be opaque. (E) The Zoning Administrator shall have the authority to administratively vary all requirements in this section. (F) The Zoning Administrator's determination may be appealed to the Board of Appeals. See Article XIV. 8.2.6 Procedure. In the event a development is one that requires buffers, the developer shall inform the Zoning Administrator of the proposed use, and provide information about the size of the operation, dimensions of the building(s), the planned hours of operation, security lighting and other lighting issues, anticipated traffic flow of customers, suppliers and deliveries, and any other information as required by the Zoning Administrator. The Zoning Administrator shall review the surrounding area and the uses and zoning of surrounding property. The Zoning Administrator shall then determine the appropriate buffering standards under Sec. 8.2.5, considering the following criteria: (A) The nature of the use, and all the information provided about the use and its potential nuisance impact on the neighboring and surrounding properties; (B) The existing and adjacent uses that may already impose similar negative impacts on adjoining property; (C) The existing dissimilar uses of surrounding property and the current zoning of the surrounding property; (D) The location of any nearby residences; and (E) The existence of any streams, roads or other rights-of-way, the natural terrain and the existing topography, that may provide buffering. 8.2.7 County property that is adjacent to municipal property shall have a buffer requirement for the common border equal to the buffer that would be required for the most similar or closest equivalent County zoning district, based on the underlying use, setback, and density criteria of the districts. This determination shall be made by the Zoning Administrator comparing the ordinances. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § XI) Sec. 8.3. Reduction of buffers. 8.3.1 Policy. Buffers are designed to protect adjacent properties from negative impacts of incompatible uses. Agreement by a current owner to reduce an adjacent buffer may create problems when future owners attempt different uses of the property. Therefore, permission to reduce buffers should be given only after careful review, and determination that no other property will be negatively impacted or lose any buffer protection. In addition, the reduction shall be recorded as a public record so that future purchasers are aware of the reduction. 8.3.2 Procedure. Any adjacent property owner may request a buffer reduction (i.e., allowing an adjacent property owner to reduce the buffer protecting the applicant's property) by filing a request on forms provided by the zoning administrator. Reduction in any amount, down to zero feet, may be requested. 8.3.3 Restrictions. No buffer reduction may result in the buffer zone being reduced to less than the required minimum distance for any portion of any property not participating in the request (i.e., a buffer could not be reduced for the full width of a property if an adjacent property would not have a full buffer from all points on the adjoining corner). The property burdened by the buffer cannot be the applicant to reduce its own buffer. This section cannot be used to reduce a buffer imposed by a zoning condition. 8.3.4 Requirements. (A) The properties involved must be adjacent to each other. CDA:107 Supp. No. 14 (B) All the then-current owners of the property desiring that the buffer be reduced (i.e. the property giving up the protection of buffer) must sign said request and have the signature(s) notarized. (C) The applicant must provide the following along with the application: 1. The deed of the property making application. 2. One copy of a plat, drawn to scale, showing north arrow, land lot and district, the dimensions, acreage and location of the tract and showing the reduced or eliminated buffer area and buffers remaining to protect adjacent property not participating in the request. The plat should show the zoning of all the involved and adjoining parcels. The plat must be prepared by an architect, engineer, landscape architect or land surveyor whose state registration is current and valid. The preparer's seal shall be affixed to the plat. If a new plat is prepared, the plat must be prepared in compliance with the county's GPS Control Network and Digital Enterprise GIS system (consult the engineering department for details). An additional electronic copy of the plat shall be submitted by the applicant, owner or developer to the engineering department. 3. The names and addresses of the owners of the land and their agents, if any. 4. The names and addresses of all adjoining property owners. In determining the adjoining property owners, streams and road, street or railroad rights-of-way shall be disregarded. 8.3.5 Approval. (A) Once filed with the zoning administrator, the zoning administrator shall have 15 days to approve or deny the request or determine that the request is incomplete. (B) In determining whether to approve the application, the zoning administrator shall consider 1) whether the application satisfies the requirements of this section, 2) whether it protects the adjoining property owners who are not participating in the request; 3) whether the reduction of the buffer would create a nuisance; 4) whether the reduction of the buffer serves the public health, safety and welfare; and 5) whether the reduction of the buffer serves the purposes of this zoning ordinance. Failure to satisfy any of these conditions will justify a denial. If the reduction of the buffer can be reasonably anticipated to create future nuisances, it may be denied. (C) A denial may be appealed to the board of zoning appeals under subsection 14.4.1. 8.3.6 Effect on property upon which buffer is waived or reduced. (A) Once the adjoining property owner waives or reduces the buffer, it is waived or reduced hereafter unless both current adjoining property owners file a request for the buffer to be reinstated. (B) If the request is approved, the applicant shall submit a proposed agreement, covenant or other instrument to the zoning administrator, for review and approval prior to filing in the office of the clerk of superior court, Bartow County, Georgia, in the deed records. The plat shall also be filed and referenced therein reflecting the buffer reduction. The purpose of this instrument shall be to inform all subsequent purchasers of the reduction of the buffer. The buffer reduction shall not take effect until said instrument has been reviewed and approved, and it and the plat have been recorded. (C) A buffer that has been reduced or eliminated through this section may be increased or re-imposed by future zoning decision or zoning condition imposed by the commissioner, especially if conditions change. The reduction granted in this section by the zoning administrator shall not abridge the zoning power of the county's governing authority. However, any future zoning decision or zoning condition should respect the vested rights of the property owners. (Ord. of 7-21-2021(4)) ARTICLE IX. DETAILED REGULATIONS FOR SPECIFIC USES Sec. 9.1. Institutional-residential uses. 9.1.1 Institutional-Residential Uses are generally uses that provide residential living space or dwelling units for persons in an institutional or group setting, whether for day care, 24-hour care or unassisted living, specifically defined as one of the following types: Adult day care: A use that provides care, assistance with personal services and/or supervision for adults for more than four (4) hours and less than twenty-four (24) hours per day. Uses providing medical services or assistance with medical or rehabilitative treatment are not included. Assisted-living facility: A residential facility that provides an array of coordinated supportive personal and health care services, available 24 hours per day, to residents who need any of these services. Such facility does not include nursing homes, or group homes for persons with a disability. Child day care: A use that provides care, assistance with personal services and/or supervision for children for more than four (4) hours and less than twenty-four (24) hours per day. Uses providing medical services or assistance with medical or rehabilitative treatment are not included. Disability: A physical or mental impairment that substantially limits one or more of a person's major life activities, including a person having a record of such an impairment or being regarded as having such an impairment. A "disability" does not include current illegal use of, or addiction to, any federally controlled substance, as defined in Section 102 of the Controlled Substances Act, 21 U.S.C. 802 or successor law. "Major life activities" means functions such as caring for one's self, performing manual tasks, walking, seeing, hearing, speaking, breathing, learning and working. "Has a record of such an impairment" means has a history of, or has been classified as having, a mental or physical impairment that substantially limits one or more major life activities. CDA:109 Supp. No. 14 Group home for persons with a disability: A residence in which three or more persons with a disability reside and which is licensed by the State Department of Human Resources as a personal care home under Title 31. Group home (non-disability): Any dwelling, whether operated for profit or not, which undertakes through its ownership or management to provide or arrange for the provision of housing, food service and one or more personal services for two or more adults who are not related to the owner by blood or marriage and falls under the jurisdiction of the Georgia Department of Human Resources, but that does not meet the definition of "Group Home for Persons with a Disability." Home for the aged: A use comprising building or buildings providing dwelling units for persons over a certain minimum age, where no domiciliary care, nursing care, or other assistance is provided. Homeless shelter: A facility either (1) operated, licensed or contracted by a governmental entity, or (2) operated by a charitable, non-profit organization, which, for no compensation provides temporary lodging, meals, and counseling to individuals and groups such as the homeless, pregnant teenagers, victims of domestic violence, neglected children, and runaways. Temporary lodging is typically less than thirty (30) days. See Sec. 9.1.2. Hospice: A use, other than uses fitting the description of Nursing Homes or Group Home for Persons with a Disability, in which domiciliary care is provided with support and supervisory personnel that provide room and board, personal care and rehabilitation services in a family environment for persons not meeting the definition of handicapped under the Fair Housing Act, 42 U.S.C. § 3601 et seq. Kindergarten: A day program or part-day program for teaching of children between four and six years old, that serves as an introduction to school. Nursery school: The same as a "Child Day Care." Nursing home: A long-term residential facility for elderly, or otherwise ill persons which may include some or all of the following: individual dwelling units, living and sleeping rooms, a common dining room, skilled nursing care, recreational facilities, and transportation for social and medical purposes. Such facility does not include an Assisted Living Facility, a Hospice, a Group Home for Persons with a Disability, or a Group Home, Non-Disability. Protective housing facility: The same as a "Homeless Shelter." Rehabilitation facility: A facility (residential or non-residential) to provide rehabilitation, treatment, or counseling services. Without limitation, such services may include rehabilitation, treatment, counseling, or assessment and evaluation services related to delinquent behavior, alcohol and drug abuse, sex offenders, sexual abuse, mental health, behavioral dysfunctions, emotional or psychological problems, or other similar facilities. See Sec. 9.1.2. Rest home: The same as a "Home for the Aged." Retirement home: The same as a "Home for the Aged." Shelter care facility: The same as a "Homeless Shelter." 9.1.2 Buffer Requirements. Where permitted, any rehabilitation facility or homeless shelter shall be located on property of at least three acres. When adjacent to residentiallyzoned or used property, a twenty-five (25) foot landscaped buffer shall be provided. Any such facility shall be surrounded by an opaque wood fence at least six feet high along all property lines with adjacent commercial uses or that abut other zoning districts, or along the inner or outer boundary of any required buffer. No fence shall be erected along the road frontage. 9.1.3 Permitted zoning districts for specific uses. The following uses are permitted in the following districts. This section is provided for convenience only, and attempts to summarize the provisions in the various districts in Article VII. No new rights are granted by this section. To the extent there is a conflict between this section and the provisions of Article VII, Article VII shall control. (A) Group Homes for Persons with Disabilities, for six or fewer residents (not including resident staff), are permitted in A-1, RE-1, RE-2, R-1, R-2, R-3 and R-4. Please refer to the individual district regulations for more specific requirements, including generally the requirements that they be licensed by and in compliance with the applicable regulations of the Georgia Department of Human Resources; and that: i. There is no external signage or other evidence of the use of the dwelling as other than a residential dwelling unit; ii. The dwelling shall maintain its residential appearance; iii. There is adequate off-street parking for resident, staff and visitors' parking such that, except for planned special events, there are no vehicles parked on the street or road right-of-way; and iv. Visitation hours are restricted so as to not create undue traffic congestion. (B) Group Homes for Persons with Disabilities (no size limit), are permitted in C-1. (C) Group Homes (Non-Disability) are permitted in C-1. (D) In home child day cares and kindergartens, for six or fewer children, are permitted in A-1, RE-1, RE-2, R-1, R-2, R-3, and R-4 districts. Please refer to the individual district regulations for more specific requirements, including generally the requirements that they shall have at least thirty-five (35) square feet of indoor space provided for each child and at least 100 square feet of play area per child in the outdoor play area which shall be enclosed by a fence having a minimum height of six (6) feet and provided further that, prior to the application, the applicant shall show proof of registration and licensing as required by the Georgia Department of Human Resources (E) Child day cares, adult day cares and kindergartens are permitted in the C-N district, in accordance with the requirements of that district. (F) In C-1, all of the following are permitted, in accordance with the requirements of that district: Hospitals, group homes for persons with a disability, group homes (nonAPPENDIX A—ZONING § 9.1 CDA:111 Supp. No. 14 disability), clinics, nursing homes, assisted living facilities, adult day cares, child day cares, kindergartens, retirement homes, shelter care facilities, rehabilitation and treatment facilities, residential treatment centers, hospices, and related facilities. (Ord. of 7-21-2021(4)) Sec. 9.2. Golf course communities/country club community. Golf Course Communities or Country Club Communities are authorized as conditional uses in the A-1 District, when located on lands comprising one hundred (100) acres or more, provided that at USGA Regulation 18-hole golf course is constructed first or simultaneously with the housing. Residential development in a golf course community or country club community shall comply with the requirements of the R-1 district as to lot size, width, setback and yard requirements. A 50-foot buffer, meeting the standards of Sec. 8.2.5, is required for all external boundaries of the property, to screen all neighbors. The applicant must present a plat for the proposed community, and the conditional rezoning, if granted, shall be conditioned to the plat. The Golf Course must remain perpetually a golf course for the community, and cannot be developed into a subdivision at a future date. The covenants on the community shall reflect this requirement. (Ord. of 7-21-2021(4)) Sec. 9.3. Resort communities. 9.3.1 A resort community is a large, mixed-use development centered around a golf course and hotel, and may contain residential development, recreational activities and related amenities and limited commercial development. To qualify as a resort community, a project must contain the following: 1) a minimum of three hundred (300) acres; 2) a minimum of one (1) regulation 18-hole golf course (i.e., contains a variety of par three, par four and par five holes, and is at least 5,200 yards in length and at least par 66); 3) fifty room hotel, or greater (not a motel; internal access rooms only); and 4) At least twenty-five percent (25%) of the gross acreage of the resort community must be non-impervious areas, which may include, but are not limited to, open space, golf courses and related areas, undisturbed natural areas, water courses, flood plains, wetlands, landscaped areas, parks, buffers and historic preservation areas. All external boundaries of the resort community must contain a fifty (50) foot buffer, meeting the requirements of Sec. 8.2.5. 9.3.2 The following are permitted uses in a resort community: (A) Residential development at a maximum total allowable density of two (2) dwelling units per gross acre, including all single-family and multi-family development. Residential development is not permissible until the 18-hole golf course is completed and operating. Single-family development and multi-family development is permissible, but manufactured houses are prohibited. For residential single-family development, minimum lot size shall be 5,000 square feet, minimum lot width shall be 40 feet measured at front street right-of-way line. For multi-family development, including apartments and fee simple townhouses, the provisions of Sec. 7.6. shall apply. Residential dwelling units may be made available for rent to guests on a temporary basis on such terms as are customarily available in a resort community. (B) Hotels, which may be located in one or more buildings, containing at least 50 internal access rooms, and which may also contain suites/cabanas with external access, conference centers, reception and catering facilities for social and business-related purposes, restaurants and associated buildings, and offices necessary for the management and operation of the resort, including, without limitation, marketing, rental property management and sales offices. (C) Mixed-use residential-commercial (not to exceed ten percent (10%) of all allowable residential units). (D) Places of worship. (E) Wellness clinics and spas offering limited medical care, including therapy and diagnostic testing in conjunction with rest and rejuvenation, but not hospitals, nursing homes or any facility requiring a certificate of need from the State of Georgia. Only guests at the resort or residents may use such facilities. (F) In addition to the commercial and retail areas located in golf or other recreational shops, clubhouses or hotels within the resort community, limited retail and commercial uses, in compliance with the provisions of Sec. 7.10, and designed to serve the guests and residents of the resort community. Commercial uses shall not exceed three percent (3%) of the gross acreage of the resort community. (G) Recreational, sporting, and cultural facilities and amenities, both indoor and outdoor, including, without limitation, clubhouses and pro shops, golf courses, tennis courts, playgrounds and children's activity facilities, swimming pools and water activity facilities, spas, fitness centers, stables, sports fields and courts, skeet and target-shooting ranges, cultural and educational centers and performance stages. (H) All legal conforming buildings and all legal conforming uses of land and/or buildings existing within a resort community on August 6, 2003. Any building or use of any land and/or building within a resort community which is the subject of a conditional use permit on August 6, 2003 and which has not otherwise been established as a permitted use pursuant to this Section shall continue as a conditional use in accordance with the provisions of such conditional use permit. 9.3.3 The following development standards shall apply in a resort community so as to promote a higher standard of quality, preservation and community aesthetics. (A) All single-family lots less than one-half acre shall be planned in a village-style or similar cluster-type arrangement such as to promote preservation of natural areas or development of previous spaces such as landscaped areas, parks, amenities and open spaces. To accommodate such planning, front and rear setbacks may be reduced to a minimum of five feet, and the minimum side setback may be reduced as low as zero feet on one side so long as aggregate of the two side setbacks shall be at least 10 feet. CDA:113 Supp. No. 14 (B) Roads within a resort community shall be either a Neighborhood Collector street, a Neighborhood Street, or an Alley. i. A "Neighborhood Collector street" shall be defined as a through road that has more than four Neighborhood Streets intersecting it. A Neighborhood Collector street shall have a fifty (50) foot right-of-way inclusive of twenty (20) feet of pavement and two feet of rolled curb gutter on each side, and a maximum slope of eighteen percent (18%). ii. A "Neighborhood Street" shall be defined as any road within a resort community that is not a Neighborhood Collector street. A Neighborhood Street shall have a forty (40) foot right-of-way inclusive of eighteen (18) feet of pavement and the option of having no gutter where conditions permit or two feet of rolled curb gutter on each side, and a maximum slope of eighteen percent (18%). iii. "Alleys," as said term is used in this Section, means minor ways on which such lots will abut and which are intended to provide means of vehicular access to and parking for the dwelling unit on such lot, minimum width fourteen (14) feet. (C) Rural ditch sections may be used for stormwater conveyance. (D) Walking trails of either pervious or impervious surface shall be developed to provide pedestrian access throughout the community. Such trails may include the use of walkways and bridges where necessary to promote pedestrian enjoyment of watercourse areas. Wherever such trails are not practical, sidewalks of at least four (4) feet in width shall be provided on one side of the street. (E) Street right-of-ways may be used for the planting, placement or location of trees, monumentation, signage, lighting, roundabouts or rotaries, and architectural elements, such as benches, gazebos or fountains. (F) All utility lines shall be installed underground. (G) Access to a resort community may be by way of a secured, controlled or gated entry, provided that entry into the resort community is available at all times for emergency vehicles, utility providers, municipal services, such as trash collection, meter reading and fire and law enforcement personnel. (H) All roads, alleys, drainage, stormwater management facilities, and rights-of-way within a resort community shall be private, and shall be maintained by the resort community. All deeds for conveyance of property within a resort community shall contain the following statement in bold capital letters: THE GRANTEE HEREIN ACKNOWLEDGES THAT ALL STREETS, DRAINAGE FACILITIES, AND STORMWATER MANAGEMENT FACILITIES IN THE RESORT COMMUNITY ARE PRIVATE, AND ARE NEITHER MAINTAINED NOR OWNED BY BARTOW COUNTY; MAINTENANCE AND UPKEEP ARE THE RESPONSIBILITY OF THE RESORT COMMUNITY." All plats and site plans for development shall contain similar language. (I) Dwelling units within a resort community may front on a park, golf course or other open space with primary pedestrian and vehicular access provided to such dwelling unit from an alley. (J) Off-street parking and off-street loading requirements of the Ordinance shall not apply to resort communities, except that all parking for residents, guests and for any special events held on such communities must be located on resort community property and not on County rights-of-way or other private property. (Ord. of 7-21-2021(4)) Sec. 9.4. Landfills and solid waste disposal facilities. 9.4.1 Permitted landfills/disposal facilities are classified into three types: 1) inert waste landfills; 2) construction and demolition (C & D) landfills; and 3) municipal solid waste (MSW) landfills. Each type of landfill is defined below. Inert waste landfills are permitted as of right in the M-1 district, and permitted as conditional uses in the I-1 and I-2 districts. C&D and MSW landfills are only permitted as conditional uses in the I-2 district. Landfills that are not permitted in any district include hazardous waste landfills. In the event a solid waste disposal facility is sought to be constructed that is not covered specifically herein, the Zoning Administrator shall make a determination as to what use it is most closely related to and apply the relevant regulations. This Section incorporates by reference the definitions contained in O.C.G.A. § 12-8-22 and DNR Rule 391-3-4-.01. Types of Disposal Facilities: (A) "Inert Waste Landfill" means a disposal facility accepting only wastes that will not or are not likely to cause production of leachate of environmental concern. Such wastes are limited to earth and earth-like products, concrete, cured asphalt, rocks, bricks, yard trimmings, stumps, limbs, and leaves. This definition excludes industrial and demolition waste not specifically listed above. (B) "Construction/Demolition Waste Landfill" means a disposal facility accepting only waste building materials and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures. Such waste include, but are not limited to, wood, bricks, metal, concrete, wall board, paper, cardboard, inert waste landfill material, and other nonputrescible wastes which have a low potential for groundwater contamination. (C) "Municipal Solid Waste Landfill" means any facility or location where the final deposition of any amount of municipal solid waste occurs, whether or not mixed with CDA:115 Supp. No. 16 or including commercial or industrial solid waste, and includes, but is not limited to, municipal solid waste landfills and municipal solid waste thermal treatment technology facilities. "Municipal solid waste" means any solid waste derived from households, including garbage, trash, and sanitary waste in septic tanks and means solid waste from single-family and multifamily residences, hotels and motels, bunkhouses, campgrounds, picnic grounds, and day use recreation areas. The term includes yard trimmings, construction or demolition waste, and commercial solid waste but does not include solid waste from mining, agricultural, or silvicultural operations or industrial processes or operations. (D) "Hazardous Waste Disposal Facility." Hazardous waste landfills are prohibited, and hazardous waste (which means any solid waste which has been defined as hazardous waste in regulations promulgated by the Board of Natural Resources, Chapter 391-3-11.) may not be disposed of in inert, construction/demolition, or solid waste landfills. 9.4.2 Regulations Applying to C & D and MSW Landfills/Disposal Facilities. (A) Any C & D or MSW landfill/disposal facility must be located on a minimum of 250 acres. The landfill "cell" area (that is, holding actual waste) may not exceed 30% of the total acreage, with landfill operations areas (i.e., "cells" plus scales, offices, storage, other buildings, etc.) not exceeding 40%. No landfill cell may exceed 60 feet in height from the original grade, when fully filled, covered and vegetated. No more than 10 acres of the property can be active landfill cell at any one time. (B) All landfill cell areas and landfill operations areas must be surrounded by a chain link fence at least six (6) feet high and topped with anti-climbing devices. The boundary of the landfill property (either inside or outside the vegetated buffer) must be surrounded by a wooden privacy fence, at least eight (8) feet high. (C) All C & D and MSW landfills must be surrounded by a buffer at least one thousand (1,000) feet thick, located on the landfill property. The buffer must be sufficiently vegetated to be completely opaque and prevent viewing of any landfill cell at all times of the year. At least 500 feet of the buffer must be vegetated, even if plantings are required; the planting plan shall be approved by the Zoning Administrator. The buffer must also comply with all requirements and specifications of Sec. 8.2.5 which do not conflict with these requirements. (D) No landfill cell may be located within two thousand (2,000) feet of any residential dwelling (so used at the time of application for the permit). No landfill cell may be located within two-hundred fifty (250) feet of a wetland, groundwater recharge area, lake or other body of water, floodplain, stream or river. 9.4.3 Regulations applying to inert landfills. (A) Any inert landfill must be located on a minimum of 50 acres. The landfill "cell" area (actual waste disposal area) may not approach within 100 feet of the property line. No landfill cell may exceed 30 feet in height above the surrounding topography, when fully filled, covered and vegetated. (B) All landfill cell areas and landfill operations areas must be surrounded by a chain link fence at least six (6) feet high and topped with anti-climbing devices. (C) All inert landfills must be surrounded by a vegetated buffer at least one hundred (100) feet thick, located on the landfill property. The buffer must be sufficiently vegetated to be completely opaque and prevent viewing of any landfill cell at all times of the year. If plantings are required to meet this standard, the planting plan shall be approved by the Zoning Administrator. The buffer must also comply with all requirements and specifications of Sec. 8.2.5 which do not conflict with these requirements. 9.4.4 Regulations applying to all landfills and disposal facilities. (A) All lights at landfill/disposal facilities shall be downward firing and shielded. Hours of operation of any landfill shall be no greater than 8:00 a.m. to 5:00 p.m. Monday to Friday, 8:00 a.m. to 4:00 p.m. Saturday. No operation allowed on Sunday. (B) A landfill/disposal facility shall only be permitted where all County roads used for access have been built to a standard sufficient to withstand the projected number of trips per day at maximum weight for the vehicles expected. If a landfill is proposed adjacent to County roads that are not sufficient, according to the County Engineer, to withstand the loads, or were not designed for such loads, the landfill owner may pay to bring such roads up to standard from the entrance(s) of the landfill to the nearest County or State road of sufficient strength; or the landfill shall be denied. Truck traffic shall be restricted to roads of sufficient strength. 9.4.5 An application for a conditional use permit for a landfill shall also submit the following information, in addition to other conditional use requirements: (A) A topographic site plan showing the proposed landfill, all surrounding uses in a -mile radius, the zoning on all adjacent parcels, the location of the landfill cells, all buffers and fences, highlighting land sloping 25% or more, and showing such other information as may be required by the Zoning Administrator. (B) Proximity to airports, sailports, private airstrips and similar uses within ten miles shall be indicated. Proximity to national historic sites within five miles shall be indicated. (C) A report from a geologist of the soil conditions on the landfill, discussing the topography (especially any steep slopes), the substrata, and any geologic hazards or relevant conditions on the property, as well as giving an opinion as to the property's suitability for the type of landfill proposed. (D) A site plan prepared by a qualified engineer depicting all floodplains, streams and rivers, watershed areas, wetlands, and groundwater recharge areas within mile of the subject property (including on the subject property), as well as showing the location of the landfill and the landfill cells to those features, showing all buffers and setbacks. The plan shall also depict all water wells within mile of the landfill cells. CDA:117 Supp. No. 16 (E) A plan showing access, ingress and egress, including mechanisms to keep dust down and dirt off county roads. All access roads to landfill cells must be paved, and a truck cleaning station must be used at any exit. An estimate of daily truck traffic shall be provided, and entrances shall be located to minimize traffic hazards, with accelerate/ decelerate lanes provided. (F) A traffic plan showing ingress and egress, number of trips per day, vehicle type, and maximum weight of vehicles expected. (G) A determination of plan consistency obtained under the Bartow County Joint Solid Waste Management Plan showing that the landfill is consistent with the JSWMP. This should be obtained prior to seeking a conditional use permit. 9.4.6 In addition to the conditional use criteria in Article XVI, in considering a conditional use application for a landfill, the following additional criteria shall also apply: (A) Is the property and general area suitable for a landfill, considering geography, wetlands, streams and rivers, watersheds, groundwater recharge areas, adjacent uses and zoning, airports, national historic sites, jurisdictional boundaries and similar criteria? (B) Do the property and site plan meet all the buffer requirements relating to landfills? (C) Will the landfill have any negative impacts on the adjacent properties? (D) Are access, ingress and egress adequately provided for, considering the volume of traffic expected? (E) Is the use consistent with the Future Land Use Map, the Bartow County Comprehensive Plan, the pattern of development in the area, and the Bartow County Joint Solid Waste Management Plan? (Ord. of 7-21-2021(4); Ord. of 12-6-2023(4), § V) Sec. 9.5. Recovered materials processing facilities and solid waste handling facilities. 9.5.1 Recovered Materials Processing Facilities and Solid Waste Handling Facilities (referred to in this section as "Facility") are permitted as a conditional use in the I-2 Heavy Industrial District. 9.5.2 "Recovered Materials Processing Facility" means a facility engaged solely in the storage, processing, and resale or reuse of recovered materials; also known as a "recycling facility." Such definition shall not include a solid waste handling facility; provided, however, any solid waste generated by such facility shall be subject to all applicable laws and regulations relating to such solid waste. "Solid Waste Handling Facility" means any facility (including a composting facility), the primary purpose of which is the storage, collection, transportation, treatment, utilization, processing, or disposal, or any combination thereof, of solid waste. "Recovered Materials" means those materials which have known use, reuse, or recycling potential; can be feasibly used, reused or recycled; and have been diverted or removed from the solid waste stream for sale, use, reuse, or recycling, whether or not requiring subsequent separation and processing. "Recycling" means any process by which materials which would otherwise become solid waste are collected, separated, or processed and reused or returned to use in the form of raw materials or products. 9.5.3 Any Facility must be located on a minimum of 50 acres. The active waste handling area (that is, an area for handling, storing, collecting, processing, treating, etc. waste) must be in an enclosed structure. 9.5.4 The boundary of the Facility property (either inside or outside the vegetated buffer) must be surrounded by a wooden privacy fence, at least eight (8) feet high. Any active waste handling area must be surrounded by a chain-link fence at least six (6) feet high and topped with anti-climbing devices. 9.5.5 The standard I-2 buffers shall apply, although the Planning Commission and County Commissioner can increase buffers through zoning conditions if it is deemed appropriate. At least 100 feet of the buffer must be vegetated, even if plantings are required; the planting plan shall be approved by the Zoning Administrator. The buffer must also comply with all requirements and specifications of Sec. 8.2.5 which do not conflict with these requirements. 9.5.6 No waste handling area (as measured from the chain link fence boundary) may be located within one thousand (1,000) feet of any residential dwelling (so used at the time of the application). Waste handling areas may not be located within two-hundred fifty (250) feet of a wetland, groundwater recharge area, lake or other body of water, floodplain, stream or river. 9.5.7 All lights at a Facility shall be downward firing and shielded. Hours of operation of any Facility shall be no greater than 8:00 a.m. to 5:00 p.m. Monday to Friday, 8:00 a.m. to 4:00 p.m. Saturday. No operation allowed on Sunday. 9.5.8 The requirements of Sec. 9.4.7 regarding roads (replacing the word "landfill" as used in that section with the word "Facility") shall apply. 9.5.9 An application for a conditional use permit for a Facility shall also submit the information required in Sec. 9.4.8 (replacing the word "landfill" as used in that section with the word "Facility") in addition to other conditional use requirements. 9.5.10 In addition to the conditional use criteria in Article XVI, in considering a conditional use application for a Facility, the following additional criteria shall also apply: (A) Is the property and general area suitable for a Facility, considering geography, wetlands, streams and rivers, watersheds, groundwater recharge areas, adjacent uses and zoning, airports, national historic sites, jurisdictional boundaries and similar criteria? (B) Do the property and site plan meet all the buffer requirements relating to Facilities? (C) Will the Facility have any negative impacts on the adjacent properties? CDA:119 Supp. No. 16 (D) Are access, ingress and egress adequately provided for, considering the volume of traffic expected? (E) Is the use consistent with the Future Land Use Map, the Bartow County Comprehensive Plan, the pattern of development in the area, and the applicable solid waste management plan? (Ord. of 7-21-2021(4); Ord. of 12-6-2023(4), §§ VI—VIII) Sec. 9.6. Junk yards; salvage yards; scrap yards. Any junk yard (including salvage yards and scrap yards), whether preexisting or new, shall maintain a 25-foot buffer that complies with the standards of Sec. 8.2.5 of this Ordinance. Any stacking of inoperable, crushed or otherwise damaged vehicles shall only be permitted in a junk yard. Impound lots, towing services and similar businesses shall be permitted to retain junk, inoperative or abandoned vehicles for a maximum of 120 days before disposal; long term or permanent storage of such vehicles shall only be permitted in a junk yard. (Ord. of 7-21-2021(4)) Sec. 9.7. Cemeteries and family plots. 9.7.1 Family plots. Family plots are burial grounds restricted to members of the family owning the land. Family plots are permitted in the A-1 district, not to exceed twelve grave sites, and only on lots of five acres or greater. Family plots must be located in the rear yard of said property, at least twenty-five (25) feet from the side and rear lot line. Such plots must comply with all other state regulations regarding burial. 9.7.2 Cemeteries. Cemeteries are burial grounds, generally where multiple burial plots are sold or provided for burial of persons beyond the immediate family. Cemeteries are permitted as conditional accessory uses to churches, and are permitted in the A-1 district as a conditional use. All cemeteries must be located on at least five acres, and shall have a twenty-five (25) foot vegetative buffer where adjacent to any residentially-zoned or used property. 9.7.3 Marking and boundaries. All family plots and cemeteries must be marked on plats and surveys of property, and if not clearly ascertainable, the boundaries must be marked by fencing or other monuments or markers. All abandoned or historic cemeteries must be maintained by the property owner. (Ord. of 7-21-2021(4)) Sec. 9.8. Special event permit for firearms-related events. A special event permit shall be required for any event featuring the use or firing of firearms, such as shooting exhibitions, historical reenactments, target shooting matches, gun shoots, shooting festivals and similar events, unless taking place at an existing and lawfully-permitted firing range. The applicant shall apply to the Zoning Administrator at least 14 days prior to the event for the permit, providing such information as is required by the Zoning Administrator to make a determination. Any such event shall be permitted only on lots of at least 100 acres, with all firing to take place at least 1000 feet from the property line, and only between the hours of 8:00 a.m. and 5:00 p.m. The site must be adequate to provide sufficient parking for the event. The permit shall be denied if the event cannot meet these criteria, or if in the discretion of the Zoning Administrator, it would create a traffic hazard, safety hazard, or public nuisance. A denial may be appealed to the Commissioner of Bartow County. Permits shall be limited to one day. The Zoning Administrator shall notify the Bartow County Sheriff's Office and Bureau of Alcohol, Tobacco and Firearms regarding the event. Organized hunting events such as dove shoots or quail hunting events are exempt from this requirement, but any such event featuring more than 25 participants must notify the Zoning Administrator at least five days in advance. (Ord. of 7-21-2021(4)) ARTICLE X. HOUSING REGULATIONS Sec. 10.1. Individual detached single-family dwellings. 10.1.1 These provisions shall apply evenly to all individual single-family detached dwellings, including conventional, industrialized and manufactured homes. 10.1.2 Any single-family dwelling shall contain not less than 1,200 square feet of heated living space, and shall comply with the applicable standards of the zoning district. The county building code ordinance and the county building inspections department should be consulted for other applicable regulations and codes. An existing structure may not include an addition to fulfill the minimum square footage. 10.1.3 Any dwelling which is damaged beyond repair by fire or natural or manmade disaster shall be removed and disposed of within a time period not to exceed 60 days after said damage occurred. An extension of this time may be approved by the zoning administrator. 10.1.4 Any single-family dwelling shall have a minimum roof pitch of 5:12. Minimum roof pitch does not apply to architectural features such as porches, bay windows, etc. 10.1.5 Any single-family dwelling shall have porches or landings on at least two sides, within a minimum size of 5 feet by 5 feet. (Ord. of 7-21-2021(4)) Sec. 10.2. Additional dwelling requirements. Any lot zoned A-1 that is greater than 10 acres and has at least 100 feet of contiguous public road frontage is allowed to have an additional conventional single-family home. (Ord. of 9-3-2025, § IX) CDA:121 Supp. No. 18 Sec. 10.3. Manufactured houses. Any dwelling that is classified as a manufactured house by the definitions stated in this Ordinance shall be subject to the following provisions of this Ordinance: 10.3.1 Decal. A location decal application shall be required to be filed for a manufactured house in the office of the Tax Commissioner annually for each manufactured house that is henceforth located on an individual lot, in a manufactured house park, or subdivision in Bartow County. 10.3.2 Permanent placement. Any manufacture home used as a single-family dwelling shall be permanently affixed to the ground. 10.3.3 Use for Storage Prohibited. Manufactured house units (or mobile homes) may not be used for storage buildings. Manufactured houses may only be placed in compliance with the terms of this Ordinance and used as dwelling units. 10.3.4 Improper Placement. t is not permitted to place or store a manufactured house on a residential lot without compliance with this Ordinance and without first obtaining an installation permit from the Building Official. Manufactured houses may not be placed or erected in the front yard of a dwelling, or in the public right-of-way, or in any setback or buffer area. An administrative variance to these provisions may be granted by the Zoning Administrator in hardship situations, but in no case for occupancy. 10.3.5 See the Bartow Building Code Ordinance (the Building Code) for additional regulations regarding installation of manufactured homes where permitted. (Ord. of 7-21-2021(4)) Sec. 10.4. Replacement of existing residential structure; building permit. When replacing an existing residential structure—whether conventional, industrialized, or manufactured—with a new residential structure, a building permit for the new structure may be issued prior to the demolition or removal of the existing structure, provided that the subject property is one acre or larger in size. The existing residential structure must be fully removed prior to the final erosion control inspection. All building permits issued pursuant to this provision shall be subject to the time limitations set forth in Section 18-168; must be completed within 12 months from the date of permit issuance. (Ord. of 9-3-2025, § X) ARTICLE XI. SIGN ORDINANCE Sec. 11.1. General provisions and definitions. 11.1.1 No sign shall be placed or maintained within the unincorporated area of Bartow County except in conformity with this Sign Ordinance. 11.1.2 Notwithstanding any other restrictions in this Sign Ordinance, any sign, display or device allowed under this Ordinance may contain any commercial or non-commercial message, or any political or non-political message; except that such messages cannot depict obscenity, as defined by O.C.G.A. § 16-12-80, nor can they depict sexual conduct or sexually explicit nudity, as defined in O.C.G.A. § 36-60-3, nor advertise any activity illegal under the laws of Georgia or the United States. 11.1.3 Definitions. As used in this section, the following words have the following meanings. The general definitions and interpretative rules of the zoning ordinance shall also be used. To the extent those general rules or definitions conflict with these specific definitions, these definitions shall control. Entrance sign: A sign erected at the entrance to a development or subdivision. May only be single sided. Ground sign: A sign that is anchored to the ground and is wholly independent of a building for support. Freestanding signs are included in this definition, as are signs on poles, frames, or other mounting structures other than buildings. CDA:122.1 Supp. No. 18 Planned center: A single office, commercial, or industrial property that is designed or intended for occupancy by two or more principal businesses that are separately owned and have no corporate relationship (e.g., strip shopping mall, office complex, industrial park, etc.). Sign: Any display of words, shapes or images designed to convey a message to the viewer, located on the exterior of any dwelling, building or structure, or located anywhere on a lot upon a dedicated supporting structure or device, including poles, banners, windows and similar devices. Sign face: The actual message-carrying portion of the sign that can be used to display content, including any area that can display or does display words, pictures or other communicative elements of the sign, including the background color. Sign structure: This includes all the elements of the sign, including its supporting structure, base, lights and every portion of the sign. Wall sign: A sign that is fastened directly to or is placed or painted directly upon the exterior wall of a building, with the sign face parallel to the wall, and extending from the surface of the wall no more than 24 inches. A sign that is attached at an angle to the wall may extend outward no more than five (5) feet, and requires an administrative variance from the Zoning Administrator. (Ord. of 7-21-2021(4)) Sec. 11.2. Procedures. 11.2.1 Permits. A. Sign review. Prior to issuance of a building permit, sign review approval is needed from the zoning administrator. Zoning review and compliance with this ordinance does not constitute full approval of a sign. Approval from other departments or agencies may be required for a sign to be lawful. (See paragraphs C and D, below.) B. Information required. The permit application shall be on forms provided by the community development department, and shall provide the following information, as well as any additional information required by the zoning administrator: i. The name and address of the property owner and sign owner, if different; ii. The address of the sign, and description of the parcel upon which the sign is located; iii. The zoning district of the property containing the sign; iv. Site plan showing the location of the sign on the lot, including setbacks and distances to property lines and rights-of-way; v. Elevation drawing showing the height and dimensions of sign face, and height of sign structure; CDA:123 Supp. No. 17 vi. Square foot area per sign face and the aggregate square foot area if there is more than one sign face; and vii. The application must be signed by either the property owner or sign owner. C. Building permits and electrical permits. Signs using electrical wiring and connections (i.e., illuminated signs) may require a building permit and electrical permit. The county building official should be contacted regarding such signs. However, issuance of a building permit should not be considered the only approval necessary to erect a sign; approvals from other departments or state agencies may be required. (See paragraph D, below.) D. Other permits or approvals. Other county ordinances (e.g., the county development regulations) or state laws and regulations (e.g., MUTCD, DOT regs.) may be applicable to a sign. A party seeking to erect a sign should consult with the state department of transportation (if on state road), and the county engineering department prior to construction of a new sign to ensure that all applicable regulations are observed. E. Time for sign permitting. Prior to the erection or installation of any permanent sign, the sign owner or property owner is required to obtain the applicable permit regarding the sign. 11.2.2 Enforcement. The County reserves the right to take legal action to remove signs erected in violation of this Ordinance. Failure to obtain the applicable permit in a timely fashion shall be a violation of this Ordinance. (Ord. of 7-21-2021(4); Ord. of 11-13-2024(2), § II) Sec. 11.3. Permitted signs by zoning district. 11.3.1 If not otherwise stated, any sign not specifically permitted in a zoning district as provided under this section shall be prohibited. These regulations apply to signs located on any lot or development. See Section 11.1.3 for definitions in addition to general definitions of Article III. A double-sided (double-faced) sign is counted as one sign, but each face counts towards the maximum area permitted. Height is measured from grade to the highest portion of the sign structure. 11.3.2 Signs permitted in A-1, RE-1, RE-2, R-1, R-2, R-3, R-4, R-6, R-7, and R-8 Zoning Districts. (A) Ground Signs: Up to two double-faced signs per lot. No single sign face may exceed 16 square feet. Total maximum area for all sign faces is 32 square feet (e.g., two 16 sf sign faces, or four 8 sf faces, etc.). Height is limited to 5 feet. (B) Window Signs: One per dwelling, max 8 square feet area. (C) Wall Signs: Not permitted. (D) Entrance Signs: Two per subdivision development, maximum area of each sign is 32 square feet. Entrance signs may only be single-sided, unless only one is erected, in which case it can be double-sided. Entrance signs are only permitted at the entrance to a subdivision development. Entrance signs must be setback from the right-of-way a distance of ten (10) feet for safety reasons and cannot block traffic sight lines. Maximum height is 6 feet. 11.3.3 Signs permitted in the C-1, C-N and O/I Zoning Districts, for individual uses. (A) Ground Signs: One double-faced sign per lot. No sign face may exceed 100 square feet. Total maximum sign face area is 200 square feet. If the lot contains a principal building of over 10,000 square feet, no sign face may exceed 200 square feet and total maximum sign face area is 400 square feet. If the principal building exceeds 100,000 square feet, no sign face may exceed 300 square feet and total maximum sign face area is 600 square feet. Maximum height for all ground signs is 25 feet in C-N, O/I, and C-1. (B) Window Signs: Total signage not to exceed 25% of the area of windows facing road frontage. (C) Wall Signs: Up to four signs per lot. Total wall signage not to exceed 200 square feet on all walls (e.g., four 50 sf signs or one 200 sf sign). If the lot contains a principal building of over 10,000 square feet, the total amount of permissible wall signage increases to 250 square feet. If the lot contains a principal building of over 100,000 square feet, the total amount increases to 300 square feet. No single wall sign may exceed 250 square feet. (D) Entrance Signs: Not permitted. 11.3.4 Signs permitted in O/I, C-1 or C-N Zoning Districts, for Planned Centers. (A) Ground Signs: One double-faced sign of up to 200 square feet per face for the entire planned center. Total maximum sign face area is 400 square feet. If the development contains over 50,000 total square feet, no sign face may exceed 300 square feet. Total maximum sign face area is 600 square feet. Maximum height for all ground signs is 25 feet in C-N, O/I, and C-1. (B) Window Signs: Total signage not to exceed 25% of the area of windows facing road frontage. (C) Wall signs: Four signs per business. Total area of all signs is not to exceed 10% of the gross floor area of each business. No single wall sign shall exceed 250 square feet. (D) Entrance Signs: Two per planned center, maximum area of each sign is 50 square feet. Entrance signs may only be single-sided, unless only one is erected, in which case it can be double-sided. Entrance signs are only permitted at the entrance to the planned center. Entrance signs must be setback from the right-of-way a distance of ten (10) feet for safety reasons and cannot block traffic sight lines. Maximum height is 10 feet. CDA:125 Supp. No. 17 11.3.5 Signs permitted in the M-1, I-1, and I-2 Zoning Districts, for individual uses. (A) Ground Signs: One double-faced sign of up to 200 square feet per face; maximum total area is 400 square feet. Maximum height is 25 feet. (B) Window Signs: Total signage not to exceed 25% of the area of windows facing road frontage. (C) Wall Signs: Total signage not to exceed 200 square feet on all walls. If the lot contains a principal building of over 50,000 square feet, the total amount increases to 300 square feet. No single wall sign may exceed 200 square feet. (D) Entrance Signs: Not permitted. 11.3.6 Signs permitted in I-1 and I-2 Zoning Districts, for Planned Centers. (A) Ground Signs: One double-faced sign of up to 200 square feet per face for the entire planned center. Total maximum sign face area is 400 square feet. Maximum height is 25 feet. (B) Window Signs: Total signage per business not to exceed 25% of the area of windows facing road frontage. (C) Wall Signs: Total area of all signs is not to exceed 10% of the gross floor area. No more than four signs per business are permitted and no single wall sign shall exceed 250 square feet. (D) Entrance Signs: Two per planned center, maximum area of each sign is 50 square feet. Entrance signs may only be single-sided, unless only one is erected, in which case it can be double-sided. Entrance signs are only permitted at the entrance to the planned center. Entrance signs must be setback from the right-of-way a distance of ten (10) feet for safety reasons and cannot block traffic sight lines. Maximum height is 10 feet. 11.3.7 Signs permitted in the PUD Zoning District and PGDD Overlay District. Within the residential portion of any property in the PUD zoning district or PGDD overlay district, the provisions of Section 11.3.2 apply. Within the commercial portion of any property in the PUD zoning district or PGDD overlay district, the provisions of Sections 11.3.3 and 11.3.4 apply with the following exception: any proposed freestanding sign (whether ground or entrance sign) must be monument-style brick or masonry with maximum height of fifteen (15) feet. Within the industrial portion of any property in the PUD zoning district or PGDD overlay district, the provisions of Sections 11.3.5 and 11.3.6 apply. 11.3.8 Signs permitted in the BPD Zoning District. 1. Ground Signs: One monument-style brick or masonry sign for each individual building in the park. Maximum area of each sign is 60 square feet. Maximum height is 6 feet. The sign may be double-sided. One additional monument-style brick or masonry sign of no more than 60 square feet and six feet in height shall be permitted if the building has more than one access point. 2. Window Signs: Total signage per business not to exceed 25% of the area of windows facing road frontage. 3. Wall Signs: Total area of all signs is not to exceed 10% of the gross floor area of the building. No more than four wall signs per business are permitted and no single wall sign shall exceed 250 square feet. 4. Entrance Signs: Two monument-style brick or masonry entrance signs at each entrance to the business park. Maximum area of each sign is 100 square feet. Entrance signs may only be single-sided, unless only one is erected at an entrance, in which case it can be double-sided. Entrance signs only permitted at the entrance to the planned center. Entrance signs must be setback from the right-of-way a distance equal to their height plus one foot for safety reasons and cannot block traffic sight lines. Maximum height is 10 feet. (Ord. of 7-21-2021(4); Ord. of 11-13-2024(2), § II) Sec. 11.4. Signs which do not require a permit. The following signs are permitted in any zoning district. 11.4.1 Class 1 Temporary Signs. Class 1 temporary signs are signs that may be erected after 1:00 p.m. on any Friday and must be taken down by 8:00 p.m. the following Sunday. (A) Class 1 temporary signs may not exceed three feet in height and four square feet per side, and shall not be more than two-sided. (B) Class 1 temporary signs must not be placed within five feet of the curb or pavement or within the public right-of-way. (C) Class 1 temporary signs erected in violation of this Ordinance may constitute a safety hazard and are subject to being removed without notice and being destroyed. Additionally, if such signs are erected unlawfully, or in improper areas, or beyond the permissible time frame, they are subject to being taken down and destroyed by the County without notice. (D) Class 1 temporary signs must meet the construction standards of Section 11.6. 11.4.2 Class 2 Temporary Signs. Class 2 temporary signs are permitted to be erected during any election cycle. (A) Class 2 temporary signs shall not exceed five feet in height and thirty-two (32) square feet per side, and shall not be more than two-sided. (B) The election cycle is the time period starting 150 days prior to any primary, special election, general election, or run-off, and ending 20 days after the primary, special election, general election, or runoff, is held. Election cycles may overlap. For example, the election cycle for a primary will typically overlap with the election cycle for the general election; if a run-off is then scheduled, it would be extended further. CDA:127 Supp. No. 17 "Election," as used herein, shall refer to Federal elections, Georgia statewide elections, Bartow County elections, or municipal elections for any city in Bartow County. (C) Nothing in this section affects the regular sign ordinance provisions; these are extra signs allowed during the election cycle. Any message can be placed on Class 2 temporary signs. There is no limit on the amount of Class 2 temporary signs that can be erected on one lot, as long as they do not pose a traffic hazard nor create a nuisance, and comply with all other provisions of this ordinance (e.g., type, location, construction, etc.). (D) Signs erected in the beds of pick-ups are permitted during an election cycle, of not more than thirty-two (32) square feet. (E) Class 2 temporary signs erected or left erected before or after the election cycle, as defined above, constitute a public nuisance and may be removed by the County and disposed of without notice. (F) Class 2 temporary signs must meet the construction standards of Section 11.6. 11.4.3 Very Small Signs. Very Small Signs are signs of no more than one (1) square foot, and no more than four (4) feet in height. Any number of such signs are permitted in addition to all other signs permitted under this ordinance. However, the area of all such sign faces on a single lot, parcel, residence, development, business or property may not exceed 10 square feet, and such signs may not aggregate to form one message. 11.4.4 Internal Signs. Any sign not visible from the outside of a structure or to passing members of the public is not restricted or regulated by this Article. 11.4.5 Construction Signs. Construction signs are signs that are erected or installed on private property of a site under construction, typically after a land disturbance permit and/or building permit has been issued. A maximum of three (3) such signs may be allowed per lot and each sign may be a maximum of 80 square feet per face (may be double-sided) in area. Construction signs cannot be in the public road right-of-way and cannot conflict with traffic sight visibility, utilities, and/or easements. Construction signs shall be removed prior to issuance of Certificate of Occupancy/Certificate of Completion or the installation of a permanent sign on the lot, whichever occurs first. (Ord. of 7-21-2021(4); Ord. of 11-13-2024(2), § II) Sec. 11.5. Regulations for signs. 11.5.1 Location and setback. (A) The property owner must give permission for all sign placement on the owner's property. Signs are not permitted in county road right-of-way without permission of the County Road Department Director. (B) All signs must comply with all side and rear setbacks of the underlying zoning ordinance. (C) Signs can be located in front setback areas, but all signs and sign structures must be setback at least ten (10) feet from the road right-of-way. No portion of a sign or sign structure erected on private property shall encroach on or overhang the public CDA:128.1 Supp. No. 17 right-of-way or any other person's property. Furthermore, for safety reasons, no sign erected on private property shall be located closer than 10 feet from the back of the curb of a public roadway, or if there is no curb, from the edge of the pavement. See also Sec. 11.6.3 and 11.6.4. The Engineering Department and Road Department must review and approve placement of signs located within 20 feet of the right-ofway for compliance with the Manual on Uniform Traffic Control Devices, latest edition (MUTCD) and applicable County ordinances. (D) No sign on private property can be erected closer than 50 feet to the right-of-way of Interstate Highway 75. (E) Distances are measured from the closest portion of the sign (whether that be the base, sign face, or the sign structure) to the right-of-way, curb or pavement. 11.5.2 Height Limits. Height limitations in this Article control over the general height limitations of this Ordinance, and apply to any structure that contains a sign. For example, a church spire or radio antenna with a sign would be subject to the height limitations of this Article, rather than general height limitations. Height limitations apply to both the sign and the sign structure, whichever is the tallest. 11.5.3 Number. For the purpose of determining the number of signs, ground signs shall be equal to the number of sign structures. All other non-ground signs shall be considered to be a single display surface or display device containing elements organized, related and composed to form a unit. Where matter is displayed in random manner without organized relationship of elements, such elements shall be considered to be a single sign. 11.5.4 Illumination. (A) Ground signs cannot be internally illuminated in any residential or agricultural zoning district. All signs may be externally illuminated. External illumination of any sign in any district shall be positioned and shielded so that the light source cannot be seen directly by any passing motorists nor from adjacent dwellings or businesses. (B) Flashing, blinking or otherwise varying illumination is not permitted, except as specified below. No external or internal illumination that causes confusion with or distraction from any traffic signal or safety device shall be permitted. L.E.D. signs, LCD signs, Digital Signs, "TV" type signs, or similar signs with changing images or displaying moving pictures (collectively referred to as "Electronic Variable Message Center (EVMC) signs") are not permitted, except under the special exception in paragraph (F) below. (C) All externally illuminated signs shall utilize low wattage luminaries, mounted in fixtures designed to direct the light and eliminate light trespass, such as light shining into residences or other neighboring structures. (D) All internally illuminated signs shall utilize low wattage luminaries designed to reduce light glow. CDA:129 Supp. No. 14 (E) All signs over ten feet in height shall be internally illuminated or illuminated by external lighting fixtures located above the sign area, firing downward, and not visible to passing motorists. (F) EVMC sign exception. Limited EVMC signage (as defined in paragraph (B) above) is allowed in the C-1, C-N, I-1, I-2 and BPD district as follows. No more than 70 square feet of any ground sign face area may be used as an EVMC sign. The sign may be two-faced, with 70 square feet of EVMC sign per face. This amount is not in addition to sign face limits, but rather subtracts from the limits. Example: if a C-1 lot is permitted to have a single ground sign with 100 square feet per sign face on a double-sided sign, 70 square feet of the 100 square feet may be converted to EVMC, and the remaining 30 be kept conventional sign, for each side (provided the other requirements herein are obeyed). No more than one ground sign on any lot may contain an EVMC. (G) Electronic illumination standards. No EVMC nor other electronic sign may change message more than once per ten (10) seconds. "Motion picture" type images (multiple frames per second) are not permitted. Electronic displays shall be equipped with automatic dimming technology which adjusts the sign's illumination level based on ambient light conditions. The maximum illumination level of an electronic display shall be 0.3 foot candles above ambient light levels, to be measured as follows: at least 30 minutes past sunset, and with the electronic display either turned off, showing all black copy, or blocked, a foot candle meter will be used to record the area ambient light level. An ambient reading will be taken with the meter aimed directly at the electronic display and at the following distance: Electronic sign size Measurement distance 0—100 square feet 100 feet 101—300 square feet 150 feet To establish the illumination level, the electronic display will be turned on to show all white copy and a second reading taken. The difference between the two readings shall be the electronic sign's illumination level. In no event shall daylight illumination levels exceed 7,500 nits nor nighttime exceed 250 nits. 11.5.5 Calculation of area. The area of a sign is calculated by determining the area of the sign face, and shall be determined by the Zoning Administrator. Signs of unusual shape, design, or supporting elements may have their area calculated by calculating the area of the smallest rectangle that will completely enclose all elements of the sign face and sign structure supporting the face. Parties seeking to erect an unconventional sign should check with the Zoning Administrator for compliance issues. 11.5.6 Projecting signs. Any sign with an element that would project more than five feet outside the main body of the sign area, in any direction, requires an administrative variance from the Zoning Administrator. A sign that is attached at an angle to the wall may extend outward no more than five feet, and requires an administrative variance from the Zoning Administrator. (Ord. of 7-21-2021(4)) Sec. 11.6. Safety and construction standards. 11.6.1 Official confusion. Signs which contain or are in imitation of an official traffic sign or signal, or can be confused with an official traffic sign, are prohibited. 11.6.2 Fire safety. No sign or sign structure may be erected or maintained which obstructs any fire escape, ventilation, or door; nor shall any sign or sign structure be attached to a fire escape. 11.6.3 Corner visibility. No sign or sign structure above a height of three feet shall be maintained within 15 feet of the intersection of the right-of-way lines of two streets, or of a street intersection with a railroad right-of-way. 11.6.4 Traffic visibility and safety. No sign shall obstruct the traffic sight line, or the view of vehicles entering the roadway (i.e., the view of oncoming traffic by vehicles attempting to enter the road, or vice versa). No sign shall be erected on any traffic island. No sign shall create a traffic hazard. Sign locations shall be approved by the Road Department if a safety question is raised by the Zoning Administrator. 11.6.5 Good repair. All signs, together with all their supports, braces, guys, and anchors shall be kept in good repair. 11.6.6 Temporary sign standards. All temporary signs shall be made of waterproof material, and must be attached to an independent mounting device no more than forty (40) inches above ground level. The mounting must be secure to prevent the sign from blowing off the device. The mounting device shall bear the name and phone number of the party responsible for the device. 11.6.7 Removal of unsafe signs and safety hazards. The County may remove a sign in violation of this Ordinance, without giving notice to any party, if said sign is upon the public right-of-way or upon other public property; or said sign poses an immediate safety threat to the life or health of any members of the public. (Ord. of 7-21-2021(4)) Sec. 11.7. Prohibited signs. The following types of signs are prohibited, as stated: 11.7.1 Roof Signs (which means signs mounted above a roof or projecting above the roof-line of a structure). 11.7.2 Rotating signs. CDA:131 Supp. No. 14 11.7.3 Portable signs (which means signs which are attached to vehicles, trailers, movable structures, or attached to sign structures which are not permanently anchored into the ground, or any sign which may be transported or is designed to be transported). Such signs include, but are not limited to, printed banners or billboards attached to vehicles and trailers. Inflatable figures and objects (e.g., creatures, beer cans) fall into this category. 11.7.4 Swinging or projecting signs, unless an administrative variance is granted by the Zoning Administrator. No such sign can project more than five feet, and in no case shall this type of sign exceed ten square feet in sign area. See Sec. 11.5.6. 11.7.5 Mechanical signs, or signs with moving parts. This includes signs with mechanized or moving elements; "trivision"-type signs; signs with waiving elements, whether motorized or wind-powered; "multiple message signs" as defined in O.C.G.A. § 32-6-71; or similar moving signs. However, signs that do not move or change more than six times per day are permitted. 11.7.6 Signs with flashing or blinking lights. This includes, but is not limited to, signs of varying light intensity, and signs containing exposed neon tubing. Signs with reflective elements that sparkle in the sunlight or that contain luminous paint that glows in the dark are not allowed. 11.7.7 LED and electronic signs. This includes, but is not limited to, signs displaying moving pictures, images or animation; LED (light emitting diode) signs; LCD (liquid crystal display) signs; digital signs; "TV" type signs; EVMC (electronic variable message center) signs; signs that spell words or create images with numerous small lights or other internal illumination; and similar electronic or digital signs. A limited exception to this prohibition is permitted under section 11.5.4 above. Externally illuminated, electronically controlled, segmented sign display elements are not prohibited. Digital billboards (also known as LED billboards) shall not be permitted. Existing Digital billboards existing as of the date of this amendment (July 10, 2019) shall become nonconforming uses. 11.7.8 Courtesy benches, trash cans, and similar devices displaying signs. 11.7.9 Trailer signs (which means signs mounted on trailers, exceeding two square feet). 11.7.10 Sidewalk, A-type, sandwich or curb-type signs placed on sidewalks. (Ord. of 7-21-2021(4)) Sec. 11.8. Purposes; intent; studies considered; cases considered. 11.8.1 Purposes. It is the purpose of Bartow County in enacting Article XI to provide standards to safeguard life, public health, property and welfare by regulating the location, size, illumination, erection, maintenance and quality of materials of all signs. More specifically, signs have a powerful impact on the aesthetic environment of the community, and it is the purpose of this Ordinance to encourage an aesthetically attractive environment, allowing sufficient opportunities for communications to serve business, interest groups and the public, while complying with the Federal and State Constitutions and laws. Signs create visual clutter and therefore should be regulated in their size, location, construction and illumination. Signs can detract from the beauty of the neighborhood and lower property values. In seeking to comply with federal and state law, the County has determined the following: large signs are, as the U.S. Supreme Court has recognized, an aesthetic harm; the Georgia Supreme Court has upheld sign regulations on the basis of aesthetics and preserving the beauty of environment; and, the Eleventh Circuit has recognized portable signs are visual clutter and a potential traffic hazard. These holdings show that the County's ordinance is within the law and constitutional, which is a goal of the County. The goal of this Article is to avoid being an impermissible content-based regulation, and instead to be a permissible time, place and manner restriction. Many signs can also be a hazard and negatively impact traffic safety, by distracting drivers and blocking views of other vehicles and dangers, by making intersections more treacherous, and by making it difficult to see oncoming traffic when entering a roadway. The County finds that especially distracting to drivers are moving signs, digital signs and electronic signs that resemble televisions or computer screens. Therefore, it is also the purpose of this Ordinance to prevent those harms by regulating signs to safe locations, safe sizes, with proper and safe illumination and construction, or to prohibit signs that are too distracting. Finally, it is the belief of the County that more communication is desirable during the election cycle, so that all citizens may freely express their viewpoints during the election campaigns, and therefore the ordinance allows increased opportunities to erect signs during these periods, without limiting content or favoring content in any fashion. At all times, any sign permitted under this regulation can carry any message, political or non-political, commercial or non-commercial. 11.8.2 Intent. In adopting Article XI, it is the intent of Bartow County to: (A) balance the right of individuals to convey their messages through signs and the right of the public to be protected against the unrestricted proliferation of signs; and (B) further the objectives of the County's Future Land Use Map and sound planning principles and objectives; and (C) protect the public health, safety and welfare; and (D) reduce traffic and pedestrian hazards; and (E) maintain the historical and cultural heritage and image of the County; and (F) protect property values by minimizing the possible adverse effects and visual blight caused by signs; and (G) avoid the harmful aspects of the unrestricted proliferation of signs; and (H) promote economic development and tourism; and (I) protect private property values; and (J) ensure the fair and consistent enforcement of sign regulations. CDA:133 Supp. No. 14 11.8.3 Studies Considered. Having considered the following studies, which the Bartow County Commissioner finds to be relevant, useful and applicable to Bartow County, Georgia, the County finds that the size, location and quantity of sign structures within the County must be regulated in order to achieve the above-stated intents and purposes: University of Georgia Land Use Clinic (2003, June 26). Sign Control on Rural Corridors: Model Provisions and Guidance. Wisconsin Department of Transportation (1994, December). Milwaukee County Stadium Variable Message Sign Study: Impacts of an Advertising Variable Message Sign on Freeway Traffic. Scenic America (2007). Billboards in the Digital Age: Unsafe (and Unsightly) at Any Speed. Scenic America Issue Alert. Nasar, Jack L. and Hong, Xiaodong (1999, September). Visual Preferences in Urban Signscapes. Journal of Environment and Behavior, 31(5), 671-691. Office of Safety Research and Development, Federal Highway Administration (2001, September 11). Research Review of Potential Safety Effects of Electronic Billboards on Driver Attention and Distraction. U.S. Department of Transportation.; New York State Department of State, Division of Local Government Services (2006, January). Municipal Control of Signs. James A. Coon Local Government Technical Series. Weinstein, Alan C. A Study of Local Regulation of Outdoor Advertising in 268 U.S. Jurisdictions. Outdoor Advertising Association of America, Inc. City Club of Portland (1996, September 6). Billboard Regulation in Portland. City Club of Portland Bulletin, 78(13), 1-40. Smily, Alison and Persaud, Bhagwant, et al (2005). Traffic Safety Evaluations of Video Advertising Signs. Transportation Research Record: Journal of the Transportation Research Board, No. 1937, 105-112. Such studies, which were considered by the Commissioner prior to adoption of this provision, are part of the official record of the adoption of this Ordinance. 11.8.4 Cases Considered. In adopting these sign regulations, the Bartow County Commissioner especially recognizes the vast number of court decisions, coming from Georgia courts, the federal courts, and courts throughout the United States, which recognize that the regulation of the size, location and quantity of sign structures is a valid and lawful means of achieving the above-stated intents and purposes, and that such intents and purposes are valid and lawful governmental interests, which include the following: Granite State Outdoor Advertising, Inc. v. Cobb County, Ga., 193 Fed.Appx. 900 (C.A.11th 2006)(finding that the stated goals within a sign ordinance of protecting against traffic hazards and the adverse impact on the county's aesthetic qualities are substantial government interests); Gregory v. Clive, 2007 WL 2914515 (Ga. S.Ct. 2007)(recognizing as within a local government's police power to enact legislation governing billboards and signs, as such legislation clearly addresses the public health, safety, or general welfare of the community); H & H Operations, Inc. v. City of Peachtree City, Ga., 248 Ga. 500 (1981)(holding that, under its police power, a municipality can enact and enforce reasonable regulations governing the erection and maintenance of signs within its jurisdiction); Harnish v. Manatee County, Florida, 783 F.2d 1535 (C.A. 11th 1986)(finding that aesthetics is a substantial governmental goal which is entitled to and should be accorded weighty respect, and that the governmental entity charged with the responsibility of protecting the environment must be given discretion in determining how much protection is necessary and the best method of achieving that protection); Lamar Advertising Company v. City of Douglasville, Ga., 254 F.Supp.2d 1321 (N.D.Ga. 2003)(finding that where a sign ordinance asserts the goals of public safety, traffic safety, health, welfare and aesthetics, a municipality has shown an important or substantial governmental interest unrelated to the suppression of free speech); Metromedia, Inc. v. City of San Diego, 453 U.S. 490 (1981)(holding that the goals of traffic safety and aesthetics advanced by a municipality as justification for regulating signs is a substantial governmental interest); St. Louis Poster Advertising Co. v. City of St. Louis, 249 U.S. 269 (1919)(finding that billboards may be prohibited in the residential districts of a city in the interest of the safety, morality, health and decency of the community); Members of the City Council of the City of Los Angeles v. Taxpayers for Vincent, 466 U.S. 789 (1984)(finding that a government entity can regulate signs and billboards when necessary to advance a significant and legitimate state interest, such as the protection of the aesthetics and quality of life within its jurisdiction); City of Doraville v. Turner Communications, Corp., 236 Ga. 385 (1976)(finding that under its police power authority, a municipality can regulate the location and maintenance of outdoor advertising signs within their territorial jurisdiction); Spratlin Outdoor Media, Inc. v. City of Douglasville, 2006 WL 826077 (N.D.Ga. 2006)(upholding sign ordinance where the ordinance's height and setback restrictions were rationally related to its stated goals of promoting the health, safety, morality and general welfare of the community, promoting the orderly and beneficial development of the city, promoting adequate access to natural light and air, improving the aesthetic appearance of the city, and encouraging the most appropriate use of land and buildings in accordance with the city's comprehensive plan). Such cases, which were considered by the Commissioner prior to adoption of this provision, are part of the official record of the adoption of this Ordinance. (Ord. of 7-21-2021(4)) ARTICLE XII. TELECOMMUNICATIONS TOWERS AND ANTENNAS Sec. 12.1. Purposes. The purpose of this Article is to provide zoning classification requirements for the siting of all wireless, cellular, television and radio telecommunications towers and antennas; to encourage the location of towers in non-residential areas; to minimize the total number of towers within the community necessary to provide adequate personal wireless services to CDA:135 Supp. No. 14 residents of Bartow County; to encourage the joint use of new and existing tower sites among service providers; to locate telecommunications towers and antennas in areas where adverse impacts on the community are minimized; to encourage the design and construction of towers and antennas to minimize adverse visual impacts; and to enhance the ability of the providers of telecommunications services to deliver such services to the community effectively and efficiently. (Ord. of 7-21-2021(4)) Sec. 12.2. Definitions. For the purpose of this Article, certain terms used herein shall be defined as follows. The general definitions and interpretative rules of the zoning ordinance shall also be used. To the extent those general rules or definitions conflict with these specific definitions, these definitions shall control. Alternative tower structure: Clock towers, bell towers, church steeples, light/power poles, electric transmission towers, on premises signs, outdoor advertising signs, water storage tanks, and similar natural or man-made alternative-design mounting structures that camouflage or conceal the presence of antennas or towers. Antenna: Any exterior apparatus designed for wireless telecommunication, radio, or television communications through the sending and/or receiving of electromagnetic waves. Co-location: The placement of the antennas of two or more service providers upon a single tower or alternative tower structure. Department: The Bartow County Planning, Zoning and Development Department. FAA: The Federal Aviation Administration. FCC: The Federal Communications Commission. Geographic antenna placement area: The general vicinity within which the placement of an antenna is necessary to meet the engineering requirements of an applicant's cellular network or other broadcasting need. Height: When referring to a tower or other structure, "height" means the distance measured from ground level to the highest point on the tower structure or appurtenance. Preexisting tower and antennas: Structures as set forth in Section 12.3.4 of this Article. Scenic views: Those geographic areas containing visually significant or unique natural features, as identified in the Bartow County Comprehensive Plan. Tower: Any structure that is designed and constructed primarily for the purpose of supporting one or more antennas, including self-supporting lattice towers, guy towers, or monopole towers. The term includes radio and television transmission towers, microwave towers, common-carrier towers, cellular telecommunication towers, man-made trees (with accessory buildings/structures) and other similar structures. Visual quality: The appropriate design, arrangement and location of tower structures in relation to the built or natural environment to avoid abrupt or severe differences. (Ord. of 7-21-2021(4)) Sec. 12.3. Applicability. 12.3.1 General application. Except as otherwise provided herein, the provisions, requirements and limitations of this Article shall govern the location of all wireless telecommunication, cellular telecommunication, television, microwave or radio transmission tower or antenna installed within unincorporated Bartow County. In the event of any conflict between any other provision of the Zoning Ordinance and this Article, this Article shall control. 12.3.2 Governmental exemption. Except as otherwise specifically provided for in this Article, the provisions of this Article shall not apply to Bartow County's properties, facilities or structures. Private facilities and structures placed upon County property shall be governed by a lease agreement between the County and the provider. 12.3.3 Amateur radio; receive-only antennas. This Article shall not govern any tower, or the installation of any antenna, that is 75 feet or less in height and is owned and operated by a federally-licensed amateur radio station operator from the operator's residence, or is used exclusively as a receive-only antenna; provided, however, only one such tower or antenna per residence shall be excluded from this Article. 12.3.4 Pre-existing towers and antennas. Towers and antennas permitted and erected as of September 7, 2001 shall be deemed pre-existing, and shall not be subject to the requirements of this Article. The placement of additional antennas on any nonconforming structure shall not create a vested right for the continued use of the structures should the nonconforming use cease. If an additional antenna is co-located on a preexisting tower after September 7, 2001, the requirement of this Ordinance shall be met. (Ord. of 7-21-2021(4)) Sec. 12.4. General provisions. 12.4.1 Conditional use required. A conditional use permit shall be required for the placement of any tower or alternative tower structure, except as otherwise permitted herein. Procedures for conditional use permits sought under this Article are contained in Section 12.5. 12.4.2 Principal or accessory use. A tower and/or antenna is considered a principal use if located on any lot or parcel of land as the sole or primary structure, and is considered an accessory use if located on a lot or parcel shared with a different existing primary use or existing structures. An existing use or structure on the same lot or parcel shall not preclude the installation of an antenna or tower. For purposes of determining whether the installation of a tower or antenna complies with zoning district requirements, including but not limited to set-back, buffer and other requirements, the dimensions of the entire lot or parcel shall control, even though the antenna or tower may be located on a leased area within such lot or CDA:137 Supp. No. 14 parcel. Towers that are constructed, and antennas that are installed, in accordance with the provisions of this Article shall not be deemed to constitute the expansion of a nonconforming use of structure. 12.4.3 Co-location of antennas required. Applicants for the erection of a tower or antenna, except amateur radio operators, shall be required to co-locate upon an existing tower structure, if possible. An exception to co-location shall only be made if the applicant submits a report from an engineer demonstrating that an existing tower suitable for co-location does not exist in the geographic antenna placement area, and that no suitable alternative tower structure is available, or if the applicant submits an affidavit from an employee that while a suitable tower may exist, no space is available thereon. Co-location is permissible provided the new antenna will add no more than ten (10) feet to the height of the tower and related equipment or appurtenances. Increasing the antenna height more than 10 feet requires a conditional use permit. Co-location requires only a building permit, and the information described in Sec. 12.7.2. 12.4.4 Variances. The County may grant variances from the strict enforcement of this ordinance where it finds that a substantial justification exists, where the goals of this ordinance can be met without strict compliance with the terms of this ordinance, and where such variance will not unduly prejudice any other property. 12.4.5 Time limits. Except where delay is caused by the applicant, the County shall make a final decision on applications for a conditional use permit for a new tower within 150 days of the filing of a complete application; the County shall make a final decision on co-location requests within 90 days of the filing of a complete application. (Ord. of 7-21-2021(4)) Sec. 12.5 Conditional use permit required. 12.5.1 General. (A) A Conditional Use Permit shall be required for the construction of a tower in any zoning district. All such uses shall comply with requirements set forth in this Article and all other applicable codes and ordinances, unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means including planned or potential locations which would provide the same or similar coverage or capacity. (B) In granting a Conditional Use Permit, the County may impose conditions to the extent that it concludes such conditions are necessary to minimize adverse effects from the proposed tower on adjoining or nearby properties as set out in Section 12.5.6. 12.5.2 Application; contents; fee. All applications for Conditional Use Permits shall be submitted to the Bartow County Planning, Zoning and Development Department. Each application shall contain as a part thereof detailed plans and specifications as set forth in Section 12.7. An application for a Conditional Use Permit shall not be accepted for processing without the information required in Section 12.7. An application fee shall be charged by the Department in the amount stated in Section 12.8. 12.5.3 Independent expert review. The County may engage a licensed professional engineer as an independent expert to review any of the materials submitted by an applicant for a Conditional Use Permit and render an opinion regarding any concerns about the proposal, including but not limited to, structural integrity and the feasibility of alternative sites or co-location. Following the review of an independent expert, the County shall convey its concerns to the applicant in writing and shall allow the applicant a reasonable opportunity to address those concerns. If the applicant is unable to satisfactorily address those concerns, the applicant shall be allowed a reasonable amount of time, not to exceed thirty (30) days, following the receipt of the letter, in which to modify the application to alleviate the County's concerns or withdraw the application altogether. The expert's opinion shall be considered determinative, unless the applicant agrees to pay the expenses of submitting both opinions for a peer review, which review shall then be considered final. If the independent third-party expert supports the applicant's expert, then the Department shall pay the expenses of said third-party expert. If the independent third-party expert supports the position of the Department, then the applicant shall pay the expenses of said third-party expert. 12.5.4 Public hearing. Before taking action upon the proposed Conditional Use Permit, the County shall hold a public hearing on the matter. At least 15 days prior to the date of the public hearing, the County shall cause the following notice requirements to be instituted by the Department: (A) A sign shall be erected, in a conspicuous location, on or adjacent to the property under consideration. The sign shall state the time, place, location, and purpose of the public hearing. (B) A letter shall be sent by first class mail, with proof of mailing obtained from the post office, to all property owners of record of abutting parcels, and to all property owners of residentially-used parcels lying in whole or in part within a distance of two (2) times the height of the proposed tower as measured from its base, giving notice of the public hearing. The letter shall state the same information as required for the sign. Proof of mailing means either a "Certification of Mailing" or a "Certified Mail" receipt; a "Return Receipt" showing delivery is not required. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. The letter shall be mailed at least fifteen (15) days before the hearing. Proof of mailing shall be filed with the Zoning Administrator prior to any hearing. (C) A public notice shall be published in the newspaper in which the sheriff's advertisements appear once a week for two (2) consecutive weeks prior to the date of the hearing. (D) Subsections (B) and (C) above shall be the responsibility of, and at the expense of, the applicant. Failing to comply with the requirements shall render the application CDA:139 Supp. No. 14 out-of-order, and it shall be tabled for one month. If the application is still out-of-order at the next meeting, it shall be considered withdrawn, and the applicant shall have to wait six (6) months to reapply. 12.5.5 Considerations in approval or denial of conditional use permits. Any denial of a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence contained in a written record. The following factors may be taken into consideration in acting upon a Conditional Use Permit application under the provisions of this Article: (A) The height and setbacks of the proposed tower or antenna(s); (B) The proximity of the tower or antenna(s) to residential structures and residential district boundaries; (C) The nature of uses on adjacent and nearby properties; (D) The surrounding topography; (E) The surrounding tree coverage and foliage; (F) The design of the tower or antenna(s), with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness; (G) The proposed ingress and egress; (H) The availability of suitable existing towers or other structures for antenna colocation; (I) The impact of the proposed tower or antenna(s) upon scenic views and visual quality of the surrounding area; (J) The needs of the applicant as balanced against the detrimental effects on surrounding properties; and (K) The impact of the proposed tower or antenna(s) on adjacent and nearby properties. 12.5.6 Requirements for Issuance of Conditional Use Permit. The Conditional Use Permit may be issued by the County only upon satisfaction of the following requirements: (A) A proper application filed in accordance with the requirements of Section 12.7; (B) The application is otherwise in compliance with or otherwise is satisfactory in considering the standards contained in Section 12.5.5; (C) The applicant complies with the conditions proposed by the County for the purpose of reducing the harmful effects of the use on surrounding uses and ensuring compatibility with surrounding uses; (D) The County determines that the benefits and need for the proposed conditional use are greater than any possible depreciating effects or damages to neighboring or nearby properties; and (E) All fees, including expert fees, have been paid in full. 12.5.7 Resubmittal of conditional use application. An application for a Conditional Use Permit which has been denied shall not be resubmitted for a period of twelve (12) months and then only if the applicant can document a substantial change in need for a tower or antenna at the same location. (Ord. of 7-21-2021(4)) Sec. 12.6. General requirements for towers. 12.6.1 Setbacks and separation. The following setbacks and separation requirements shall apply to all towers. (A) Towers shall be setback a distance equal to the height of the tower from its base to any public right-of-way or occupied structure, or property line of the lot or parcel containing the tower, except when a property owner or adjoining property owner consents in writing to waive the setback and the applicant clearly demonstrates that the tower will collapse within the parent parcel. (B) Guy-wires and accessory buildings and facilities shall meet the minimum accessory use location and setback requirements. (C) In zoning districts other than I-2 and M-1, towers shall not be located closer than five hundred (500) feet from any existing tower. This requirement shall not apply to amateur radio towers. (D) Notwithstanding any other provision of this Article, no tower or antenna shall be permitted in a residential neighborhood or within the distance of the height of the tower from any residential dwelling (example would be a 300 ft tall tower that could not be closer than 300 ft from any existing residence) unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means including planned or potential locations which would provide the same or similar coverage or capacity. (E) The requirement of Section 12.6.1(D) (above) may be waived by the adjacent property owner(s). In such cases, the applicant shall submit a notarized affidavit from the adjacent owner(s), identifying the property owned, and affirming that he or she agrees that the tower can be erected at the proposed location, which shall be specifically described, including its distance from that owner's residential dwelling. The affidavit shall further specifically state that the affiant understands that he or she is waiving his or her rights under Section 12.6.1 of the Bartow County Zoning Ordinance. 12.6.2 Aesthetics. The guidelines set forth in this section shall govern the design and construction of all towers, and the installation of all antennas, governed by this Article and shall be approved by the Administrator. (A) Towers and/or antennas shall either maintain a galvanized steel or concrete finish or, subject to any applicable standards of the FAA, be painted a neutral color so as to reduce visual obtrusiveness. CDA:141 Supp. No. 16 (B) At all tower sites, the design of all buildings and related structures shall use materials, colors, textures, screening, and landscaping that will blend the tower facilities to the natural setting and building environment. Any equipment or cabinet that supports telecommunication facilities must be concealed from public view and made compatible with the architecture of the surrounding structures or placed underground. Equipment shelters or cabinets shall be screened from public view by using landscaping or materials and colors consistent with the surrounding backdrop. The shelter or cabinet must be regularly maintained. (C) For antennas installed on a structure other than a tower, the antenna and supporting electrical and mechanical ground equipment shall be of a neutral color so as to make the antenna and related equipment visually unobtrusive. (D) Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. If lighting is required, the County may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding views. The lighting shall be dimmed or changed to red lights from the sunset to sunrise. (E) No signage or other identifying markings of a commercial nature shall be permitted upon any tower or alternative tower structure within Bartow County. (F) To the extent practical, telecommunication facilities shall not be placed in a direct line of sight with historic or scenic view corridors as designated by the governing body or by any state or federal law or agency. (G) Access to the tower site shall be restricted so as to minimize visibility of the access. Where possible, existing roads shall be used. Where no roads exist, access shall follow the existing contours of the land. (H) Such other additional requirements as the Administrator shall reasonably require to minimize the visual impact of the site on the surrounding area. 12.6.3 Security Fencing/Anti-Climbing Devices. All towers and supporting equipment shall be enclosed by fencing not less than six (6) feet in height and shall also be equipped with appropriate anti-climbing devices. Fencing shall be of chain link, wood or other approved alternative. 12.6.4 Landscaping. The following requirements shall govern landscaping surrounding all towers. (A) Where adequate vegetation is not present, tower facilities shall be landscaped with a landscaped strip of plant materials which effectively screens the view of the tower compound. Landscaped strips shall be a minimum of ten (10) feet in width and located outside the fenced perimeter of the compound. (B) Existing mature tree growth and natural landforms on the site shall be preserved to the maximum extent possible. Where natural vegetation around the perimeter of the site would provide an adequate visual screen, an undisturbed buffer may be utilized. The applicant shall provide a site plan showing existing significant vegetation to be removed, and vegetation to be replanted to replace that lost. (C) Landscaping shall be maintained by the provider and shall be subject to periodic review by the Administrator to assure proper maintenance. Failure to maintain landscaping shall be deemed a violation of this Article. (D) Amateur radio towers and antennas, or receive-only antennas shall not be subject to the provision of this section unless required by the County through the Conditional use Permit process. 12.6.5 Maintenance impacts. Equipment at a transmission facility shall be automated to the greatest extent possible to reduce traffic and congestion. Where the site abuts or has access to a collector or local street, access for maintenance vehicles shall be exclusively by means of the collector or local street, utilizing existing access to the property on which such facility is to be located, where possible. 12.6.6 Review of tower and antenna erection by the airport authority. If, upon receipt of an application for the erection of any tower or alternative tower structure governed by this Article, the Department deems that the proposed structure may interfere with or affect the use of the airways of the County by the public or interfere with or affect the operation of existing or proposed airport facilities, a copy of the application shall be submitted by the Department to the Cartersville-Bartow County Airport Authority for review and recommendation. 12.6.7 Federal requirements; removal of towers. All towers must meet or exceed current standards and regulations of the FAA, the FCC, and any other agency of the federal government with the authority to regulate towers and antennas. If such standards and regulations are changed, the permittee or the lessee of the tower and antenna governed by this Article shall bring such tower and/or antenna into compliance with such revised standards and regulations within six (6) months of the effective date of such standards and regulations unless a more or less stringent compliance schedule is mandated by the controlling federal agency. Failure to bring such tower and/or antenna into compliance with such revised standards and regulations shall be deemed to be a declaration of abandonment of the tower and constitute grounds for the removal of the tower or antenna at the owner's, permittee's, or lessee's expense. Any such removal by the County shall be in the manner provided in the Bartow County Unfit Property Ordinance then in effect. 12.6.8 Building codes; safety standards; removal of towers. To ensure the structural integrity of towers, the owner, permittee or subsequent lessee of a tower or alternative tower structure shall ensure that it is maintained in compliance with standards contained in applicable Standard Building Codes and the applicable standards for towers that are published by the Electronic Industries Association, as amended from time to time. If, upon inspection, the Department concludes that a tower fails to comply with all applicable codes and standards, or constitutes a danger to persons or property, then upon receipt of written CDA:143 Supp. No. 16 notice by the owner, permittee or lessee of the tower, said party shall have fifteen (15) days to bring the tower into compliance with such standards. Failure to bring such tower into compliance within fifteen (15) days shall be deemed a declaration of abandonment of the tower and constitute grounds for removal of the tower as provided in the Bartow County Unfit Property Ordinance. Prior to the removal of any tower, the Department may consider detailed plans submitted by the owner, permittee or subsequent lessee for repair of substandard towers, and may grant a reasonable extension of the above-referenced compliance period. Abandoned towers or towers deemed unsafe may also be removed under the Bartow County Unfit Property Ordinance procedures. 12.6.9 Change of ownership notification. Upon the transfer of ownership of an interest in any tower, alternative tower structure, or lot upon which such a structure has been erected, the tower permittee shall notify the Department of the transaction in writing within 30 days. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § XXVIII) Sec. 12.7. Application procedures. 12.7.1 General application requirement. Application for a permit for any telecommunication facility shall be made to the Department by the person, company or organization that will own and operate the telecommunications facility. An application will not be considered until it is complete. The Administrator is authorized to develop application forms to assist in providing the required information and facilitate the application process. Except for a co-location information submittal under Section 12.7.2 of this Article, the following information shall be submitted when applying for any permit required by this Article and must be submitted for an application to be considered complete: (A) Site plan or plans to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses. Applicants shall submit both a paper location map and a digitized location map in a format compatible with the GIS software currently utilized by the County Information Services Department. (B) Landscaped plan to scale indicating size, spacing and type of plantings required in Section 12.6.4. (C) A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streetscapes or scenic view corridors. (D) A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic or safety impacts of such maintenance. (E) Report from a professional qualified engineer licensed in the State of Georgia, or other appropriate qualified industry expert, documenting the following: i. Tower or antenna type, height, and design; ii. Engineering, economic, and other pertinent factors governing selection of the proposed design; iii. Total anticipated capacity of the telecommunications facility, including numbers and types of antennas which can be accommodated; iv. Evidence of structural integrity of the tower or alternative tower structure; v. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris; vi. Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing non-ionizing electromagnetic radiation (NIER), and that the radio frequency levels meet the American National Standards Institute (ANSI) guidelines for public safety; vii. Certification that the proposed height of the tower is the minimum height necessary for coverage; and viii. A propagation study which documents the proposed location is the only location for the tower that reduces alleged gaps in coverage. (F) Identification of the geographic service area for the subject installation, including a map showing the proposed site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is necessary for the service network (i.e., whether such antenna or tower is needed for coverage or capacity.) (G) If the proposed site is zoned C-1, C-N, I-1, R-1 through R-6, RE-1, RE-2, or O/I, applicants must describe why an alternate site zoned A-1, I-2, or M-1 was not proposed by identifying; i. what good faith efforts and measures were taken to secure such an alternate site; ii. why such an alternate site was not technologically, legally or economically feasible and why such efforts were unsuccessful; and iii. how and why the proposed site is essential to meet service demands for the geographic service area. (H) The Department will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The Department shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site. (I) The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage and power line easements impacting the proposed tower site. CDA:145 Supp. No. 16 (J) The applicant must provide any other information which may be requested by the Department to fully evaluate and review the application and the potential impact of a proposed telecommunications facility. 12.7.2 Tower co-location information submittals. Any person or entity co-locating an antenna or antennas on a tower for which a permit has already been issued shall submit the following information only: (A) The name of the person or entity co-locating the antenna. (B) The name of the owner of the tower. (C) The tower's permit number. (D) The location of the tower. (E) The remaining structural capacity of the tower. (F) Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing non-ionizing electromagnetic radiation (NIER), and that the radio frequency levels meet the American National Standards Institute (ANSI) guidelines for public safety. (Ord. of 7-21-2021(4)) Sec. 12.8. Application and permit fees. 12.8.1 Conditional use permit. The fee for an application seeking a conditional use permit to erect a new tower on an alternative tower structure shall be $3,000.00. 12.8.2 Co-location. There shall be no fee for an application seeking a conditional use permit for co-location on an existing tower or alternative tower structure other than the building permit fee. 12.8.3 Building permit fees. In addition to the application fees set forth herein, the applicable construction and utility inspection permit fees in effect at the time of the application for the permit shall apply. (Ord. of 7-21-2021(4)) ARTICLE XIII. ENFORCEMENT Sec. 13.1. Zoning enforcement officer; appeals. The provisions of this Ordinance shall be administered and enforced by the Zoning Administrator. Requests for an administrative variance from the requirements of this Ordinance shall be heard and decided by the Zoning Administrator in accordance with the guidelines set forth in Section 14.1. Decisions of the Zoning Administrator may be appealed in accordance with the provisions of Article XIV. Requests for a variance other than an administrative variance shall be heard and decided by the Board of Appeals in accordance with the guidelines set forth in Section 14.4. (Ord. of 7-21-2021(4)) Sec. 13.2. Enforcement actions. 13.2.1 Enforcement options. Enforcement of this ordinance may be through criminal prosecution, civil fines, or other civil proceedings. Any person, firm, partnership, corporation or other legal entity who shall do anything prohibited by this Ordinance as the same exists or as it may hereafter be amended or which shall fail to do anything required by this Ordinance as the same exists or as it may hereafter be amended shall be subject to an enforcement action. The County shall also be authorized to bring actions in rem against the property itself. (A) Representatives of the County shall have the power to conduct such investigations as may reasonably be deemed necessary to assure or compel compliance with the requirements and provisions of this Ordinance, and for this purpose to enter at reasonable times upon any property for the purpose of investigation and inspection, as permitted by law. Officers and officials may seek inspection warrants or search warrants on probable cause of a violation occurring inside a structure. No warrant shall be required to investigate visible and open violations or uses. (B) No person shall obstruct, hamper or interfere with any County representative while in the process of carrying out his official duties in the enforcement of this Ordinance. 13.2.2 Persons who may be cited. Owners are ultimately responsible for the condition of their property and ensuring that their property and all activity occurring on such property are in compliance with this Ordinance. For any violation, both the owner of the property and/or the individual agent, tenant or invitee of the owner responsible for the violation may be cited, where appropriate. Agents of the owner would include, but not be limited to, developers, builders, contractors, and sub-contractors. Tenants and invitees would include, but not be limited to, any renter, leaseholder, owner of any vehicle or structure on the property, or other person conducting an activity on the property who is not a trespasser. Corporations and companies responsible for the work may be cited in lieu of or in addition to citations issued to the actual individuals on-site committing violations. In addition, the County shall also be authorized to bring actions in rem against the property itself. 13.2.3 Daily violations. Each day during which the violation or failure or refusal to comply continues shall constitute a separate violation, subjecting the offender to a new citation, or other civil or criminal proceeding. 13.2.4 Multiple violations. Each separate action, omission, or occurrence relating to any specific provision of this Ordinance shall be a separate violation, subjecting the offender to a separate citation. Multiple junk cars count as one violation, but the fee increases as shown in Section 13.3 below. CDA:147 Supp. No. 16 13.2.5 Criminal prosecution. The Zoning Administrator, or designated code enforcement personnel, or other authorized personnel, may issue criminal citations for violations of this ordinance, or violation of any stop-work order. (A) Criminal prosecutions for violation of this Ordinance shall be commenced by the completion, signing, and service of a citation by an authorized county official or zoning enforcement officer. No warning need be issued prior to a citation being issued. The original of the citation shall be personally served upon the accused, his or her authorized representative or, if a corporation, an officer of the corporation or its on-site representative or the person or persons in charge of the activity on the property; a copy shall be promptly filed with the magistrate court. A stop-work order may be issued in conjunction with a citation. (B) Each citation shall state the time and place at which the accused is to appear for trial in magistrate court, shall identify the offense with which the accused is charged, shall have an identifying number by which it shall be filed with the Court, shall indicate the identity of the accused and the date of service, and shall be signed by the deputy sheriff or other authorized officer who completes and serves it. (C) Any Defendant who fails to appear for trial shall thereafter be arrested on the warrant of the Magistrate and required to post a bond for his or her future appearance. (D) The District Attorney, County Attorney, or another attorney designated by Bartow County may act as prosecuting attorney for violations of this Ordinance. (E) Fines shall be assessed in accordance with Sec. 13.3. 13.2.6 Civil fines and proceedings. In addition to or in lieu of any other remedy, the County may seek injunctive, mandamus or other appropriate relief in superior court to enjoin or prevent a violation of any provision of this Ordinance. Such action may also seek civil fines at the mandatory rates specified in Section 13.3 for violation of this Ordinance, and may additionally seek the costs of restitution, and any other costs associated with the action to enjoin or prevent any violation of any provision of this Ordinance. The County shall be entitled to its reasonable attorney's fees and costs for bringing an action in superior court wherein any relief is granted or fine assessed. 13.2.7 Stop work orders. Upon notice from the Zoning Administrator, designated code enforcement officers, or other authorized personnel, work on any project that is being done contrary to the provisions of this Ordinance shall be immediately stopped. (A) Stop work orders shall affect all work being done on a project or development (including work done on other lots in the subdivision owned by the same violator). Stop work orders stop not only the work in violation, but all other work by contractors or sub-contractors on the same property. Only work to remedy the deficiency shall be allowed until the stop work order is lifted. (B) A stop work order shall be in writing and shall be given to the owner of the property, his authorized agent or the person or persons in charge of the activity on the property, and shall state the conditions under which work may be resumed. Where an emergency or other exigent circumstances exist, no written notice shall be required, and a verbal stop work order may be issued, with a written order to be provided within three working days. (C) Stop work orders may be issued on their own, or in conjunction with criminal citations, or civil proceedings in superior court. (D) Issuance of a stop work order may be appealed to the Board of Appeals. 13.2.8 Additional criminal penalties. Persons cited criminally are also subject to the other penalties within the jurisdiction of the magistrate court, including incarceration up to 60 days, community service, and probation. (Ord. of 7-21-2021(4)) Sec. 13.3. Fines. 13.3.1 Fine Schedule. Fines assessed under this Ordinance shall be assessed according to the following mandatory schedule, whether assessed as a civil fine in superior court, or assessed as a criminal penalty upon conviction in magistrate court. The maximum permissible fine shall be $1,000 per offense. In no event shall a fine be reduced below the mandatory minimum, as set forth below. Fines may be increased by mandatory add-ons under State law. As a deterrent to violation, second and subsequent violations by the same offender of any provision of this Ordinance, whether violations of the same or different provisions of this Ordinance as the initial violation, and whether involving the same or different property, shall increase the fine owing. However, repeated citations for the same violation on a second and subsequent days shall not count as a subsequent violation, but shall rather be assessed at the same rate as the initial violation. Note: "Per vehicle" additions relate to violations such as junk vehicles, parking violations, and similar violations, where each vehicle is in violation of the Ordinance. (A) First Violation: For the first violation of any provision of this Ordinance by any violator (whether an individual or corporation), the fine shall be as follows, unless otherwise noted: Violation of Article VI: $350 (plus $75 per vehicle, if applicable) Violation of any other Article: $300 (B) Second Violation: For the second violation of any provision of this Ordinance (whether the same or different as the first violation) by the same violator (whether an individual or corporation), the fine shall be as follows, unless otherwise noted: Violation of Article VI: $750 (plus $100 per vehicle, if applicable) Violation of any other Article: $500 CDA:149 Supp. No. 16 (C) Third and Subsequent Violations: For the third and subsequent violation of any provision of this Ordinance (whether the same or different as the prior two violations) by the same violator (whether an individual or corporation), the fine shall be as follows, unless otherwise noted. Violation of Article VI: $1,000 (plus $150 per vehicle, if applicable) Violation of any other Article: $800 (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § XXIX) Sec. 13.4. Records. The Zoning Department shall keep records of violators, whether corporate or individual, in order to determine when second or subsequent violations occur. (Ord. of 7-21-2021(4)) ARTICLE XIV. VARIANCES; BOARD OF APPEALS Sec. 14.1. Administrative adjustment. If in the judgment of the Zoning Administrator, the application of any particular numeric criteria, standard or requirement of this Ordinance causes undue hardship on the applicant, the Zoning Administrator shall be empowered to grant an administrative adjustment to adjust said requirement by up to twenty (20) percent, if in doing so, the purposes of the ordinance are not impaired, and there is not a negative impact on the surrounding uses, properties, or neighbors. In granting an administrative adjustment, the Zoning Administrator may attach such conditions as the Zoning Administrator may deem advisable so that the purpose of this Ordinance will be served, public safety and welfare secured and substantial justice done. The Zoning Administrator shall not be authorized to grant a use in a district in which the use is prohibited. An administrative adjustment shall be granted or denied in writing. Notice of the grant of an administrative adjustment shall be sent to all adjoining property owners via first class mail by the applicant. The notice shall describe the adjustment granted and state that interested parties have 15 days in which to file an appeal of the decision. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. Proof of mailing, as described in Sec. 14.5.3, shall be submitted to the Zoning Department within 10 days of grant of the adjustment. The 15 days shall be counted from the date of mailing of the notice. The purpose of the administrative adjustment is to address particular hardship situations of individual lots and parcels. The purpose is not to grant a wholesale adjustment for an entire subdivision. For any residential subdivision or development, no more than ten percent (10%) of the units can receive the same administrative adjustment. Any greater request must seek a variance under Sec. 14.4. For example, for a 150 lot R-8 subdivision, the front yard setback of no more than 15 lots can be reduced below 20 feet by administrative adjustment. Similarly in non-residential development, the administrative adjustment should be applied only when necessary for a hardship situation such as topography concerns. (Ord. of 7-21-2021(4); Ord. of 8-9-2023, § XXX) Sec. 14.2. Establishment of board of appeals. 14.2.1 The Board of Zoning Appeals, also referred to as the Board of Appeals, was established by previous version of this Ordinance, and remains authorized under this Ordinance. Existing Board members shall continue in their current terms unaffected by the adoption of this Ordinance. The Board consists of five (5) members and two (2) alternate members appointed by the County Commissioner for staggered terms of three (3) years. Each successive appointment shall be for three (3) years. 14.2.2 Members shall be paid per meeting at a rate established by the Commissioner and may be reimbursed for any expenses incurred while representing the board. Any vacancy in the membership of the board of appeals shall be filled for the unexpired term in the same manner as the initial appointment. Members shall be removable for cause by the county commissioner upon written charges and after public hearing. The board of appeals previously appointed under the authority of the prior zoning ordinance shall continue without change as if appointed under this ordinance. 14.2.3 Alternate members can only vote when there is a lack of a quorum from other members. (Ord. of 7-21-2021(4)) Sec. 14.3. Proceedings of the board of appeals. 14.3.1 The Board of Appeals shall elect a chair-person and a vice chair-person from its members who shall serve for three years or until re-elected or until their successors are elected. The Board shall appoint a secretary, who may be a county officer, an employee of the county, or a member of the Board. The Board shall adopt such rules and bylaws as they deem appropriate. The Board shall meet every other month or on such schedule as it chooses to adopt, but no less than four times per year, providing there are matters to consider. If there are no agenda items, the regularly scheduled meeting shall be cancelled. 14.3.2 Meetings of the Board shall be held at the call of the chair-person and at such other times as the Board may determine. The chair-person, or in his absence, the vice chair-person, may administer oaths to witnesses. 14.3.3 The Board shall keep minutes of its proceedings, showing the vote of each member upon each question, or if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the office of the Board and may be a public record. 14.3.4 All meetings of the Board of Appeals shall be open to the public. (Ord. of 7-21-2021(4)) Sec. 14.4. Powers and duties of the board of appeals. The Board of Appeals shall have the following powers and duties: 14.4.1 Appeals. To hear and decide appeals where it is alleged there is error in any order, requirement, decision, or determination made by the Zoning Administrator in the enforceAPPENDIX A—ZONING § 14.4 CDA:151 Supp. No. 16 ment of this Ordinance. Appeals to the Board of Appeals may be taken by any person aggrieved or by any officer, department, board, or bureau of Bartow County affected by any decision of the Zoning Administrator. Such appeal shall be taken within thirty (30) days of said decision by filing with the Zoning Administrator a written notice of appeal specifying the grounds thereof. Decisions on appeals shall be issued in writing within ten days of the appeal. 14.4.2 Variances. The Board of Appeals has the power to hear requests for variances from the provisions of this Ordinance. Variance may be granted only if the Board finds all of the following to exist: (A) That one of the following is true, through no action or fault of the property owner or predecessor: (i) the property is exceptionally narrow, shallow or unusually shaped, (ii) the property contains exceptional topographic conditions, (iii) the property contains other extraordinary or exceptional conditions, or (iv) there are existing other extraordinary or exceptional circumstances; and (B) That the strict application of the requirements of this Ordinance would result in practical difficulties to, or undue hardship upon, the owner of this property; and (C) That the requested variance relief may be granted without substantially impairing the intent and purpose of this Ordinance. Variance decisions shall be issued in writing within ten days of the hearing. 14.4.3 Conditions. In granting a variance, the Board of Appeals may attach such conditions regarding the location, character and other features of the proposed building, structure or use as it may deem advisable so that the purpose of this Ordinance will be served, public safety and welfare secured and substantial justice done. 14.4.4 Limitations on variances; improper variance requests. Variances cannot be given to totally remove a requirement or to exempt a property or applicant entirely from a requirement. If a variance is being sought that is, in the judgment of the Zoning Administrator, a request that would constitute a text amendment, then the application shall not be accepted. For example, a request to be exempted from the Etowah Valley Historic District requirements would not be the subject of a variance. The applicant shall instead be directed to file for a text amendment. Variances can only be given to alter a numeric value, such as a setback, height limit, area limit, and so forth. Furthermore, the Board of Appeals shall not be authorized to grant a density variance or a use variance to permit a use in a district in which the use is prohibited. A variance application shall not be accepted if the variance seeks something that cannot be varied, or to eliminate rather than modify a requirement or regulation. A variance application shall not be accepted if the variance is contradictory to the ordinance (such as reducing a requirement to zero or totally eliminating a requirement). A variance shall not be granted to increase the maximum area of signs as permitted in a zoning district, nor the maximum number of signs. A variance shall not be granted to approve a billboard nor to convert an existing sign to electronic signage. A variance shall not be granted to reduce the C-1 zoning district design standards for new construction. 14.4.5 Self-inflicted hardship. The Board shall not grant variances when the hardship was created by the property owner or his predecessor, and shall not grant hardship variances based on shape or topography for lots of record not existing prior to February 21, 1996. Configuring a subdivision to create lots that are difficult to build is an example of a hardship created by the property owner or processor, that do not justify a variance. 14.4.6 Place of worship. In compliance with Federal law, if the variance is requested by a place of worship or church, in connection with the exercise of religion, the Board shall additionally consider whether the regulation imposes a substantial burden on the exercise of religion, whether the regulation serves a compelling governmental interest, whether the denial is the least restrictive means to serve that interest, or whether the variance can be granted without harming that interest. 14.4.7 Group homes. If the variance is related to a Group Home for Persons with a Disability, the Board shall additionally consider what reasonable accommodations in this Ordinance can be made to provide persons with a disability equal opportunities to use and enjoy dwellings, while not abrogating the purposes of this Ordinance. Any reasonable accommodation should only relate to the disability. (Ord. of 7-21-2021(4)) Sec. 14.5. Applications, hearing and notice. 14.5.1 Applications. Applications for appeals or variances must be filed in accordance with the schedule set out by the Zoning Administrator. The contents of the application shall be determined by the Zoning Administrator. The Zoning Administrator shall forthwith transmit to the Board all documents constituting the record upon which the action appealed from was taken. Variances may be sought by filing an application on forms provided by the Zoning Administrator. Written notice of the date, time and location of the Board's hearing shall be mailed to the owner of the property that is the subject of the application at least 30 days prior to the hearing. 14.5.2 Published notice. Due notice of the public hearings pursuant to this Article shall be published in the newspaper of general circulation within the county. Notice advertising the hearing on the appeal or variance and indicating date, time, place and purpose of the public hearing shall be published at least thirty (30) days but not more than forty-five (45) days prior to the date of the hearing. The cost of the advertisement shall be borne by the applicant. The Zoning Administrator shall post, at least thirty (30) days prior to the Board of Appeals' public hearing, in a conspicuous place in the public right-of-way fronting the property or on the property for which an application has been submitted, a sign or signs containing information as to the application number, date, time and place of the public hearing. CDA:153 Supp. No. 16 14.5.3 Letters to adjacent property owners. The applicant for said appeal or variance shall also give notice of the appeal or variance and the public hearing thereon to all property owners adjoining the property for which said appeal or variance is made or sought. Said notice shall be given to each adjoining property owner by first class mail, with proof of mailing obtained from the Post Office. Proof of mailing means either a First Class "Certificate of Mailing" or a First Class "Certified Mail" receipt; a proof of delivery is not required. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. In determining the adjoining property owners, road, street or railroad rights-of-way shall be disregarded. Proof of mailing for each recipient shall be provided to the Zoning Administrator before the public hearing. Said notice must be mailed at least fifteen (15) days prior to the date of said scheduled public hearing. 14.5.4 Information in notice. The notice required herein to be published and to be served upon adjacent property owners shall contain the following information: (A) name and address of the applicant; (B) address and location of the property for which the appeal or variance is sought; (C) current zoning of the property for which the appeal or variance is sought; (D) the variance requested or the subject matter of the appeal and the reason for the requested variance or the appeal; and (E) the date, time and place of the public hearing on said requested appeal or variance. 14.5.5 Recording hearing. The Applicant may arrange for and provide a certified court reporter to transcribe the hearing before the Board of Appeals, at the expense of the Applicant. Upon appeal of the decision of the Board of Appeals, said transcript shall be made part of the record for review. Board hearings shall also be recorded by video or audio tape. (Ord. of 7-21-2021(4); Ord. of 8-10-2022(2), § I) Sec. 14.6. Stay of proceedings. An appeal stays all legal proceedings in furtherance of the action appealed from, unless the Zoning Administrator certifies to the Board of Appeals after the Notice of Appeal shall have been filed with him, that by reason of facts stated in the Certificate, a stay would in his opinion cause imminent peril to life and property. In such case, proceedings shall not be stayed otherwise than by a stay granted by the Board of Appeals or by a restraining order issued by a court of record on application, on notice to the Zoning Administrator, and for due cause shown. (Ord. of 7-21-2021(4)) Sec. 14.7. Action by the board of appeals. 14.7.1 In exercising its powers, the Board of Appeals may, in conformity with the provisions of this Ordinance, reverse or affirm, wholly or partly, or may modify the order, requirements, decision, or determination, and to that end shall have all the powers of the Zoning Administrator. 14.7.2 The concurring vote of a majority of the members present of the Board shall be necessary to reverse any order, requirement, decision or determination of the Zoning Administrator, or to decide in favor of the applicant on any matter upon which it is required to pass under this Ordinance or to affect any variation of this Ordinance. 14.7.3 On all appeals, applications and other matters brought before the Board of Appeals, said Board shall inform, in writing, all the parties involved of its decisions and the reasons therefore. Such written decision shall be prepared by the zoning staff or county attorney and signed by the secretary. (Ord. of 7-21-2021(4)) Sec. 14.8. Conduct of the board of appeals' hearing. 14.8.1 Sign up. All persons who wish to address the Board of Appeals at a hearing concerning an appeal or variance under consideration by the Board of Appeals shall first sign up on a form to be provided by the County prior to the commencement of the hearing. At least one person representing the application must be present at the hearing in order to explain the request and/or respond to questions regarding the application. if no one is present, the Board of Appeals shall be empowered to table or deny the application. 14.8.2 Matter presented; out of order applications. The Secretary of the Board of Appeals will read the proposed appeal or variance under consideration in the order determined by the Zoning Administrator. The Zoning Administrator, or his designee, shall then present the basis of the appeal or variance, along with the pertinent departmental reviews, if any, prior to receiving public input on the proposed appeal or variance. Any appeal or variance that has not complied with all notice and other requirements of this Ordinance shall be deemed out of order and shall not be considered at that hearing. It shall be postponed until the next meeting, and if it is still out of order at the next meeting, the application shall be deemed denied. 14.8.3 Speakers. The Secretary of the Board of Appeals shall call each person who has signed up to speak on the appeal or variance then before the Board of Appeals in the order in which the persons have signed up to speak, except the applicant who will always speak first. Prior to speaking, the speaker will identify himself or herself and state his/her current address. Only those persons who signed up to speak prior to the commencement of the hearing shall be entitled to speak, unless a majority of the members of the Board of Appeals present at the hearing allow the person to speak to the appeal or variance, notwithstanding the failure of the person to sign up prior to the hearing. 14.8.4 Time limits. The applicant or appellant and those in favor of the variance or appeal shall have fifteen (15) minutes to speak, total. Those opposed to the application or appeal shall have fifteen (15) minutes to speak, total. The Board may extend these times upon majority vote. Each individual speaker shall have no more than three minutes to speak, except the applicant, who can take as much of the fifteen minutes as is desired. The CDA:155 Supp. No. 16 applicant may reserve time for rebuttal. Upon vote of a majority of the Board, either side may be granted additional time in any amount the Board desires, but in such event, the other side shall be granted the same additional time. 14.8.5 Evidence, cross-examination. Each side shall have the opportunity to present evidence and witnesses which shall be entered into the record. Cross-examination of opposing witnesses shall be allowed by the Chair, but decorum shall be maintained. The Board may require the applicant and opponents to designate one person to conduct any desired cross-examination. 14.8.6 Decorum and order. Each speaker shall speak only to the merits of the proposed appeal or variance under consideration and shall address his/her remarks only to the members of the Board of Appeals. Each speaker shall refrain from personal attacks on any other speaker or the discussion of facts or opinions irrelevant to the proposed appeal under consideration. The chair may limit or refuse a speaker the right to continue, if the speaker, after first being cautioned, continues to violate this subsection. Nothing contained herein shall be construed as prohibiting the chair from conducting the hearing in an orderly and decorous manner to assure that the public hearing on the appeal or variance is conducted in a fair and orderly manner. (Ord. of 7-21-2021(4)) Sec. 14.9. Appeals to the commissioner and to superior court. 14.9.1 Appeal to commissioner. Recourse from a decision by the Board of Appeals shall be to the Commissioner of Bartow County, by filing a written notice of appeal within thirty days of the Board of Appeal's decision. The Commissioner shall have a hearing on said appeal within 60 days of completion of preparation of the record and transcript, which shall be certified to the Commissioner by the County Attorney or other designee. The Commissioner's hearing shall be noticed according to the requirements of Section 14.5, including published notice, sign, and letters to property owner and adjacent property owners. The hearing shall be open to the public, but public comment shall not be taken. At the hearing, the Commissioner shall review the evidence presented below, which shall automatically include the Zoning Ordinance, Official Zoning Map, the County's file on the application, and any other County Ordinance relevant to the dispute. No new evidence not presented to the Board of Appeals may be presented on an appeal to the Commissioner; only argument of counsel (or unrepresented parties) is permitted. The Commissioner may issue a decision at the hearing or may issue a written decision within ten days. Appeals can be taken by the applicant, any opponent, or the County staff. 14.9.2 Appeals to superior court. Parties seeking an appeal from a final decision of the Commissioner reviewing the Board of Zoning Appeals' decision shall file an appeal with the Superior Court of Bartow County in the manner provided by law. (Ord. of 7-21-2021(4); Ord. of 8-10-2022(2), § II) ARTICLE XV. AMENDMENTS Sec. 15.1. Initiation of amendments. 15.1.1 Text amendment. An application to amend the text of this Ordinance may be initiated by the Planning Commission or be submitted to the Planning Commission by the Commissioner, zoning staff, or by any person having an interest in the county. 15.1.2 Map amendment. An application to amend the Future Land Use Map or the official zoning maps may be initiated by the Planning Commission or be submitted to the Planning Commission by the Commissioner or zoning staff, property owner or agent of the owner. Unless initiated by the Commissioner, the Planning Commission or zoning staff, all applications to amend the Future Land Use Map or official zoning maps must be submitted by an owner of the affected property or an authorized agent of an owner, following procedures set forth in Sections 15.2 and 15.3. If submitted by an agent of the owner, such authorization shall be notarized and attached to the application. If a property has multiple owners, only one owner need file the application, and it will be assumed that the other owners consent; however, if any owner does not consent to the application (or otherwise objects), the rezoning application will not go forward. If owned by a corporation or other entity, the application must be filed by a person with proper corporate or entity authority, and the zoning administrator may require documentation to support a claim of authority. In the event there are separate owners of the surface rights and the mineral rights, both will be treated as an independent owner and be allowed to file for rezoning, regardless if the other party objects. 15.1.3 Resubmission after Denial. In the event an application for an amendment to the zoning map or Future Land Use Map has been denied, another rezoning application affecting the same property shall not be submitted nor accepted until twelve (12) months have passed from the date of the final decision by the Commissioner, or decision by a Court to uphold the County's decision, or the date an appeal was dismissed. The Commissioner may reduce said twelve-month time interval by resolution to a minimum of six (6) months. 15.1.4 Alter conditions. An application to alter conditions of rezoning may be submitted at any time after the final decision of the Commissioner. The Applicant must show a change in circumstances or additional information not available to the Applicant at the time of the original decision by the Commissioner to impose the condition. Another application to alter the same condition shall not be submitted more than once every twelve (12) months, such interval to begin on the date of the final decision by the Commissioner on said application to amend the condition. 15.1.5 Withdrawal. An application may be withdrawn without prejudice at any time prior to 6:00 p.m. on the day of the Planning Commission hearing. The Planning Commission may give permission for a withdrawal without prejudice at its hearing. Withdrawal after the Planning Commission's hearing shall mean such application may not be resubmitted for consideration for a period of six (6) months, counting from the date of withdrawal to the date of renewed application. Unless withdrawn at the hearing, the withdrawal must be in writing, signed and dated by the applicant. CDA:157 Supp. No. 17 15.1.6 Reduced requirements for county applications. The requirements of Section 15.2 (including limitation as to number accepted) do not apply to any application for amendment initiated by the zoning department staff, the Planning Commission or the Commissioner, and such applications shall only contain such information as is required by the Zoning Administrator. County initiated map changes do not require that the County send letters to property owners or post signs on properties affected. Such notice is not required under the Zoning Procedures Law and is not practical when the County changes large numbers of parcels at one time. 15.1.7 Simultaneous applications. If multiple amendments are submitted on one parcel, they are considered in the following order: 1) text amendments; 2) Future Land Use Map amendment; 3) zoning map amendment; 4) conditional use permit; 5) zoning condition amendment. Each application shall be voted on separately, in the above-stated order. If a rezoning change is denied and the proposed conditional use is not permitted in the original zoning district, that application shall be denied. 15.1.8 Campaign contribution disclosures. Applicants and opponents to rezoning actions that change the zoning district on a parcel are requested to consult the Conflict of Interest in Zoning Act, O.C.G.A. § 36-67A-1, which requires disclosure of campaign contributions, made within two years of the rezoning application, and aggregating $250.00 or more, to any Planning Commission member or the Commissioner. Such disclosures should be filed at least five calendar days prior to the Planning Commission's hearing on forms available at the Zoning office. Violation of this Act shall not affect the validity of the rezoning, but such action may be a misdemeanor under O.C.G.A. § 36-67A-4. (Ord. of 7-21-2021(4); Ord. of 11-13-2024(2), § III) Sec. 15.2. Applications for amendments. 15.2.1 Applications. Each application required by this Ordinance, including without limitation, to amend this Ordinance, the Future Land Use Map, or the official zoning maps shall be filed with the Zoning Administrator. The following requirements for information are mandatory, unless the requirement is deleted by the Zoning Administrator. The Zoning Administrator may require additional information to evaluate the application, the suitability of the proposed use, and other aspects of any proposed development, and any such information shall be provided. Such information is not required for County-initiated applications. 15.2.2 Maximum Number. A maximum of five (5) applications shall be accepted by the Zoning Administrator for consideration at any public hearing before the Planning Commission and/or the Commissioner. Of the maximum of five (5) total zoning applications per month, a maximum of two (2) residential development zoning applications that include 25 residential units or more (whether residential use only or mixed use) shall be accepted. Exception: if an application is initiated by the Bartow County staff, Planning Commission, or the Commissioner, it shall not count toward the maximum of five (5) applications. 15.2.3 Procedure. Zoning numbers will be issued to applicants, in order of request, starting on the first day applications are accepted. A schedule may be obtained from the Zoning Office. All applications must be complete and submitted by the end of the business day on the date the zoning number is issued. Incomplete applications will not be accepted, except with permission of the Zoning Administrator. Furthermore, applicants not filing a complete application on the date the zoning number is issued will forfeit their assigned number, and will have to request a new number no sooner than the next available date to accept applications, once their application is complete and ready for submission. 15.2.4 Text amendment applications. Text amendment applications shall include the following minimum information, unless the requirement(s) listed below are waived by the Zoning Administrator. Additional information may also be requested by the Zoning Administrator: (A) Name and current address of the applicant; (B) Current provisions of the text to be affected by the amendment; (C) Proposed wording of text change; and (D) Reason for the amendment request. 15.2.5 Future land use map amendment. Future Land Use Map amendment applications shall include the following minimum information, unless the requirement(s) listed below are waived by the Zoning Administrator. Additional information may also be requested by the Zoning Administrator: (A) An identification of the geographic area in the county that is to have a revised land use under the applicant's proposal; (B) All permitted land uses for the identified area under the existing Future Land Use Map; (C) All changes to existing land use designations that are proposed by the application; (D) All land uses immediately adjacent to the subject property under the existing Future Land Use Map; (E) All reasons for the amendment application; (F) Names and addresses of the applicant owners and their agents, if any, authorized to apply for an amendment; and (G) An initiating party shall also file any other information or supporting materials that are required by the Commissioner, Planning Commission, or Zoning Administrator. 15.2.6 Zoning map amendment. Official zoning map amendment applications shall include the following minimum information, unless the requirement(s) listed below are waived by the zoning administrator. Additional information may also be requested by the zoning administrator: A. A tax parcel card from the county tax assessor identifying the parcel to be rezoned, or the parent parcel of the parcel to be rezoned, if a split or subdivision is occurring; CDA:159 Supp. No. 17 B. One copy of a new survey or the existing recorded plat, drawn to scale, showing north arrow, land lot and district, the dimensions, acreage and location of the tract prepared by a land surveyor whose state registration is current and valid. C. The present and proposed zoning district for the tract; D. Existing and intermediate regional floodplain and structures, as shown on the Federal Emergency Management Agency FIRM rate maps for the county, if any, and the county regulatory flood maps; E. The names and addresses of the owners of the land and their agents, if any; F. The names and addresses of all adjoining property owners. In determining the adjoining property owners, streams and road, street or railroad rights-of-way shall be disregarded; G. A utility availability and capacity letter from the water and sewer provider(s) must be filed with the application for rezoning. Sewer should be available immediately or estimated to be available within two (2) years of the date of the utility letter. In accordance with the Standards for Governing the Exercise of Zoning Power, the Planning Commission and Commissioner may consider whether the zoning proposal will result in a use which will or could cause an excessive or burdensome use of existing utilities. H. Applicants submitting an application to rezone property for residential developments, whether single-family or multi-family, are required to include example renderings of residences to be built on the property. I. A conceptual site plan depicting the proposed use of the property including: 1. A drawing of the subject district and immediate surrounding area, drawn to scale. 2. A correct scale and north arrow. 3. The proposed land use and zoning as it would appear should the zoning map amendment application be approved. 4. The present zoning classification of all adjacent parcels. 5. The proposed location of streets and entry/exit points for vehicular traffic. 6. Required yard setbacks noted on the plan. 7. The location and extent of required buffer areas, depicting extent of natural vegetation and type and location of additional vegetation if required. 8. A location map showing all arterial and collector streets of the adjacent area. 9. Location and elevation of the 100-year floodplain and the county regulatory floodplain on the property subject of the proposed zoning. 10. Acreage of property and proposed number of residential lots or dwelling units, if applicable. J. Conceptual site plans shall be required with any rezoning application in which the application is for a residential, commercial, institutional, industrial, or mining development. A rezoning application from the A-1 to the R-1 district for a proposed lot split, for example, would not require submittal of a conceptual site plan. K. Such other and additional information as may be requested by the zoning administrator. 15.2.7 Application schedule. Applications shall be submitted according to the schedule set by the Zoning Administrator and adopted by the Planning Commission. Application fees for an application to amend this Ordinance, the official zoning maps, or the Future Land Use Map shall be established by the Commissioner and made available by the Zoning Administrator. A fee shall not be charged for applications initiated by the zoning staff, Commissioner or Planning Commission. 15.2.8 Proposed conditions. With respect to amendments to the official zoning maps, an applicant may file site plans, renderings, construction specifications, written development restrictions and other conditions which the applicant proposes as binding conditions upon the development and use of the property involved in the application. (Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § XII; Ord. of 12-6-2023(4), §§ IX, X) Sec. 15.3. Public notification. 15.3.1 Legal notice. Due notice of the public hearings pursuant to this Article shall be published in the newspaper of general circulation within the county. Notice advertising the application and indicating date, time, place and purpose of the public hearings shall be published at least fifteen (15) days prior to the date of the scheduled hearing of the Bartow County Commissioner but not more than forty-five (45) days prior to the date of the first scheduled hearing conducted by the Commissioner. If the application is to amend the Future Land Use Map, the notice shall include location, current land use category and proposed land use category. If the application is for amendment to the official zoning maps, then the notice shall also include the location of the property, the present zoning district of the property, and the proposed zoning district of the property. The cost of the advertisement shall be borne by the applicant. The notice shall also state, "Notice is hereby given that the Commissioner has the power to impose a different zoning classification from the classification requested, and impose or delete zoning conditions that may change the application considerably." If the notice does not run in the newspaper in conformance with these requirements, the application is void and cannot be considered as scheduled. The applicant shall coordinate with the zoning office and re-advertise for a future hearing, as assigned by the staff. 15.3.2 Signs posted. The Zoning Administrator shall post, at least fifteen (15) days prior to the Planning Commission's public hearing, in a conspicuous place in the public right-of-way fronting the property or on the property for which an application has been submitted, a sign or signs containing information as to the application and date, time and place of the public hearing. CDA:161 Supp. No. 17 15.3.3 Letters to Property Owners. The applicant shall notify each owner of property adjacent to or adjoining the property for which the amendment (other than a text amendment) is sought by mailing to each property owner a letter by first class mail, with proof of mailing obtained from the Post Office. Proof of mailing means either a First Class "Certificate of Mailing" or a First Class "Certified Mail" receipt; a proof of delivery is not required. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. In determining the adjoining property owners, road, street or railroad rights-of-way shall be disregarded. Notice shall also be provided by letter to such other impacted property owners or interest holders as the Zoning Administrator directs. The form letter provided by the County shall be used, or a letter conveying substantially the same information. Proof of mailing for each recipient shall be provided to the Zoning Administrator before the public hearing. Said notice must be mailed at least thirty (30) days prior to the date of the Planning Commission's public hearing. 15.3.4 County Exemptions. The provisions of Sections 15.3.2 and 15.3.3 shall not apply if the application is initiated by the zoning department staff, the Planning Commission or the Commissioner. (Ord. of 7-21-2021(4); Ord. of 11-13-2024(2), § IV) Sec. 15.4. Action by the planning commission. 15.4.1 A Planning Commission was established by previous version of this Ordinance, and remains authorized under this Ordinance. Existing Commission members shall continue in their current terms unaffected by the adoption of this Ordinance. The Planning Commission of Bartow County consists of seven (7) members appointed by the Commissioner for staggered terms of three (3) years. The Commission shall meet every other month or on such other schedule as it chooses to adopt, but in no event less than four times per year. If there are no agenda items, the regularly scheduled meeting shall be cancelled. 15.4.2 Members. Members shall be paid per meeting at a rate established by the Commissioner and may be reimbursed for actual expenses incurred while representing the commission. Appointments shall be made by resolution of the commissioner. Any vacancy in the membership of the commission shall be filled for the unexpired term in the same manner as the initial appointment. Members shall be removable for cause by the county commissioner upon written charges and after a public hearing; provided, however, that any member who fails to attend three consecutive meetings, without cause, may be removed without a public hearing. The commission may adopt such by-laws as it deems necessary to provide for the orderly conduct of its business. The commission previously appointed by the commissioner shall continue to serve without change as if appointed under this ordinance. 15.4.3 Public hearing. The Planning Commission shall hold a public hearing on each application for an amendment pursuant to this Article in accordance with a schedule adopted by the Commission. As to each application, the Planning Commission shall make a recommendation for approval, approval with conditions, or denial. A tie vote on any motion shall equate to denial. The Planning Commission may grant the applicant's request to withdraw without prejudice at its hearing. 15.4.4 Tabling or remand. The Planning Commission may table an application if new information has been submitted, or to provide the applicant time to revise an application. At the hearing in which the tabling is granted, the Planning Commission shall specify the date of the next hearing and this action shall constitute public notice of such hearing, and no additional notices shall be required prior to the hearings. 15.4.5 Report. A written report or summary of the Planning Commission's recommendation shall be prepared by the zoning staff, and shall be a public record. The Planning Commission's action may recommend amendments or conditions to the applicant's request which would reduce the land area for which the application is made, change the district requested and recommend conditions of rezoning which may be deemed advisable so that the purpose of this Ordinance will, if applicable, be served, and health, public safety and general welfare secured. (Ord. of 7-21-2021(4)) Sec. 15.5. Conduct of the planning commission's hearing. 15.5.1 Sign up. All persons who wish to address the Planning Commission at a hearing on the proposed amendment under consideration by the Planning Commission shall first sign up on a form to be provided by the County prior to the commencement of the hearing. At least one person representing the application must be present at the hearing in order to explain the request and/or respond to questions regarding the application. if no one is present, the Planning Commission shall be empowered to table or recommend denial of the application. 15.5.2 Matter presented; out of order applications. The Secretary of the Planning Commission will read the proposed amendments under consideration in the order determined by the Zoning Administrator. The Zoning Administrator, or his designee, shall then present the amendment, along with the pertinent departmental reviews, if any, prior to receiving public input on the proposed amendment. If an application is not complete, or all requirements of this Ordinance have not been complied with, the application is out of order and may be taken off the agenda. It shall be postponed until the next meeting of the Planning Commission. If the application has already been advertised and persons wishing to speak have appeared for the hearing, the Commission may choose to hear from them, but an additional hearing shall be required. If the application is still incomplete or out of order at the next meeting, it shall be deemed withdrawn. The applicant shall have to wait six (6) months to reapply. 15.5.3 Speakers. The Secretary of the Planning Commission will then call each person who has signed up to speak on the amendment in the order in which the persons have signed up to speak, except the applicant who will always speak first. Prior to speaking, the speaker will identify himself or herself and state his or her current address. Only those persons who CDA:163 Supp. No. 17 signed up to speak prior to the commencement of the hearing shall be entitled to speak, unless a majority of the Commission, in its discretion, allows the person to speak to the amendment, notwithstanding the failure of the person to sign up prior to the hearing. 15.5.4 Time limits. Each side shall be given a maximum of 30 minutes to address the Planning Commission concerning the amendment then under consideration unless the Planning Commission, by majority vote of the members present, votes to allow additional time for a particular speaker to address the Commission on said proposed amendment. Each speaker, excluding the applicant, shall be allowed three (3) minutes to address the Planning Commission concerning the amendment then under consideration, unless the Planning Commission, by majority vote of the members present, votes to allow additional time for a particular speaker to address the Commission on said proposed amendment. Any groups which are present are encouraged to choose a spokesperson to present their views. The applicant shall have a minimum of 10 minutes for his presentation (including all related witnesses or experts). The applicant may initially use all of the time allotted to him to speak, or he may speak and reserve a portion of his allotted time for rebuttal. Opponents are not allowed rebuttal or a second opportunity to speak, unless specifically granted by majority vote of the Commission. In all circumstances, in order to comply with state law, the proponent(s) and opponent(s) of each amendment shall have no less than 10 minutes per side for presentation of data, evidence, and opinion thereon; if there is only one applicant or opponent, such person shall have the full 10 minutes if desired. In the event the opponents collectively take more than 30 minutes, the applicant's time shall be extended similarly if desired. One member of the Planning Commission or staff shall be designated as the time keeper to record the time expended by each speaker. 15.5.5 Decorum and order. Each speaker shall speak only to the merits of the proposed amendment under consideration and shall address his remarks only to the members of the Planning Commission. Each speaker shall refrain from personal attacks on any other speaker or the discussion of facts or opinions irrelevant to the proposed amendment under consideration. The chair may limit or refuse a speaker the right to continue, if the speaker, after first being cautioned, continues to violate this subsection. Nothing contained herein shall be construed as prohibiting the chair from conducting the hearing in an orderly and decorous manner to assure that the public hearing on a proposed amendment is conducted in a fair and orderly manner. 15.5.6 These procedures shall be available in writing at each hearing. (Ord. of 7-21-2021(4)) Sec. 15.6. Action by the commissioner. 15.6.1 Public hearing. Before taking action on a proposed amendment and after receipt of the Planning Commission recommendations, the Commissioner shall hold a public hearing on the proposed amendment made pursuant to this Article, which shall be advertised as stated in Sec. 15.3 and conducted pursuant to Sec. 15.7. 15.6.2 Powers of the commissioner. At the public hearing, the Commissioner shall review the analysis submitted by the initiating party and the recommendation prepared by the Planning Commission. So that the purpose of this Ordinance will be served, health, public safety and general welfare secured, the Commissioner may approve or deny the application, reduce the land area for which the application is made, change the district or land use category requested, or add or delete conditions of the application. The Commissioner shall have the power to impose a different zoning classification from the classification requested, and impose any zoning conditions which ameliorate the impact of the zoning, or serve other lawful purposes of this Ordinance. The submission of an application for a rezoning shall be deemed notice of this power and consent to any such action. The Commissioner may also remand the application, if it has been changed or for any reason, to the Planning Commission for further review and recommendation. 15.6.3 Tabling application. The Commissioner shall have the power to table incomplete applications, or to seek more time for further information to be submitted. The action by the Commissioner to table the application shall include a statement of the date and time of the next meeting at which the application will be considered, which statement shall constitute public notice of the hearing on the application; and no further notice, such as that required by Section 15.3, is required. The application can be tabled for up to three months at a time to obtain necessary information or for other reasons of the Commissioner. The application can be tabled more than once if necessary, extending the duration the application remains on the table. (Ord. of 7-21-2021(4)) Sec. 15.7. Conduct of the commissioner's hearing. 15.7.1 Sign up. All persons who wish to address the Commissioner at a hearing concerning a proposed zoning decision under consideration by the Commissioner shall first sign up on a form to be provided by the County prior to the commencement of the Hearing. 15.7.2 Matter presented. Proposed zoning decisions shall be called in the order determined by the Zoning Administrator. The Zoning Administrator or his designee will read the proposed zoning decision under consideration and summarize the departmental reviews pertaining thereto prior to receiving public input on said proposed zoning decision. If an application is not complete, or all requirements of this Ordinance have not been complied with, the application is out of order and will not be called at that meeting. It shall be tabled for one month. If the application is still incomplete or out of order at the next meeting, it shall be deemed withdrawn. The applicant shall have to wait six months to reapply. 15.7.3 Speakers. The Zoning Administrator or his designee shall call each person who has signed up to speak on the zoning decision in the order in which the persons have signed up to speak, except the applicant who will always speak first. Prior to speaking, the speaker will identify himself or herself and state his or her current address. Only those persons who CDA:165 Supp. No. 17 signed up to speak prior to the commencement of the hearing shall be entitled to speak, unless the Commissioner, in his discretion, allows the person to speak to the zoning decision, notwithstanding the failure of the person to sign up prior to the hearing. 15.7.4 Time limits. Each side shall be given a maximum of 30 minutes to address the Commissioner concerning the zoning decision then under consideration, unless the Commissioner allows additional time for a particular speaker to address the Commissioner on said proposed zoning decision. Each speaker, excluding the applicant, shall be allowed three (3) minutes to address the Commissioner concerning the zoning decision then under consideration, unless the Commissioner allows additional time for a particular speaker to address the Commissioner on said proposed zoning decision. Any groups which are present are encouraged to choose a spokesperson to present their views. The applicant shall have a minimum of 10 minutes for his presentation (including all related witnesses or experts). The applicant may initially use all of the time allotted to him to speak, or he may speak and reserve a portion of his allotted time for rebuttal. Opponents are not allowed rebuttal or a second opportunity to speak, unless specifically granted by the Commissioner. In all circumstances, in order to comply with state law, the proponent(s) and opponent(s) of each amendment shall have no less than 10 minutes per side for presentation of data, evidence, and opinion thereon; if there is only one applicant or opponent, such person shall have the full 10 minutes if desired. In the event the opponents collectively take more than 30 minutes, the applicant's time shall be extended similarly if desired. A member of the Commissioner's staff shall be designated as the time keeper to record the time expended by each speaker. 15.7.5 Decorum and order. Each speaker shall speak only to the merits of the proposed zoning decision under consideration and shall address his remarks only to the Commissioner. Each speaker shall refrain from personal attacks on any other speaker or the discussion of facts or opinions irrelevant to the proposed zoning decision under consideration. The Commissioner may limit or refuse a speaker the right to continue, if the speaker, after first being cautioned, continues to violate this subsection. Nothing contained herein shall be construed as prohibiting the Commissioner from conducting the hearing in an orderly and decorous manner to assure that the public hearing on a proposed zoning decision is conducted in a fair and orderly manner. 15.7.6 These procedures shall be available in writing at all hearings. (Ord. of 7-21-2021(4)) Sec. 15.8. Appeals to superior court. Appeals of a decision to deny or grant a rezoning shall be taken within thirty (30) days of the decision by filing an appeal in superior court, pursuant to law. (Ord. of 7-21-2021(4)) Sec. 15.9. Standards for governing the exercise of zoning power. The following standards governing the exercise of the zoning power are adopted in accordance with O.C.G.A. 36-66-5(b): (A) The existing land uses and zoning classification of nearby property; (B) The suitability of the subject property for the zoned purposes; (C) The extent to which the property values of the subject property are diminished by the particular zoning restrictions; (D) The extent to which the diminution of property values of the subject property promotes the health, safety, morals or general welfare of the public; (E) The relative gain to the public, as compared to the hardship imposed upon the individual property owner; (F) Whether the subject property has a reasonable economic use as currently zoned; (G) The length of time the property has been vacant as zoned considered in the context of land development in the area in the vicinity of the property; (H) Whether the proposed zoning will be a use that is suitable in view of the use and development of adjacent and nearby property; (I) Whether the proposed zoning will adversely affect the existing use or usability of adjacent or nearby property; (J) Whether the zoning proposal is in conformity with the policies and intent of the land use plan; (K) Whether the zoning proposal will result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities, or schools; and (L) Whether there are other existing or changing conditions affecting the use and development of the property which give supporting grounds for either approval or disapproval of the zoning proposal. (Ord. of 7-21-2021(4)) Sec. 15.10. Conditional approval. In adopting an Amendment to the Official Zoning Map, or approving a Conditional Use, the Commissioner may impose conditions of approval which it deems necessary in order to make the requested action acceptable and consistent with the purposes of this Zoning Ordinance and of the zoning district(s) involved, to ameliorate negative issues identified through evaluation of the standards governing consideration of a zoning change under Section 15, or to further the goals and objectives of any County adopted plans. A. Types of conditions. Such conditions may consist of any or all of the following: 1. Dedication of required rights-of-way to the County where insufficient amounts or none exist; 2. Setback requirements from any lot line; 3. Specified or prohibited locations for buildings, parking, loading, or storage areas or other land uses; 4. Driveway curb cut restrictions; CDA:167 Supp. No. 17 5. Restrictions as to what land uses or activities shall be permitted; 6. Maximum building heights or other dimensions; 7. Special drainage or erosion provisions; 8. Landscaping or planted area which may include the location, type and maintenance of plant materials; 9. Fences, walls, berms, or other landscaping or buffering provisions or protective measures; 10. Preservation of existing trees or planting of new trees or other vegetation; 11. Special measures to alleviate undesirable views, light, glare, noise, dust or odor; 12. Permitted hours of operation; 13. Architectural style; 14. A requirement that developers must build according to the concept plan as adopted; 15. A limitation on exterior modifications of existing buildings; or 16. Any other requirement that the Commissioner may deem appropriate and necessary as a condition of rezoning or approval of a Conditional Use. B. Such conditions: 1. Shall only be valid if they are included in the Commissioner's Resolution; 2. Shall be in effect as long as the zoning change is in effect, or for the period of time specified in the motion for approval of the zoning change; 3. Shall be required of the property owner and all subsequent owners as a condition of their use of the property; and shall be interpreted and continuously enforced by the Zoning Administrator in the same manner as any other provision of this Zoning Ordinance. 4. Failure to meet a condition of rezoning could result in penalties including the County not issuing a building permit, business license or Land Disturbance Permit for a property, or other enforcement detailed in Section 13 of the Zoning Ordinance. (Ord. of 11-13-2024(2), § V) ARTICLE XVI. CONDITIONAL USE PERMITS Sec. 16.1. Procedures. 16.1.1 An applicant for a conditional use permit shall file an application on forms provided by the Zoning Administrator. The grant or denial of a conditional use permit shall follow the procedures for a rezoning, as specified in Sections 15.3 through 15.7, unless modified by the provisions of this Article, provided that notice of the public hearing shall be provided to the owner of the property that is the subject of the application by mail at least 30 days prior to the public hearing, and the sign and published notice shall be posted at least 30 days prior to public hearing. 16.1.2 Any use which may be authorized by a Conditional Use Permit may be approved by the Bartow County Commissioner only if, in the exercise of the Commissioner's legislative discretion, he finds that: (A) A proper application has been filed in accordance with the requirements of the Ordinance; (B) A recommendation has been received from the Planning Commission in accordance with the provisions of Article XV; (C) The applicant is in compliance with the particular conditions for the proposed conditional use that are required by this Ordinance; (D) The use is consistent with the purposes and intent of this Ordinance; and (E) After considering the application and the facts, and the Standards for making a zoning decision contained in Section 15.9 of this Ordinance, the Commissioner determines that the Standards are satisfied such that the benefits of and need for the proposed conditional use outweigh any possible harmful effects, negative impacts, or damages to the neighboring properties or the County in general. 16.1.3 In compliance with Federal law, if the conditional use is requested by a place of worship or church, in connection with the exercise of religion, the Planning Commission and Commissioner shall additionally consider whether the regulation imposes a substantial burden on the exercise of religion, whether the regulation serves a compelling governmental interest, whether the denial is the least restrictive means to serve that interest, or whether the conditional use can be granted without harming that interest. 16.1.4 If the conditional use is related to a Group Home for Persons with a Disability, the Board shall additionally consider what reasonable accommodations in this Ordinance can be made to provide persons with a disability equal opportunities to use and enjoy dwellings, while not abrogating the purposes of this Ordinance. Any reasonable accommodation should only relate to the disability. (Ord. of 7-21-2021(4); Ord. of 8-10-2022(2), § III) Sec. 16.2. Action by the commissioner. The Commissioner shall consider all evidence in the record in making his decision. This Ordinance is automatically a part of the record in each case, as is the entire application file. The Commissioner shall have the power to table the application for further information to be presented, or to remand the application to the Planning Commission if new information has been presented that they have not considered. The Commissioner shall have the power to grant, deny, or grant with further specific conditions imposed. (Ord. of 7-21-2021(4)) CDA:169 Supp. No. 18 Sec. 16.3. Conduct of the hearing. Hearings on conditional use permits shall follow the procedures of hearings on rezoning amendments, except as modified below: 16.3.1 The applicant shall have up to 15 minutes to present his case, and submit all evidence and witnesses for the record, and opponents shall have equal opportunity to present their case. The applicant can request additional time if voluminous evidence is to be submitted, and may be granted at the discretion of the Commissioner. Equal time shall be allowed to the opponent. The County, as represented by the Zoning Administrator or his designee, or the County Attorney or his designee, shall have the right and equal time to present any witnesses and evidence into the record it chooses. 16.3.2 The applicant or his attorney shall have a right to cross-examine any witnesses in opposition to the application, and one representative or attorney of the opponents shall have a similar opportunity to cross-examine the witnesses. The County shall also have a similar opportunity to cross-examine all witnesses. 16.3.3 The Commissioner may question any witness, or request further information and table a decision for one month to await additional information or evidence. The Commissioner may also request expert reports or studies relating to the request, and shall similarly table the application in such cases. An application may only be tabled one time without the consent of the applicant. 16.3.4 The hearing shall be recorded in some fashion and that recording preserved for sixty (60) days after the decision, or during the pendency of any appeal that is filed in superior court. (Ord. of 7-21-2021(4)) Sec. 16.4. Appeals to superior court. Appeals of a decision to deny or grant a conditional use permit shall be taken within thirty (30) days of the decision by filing an appeal in superior court, pursuant to law. (Ord. of 7-21-2021(4)) Sec. 16.5. Reapplication. An application for a conditional use which was denied shall not be resubmitted for a period of 12 months, counting from the date of denial to the date of renewed application. If an application is withdrawn after the Planning Commission's hearing, a new application may not be resubmitted for consideration for a period of six months, counting from the date of renewed application. Unless withdrawn at the hearing, the withdrawal must be in writing, signed and dated by the applicant. (Ord. of 7-21-2021(4); Ord. of 9-3-2025, § XI) ARTICLE XVII. LEGAL STATUS PROVISIONS Sec. 17.1. Conflict with other regulations. Whenever the regulations of this Ordinance require a greater width or size of yards, courts, or other open spaces, or require a lower height of buildings or smaller number of stories, or require a greater percentage of lot to be left unoccupied, or impose other more restrictive standards than are required in or under any other ordinance or statute, the regulations and requirements of this Ordinance shall govern. Whenever the provisions of any other statute or ordinance require more restrictive standards than are required by this Ordinance, the provisions of such statute or ordinance shall govern. (Ord. of 7-21-2021(4)) Sec. 17.2. Separability/severability. Should any section or provision of this Ordinance be declared by the courts to be unconstitutional or invalid, such declaration shall not affect the validity of the Ordinance as a whole or any part thereof other than the part so declared to be unconstitutional or invalid. It is the intent that any provision declared unconstitutional shall be severed from the Ordinance, and the remainder of the Ordinance remain in effect. (Ord. of 7-21-2021(4)) Sec. 17.3. Repealer. This Ordinance replaces the prior Zoning Ordinance, adopted November 4, 2020, which in turn replaced the ordinance adopted September 16, 2020, which in turn replaced the ordinance adopted August 5, 2020, which in turn replaced the ordinance adopted July 8, 2020, which in turn replaced the ordinance adopted June 5, 2020, which in turn replaced the ordinance adopted December 4, 2019, which in turn replaced the ordinance adopted November 6, 2019, which in turn replaced the ordinance adopted September 11, 2019. In the event this Ordinance is struck down as void, unconstitutional or invalid, including therefore this provision, the prior ordinances shall be considered to not have been repealed, and shall therefore still be in effect. In the event the prior ordinance is declared void, unconstitutional or invalid, the next prior ordinance shall be considered to not have been repealed, and shall therefore still be in effect; and so on. (Ord. of 7-21-2021(4)) Sec. 17.4. Effective date. This Ordinance shall take effect and be in force as of the date of its adoption, the public welfare of Bartow County demanding. (Ord. of 7-21-2021(4)) CDA:171 Supp. No. 18 APPENDIX A. ADULT ENTERTAINMENT REGULATIONS Sec. A.1. Purpose. It is the purpose of this appendix to regulate adult establishments in order to promote the health, safety, and general welfare of the citizens of the County, and to establish reasonable and uniform regulations to prevent the deleterious secondary effects of adult establishments within the county. The provisions of this appendix have neither the purpose nor effect of imposing a limitation or restriction on the content or reasonable access to any communicative materials, including sexually oriented materials. Similarly, it is neither the intent nor effect of this appendix to restrict or deny access by adults to sexually oriented materials protected by the First Amendment, or to deny access by the distributors and exhibitors of sexually oriented entertainment to their intended market. Neither is it the intent nor effect of this appendix to condone or legitimize the distribution of obscene material. (Ord. of 7-21-2021(4)) Sec. A.2. Findings and rationale. Based on evidence of the adverse secondary effects of adult uses presented in hearings and in reports made available to the commissioner, and on findings, interpretations, and narrowing constructions incorporated in the cases of City of Littleton v. Z.J. Gifts D-4, L.L.C., 541 U.S. 774 (2004); City of Los Angeles v. Alameda Books, Inc., 535 U.S. 425 (2002); City of Erie v. Pap's A.M., 529 U.S. 277 (2000); City of Renton v. Playtime Theatres, Inc., 475 U.S. 41 (1986); Young v. American Mini Theatres, 427 U.S. 50 (1976); Barnes v. Glen Theatre, Inc., 501 U.S. 560 (1991); California v. LaRue, 409 U.S. 109 (1972); N.Y. State Liquor Authority v. Bellanca, 452 U.S. 714 (1981); Sewell v. Georgia, 435 U.S. 982 (1978); FW/PBS, Inc. v. City of Dallas, 493 U.S. 215 (1990); City of Dallas v. Stanglin, 490 U.S. 19 (1989); and Trop, Inc. v. City of Brookhaven, 296 Ga. 85 (2014); Oasis Goodtime Emporium I, Inc. v. City of Doraville, 297 Ga. 513 (2015); Flanigan's Enters., Inc. v. Fulton County, 596 F.3d 1265 (11th Cir. 2010); Peek-a-Boo Lounge v. Manatee County, 630 F.3d 1346 (11th Cir. 2011); Daytona Grand, Inc. v. City of Daytona Beach, 490 F.3d 860 (11th Cir. 2007); Jacksonville Property Rights Ass'n, Inc. v. City of Jacksonville, 635 F.3d 1266 (11th Cir. 2011); Artistic Entertainment, Inc. v. City of Warner Robins, 331 F.3d 1196 (11th Cir. 2003); Artistic Entertainment, Inc. v. City of Warner Robins, 223 F.3d 1306 (11th Cir. 2000); Williams v. Pryor, 240 F.3d 944 (11th Cir. 2001); Williams v. A.G. of Alabama, 378 F.3d 1232 (11th Cir. 2004); Williams v. Morgan, 478 F.3d 1316 (11th Cir. 2007); Gary v. City of Warner Robins, 311 F.3d 1334 (11th Cir. 2002); Ward v. County of Orange, 217 F.3d 1350 (11th Cir. 2002); Boss Capital, Inc. v. City of Casselberry, 187 F3d 1251 (11th Cir. 1999); David Vincent, Inc. v. Broward County, 200 F.3d 1325 (11th Cir. 2000); Sammy's of Mobile, Ltd. v. City of Mobile, 140 F.3d 993 (11th Cir. 1998); Lady J. Lingerie, Inc. v. City of Jacksonville, 176 F.3d 1358 (11th Cir. 1999); This That And The Other Gift and Tobacco, Inc. v. Cobb County, 285 F.3d 1319 (11th Cir. 2002); DLS, Inc. v. City of Chattanooga, 107 F.3d 403 (6th Cir. 1997); Grand Faloon Tavern, Inc. v. Wicker, 670 F.2d 943 (11th Cir. 1982); International Food & Beverage Systems v. Ft. Lauderdale, 794 F.2d 1520 (11th Cir. 1986); 5634 E. Hillsborough Ave., Inc. v. Hillsborough County, 2007 WL 2936211 (M.D. Fla. Oct. 4, 2007), aff'd, 2008 WL 4276370 (11th Cir. Sept. 18, 2008) (per curiam); Fairfax MK, Inc. v. City of Clarkston, 274 Ga. 520 (2001); Morrison v. State, 272 Ga. 129 (2000); Goldrush II v. City of Marietta, 267 Ga. 683 (1997); Flippen Alliance for Community Empowerment, Inc. v. Brannan, 601 S.E.2d 106 (Ga. Ct. App. 2004); Oasis Goodtime Emporium I, Inc. v. DeKalb County, 272 Ga. 887 (2000); Chamblee Visuals, LLC v. City of Chamblee, 270 Ga. 33 (1998); World Famous Dudley's Food & Spirits, Inc. v. City of College Park, 265 Ga. 618 (1995); Airport Bookstore, Inc. v. Jackson, 242 Ga. 214 (1978); Entm't Prods., Inc. v. Shelby County, 721 F.3d 729 (6th Cir. 2013); Lund v. City of Fall River, 714 F.3d 65 (1st Cir. 2013); Imaginary Images, Inc. v. Evans, 612 F.3d 736 (4th Cir. 2010); LLEH, Inc. v. Wichita County, 289 F.3d 358 (5th Cir. 2002); Ocello v. Koster, 354 S.W.3d 187 (Mo. 2011); 84 Video/Newsstand, Inc. v. Sartini, 2011 WL 3904097 (6th Cir. Sept. 7, 2011); Plaza Group Properties, LLC v. Spencer County Plan Commission, 877 N.E.2d 877 (Ind. Ct. App. 2007); East Brooks Books, Inc. v. Shelby County, 588 F.3d 360 (6th Cir. 2009); Entm't Prods., Inc. v. Shelby County, 588 F.3d 372 (6th Cir. 2009); Sensations, Inc. v. City of Grand Rapids, 526 F.3d 291 (6th Cir. 2008); World Wide Video of Washington, Inc. v. City of Spokane, 368 F.3d 1186 (9th Cir. 2004); Ben's Bar, Inc. v. Village of Somerset, 316 F.3d 702 (7th Cir. 2003); H&A Land Corp. v. City of Kennedale, 480 F.3d 336 (5th Cir. 2007); Hang On, Inc. v. City of Arlington, 65 F.3d 1248 (5th Cir. 1995); Fantasy Ranch, Inc. v. City of Arlington, 459 F.3d 546 (5th Cir. 2006); Illinois One News, Inc. v. City of Marshall, 477 F.3d 461 (7th Cir. 2007); G.M. Enterprises, Inc. v. Town of St. Joseph, 350 F.3d 631 (7th Cir. 2003); Richland Bookmart, Inc. v. Knox County, 555 F.3d 512 (6th Cir. 2009); Bigg Wolf Discount Video Movie Sales, Inc. v. Montgomery County, 256 F. Supp. 2d 385 (D. Md. 2003); Richland Bookmart, Inc. v. Nichols, 137 F.3d 435 (6th Cir. 1998); Spokane Arcade, Inc. v. City of Spokane, 75 F.3d 663 (9th Cir. 1996); DCR, Inc. v. Pierce County, 964 P.2d 380 (Wash. Ct. App. 1998); City of New York v. Hommes, 724 N.E.2d 368 (N.Y. 1999); Taylor v. State, No. 01-01-00505-CR, 2002 WL 1722154 (Tex. App. July 25, 2002); Fantasyland Video, Inc. v. County of San Diego, 505 F.3d 996 (9th Cir. 2007); Gammoh v. City of La Habra, 395 F.3d 1114 (9th Cir. 2005); Starship Enters. of Atlanta, Inc. v. Coweta County, No. 3:09-CV-123, R. 41 (N.D. Ga. Feb. 28, 2011); High Five Investments, LLC v. Floyd County, No. 4:06-CV-190, R. 128 (N.D. Ga. Mar. 14, 2008); 10950 Retail, LLC v. Fulton County, No. 1:06-CV-1923, R. 62 Order (N.D. Ga. Dec. 21, 2006); 10950 Retail, LLC v. Fulton County, No. 1:06-CV-1923, R. 84 Contempt Order (N.D. Ga. Jan. 4, 2007); Z.J. Gifts D-4, L.L.C. v. City of Littleton, Civil Action No. 99-N-1696, Memorandum Decision and Order (D. Colo. March 31, 2001); People ex rel. Deters v. The Lion's Den, Inc., Case No. 04-CH-26, Modified Permanent Injunction Order (Ill. Fourth Judicial Circuit, Effingham County, July 13, 2005); Reliable Consultants, Inc. v. City of Kennedale, No. 4:05-CV-166-A, Findings of Fact and Conclusions of Law (N.D. Tex. May 26, 2005); And based upon reports concerning secondary effects occurring in and around adult establishments, including, but not limited to, "Correlates of Current Transactional Sex among a Sample of Female Exotic Dancers in Baltimore, MD," Journal of Urban Health (2011); "Does the Presence of Sexually Oriented Businesses Relate to Increased Levels of Crime?" Crime & Delinquency (2012) (Louisville, KY); Metropolis, Illinois - 2011-12; CDA:173 Supp. No. 17 Manatee County, Florida - 2007; Hillsborough County, Florida - 2006; Clarksville, Indiana - 2009; El Paso, Texas - 2008; Memphis, Tennessee - 2006; New Albany, Indiana - 2009; Louisville, Kentucky - 2004; Fulton County, GA - 2001; Chattanooga, Tennessee - 1999-2003; Jackson County, Missouri - 2008; Ft. Worth, Texas - 2004; Kennedale, Texas - 2005; Greensboro, North Carolina - 2003; Dallas, Texas - 1997; Houston, Texas - 1997, 1983; Phoenix, Arizona - 1995-98, 1979; Tucson, Arizona - 1990; Spokane, Washington - 2001; St. Cloud, Minnesota - 1994; Austin, Texas - 1986; Indianapolis, Indiana - 1984; Garden Grove, California - 1991; Los Angeles, California - 1977; Whittier, California - 1978; Oklahoma City, Oklahoma - 1986; New York, New York Times Square - 1994; the Report of the Attorney General's Working Group On The Regulation Of Sexually Oriented Businesses, (June 6, 1989, State of Minnesota); Dallas, Texas - 2007; "Rural Hotspots: The Case of Adult Businesses," 19 Criminal Justice Policy Review 153 (2008); "Stripclubs According to Strippers: Exposing Workplace Sexual Violence," by Kelly Holsopple, Program Director, Freedom and Justice Center for Prostitution Resources, Minneapolis, Minnesota; "Sexually Oriented Businesses: An Insider's View," by David Sherman, presented to the Michigan House Committee on Ethics and Constitutional Law, Jan. 12, 2000; Sex Store Statistics and Articles; Law Enforcement and Private Investigator Affidavits (Adult Cabarets in Forest Park, GA and Sandy Springs, GA); and Strip-Club Trafficking Documents, The Commissioner finds: (1) Adult establishments, as a category of commercial uses, are associated with a wide variety of adverse secondary effects including, but not limited to, personal and property crimes, human trafficking, prostitution, potential spread of disease, lewdness, public indecency, obscenity, illicit drug use and drug trafficking, negative impacts on surrounding properties, urban blight, litter, and sexual assault and exploitation. Alcohol consumption impairs judgment and lowers inhibitions, thereby increasing the risk of adverse secondary effects. (2) Adult establishments should be separated from sensitive land uses to minimize the impact of their secondary effects upon such uses, and should be separated from other adult establishments, to minimize the secondary effects associated with such uses and to prevent an unnecessary concentration of adult establishments in one area. (3) Each of the foregoing negative secondary effects constitutes a harm which the county has a substantial government interest in preventing and/or abating. This substantial government interest in preventing secondary effects, which is the county's rationale for this appendix, exists independent of any comparative analysis between adult establishments and other businesses. Additionally, the county's interest in regulating adult establishments extends to preventing future secondary effects of either current or future adult establishments that may locate in the county. The county finds that the cases and documentation relied on in this appendix are reasonably believed to be relevant to said secondary effects. The county hereby adopts and incorporates herein its stated findings and legislative record related to the adverse secondary effects of adult establishments, including the judicial opinions and reports related to such secondary effects. (Ord. of 7-21-2021(4)) Sec. A.3. Adult entertainment establishments. A.3.3 Definitions. Adult establishment: An "adult arcade," an "adult bookstore," an "adult motion picture theater," a "semi-nude lounge," or a "sex paraphernalia store" as those terms are defined in Chapter 4 (Adult Establishments) of the Bartow County Code. Licensed child day care center: A facility licensed by the State of Georgia, whether situated within the county or not, that is a "child day care" use as set forth in Article IX, section 9.1.1 of the Zoning Ordinance. (Ord. of 7-21-2021(4)) CDA:175 Supp. No. 17 Appendix B DEVELOPMENT REGULATIONS CDB:1 Supp. No. 14 Secs. 5.26, 5.27. Reserved. APPENDIX B—DEVELOPMENT REGULATIONS CDB:3 Supp. No. 13 ARTICLE I. IN GENERAL Sec. 1.1. Introduction. This document illustrates the continued commitment on behalf of the Bartow County Commissioner to encourage quality growth and development in Bartow County. All operating departments in the development plan review process work together to produce this document. This document has been created, revised and otherwise set forth as a tool for communication between the county and professional contractors, engineers, architects, developers, planners, builders, and other agents for development. To that end, these regulations are a compilation of the accepted procedures, plan requirements, and approval criteria in the area of land use and site development. (Ord. of 4-15-2015, § I) Sec. 1.2. Title. These regulations shall be known and may be cited as "The Development Regulations of Bartow County, Georgia," and may be referred to generally as "the development regulations" or, as used herein, "these regulations." (Ord. of 4-15-2015, § I) Sec. 1.3. Purposes. It is the purpose of these development regulations to promote the public health, safety and welfare of the citizens of Bartow County and visitors thereto. To these ends, these regulations are intended to achieve, and is enacted for, the following purposes: (1) To guide and regulate developments and subdivisions in Bartow County, in order to promote the general welfare of the county and residents and users of such developments and subdivisions; (2) To provide standards for road and street construction, and subdivision design, to create orderly traffic flow and serve the public health, safety and welfare, and to prevent congestion; (3) To provide for the control of stormwater and other negative impacts resulting from developments, and to protect from flooding and flood hazards; (4) To promote, in the public interest, the wise utilization of land; (5) To provide for adequate light, air, convenience of access, and safety; (6) To facilitate the creation of a convenient, attractive and harmonious community; (7) To expedite the provision of adequate police and fire protection and other public services; (8) To provide for protection of the constitutional rights and obligations of all citizens within the county; CDB:5 Supp. No. 18 (9) To streamline the construction plan review process by providing clear lines of communication and direction to staff; (10) Provide a system for the subdividing of lands and the accurate recording of land titles; (11) Provide assurance that those lots shown on recorded subdivision plats are usable by the purchasers for their intended and permitted functions; (12) Assure equitable, efficient and detailed review of all residential and non-residential construction plans by providing uniform development regulations for the development and subsequent construction of structures, buildings, or other improvements of any land within unincorporated Bartow County. (Ord. of 4-15-2015, § I) Sec. 1.4. Authority. These development regulations are adopted and certified by the Bartow County Commissioner under the authority of the Constitution of the State of Georgia (1983) and the Official Code of Georgia enacted pursuant to such authority. (1) These regulations shall govern the subdivision and development of land in unincorporated Bartow County, Georgia, pursuant to Georgia law and the authority of the Bartow County Commissioner. (2) Any development or subdivision of land must comply with any and all provisions of these regulations, the Bartow County Zoning Ordinance, and any other adopted rules and regulations of Bartow County. (3) For the purposes of these regulations, any division of a tract or parcel of land into three or more lots, building sites, or other divisions, and any development of land involving a new street or a change in existing streets must comply with all applicable provisions contained herein. (4) These development regulations incorporate by reference the Bartow County Development Checklist, which may be amended from time to time by the authority of the engineering department director. (Ord. of 4-15-2015, § I; Ord. of 10-1-2025) Sec. 1.5. Interpretation and intent. For the interpretation and application of the development regulations, all provisions shall be: (1) Considered as minimum requirements for the promotion of public health, safety, and general welfare. (2) Deemed neither to limit nor repeal any other powers granted under federal and state statutes. (3) The intent of these regulations is that they apply to and provide guidance for the development of any lands within the unincorporated areas of Bartow County, or any other areas over which the Bartow County Commissioner has authority pertaining to land development. (4) These regulations apply to all land disturbing activity and development activity, whether the development involves the subdivision of land for sale to individual users or pertains only to the construction of buildings or other improvements on a single parcel. (5) These regulations are intended to address these important needs: (A) Increased demand for development criteria in response to an ever-increasing environmental awareness. (B) Improved communication and coordination among county agencies and departments. (C) Improved efficiency and better service to the development community. (Ord. of 4-15-2015, § I) Sec. 1.6. Conflict with other regulations. Whenever these development regulations impose other more restrictive standards than are required in or under any other ordinance or statute, the regulations and requirements of these development regulations shall govern. Whenever the provisions of any other statute or ordinance require more restrictive standards than are required by these development regulations, the provisions of such statute or ordinance shall govern. (Ord. of 4-15-2015, § I) Sec. 1.7. Separability. The provisions of these regulations are separable. If a sentence, section, subsection or provision of these regulations, or the application of a provision of these regulations, be declared unconstitutional or invalid, such declaration shall not affect or impair the validity of the remaining portions of these regulations or the regulations as a whole, other than the part so declared unconstitutional or invalid. (Ord. of 4-15-2015, § I) Sec. 1.8. These regulations not zoning. These development regulations are not a zoning ordinance, but any proposed developer or sub-divider is advised to ensure that the proposed development or subdivision is in compliance with the requirements of the Bartow County Zoning Ordinance (Appendix A). (Ord. of 4-15-2015, § I) CDB:7 Supp. No. 18 Sec. 1.9. Exemptions. The following types of developments are required to submit only a final plat for approval by the development review committee: (1) Any combination or recombination of previously platted lots where the total number of lots is not increased and the resultant lots all meet the development standards of Bartow County. (2) Any division of land for the purposes of legacy, which is defined as a transaction between immediate family members (parents, children, grandparents, grandchildren, great grandparents, great grandchildren), as approved by the county engineer. (3) Certain developments may be exempt from these requirements if the project area being developed is comprised of less than one acre and/or is not located within 200 feet of any state waters. The county engineer may require site plans or construction plans if it is determined that the proposed facility will have a negative site impact, or are electrical substations, telecommunication towers, water and sewer pumping stations, and/or other similar facilities. (4) Clearly agricultural uses, limited to the cultivation of the land, dairying or animal husbandry, are not intended to be governed by these regulations, provided that land proposed to be converted to a new agricultural use must be zoned A-1 to be exempt from the provisions herein. (5) Recognizing that not all subdivision requirements are logical or affordable for large lot subdivisions, subdivision of land in the A-1 agriculture district into large lots (meaning where all lots are ten acres or greater in size) may be granted, upon approval of the county engineer, without requiring a preliminary plat before approval of a final plat. The county engineer is authorized to determine that the following development regulations either shall not apply or may be reduced from the stated requirement for large lot residential subdivisions: road right-of-way dedication (section 5.31(10)), connection to public water (section 3.1(6)), and/or stormwater management requirements (Code chapter 34, section 34-555). In order to eliminate or reduce such regulations, the county engineer must make a determination in writing that the proposed reduction or elimination is consistent with the spirit and intent of the code, will not harm the public interest or adjacent property, and is in the best interests of the county. Any such approved modification shall be noted on the final plat to provide public record of the fact that existing regulations have been varied or reduced for the particular large lot residential development. (Ord. of 4-15-2015, § I; Ord. of 8-5-2020(1), § I) Sec. 1.10. Amendments and revisions. These regulations may be amended from time-to-time by resolution of the Bartow County Commissioner. Such amendments shall be effective as of their date of adoption unless otherwise stated in the adopting resolution. Any subdivision or other development project for which a valid and complete application for a development permit shall have been received prior to the adoption of an amendment to these regulations may, at the developer's option, proceed to completion and building permits may be issued as though no amendment had been approved, provided that the development permit is or can be issued within 90 calendar days of said amendment and all time frames associated with said permit are observed. (Ord. of 4-15-2015, § I) Sec. 1.11. Existing permits. Any project for which an active development permit application exists prior to the adoption of an amendment to these regulations may, at the developer's option, proceed to completion and building permits may be issued as though no amendment had been approved. Variances and modifications in accordance with these regulations shall be granted as necessary and appropriate where full compliance is not feasible or cannot reasonably be achieved because of the stage of development, limitations imposed by the site, or design parameters. No amendment to these regulations shall be construed to affect the validity of any development permit or building permit lawfully issued prior to the adoption of said amendment. (Ord. of 4-15-2015, § I) Sec. 1.12. Subdivision and development of property. (1) Subdivision of three or more lots. These regulations shall govern all subdivision of land into three or more individual parcels or lots, within the unincorporated limits of Bartow County, Georgia, or any other areas over which the Bartow County Commissioner has authority pertaining to land development. (2) Development. These regulations shall also govern all new residential and nonresidential development and shall include redevelopment of existing development. It shall include the construction of any commercial, industrial, multi-family or office building or structure, even if on a single lot, and shall include the construction of a manufactured home park. (3) Pre-application review. Whenever a subdivision or development is proposed, the owner/developer will consult with the Bartow County Development Review Committee. The owner/developer will submit concept plans and data showing existing conditions within the site and its vicinity and the proposed development layout of the subdivision. (4) Approvals. The development review committee shall approve all preliminary plats and construction plans in accordance with these regulations. (5) Time limits on preliminary plat and construction plan approval. Preliminary plats shall be good for a period of one year after development review committee approval. Within that year construction plans must be submitted and approved. Construction of the project must begin within one year of construction plan approval. If these time limits are exceeded, the project shall be void and subject to re-application. CDB:9 Supp. No. 18 (6) Construction of phased developments. Developers shall be responsible for damages and maintenance of previously accepted streets. When construction traffic of new phases/ developments impact severely on existing county streets, as determined by the Bartow County Engineering Department, and the developer fails to take necessary corrective action, the developer's maintenance bond may be used for these off site repairs and maintenance. (7) Status of platted streets and other public spaces and utilities. After final approval by the development review committee and the completion of all improvements required by these regulations and the expiration of the required maintenance bond period, the owner/ developer may request the county to accept platted streets and other public spaces and utilities by preparing deeds to be reviewed by the engineering department fully describing the streets and infrastructure to be accepted by resolution of the Bartow County Commissioner. (8) Priority of health department. Nothing contained in these regulations shall be construed as preventing the health department, after study of the conditions existing in a proposed subdivision, from requiring that all or any portion of the area of such subdivision shall not be built upon or that the minimum lot sizes set forth in these regulations are inadequate and must be increased to insure the protection of public health. (Ord. of 4-15-2015, § I; Ord. of 10-1-2025) Sec. 1.13. Subdivision lot criteria. (1) Jurisdictional boundary lines. Lots shall not be divided by corporate or county boundary lines. (2) Corner lots. Corner lots for residential development shall have driveways on only one street. (3) Double frontage. For double frontage lots (i.e., lots having street frontage both in front and rear) in residential subdivisions along major thoroughfares, a no-access easement of at least ten feet in width, across which there shall be no right of access, shall be provided along the line of lots abutting said major thoroughfare. The no-access easement shall be planted with a single line of shrubs or trees, or contain a solid or decorative fence, or contain other such screening treatment as may be proposed by the developer and approved by the development review committee. For double frontage lots in subdivisions along minor collectors or local streets, there shall also be a no-access easement as described above, except that any planting or screening of the no-access easement shall be at the sole option of the developer. (4) Lot lines. Insofar as practical, side lot lines shall be at right angles to straight street lines and radial to curved street line. (5) Minimum lot dimensions and area. The minimum lot width at the front building line and minimum lot area shall be in accordance with the Bartow County Zoning Ordinance. (6) Street access. Every lot hereafter established shall front or abut on a street which is to be dedicated to the public and conforms to the requirements of these regulations, unless on an approved driveway easement or as otherwise approved by the development review committee. Generally, lots shall not derive access exclusively from any street designated as an arterial or collector street on the roadway classification map. If access must be obtained from an arterial or collector street, single family residential driveways shall be designed and arranged to avoid requiring vehicles to back into traffic. Multiple family residential driveways and drives serving all nonresidential land uses shall be designed and arranged to avoid requiring vehicles to back into traffic on all streets. A maximum of 150 residential dwelling units shall be allowed to be constructed with only one street outlet on an existing public street. If a second access to an existing public street is not available or, in the opinion of the development review committee, could induce non-residential traffic through the development, a single entrance may be allowed if designed to accommodate a traffic signal and/or sufficient right-of-way and improvements to provide a protected left-turn lane, subject to the approval of the Bartow County Engineering Department. (Ord. of 4-15-2015, § I; Ord. of 10-1-2025) Sec. 1.14. Effective date. These development regulations shall take effect and be in force immediately upon approval by resolution of the Bartow County Commissioner during a public hearing. Revisions to these development regulations shall be effective immediately and apply to all development activities received for review by the Bartow County Development Review Committee on or after this date. Projects received for review prior to such revisions shall satisfy the development regulation criteria in place at the time the documents were initially submitted and/or approved. This ordinance replaces those sections herein revised in their entirety the previous Bartow County Development Regulations as amended, except to the extent the provision of those regulations remain in effect for existing construction and projects under review prior to the effective date of these regulations. The provisions of those regulations shall remain in effect and be incorporated herein for such existing construction, subdivisions, structures and developments not subject to this ordinance. (Ord. of 4-15-2015, § I) ARTICLE II. DEFINITIONS Sec. 2.1. Interpretation of certain words and phrases. Except as specifically described herein, all words shall have the customary dictionary meaning. Engineering terms of art and concepts, if not specifically defined herein, shall carry their customary meaning within the engineering profession. For the purpose of interpreting these regulations, certain words or terms used herein shall be defined as follows: Words used in the present tense include the future tense. Words used in the singular number include the plural, and words used in the plural include the singular. The word "person" includes a firm, association, organization, partnership, corporation, trust, and CDB:11 Supp. No. 18 company as well as an individual. The word "used" or "occupied" as applied to any land or building shall be construed to include the words "intended, arranged, or designated to be used or occupied. "The word "lot" includes the word "plot" or "parcel." The word "shall" is always mandatory. The word "used" or "occupied" as applied to any land or building shall be construed to include the words "intended, arranged or designed to be used or occupied." Doubt as to the precise meaning of any word used in these regulations shall be clarified by the engineering department director or his designee. (Ord. of 4-15-2015, § II; Ord. of 10-1-2025) Sec. 2.2. Definitions of words and phrases. [The following words, terms and phrases, when used in this appendix, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:] Alley or service drive: A minor, permanent way, public or private, used primarily for vehicular service access to the back or side for properties otherwise abutting a street and which affords only a secondary means of access to abutting property, and is not intended for general traffic. AASHTO Standards: Standards set forth by the American Association of State Highway Transportation Officials. Average daily trips (ADT): The total number of vehicle movements both entering and exiting the designated study site on an average weekday. ADT for various land uses will be determined using the most current edition of the Institute of Transportation Engineers' (ITE) Trip Generation Manual. Applicant: A person, either the owner or the bona fide representative of the owner of land or structures governed by these regulations, who seeks authority to use, develop, construct upon or otherwise enjoy the use of property through any of these procedures established under these regulations. Arterial: A principal arterial or minor arterial street as defined and designated in the comprehensive plan of Bartow County and in the functional roadway classification map of Bartow County. As-built survey: See Record drawings. Bartow County Development Checklist: A separate publication available from the engineering department director that is incorporated herein by reference, and contains additional detailed development standards and procedures. Bartow County Site and Utility Details for Development: A separate publication available from the community development department that is incorporated herein by reference, and contains additional detailed standards relating to site and utility design. Best management practice (BMP): A collection of structural measures and protective vegetative practices properly designed, installed and maintained in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia, latest edition, incorporated herein by reference. Board of appeals: The board established by the Bartow County Zoning Ordinance to hear appeals of interpretations of the engineering department director and to hear applications for variances from the requirements of these regulations. Breakaway wall: A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system. Buffer (for erosion/sedimentation control purposes): An area along the course of any state waters to be maintained in an undisturbed and natural condition. Buffer (general): A barrier that is created by the use of trees or other acceptable plant or vegetative material alone or in combination with berms, fencing or walls used to physically separate or screen one use or property from another so as to visually shield or block noise, lights and/or dissimilar uses. Buildable lot of record: A lot or parcel of land that existed as a single parcel of ownership, recorded as such in its entirety and present boundaries with the clerk to superior court prior to September 31, 1993, or which is shown in its entirety and present boundaries on a final plat or exemption plat duly approved under in accordance with Zoning Ordinance, providing for the subdivision of land in Bartow County and recorded with the clerk to superior court of Bartow County. Building: Any structure intended for shelter, housing, or enclosure of persons, animals, chattels or property, and usually having a roof supported by columns or by walls. Building line: A line established by the Georgia Plat Act beyond which a building shall not extend, as determined by the front, side and rear yard setbacks. Certificate of occupancy (C.O.): Final approval by the chief building official for the use or occupancy of a structure for which a building permit was issued. Clearing: The removal of trees or other vegetation, but not including grubbing activities. Community development department: A department of the Bartow County government comprised of the building inspections division, and the zoning division, that has responsibility for overseeing physical land development in the county. Comprehensive plan: A plan summarizing and illustrating the adopted goals and objectives of the commissioner regarding the future location and character of anticipated land uses, transportation, and other public facilities in Bartow County. The term "comprehensive plan" includes component or functional plans for the county, including but not limited to a CDB:13 Supp. No. 18 plan for land use (i.e., Land Use Plan) or a plan for transportation facilities, and includes the classification of streets and thoroughfares as shown on the adopted long range roadway functional classification map. Concept plan: A drawing that shows the overall concept of a proposed development, and that may include lots and streets in a subdivision or the general location of buildings and improvements for a multi-family or non-residential project, and that may be drawn to approximate dimensions. These drawings are for information purposes only and shall not be formally reviewed or approved by the county. Construction plan: A set of plans that must be formally submitted to the development review committee for review and approval following the review of a concept plan and approval of a preliminary plat on residential subdivisions and application for a land disturbance permit. Such plans shall include, but not be limited to, grading plans, soil erosion and sediment control plans, hydrology studies, transportation plans, water plans, sanitary sewerage plans, on-site sewer plans and public safety plans. County: Unless otherwise stated, Bartow County, or the commissioner of Bartow County, or the commissioner's designee. County engineer: The county engineer of Bartow County, Georgia, assigned to the engineering department. Cul-de-sac: A street having one end open to traffic and being permanently terminated within the development by a vehicular turnaround. For the purpose of designation, a cul-de-sac street shall be interpreted to begin at the intersection of two or more streets nearest to the vehicular turnaround. Cut: A portion of land surface or area from which earth has been removed by excavation; also, the depth below original ground surface to excavated surface. Department: Unless otherwise stated, this term refers to the Bartow County Engineering Department. Developer: Any person, corporation or duly authorized agent who undertakes the subdivision of land as defined herein. Development, or to develop: Subdividing a tract of land into three or more lots whether for sale or rental, whether for commercial, industrial, office or residential purposes, or some combination thereof. It shall also include redevelopment of existing development. It shall also include the construction of any commercial, industrial, multi-family or office building or structure, even if on a single lot, and shall include the construction of a manufactured home park. In order that the purposes of these regulations shall not be evaded by piecemeal development or subdivision, subdividing a tract of land existing on September 31, 1993 into two tracts shall not be a development, but any further split of either tract shall be a development. 1. (Verb). All activities associated with the conversion of land or the expansion or replacement of an existing use to any new use intended for human operation, occupancy or habitation, other than for agricultural purposes devoted strictly to the cultivation of the land, dairying or animal husbandry. Such activities include land disturbance (clearing and grubbing the land of vegetation and stumps, and grading) and the construction of improvements such as but not limited to streets, driveways or parking areas, water or sewer mains, storm water drainage facilities, sidewalks or other structures permanently placed on or in the property. 2. (Noun). Where appropriate to the context, the term "development" also may be used to denote a specific subdivision or project that is a single entity or intended to be constructed as an interrelated whole, whether simultaneously or in phases. Development inspector: The county inspector responsible for inspections in the field throughout the development phase of a specific development. Development permit: A permit issued by the engineering department authorizing clearing, grubbing, grading and construction of storm drainage facilities, access drives, streets, parking or other improvements exclusive of buildings. Development review committee: A committee comprised of department representatives from building inspections, engineering, environmental health, fire/fire marshal, GIS, roads/transportation, water/sewer and zoning. The primary function of the development review committee is to review and approve all proposed subdivisions of property, residential and non-residential site developments and other such similar projects that fall under the purview of these regulations. Diameter breast height (DBH): The diameter of a tree measured at a point four and one-half feet above the ground. Drainage improvements: Those facilities and structures intended to control and direct the passage of storm waters and other surface water flows from and across a property; including, but not limited to, swales and ditches, cross drains and other piping systems, catch basins, detention ponds and velocity dissipation devices. Driveway: A vehicular access way in private ownership, other than a private street, which provides access primarily to only one property, or to no more than two single-family detached residences. Dwelling or dwelling unit: A building or other structure designed, arranged, or used for temporary or permanent living quarters for one family, whether freestanding or a part of another building containing other residences. Easement: A grant by a property owner of the use of land for a specific purpose or purposes by the general public, a corporation, or a certain person or persons and recorded in the superior court clerk's office. Enclosure: A structure with four sides and a roof designed to enclose and shelter animals, persons or objects. Environmental Health Department: See Health department. CDB:15 Supp. No. 18 Fee simple: A form of property ownership in which the buildings and surrounding lands are owned by the same person. Federal Emergency Management Agency (FEMA): The federal agency that administers the National Flood Insurance Program. FEMA prepares, revises and distributes the maps and studies referenced in these regulations. Fill: A portion of land surface to which soil or other solid material has been added; the depth above the original ground. Final plat: A finished drawing of a subdivision showing completely and accurately all legal and boundary information and certification, as specified in Article 4 of these regulations. Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design. Finished floor elevation: The top surface of the lowest inhabitable level of an enclosed area in a building, including the basement. This could be the top of the slab in concrete slab construction or the top of wood flooring in wood frame construction. The term does not include the floor of a garage used solely for parking vehicles. Fire flow: The minimum volume flow rate of water established by the water and sewer department with a required minimum residual pressure. Flood or flooding: A general or temporary condition of partial or complete inundation of normally dry land areas from either the overflow of inland or tidal waters or the unusual and rapid accumulation or runoff of surface waters from any source. Floor: The top surface of an enclosed area in a building (including basement), i.e., top of slab in concrete slab construction or top of wood flooring in wood frame construction. The term does not include the floor of a garage used solely for parking vehicles. Frontage: The width of a lot as measured where it abuts the street right-of-way. Georgia D.O.T. (GDOT): The Department of Transportation of the State of Georgia. Grading: The movement, removal or addition of earth on a site by the use of mechanical equipment. Grading permit: An official authorization issued by the engineering department permitting grading of a site, and may include installation of attendant storm water drainage facilities. See also "Land disturbance permit." Ground elevation: The original elevation of the ground surface prior to cutting or filling. Grubbing: The removal of stumps or roots from a property. Health department: The Environmental Health Services Division of the Georgia Department of Human Resources for Bartow County. Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land, but not including agricultural operations and forestry. Land disturbance permit: A permit granted under the Bartow County Soil Erosion and Sedimentation Control Ordinance that provides the authorization necessary to conduct a land-disturbing activity under the provisions of that ordinance and these regulations. Said permit may be a grading permit or development permit as defined and authorized herein. Line, lot: The boundary line of a lot. Line, yard: A line drawn parallel to a lot line at a distance there from equal to the depth of the required setback. Lot: A developed or undeveloped tract or area of land established by plat, having defined boundaries and legally transferable as a single unit of land; does not refer to public rights-of-way; also, a parcel of land, whether or not platted, in single ownership, and not divided by a street. Lot of record: Any lot identified on a final subdivision plat approved by Bartow County and recorded in the office of the clerk of Bartow Superior Court is a lot of record. Any lot described in a deed, sales contract or survey, that was recorded in the office of the Bartow County Recorder before September 31, 1993 is a lot of record. Any lot described in a deed, sales contract, or survey that was recorded after September 31, 1993 and the present, and which complied with the zoning requirements in effect at the time of its creation, is a lot of record. Lot, depth of: The mean horizontal distance between the front and rear lot lines, measured in the general direction of the side lot lines. Lot, width of: The distance between side lot lines. Major intersection: The intersection of two or more public streets in which at least one of the streets is an arterial or major collector as designated by the comprehensive plan and the roadway classification map. Major thoroughfare: Any public street, existing or proposed, which is shown in the comprehensive plan and roadway classification map as an arterial or major collector. Mean sea level: The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of these regulations, the term is synonymous with National Geodetic Vertical Datum (NGVD). Minor collector: A through street having the primary function of connecting subdivisions or other areas to major thoroughfares, or functioning as a central route within a subdivision channeling traffic from the local streets to either an abutting major thoroughfare or another CDB:17 Supp. No. 18 minor collector street. For the purposes of these regulations, a central but non-through route within a subdivision or other project will be considered as a minor collector, if the average daily traffic generated by the development on the route will exceed 2,000 trips. National American Vertical Datum (NAVD): As corrected in 1988, a vertical control used as a reference for establishing varying elevations within the floodplain. Natural ground surface: The ground surface in its original state before any grading, excavation or filling. Nephelometric turbidity units (NTU): Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed particles are present. NPDES-NOI: (NPDES) shall be as per the National Pollutant Discharge Elimination System Permit and the notice of intent (NOI) as a requirement of that permit. Owner: A person having a majority fee simple interest in real property, or a majority interest through any other form of ownership. Performance guarantee: A bond, letter of credit, cash equivalent, or other instrument provided by the developer and approved by the Bartow County Attorney that ensures funds will be available to the county if the required subdivision improvements are not completed. Person: An individual, firm, partnership, corporation, joint venture, association, social club, fraternal organization, estate, trust, business trust, receiver, syndicate, or other group or combination acting singly or collectively for a common purpose, and the duly authorized agents thereof. Plat: A map, plan or layout, of a county, city, town, lot, section, subdivision or development indicating the location and boundaries of properties. Plat, final: The plat of the subdivision, meeting the requirements of these regulations, for recording in the office of the clerk of the Superior Court of Bartow County. Preliminary plat: A drawing that shows the perimeter boundary, topography, lot arrangements, street layout and other features of a proposed subdivision, as specified in Article 4 of these regulations. Principal use: The primary purpose for which land or a building is used. Private dwelling: For the purpose of these regulations, a private dwelling is a single family or duplex residence located on any property that is not part of a platted subdivision. Project: A principal building or structure, or group of buildings or structures, planned and designed as an interdependent unit together with all accessory uses or structures, utilities, drainage, access, and circulation facilities, whether built in whole or in phases. Examples include: a principal building on a lot, a residential subdivision, a multi-family development, a shopping center or an office park. Project access improvement: Any improvement or facility that is planned and designed to provide service or access for a particular project and that is necessary for the use, safety and convenience of the occupants or users of the project and is not a system improvement. A project access improvement includes, but is not limited to: pedestrian access improvements; site driveways; new streets; median cuts; right turn lanes; left turn lanes; acceleration lanes; deceleration lanes; traffic control measures made necessary to serve site driveways or new streets; intersection improvements whose primary purpose at the time of construction is to provide access to the project; and necessary right-of-way dedications required for any project access improvement. Record drawing: A survey or other drawing based on a field survey which shows existing features or components and horizontal or vertical information (grades or location of improvements). Redevelopment: The process of developing property that has previously been developed. See Development. Regulations: These development regulations and all amendments thereto, and the Bartow County Development Checklist, and the Bartow County Site and Utility Details for Development, both of which are incorporated herein by reference. Residential drainage plan: A drawing showing lot information and all improvements, as required by Article 3 of these regulations. Right-of-way line: The dividing line between a lot, tract or parcel of land and a contiguous right-of-way. Road: See Street, Public. Roadway: The paved portion of a street from back of curb to back of curb (or edge to edge of pavement for streets not having curbs) but excluding driveway aprons, bridges, and large single and multi-cell culverts that in an hydrologic sense can be considered to function as a bridge. Roadway classification map: A map maintained by the engineering department that shows the classification, as defined in these regulations, of all roadways in Bartow County. Roadway drainage structure: A device such as a bridge, culvert or ditch that conveys water under a roadway by intercepting the flow on one side of a traveled way consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side. Setback: The open space between the lot line and the yard line, which shall be unobstructed by any structure other than as expressly permitted in the Bartow County Zoning Ordinance. Site work: Development activity to prepare a property for construction of buildings or finished structures, including clearing, grubbing, grading and installation of soil sedimentation and erosion control facilities. CDB:18.1 Supp. No. 18 Standard building codes: The state minimum standard codes as adopted by the Bartow County Building Code Ordinance, and as defined by O.C.G.A. § 8-2-20. Street: A way for vehicular traffic, whether designated as an avenue, road, boulevard, highway, expressway, lane, alley or other way. Structure: Anything constructed or erected, the use of which requires location on the ground, or attachment to something having location on the ground. Subdivider: Any person, individual, firm, partnership, association, corporation, estate, trust, or any other group or combination acting as a unit dividing or proposing to divide land so as to constitute a subdivision as herein defined, including an agent of the sub-divider. To subdivide: Dividing a tract of land into three or more lots. Subdivision: 1 (Verb) Any division or re-division of a lot, tract or parcel, regardless of its existing or future use, into three or more lots, tracts or parcels for the purpose, whether immediate or future, of sale, legacy or building development. This includes all division of land involving a new street or change in existing streets and includes re-subdivision and, where appropriate to the context, relates to the process of subdividing or to the land or area subdivided; provided, however, that the following are not included within this definition: (1) The combination or re-combination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards set forth in these regulations. (2) (Noun). Where appropriate to the context, the term "subdivision" also may be used in reference to the aggregate of all lots held in common ownership at the time of division. System improvement: Any improvement or facility such as streets, bridges or rights-ofway identified in the comprehensive plan, and any traffic control measures, landscaping or other features to same and is further designed to provide service to the community at large. Tie point: The point of reference for a boundary survey. Said point of reference shall be an established, monumented position that can be identified or relocated from maps, plats or other documents on public record. Two GPS ties with coordinates shall be required on all final plats. Tree: Any self-supporting woody perennial plant, usually having a main stem or trunk and many branches, and at maturity normally attaining a trunk diameter greater than three inches at any point and a height of over ten feet. Tree diameter: The widest cross-sectional dimension of a tree trunk measured at diameter breast height (dbh) or at any point below dbh for new trees or multi-trunked species, but in no case less than six inches from the ground. Townhouse: A multi-family residential use consisting of three or more attached dwelling units for which fee simple title is conveyed and for which an incorporated mandatory homeowners' association is provided. Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater. (Ord. of 4-15-2015, § II; Ord. of 10-1-2025) ARTICLE III. DEVELOPMENT STANDARDS* Sec. 3.1. Generally. When someone desires to conduct land-disturbing activities, it is necessary to submit site construction documents for review. Bartow County generally does not require a land disturbance permit for individual residential building lots. However, all other forms of land disturbing activities do require such permits. For the purposes of determining compliance with certain provisions of these regulations, redevelopment means "a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution." The engineering department coordinates the review and approval process for all site construction documents submitted to Bartow County for permitting under this section. It is important that all information requested on the application for plan review is completed. The failure to complete or provide all information may result in delays and/or the requirement of re-submittal of an application. Acceptance of plans by Bartow County shall not constitute or guarantee any rights unless such plans are prepared in accordance with the development regulation. It is the responsibility of the applicant to ensure the completeness and accuracy of the plans. In the event an application is determined by staff to contain false or misleading information, any permit issued hereunder may be revoked or suspended with penalties assessed. For permitting a structure, a structural plan submittal is necessary as provided in section 18-161 of the Building Code for Bartow County. Additionally, it is advisable that an applicant obtains a water and/or sewer availability letter prior to commencing the permitting process. Approval of plans by Bartow County officials or employees shall not imply nor transfer acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture or any other profession, from the professional corporation or individual under whose hand or supervision the plans were prepared and sealed. In any development or subdivision in this county, the improvements, facilities, and utilities described in this article shall be planned for and provided by the developer, by installation and/or payment prior to the approval of the development or manufactured house park. In addition, all development or subdivision in this county must comply with the following requirements, as applicable: (1) Relevant ordinances and construction plans. Any person wishing to develop or redevelop commercial, industrial or multi-family property, or subdivide residential, commercial, or industrial property, must submit construction plans (with hydrology), that also comply with the Bartow County Stormwater Management Ordinance, the Bartow County Floodplain Management/Flood Damage Prevention Ordinance, and the Bartow County Soil Erosion and Sedimentation Ordinance. (2) Interdepartmental review and approval. The engineering department shall not issue a permit for any development activities until all plats and construction plans, as applicable, have been approved by the development review committee as may have authority or jurisdiction over said activities in whole or in part. (3) Review of plats and plans required. All preliminary plats, concept plans, construction plans and final plats must be submitted to the development review committee for review and approval prior to the commencement of land disturbance or construction activities. All information requested on plan transmittal applications for plat or plan review must be provided; incomplete applications will not be accepted. Likewise all plats and plans must contain the minimum information outlined in this article. The absence of necessary design data shall result in plats and plans being resubmitted for a future plan review date. (4) Review by departments. The engineering department shall oversee communication with reviewing departments during the review period regarding review comments. (5) Paved streets. The developer/subdivider of any development or redevelopment or subdivision shall provide adequate streets and shall pave said streets according to minimum requirements (including appropriate width) as provided in these regulations. No subdivision shall be permitted on an unpaved street. (6) Public water required. All residential developments must be connected to a governmentally-owned public water system, at the expense of the developer, in accordance with the rules and regulations of the Bartow County Water Department, including the Water Service and Conservation Ordinance (Code section 74-31 et seq.), and the Sewer System Ordinance (Code section 75-251 et seq.), and including the Water Department Development Procedures. (7) Street names. The developer shall submit the names of streets and developments for approval by the county in accordance with these regulations certifying that the proposed names are not confusingly similar to other existing named streets or developments. The decision of the county approving or disapproving the proposed names shall be final. (Ord. of 4-15-2015, § III; Ord. of 10-1-2025) Sec. 3.2. Submittal process. It shall be the policy of Bartow County to review development proposals for compliance with the standards adopted by the Bartow County Commissioner. This policy shall also include performing this review in a timely manner so as not to delay development. In order to enhance operational efficiency of this policy it is imperative that developers thoroughly familiarize themselves with all the pertinent Bartow County Subdivision and Development policies, regulations and standards. A concept meeting that includes a preliminary review provides the development community the opportunity to receive feedback from representatives from each agency/department/division prior to the production of construction documents in order to obtain data critical to the design of the project. A concept meeting shall be scheduled in accordance with subsection 3.2.2. (1) General procedures. (A) All fees for both residential and non-residential developments shall be determined by resolution of the Bartow County Commissioner. (B) It shall be a condition of the Bartow County Development Regulations that any person seeking a land disturbance permit shall be required to have completed a class and received certification per O.C.G.A. § 12-7-19. (C) A traffic impact study shall be submitted to the County Engineer prior to submittal of civil (construction) plans if: i. Project exceeds 150 residential dwelling units; or ii. Contains more than 50,000 square feet of gross floor area; or iii. Project will generate more than 100 trips per peak hour per current edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual. iv. Projects that meet the thresholds of a Development of Regional Impact shall prepare a traffic study at the time of filing a rezoning application. The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review. (2) Pre-application conference/concept review. (A) For the purpose of expediting applications and reducing construction plan design and development costs, the developer shall be required to consult informally with the development review committee. When residential in nature the developer should consult with a representative of the Bartow County Board of Education. The developer shall submit an electronic pdf sketch plan showing one or more designs for the proposed development and a map of the vicinity showing the relationship between the proposed development and nearby physical features, streets, subdivisions, and/or acreage tracts. The developer shall not be bound by the determination of the pre-application conference, nor shall the development review staff be bound by any such review. CDB:18.5 Supp. No. 18 (B) A concept meeting can be scheduled through the engineering department for each Thursday morning. The request for a concept meeting must be made by contacting the engineering department by 4:00 p.m. on Wednesday of the preceding week (in other words, eight days prior to the requested conference date). The following information shall be required at the time the concept meeting is requested: (1) A preliminary or conceptual site layout plan. (2) Location of project site. (3) Tax parcel of street address. (4) District. (5) Land Lot(s). (6) Name of person to contact for confirmation of appointment. (7) Contact number and email address of the person can be reached on Thursday morning. (8) Number of people to attend conference, their names and company affiliation. (9) The general nature of the information sought from the various county departments. (10) The type of project proposed. (11) See the Bartow County Stormwater Management, section 34-587 for additional requirements regarding stormwater management procedures. (3) Plan routing. The Developer and/or his designated agent shall provide development/ construction plans for all county agencies stated herein. The community development department shall be the clearinghouse for plans submittal and pickup: Engineering 770.387.5067 Zoning 770.387.5007 Bartow County Water and Sewer 770.387.5170 Road Department 770.387.5140 Structural Numbering/GIS 770.387.5015 Building Inspections 770.387.5005 Environmental Health 770.387.2614 Fire Marshal's Office 770.387.5151 School Board (as applicable) 770.606.5800 Cities of Adairsville, Cartersville (as applicable) Georgia Department of Transportation (as applicable) (4) Plan submittal. The engineering department shall coordinate information for plan review and the development review committee. Electronic version of the plans shall be submitted to plans@bartowcountyga.gov with application and pertinent information that may be found at bartowcountyga.gov. (A) To expedite the review process for resubmittals, it is strongly suggested the developer or developer's engineer prepare a line item response to all review comments addressed in revised plans by indicating sheet, number, section, detail, etc., including if necessary, to "cloud" or "balloon" all revision items and areas. (B) The engineering department shall retain responsibility for issuance of all land disturbance permit letters and land disturbance permits for approved development projects. Once all the development review committee requirements have been met, the approvable plans as required in these regulations will be signed off electronically by each department head or his designated representative prior to the engineering department's notification to the developer of such approvals. (Ord. of 4-15-2015, § III; Ord. of 4-14-2021(1), § II; Ord. of 10-1-2025) Sec. 3.3. Applications for preliminary plat review. (1) Submittal process. Application for preliminary plat approval shall be submitted to the community development department using an application form to be determined by the county engineer. The application, a PDF copy and the appropriate fee shall be submitted to the department at plans@bartowcountyga.gov. (2) Review of preliminary plat. Each project submitted for review will be reviewed in the order received. (3) Actions taken by engineering department. After receipt of comments from the development review committee that reviews the preliminary plat, the department shall do one of the following in writing: (A) Issue an approval of the preliminary plat. (B) Disapprove the preliminary plat or any portion thereof on the grounds that the proposed subdivision would not meet the requirements of the development regulations, or would create conditions, which would be unfavorable to, or adversely affect, the health, safety, convenience, prosperity, or general welfare of the citizens of Bartow County. In such case, the county engineer shall notify the applicant in writing of the county's decision. (C) Issue a list of requirements and corrections. If the development review committee determines that an insufficient amount of information, detail or design was provided for review, the project shall be resubmitted. CDB:18.7 Supp. No. 18 (D) Upon approval of the preliminary plat, the developer shall submit an electronic copy to the community development department for inclusion into the county's GIS system. This will assist public safety personnel in locating and addressing for emergency services and model home permitting. (4) Preliminary plat approval binding one year. Approval of the preliminary plat shall be effective and binding upon the county for a period not to exceed one year from the date of approval and shall thereafter expire and be null and void except to the extent that work on the subdivision has progressed, unless a request for a one-time extension of time (limited to six months) has been submitted to and is subsequently approved by the engineering department. (5) What approval of the preliminary plat constitutes. Approval of the preliminary plat is an expression of approval of the layout submitted on the preliminary plat as a guide to the preparation of the construction documents and the final plat, and is not to be considered as approval of the final plat. (6) Effect on status of dedication. The approval of a preliminary plat by the county shall not be deemed to constitute or affect an acceptance by the county of any street or other ground shown upon the plat. (7) Improvements authorized. Notwithstanding preliminary approval, no improvements are authorized before approval of construction plans by all review departments as set forth in Section 3.4, Construction Plan Approval, of these regulations. Improvements must be installed according to construction plans. Any modifications must be approved by the appropriate department or agency representative authorized to approve such changes. (8) Preliminary plat submittal specifications. The preliminary plat shall be clearly and legibly drawn at a standard engineering scale of not less than 100 feet to one inch (1"=100'). The preliminary plat shall be prepared by the appropriate design professional, and seal of the certifier shall be shown on the plat. (A) The proposed name of the subdivision and the proposed street names shall be in accordance with these regulations. The developer shall submit the names of developments and streets for approval to the GIS department certifying the proposed names are not confusingly similar to other existing named developments and streets. The street name index, maintained by the county's GIS department, can provide information on existing street names. (B) The preliminary plat shall contain the items as summarized in the appropriate Bartow County Preliminary Plat Review Checklist incorporated herein by reference. From time to time the checklist may be amended from time to time by the authority of the engineering department director. (C) Plat certificates. Each preliminary plat submitted to the community development department shall carry the following certificates printed or stamped thereon substantially as follows: 1. Preliminary certification statement: "I hereby certify that this proposed preliminary plat represents data compiled or verified through a survey completed by me on 20 , of property shown and described heron. According to the State of Georgia Safe Dams Act Map for Bartow County, Georgia, I have determined this development does not lie in a basin below a Category II Dam." By: Registered Georgia Land Surveyor No: -ORBy: Registered Georgia Landscape Architect No: -ORBy: Registered Georgia Professional Engineer No: 2. Preliminary soil analysis certificate: (By Georgia Department of Human Resources (DHR) certified soil classifier): "I hereby certify that this document is a true representation of the results of an actual comprehensive soil analysis at a minimum DHR level three (3) soil survey by me or under my supervision and that areas are shown that are not acceptable sites for individual septic system as required by the local and/or State Health Department." By: Certification No: Date: 3. Bartow County Environmental Health Department Certificate: "Pursuant to the State Health requirements, a comprehensive soil analysis at a minimum DHR level three (3) soil survey was given final approval by the Bartow County Environmental Health Department on date stated below all of the conditions of approval having been completed, this document is hereby accepted." By: Date: 4. Preliminary plat approval certificate. The following approval certification should be provided on the preliminary plat to indicate the approval and acceptance of the appropriate Bartow County agencies/departments/divisions. "All requirements of the Bartow County Development Regulations relative to the preparation and submission of a preliminary plat have been fulfilled, CDB:18.9 Supp. No. 18 approval of this preliminary plat is hereby granted, subject to the further requirement of said Regulations. This approval does not constitute review and approval for a required land disturbance permit and any project related improvements required by the Bartow County Zoning Ordinance or Bartow County Development Regulations as part of the land disturbance permit. This certificate shall expire on Engineering Division Date Zoning Division Date 5. Each preliminary plat must contain the additional language in bold print: "PRELIMINARY PLAT, NOT TO BE RECORDED" 6. Preliminary plat filing fee. At the time of filing an application for preliminary plat approval, a fee shall be paid to the community development department. See fee schedule for appropriate fee. (Ord. of 4-15-2015, § III; Ord. of 5-11-2016, § I; Ord. of 10-1-2025) Sec. 3.4. Applications for construction plan review and approval. (1) Submittal process. Application for construction plan approval shall be submitted to the department using the application form provided. The application, along with a pdf file of the construction plans, a pdf file of a stormwater management report and the appropriate fee, shall be submitted to the department. The ideal plan sheet size is 24 inches by 36 inches. A land disturbance permit number will be assigned to each project to assist in tracking plans during the process. The number assigned during preliminary plat review will continue to be used for residential projects. The applicant is responsible for submitting a set of plans to utility departments (e.g., Cartersville Gas, Adairsville Water, etc.) of each municipality separately if applicable. (2) Information required at the time of submittal. In addition to the required application form the following information/documents shall be provided: (A) An approved preliminary plat (for residential projects). (B) The centerline of the development entrance(s) shall be located by nail and cap and painted at the centerline or edge of pavement of the roadway that the development will access. Said nail and cap location shall be indicated on the submitted construction plans along with the date that the nail and cap were placed. (C) Satisfactory results of a fire flow test. (D) Verification of erosion/sediment control certification(s). (E) An approved method of sewage disposal. (F) Satisfactory intersection sight distance and entrance plan. (G) A plan for proper disposal of waste as defined by O.C.G.A § 16-7-51(6), et, seq., and as may be amended from time to time, from the clearing and grubbing of trees and vegetation. (H) Construction plans required. All site construction documents, (hereafter the "Plan Review Copy") for approval include the following drawings: Title sheet with project map and description Preliminary plat or plan Grading/drainage plan Storm drainage profiles Soil erosion/sediment control plan Landscape/tree planting plan Water layout plan Sanitary sewer plan Sanitary sewer plan/profiles Intersection site distance plan Street plan/profiles Construction details Hydrology report Construction plans shall be submitted so as to demonstrate full compliance with all applicable provisions of the following: 1) these regulations; 2) the Bartow County Site And Utility Details For Development; 3) the Bartow County Development Checklist; 4) the Bartow County Soil Erosion and Sedimentation Ordinance (Code Sec. 34-251 et seq.); 5) the Bartow County Flood Damage Prevention Ordinance (Code section 34-31 et seq.); and 6) applicable state and federal rules, regulations and laws. The fees for review of plans and re-submittals shall be as determined by the commissioner of Bartow County from time to time. Said fees shall be paid at the time of submission. (I) Pursuant to the Georgia Safe Dams Program, when an existing Category II dam is reclassified to a Category I dam because of proposed development downstream of the dam, the developer shall provide for review to the State of Georgia the following information: (1) Location of the Category II dam and the proposed development; and (2) A surveyed cross-section as required by the Georgia Safe Dams Act of the stream valley at the location of the proposed development including proposed finished floor elevations; (3) A dam breach analysis using the Dambreak computer model to establish the height of the flood wave in the downstream floodplain. The Dambreak modeling CDB:18.11 Supp. No. 18 shall be completed in accordance with the Safe Dams Program Quality Assurance Program by a qualified registered engineer. The dam breach analysis shall identify all existing structures within the dam breach zone area, if any, and the use of each structure. Inventory information regarding Category II dams within Bartow County may be obtained through the Georgia Safe Dams Program. (J) The maximum allowable size for construction plans shall be 24 inches by 36 inches. The preparation of construction plans shall include all the applicable information outlined in these regulations. A list of the staff members of the development review committee that assist in the review and approval of the site design plans is maintained by the community development department. Each County agency/ department/division involved in the review and approval process can provide a list of data required to complete compliance with the development standards (also referred to as checklists). (K) The applicant is responsible for submitting a set of plans to the appropriate utility department of each municipality as applicable. (3) [Reserved.] (4) Project approval. Following completion of the construction plan review, an individual shall be required to incorporate all comments and recommendations into a revised set of construction plans. The amended plans must be accompanied by the red-line "Plan Review Copy" of the plans and by the package of comments returned by each agency/department/ divisions. Additionally, the agency/department/division shall evidence its approval by signature on the plans. Should these projects fall outside the jurisdictional boundaries of a Bartow County Agency/Department/Division such as water, or sewer, those jurisdictions' approval must be shown on the face of the documents. Upon receiving approval from all agencies/departments/divisions and affected outside jurisdictions, the applicant is granted a land disturbance permit at the preconstruction meeting. (A) [Reserved.] (B) [Reserved.] (C) The engineering department will issue a land disturbance permit letter for the project upon successfully obtaining the final approval of the development review committee. Once all required documentation, including bonds and/or letters of credit, preconstruction certifications, a copy of the NPDES notice of intent (NOI) ensuring compliance with the state general permit and appropriate permit fees have be submitted to the community development department, the development permit will be delivered to the project site by the department's development inspector at the time of the scheduled pre-construction meeting as required in these regulations. (D) Construction plan approval binding one year. Approval of the site construction plans shall be effective and binding upon the county for a period not to exceed one year from the date of approval and shall thereafter expire and be null and void except to the extent that work on the project has progressed, unless a request for an extension of time has been submitted to and is subsequently approved by the community development department. Land disturbing activities under this permit must commence within 120 days after issuance of permit. Failure to begin work may be cause for the permit to be canceled. Once a permit has been canceled, it cannot be reactivated for any reason. A new set of construction plans must be submitted in accordance with these regulations when the applicant is ready to begin land disturbance. (5) Required documentation prior to issuance of permit; sureties. No land disturbance permit shall be issued by the county to the developer until a surety or sureties have been furnished to the engineering division, in forms acceptable to the county (bond, cash deposit) for the various requirements of this ordinance. The county's preference shall be for bonds. Bartow County Engineering Department may, at its discretion, agree to accept an irrevocable letter of credit in lieu of a surety bond. Said bond must be in a form acceptable to Bartow County. See Section 6.142 for the method to calculate the amount of surety required in this section. The purpose of the sureties shall be any or all of the following, depending on the particular development: 1) to secure performance of the erosion and sedimentation control work in compliance with county regulations; 2) to ensure proper construction of roads, stormwater facilities and other improvements that are to be dedicated to the county in new developments; 3) to ensure proper construction of any work performed in existing Bartow County rights-of-way; 4) to provide a guaranty for the warranty and maintenance period applicable to any new road or work in any existing county right-of-way. All original preconstruction certifications shall be submitted to the engineering division prior to issuance of a land disturbance permit. (A) E&S surety. Prior to issuance of a land disturbance permit the developer shall cause to be executed in favor of Bartow County, an original bond in an amount as set forth by the Bartow County Soil Erosion and Sedimentation Control Ordinance. Said bond is for guaranty of soil erosion and sedimentation best management practices (BMPs). The bond shall remain in force until all final stabilization erosion and sedimentation control measures are in place. Once erosion and sedimentation control BMPs are complete, and the site is stabilized, the county may, at the discretion of the county engineer, authorize a release of the required bond. If the developer does not comply with these regulations or with the conditions of the permit after issuance, the county may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to install soil erosion and sedimentation prevention measures. (B) New road construction surety. Prior to issuance of a land disturbance permit the developer shall cause to be executed in favor of Bartow County a bond for the costs of completion of new roads and associated stormwater and other improvements in a development. Such surety shall also cover the cost of necessary utility relocations and installations. The amounts shall be calculated as set forth in these regulations. CDB:18.13 Supp. No. 18 This surety shall be released when as-built certifications are provided and the road is accepted by the county as a public road. At that point, the two-year maintenance period begins and the maintenance surety is required. (C) Existing right-of-way construction surety. Prior to issuance of a land disturbance permit the developer shall submit a surety bond or letter of credit for all access roads intersecting existing county roads and all work in existing rights of way, including stormwater improvements, utility relocations and installations, and other improvements. In addition, all offsite improvements required per the approved construction plans shall be covered in the existing right-of-way construction surety. Said bond is for guarantee of roadway construction in conformance with Bartow County development standards and to ensure completion of improvements to existing county roads. The surety shall remain in force until all roadway entrances and construction have been completed to the satisfaction of the engineering division and in accordance with approved plans and roadway standards, including all AASHTO and MUTCD requirements. This surety may be combined and made part of the new road construction surety required above. (D) Maintenance sureties. All work in the existing right-of-way and all new roads shall be warranted for a two-year period commencing with acceptance of the roads, in the case of new roads, or completion of the work, in the case of work in the existing right-of-way. Maintenance sureties shall be provided at or near the conclusion of the construction, as required by these regulations. (E) Preconstruction certifications. Prior to issuance of a land disturbance permit the developer shall have the design professional submit the following certifications for the various design components of the project, as applicable: (1) Flood level certification. (2) Floodplain certification. (3) Stormwater runoff certification. (4) Structural retaining wall certification. (6) Land disturbance permit. Upon receiving approval as outlined in section 3.4.4, along with all required documentation, a land disturbance permit shall be issued. This permit will allow the applicant to install sediment and erosion control measures shown on phase 1 of the erosion/sediment control plan. Some minimal clearing may be required to complete the installation of these devices. (7) Grading permit. When soil erosion/sediment control devices have been properly installed, the Development Inspector shall issue a grading permit to the applicant or his/her designee. (Ord. of 4-15-2015, § III; Ord. of 10-1-2025) Sec. 3.5. Reports and inspections. (1) Development pre-construction conference. Upon completion of construction plan review and prior to beginning any land disturbing activities, the developer shall phone the community development department to schedule a pre-construction conference to be held on the site of the project. The primary purpose of this conference is to discuss policy, procedures and construction plans and to present the developer with the development permit. The following action items shall be completed prior to the developer requesting a preconstruction conference with the appropriate county officials: (A) The land disturbance permit fee and inspection fees shall be paid along with providing all required letters of credit and bonds, as applicable. For the calculation of county permit and inspection fees, contact the community development department. (B) Advance warning signs with speed reduction advisory plates shall be placed on connecting thoroughfares at 1,000 feet and 500 feet points on either side of the intersection. The signing shall be reviewed and approved by the development inspector. (C) All buffers (state, county, and those required by zoning) shall be protected with orange tree save fencing material prior to clearing and must be reviewed and approved by the development inspector. (D) Representatives of Bartow County's Community Development, Road and Water and Sewer Departments shall attend the pre-construction conference, as shall the developer of the project. The developer is strongly encouraged to bring to the conference the grading, paving, water, sewer and other contractors that will be working on the project along with the design engineer and the monthly erosion and sediment control inspector. (E) The developer shall be presented a "Pre-Construction Procedure Checklist" at the conference and that checklist will be reviewed with him by the aforementioned Bartow County representatives. The developer shall sign a statement following the conference, attesting to his understanding of the county's development requirements and his responsibility to abide by said requirements. (F) Once all items above have been inspected and approved by the appropriate county officials and evidence has been presented that all fees have been paid, the developer shall be issued a land disturbance permit. (G) All permits shall be posted in a visible place so they will be legible from the roadway providing frontage. CDB:18.15 Supp. No. 18 (2) Monthly erosion and sedimentation reports. Upon the issuance of the land disturbance permit, the operator shall insure that a monthly erosion and sedimentation report, as required by Section 504 of the Bartow County Soil Erosion and Sedimentation Control Ordinance outlining the status of the project is delivered to the development and community development department on or before the first business day of each month. The report will be prepared by a certified professional in erosion and sediment control/ qualified professional engineer/architect/landscape architect or an individual meeting the education and certification requirements of the Bartow County Soil Erosion and Sedimentation Control Ordinance. Should this report not be received by 5:00 p.m. on the said dates, a stop work order will be issued for the project. Monthly reports are required to be submitted for the project or each phase of the project until and notice of termination, as defined by the NPDES general permit, is filed with the Georgia EPD. (3) Required inspections. The following inspections shall be required on all residential, commercial, and industrial developments during the construction of same: (A) Clearing and grubbing, and erosion and sedimentation control. All erosion and sediment control facilities must be installed and inspected before grading is allowed. The control facilities must be continuously maintained throughout the construction permit. (B) Drainage and stormwater management facilities. (C) Curbing. (D) Subgrade and base. (E) Paving: 1) Base; and 2) Topping. (F) Development entrance. (G) Water and sewer lines as required by the water and sewer department. (Inspection by water and sewer department). (H) Landscape. (I) A 24-hour notice shall be given to the construction inspectors prior to every requested initial inspection and/or re-inspection. (Ord. of 4-15-2015, § III) Sec. 3.6. Application for structural plan review—Reserved. Sec. 3.7. Expiration of approval. Approval of the construction plans shall be effective and binding upon the county for a period not to exceed one year from the date of approval and shall thereafter expire and be null and void except to the extent that work on the project has progressed. Land disturbing CDB:19 Supp. No. 9 activities under this permit must commence within 120 days after issuance of permit. Failure to begin work may be cause for the permit to be canceled. Once a permit has been canceled, it cannot be reactivated for any reason. If all construction activity has been discontinued for a period of six months, (discontinued shall mean not obtaining a permit which is required in the logical sequence of development), a new permit will be required to continue the project and approval of such construction will be subject to the most current provision of the Bartow County Development Regulations. (Ord. of 4-15-2015, § III) Sec. 3.8. Plan revisions after permit approval. Upon approval of plans, the applicant's project will be inspected for conformance to the approved plans. Inspectors are not authorized to approve field changes that expand, relocate, or delete the construction as described on the approved construction plans. Should such changes be desired or made necessary as a result of field conditions, the design engineer should contact the development review committee to coordinate approval of the appropriate revision. A minimum of eight sets of revised sets of revised construction plans must be presented for approval. If the hydrology study has also been revised, two copies must be provided. The agency/department/division whose approval is necessary for the change must be contacted individually for an appointment or a one-stop approval conference may be scheduled, if deemed appropriate. Re-submittal of amendments or revisions must clearly identify the changes or revisions desired. Field changes by the applicant require as-builts to be submitted by the design engineer to the development review committee for approval prior to final plat approval. Drawings that are submitted for revision must specifically identify those areas that are to be considered for review and approval. The revisions should be noted in tabular form in the revision block on the drawings, similar to that shown below. Any time not included in the revision block will not be considered approved even though shown on plans. REVISION NUMBER DESCRIPTION OF REVISION DATE OF REVISION 1 2 (1) Revised construction plans—Major changes. (A) All major changes requires the construction plans to be re-submitted prior to any construction changes made in the field so that all departments may be aware of changes made or proposed to be made in the field. Only those departments affected by the changes will be required to approve the changes as outlined below. (B) The following parameters are examples what constitutes a major change: (1) Any increase in the number of lots. (2) Any revision to an approved detention pond. (3) Any relocation of storm drainage structures resulting in an increase of drainage basin by ten percent or more. (4) Any revision to an approved road grade at six percent or greater that results in an increase or decrease in the road grade of four percent or more. (5) Any revision to a road layout resulting in an increase of road length by ten percent or more. (6) Any renumbering of lot numbers, blocks, pods, etc. (7) Any renaming of streets. This shall be submitted to structural numbering for approval. (2) Revised construction plans—Minor changes. (A) The following procedures must be followed for a minor change to be accepted at the time of final plat submittal. (1) The change must be minor. (2) The development inspector must have reviewed change in the field and communicated his findings with the county engineer. (3) The engineer of record must contact the county engineer. (4) The engineer of record must follow up with a letter indicating the revision or a revised plan as needed. (5) The final plat is to be submitted with the revision attached as documentation. (B) The following parameters define what constitutes a minor change: (1) Any decrease in the number of lots. (2) Any relocation of storm drainage structures resulting in less than a 10% increase of drainage basin. (3) Any revision to an approved road grade resulting in less than or equal to a four percent reduction. (4) Any revision to a road layout resulting in a decrease of road length. (5) Shifting of lot lines within a phase with no increase in the total number of approved lots. (6) Buffer revisions or variances that have been approved in compliance with the Bartow County Stream Buffer Protection Ordinance (7) Any extension of pipes for aesthetic purposes. (8) The division of approved single-phase development in to one or more phases. (Ord. of 4-15-2015, § III) CDB:20.1 Supp. No. 13 Sec. 3.9. Review fees. All residential, commercial, and industrial developers shall submit all construction plans to the community development department for review and approval before a land disturbance permit will be issued for the development. A fee will be charged for review of these plans and for the land disturbance permit. (Ord. of 4-15-2015, § III) Sec. 3.10. Rights under the permit. (1) Bartow County allows a permit to be transferred from one person/entity to another as long as the permit is still valid per the conditions of these regulations. Notification of ownership change shall be the responsibility of the recipient. (2) No permit obtained by virtue of incorrect, incomplete, or because of willful or intentional misrepresentation of any fact shall grant the holder thereof any vested rights regardless of when discovery of such error or misrepresentation is discovered. No rights vest beyond the one-year period as described in Section 3.7. (Ord. of 4-15-2015, § III) Sec. 3.11. Surety to county. (1) Prior to issuance of a land disturbance permit the developer shall cause to be executed in favor of Bartow County surety in the form of a performance and maintenance bond or an irrevocable standby letter of credit. The surety must be accepted and approved by the county engineer before the LDP can issue. (2) Purpose. The purpose of the surety shall be any or all of the following, depending on the particular development: 1) to secure performance of the erosion and sedimentation control work in compliance with county regulations; 2) to ensure proper construction of roads in new developments; 3) to ensure proper construction of any work performed in existing Bartow County rights-of-way; 4) to provide a guaranty for the warranty and maintenance period applicable to any new road or work in any existing county right-of-way; 5) to provide funds for repair of damage to any existing county roads, including roads contained in earlier phases of the same development, caused by construction traffic in the new development. (3) Approval. The surety shall only be issued in a form approved by Bartow County. The language of the surety and the term of the surety must be approved by Bartow County prior to issuance. Bartow County has forms it prefers that surety companies use, and those can be provided upon request; otherwise, the form of the surety shall be approved by the county engineer prior to acceptance of the surety. Any irrevocable standby letter of credit or surety bond shall be issued by a company or financial institution authorized to do business in the State of Georgia. Irrevocable standby letters of credit shall be issued in accordance with International Chamber of Commerce (ICC) Publication 590, International Standby Practices "ISP98," and must be issued by a bank having a physical branch within Bartow County or with a headquarters or branch in Georgia within 100 miles of Bartow County, which shall be the place of tender of the draft on said letter of credit. Bartow County reserves the right to demand a specific form of surety from a developer that has tendered unsatisfactory surety in the past. Bartow County reserves the right to reject a surety from a financial institution or insurance company that has provided an unsatisfactory surety in the past. Cash is not an acceptable form of surety. (4) Scope. In each case, the surety guarantees that all applicable provisions of any Bartow County ordinances are complied with, including but not limited to, the erosion and sedimentation control ordinance, these development regulations, the utility accommodation ordinance, Bartow County standard road details, and the regulations promulgated under each of the foregoing. (5) Amount and term. The amount of the surety depends on the project, and shall be set by the county engineer relying on experience with similar projects and the developer, knowledge of material and labor costs, and investigation of additional costs. The amount shall be sufficient to secure performance of the work and compliance with the county ordinances and regulations. Depending on the elements of the project, the amount can include one or more of the following: 1) For security of erosion and sedimentation control work, the amount shall be sufficient to permanently stabilize the entire project, at a minimum of $3,000.00 per acre of the property to be disturbed. 2) For road work on new roads, the amount shall be sufficient to grade, base and pave all new roads called for on the plans, at a rate to be determined by Bartow County and such rate may be revised from time to time as deemed necessary by the county engineer to reflect current construction costs; the amount shall also be sufficient to pay for associated utility relocations/installations and stormwater controls. 3) For work in existing county rights-of-way, the amount shall be sufficient to ensure repair of the roads after any planned work, including associated utility relocations/installations and stormwater controls, that are part of the project being approved; the minimum amount shall be $25,000.00. 4) For multi-phased developments where construction traffic is traveling through subdivision roads already accepted by the county, the minimum amount shall be $10,000.00 per 0.1 miles (i.e, 1/10th of a mile) of county-owned subdivision road being crossed by the construction traffic. The foregoing amounts are minimums and can be increased based on a more complex or expensive project, difficult terrain or other factors that would make the remedial work more expensive. No additional separate amount of surety shall be required for maintenance purposes. The term of any surety shall extend for the period from the issuance of the LDP until the project or development is completed, and additionally beyond that for the duration of any applicable warranty and maintenance period. (6) Partial release. Once erosion and sedimentation control BMPs are complete, and the site is finally stabilized, the county may, at the discretion of the county engineer, authorize a release of the portion of the surety relating to E&S work. Once a new roadway or roadways have had final "as-built certificates" issued and they have been dedicated and accepted, the county may, at the discretion of the county engineer, release a portion of the surety amount relating to the new roads; the remainder shall be kept as surety for the maintenance period. Once a project within an existing county right-of-way has been completed and inspected, the county may, at the discretion of the county engineer, release a portion of the surety amount CDB:20.2.1 Supp. No. 13 relating to the work in the existing right-of-way; the remainder shall be kept as surety for the maintenance period. Once the applicable maintenance period has passed, the remaining surety amount shall be released. In the event there are no new roads nor any work in the county right-of-way that require a warranty period, the surety shall be released upon the issuance of a certificate of occupancy. (7) Prerequisite; calling surety. No land disturbance permit shall be issued by the county until the surety has been furnished to the county, in a form acceptable to the county. If the developer does not comply with these regulations, other applicable Bartow County ordinances and regulations, or with the conditions of the permit after issuance, the county may call the surety, or any part thereof, to be forfeited and may use the proceeds to perform the work or hire a contractor to remedy the defects, whether that means installing soil erosion and sedimentation prevention measures, completing paving and road work, or completing other work. (8) Waiver. The county engineer shall be authorized, but not required, to reduce or waive the surety requirement for projects undertaken by a municipal government in the county. (Ord. of 8-5-2020(1), § II) Sec. 3.12. Erosion and sedimentation control. The developer shall comply with the Bartow County Soil Erosion and Sedimentation Control Ordinance (Code section 34-251 et seq.) and guidelines set forth in the Manual for Erosion and Sediment Control in Georgia, latest edition. The location of the erosion control devices may have to be altered from that shown on the approved plans due to changes in drainage patterns created during construction. It is the developer's responsibility to accomplish erosion control for all drainage patterns created at various stages during construction. Any difficulty in controlling erosion during any phase of construction shall be reported to the county immediately. Failure to properly install, operate or maintain all erosion control measures may result in all site activity being stopped, by issuance of a stop-work order, until such measures are corrected to the satisfaction of the county. (Ord. of 8-5-2020(1), § III) Sec. 3.13. Plan details and other requirements for development. (1) Development plan detail. The developer must submit a set of development plans of the proposed development showing the improvements required by this section which must be approved by the county prior to commencing construction. Said plan shall include, but not be limited to, showing existing two-foot contours, adjacent areas such as streams, lakes, residential areas, etc. which might be affected by proposed development, proposed grades, 100-year flood elevations if applicable, and all improvements. Hydrological studies, engineering computations, flood records and field surveys compiled and certified by an engineer currently registered in the State of Georgia may be required for exact delineation of flood limits and elevations. In addition to the requirements contained in these regulations the developer shall comply with the Bartow County Development Checklist. (2) Land disturbance permit. Upon approval of development plans, the property owner must obtain a land disturbance permit. Owner must obtain said permit within 120 days of approval of development plans. If not, the permit may be canceled. Land disturbing activity under the permit must begin within 120 days after issuance of permit. Failure to begin land disturbing activity may be cause for the permit to be canceled. Once a permit has been canceled or voided, it cannot be reactivated or reinstated for any reason. A new set of development plans must be submitted, reviewed and accepted when the applicant is ready to obtain a land disturbance permit. (3) Construction exits. The developer shall comply with section 34-267(e) regarding construction exits. (4) Utilities. All utilities shall be installed as set out in Bartow County Site and Utility Details for Development. (5) Altered conditions. If actual site conditions, grading or construction, vary from approved plans, it is the owner/developer's responsibility to inform the engineer of record and the county engineer for assessment of the varied condition. Project construction may be delayed during the assessment period. Revised plans may be required and reviewed. (6) Flood zone property. Sites affected by FEMA flood zones shall be referenced to mean sea level vertical datum. A permanent onsite benchmark must be provided. Development shall comply with the Bartow County Flood Damage Prevention Ordinance, and a certification consistent with that ordinance shall be provided at the rough inspection stage. (7) Flood hazard areas. Sites affected by flood hazard areas not determined by FEMA shall be referenced to the best vertical datum available and acceptable to the county. A permanent onsite benchmark must be provided. Flood hazard areas shall be defined to include detention ponds, retention ponds, drainage easements, headwater pools or backwater from pipes, culverts, dams, channelizations, etc., and any other manmade areas or structures relating to flood, erosion or surface water control, whether located within the floodplain or not. (8) Street access required. Access to each lot in said development may only be from a street designed and constructed as part of said development except A-1 district lots may be accessed from county right-of-way provided each lot has a minimum of 200 feet of road frontage. (9) Clear-cutting and mass clearing prohibited. The property or lot to be developed shall not be cleared except that amount of land minimally necessary for the footprint of the structure, rights-of-way, required drainage or required parking. (Ord. of 8-5-2020(1), § IV) Secs. 3.14—3.20. Reserved. CDB:20.2.3 Supp. No. 13 Sec. 3.21. Final as-built construction plan review and approval—Non-residential. (1) Submittal process. Final as-built construction plans shall be required for all multi-family, mixed-use, and non-residential developments and shall be at the same scale as the approved construction plan for the same project. The as-built construction plan shall contain the same information as the predevelopment construction plan requirements for the same project. The county development review staff may, if they deem it appropriate, accept a certification by the owner and surveyor/engineer that the project was built in conformity with the approved predevelopment construction plan except for specific changes indicated on the plan. A final as-built construction plan, shall be submitted to and approved by the development review committee prior to the issuance of a certificate of occupancy. Final as-built shall confirm to the digital submission standards in Section 3.43. (2) Submittal specifications. (A) As-built Plan (B) Stormwater Management Certificate (C) Stormwater Management Facility Maintenance Agreement (D) Stormwater Maintenance and Warranty Surety (E) Certificate of landscape compliance: Upon completion of the landscape improvements, the site shall be inspected by the engineering division for compliance with the approved landscape plan. A certificate of compliance must be issued before a certificate of occupancy can be issued for any related structures. When occupancy of a related building is desired prior to completion of the required landscaping, a temporary certificate of occupancy may be issued if a financial guarantee in the amount equal to 100 percent of the cost for landscaping improvements is provided and acceptable in form to the county attorney, provided that all attorney's fees are paid by the applicant. (3) Upon approval of the final as-built plan, the developer shall submit an electronic copy to the engineering division for inclusion into the county's GIS system. See Section 3.43 of Digital Data Submission Standards. (4) Fees. At the time of submitting an as-built for approval, a fee shall be paid to the engineering division. (5) Maintenance surety. Any roadway elements or other improvements (e.g. stormwater management, drainage easements, utility installations, etc.) in a multi-family, mixed-use, or non-residential development that are to be dedicated to the county or otherwise maintained by the county must have a maintenance surety issued pursuant to these regulations. Said warranty period shall be two years from date of acceptance of the improvement. Said improvements must be dedicated pursuant to Section 3.41. (Ord. of 4-15-2015, § III) Sec. 3.22. Final plat review and approval. (1) Whenever the subdivision or other development of property in Bartow County is proposed and the developer has complied with the requirements of these regulations, and received the necessary approvals, the developer shall proceed under these guidelines after construction of all required improvements. (2) Final plat to conform substantially to preliminary plat. The final plat shall conform substantially to the preliminary plat as approved, including all conditions specified by the engineering division. If desired by the developer, the plat may constitute only that portion of the approved preliminary plat, which the developer has developed or proposed to develop and record at that time, provided, however, that such portion conforms to all requirements of these regulations. All plats shall be required to meet the requirements of the Georgia Platting Act, and as may be amended from time to time. (3) Final plat submittal specifications. The final plat shall be clearly and legibly drawn at a standard engineering scale of not less than 100 feet to one inch. The final plat shall be prepared by a registered professional engineer, or land surveyor, and seal of the certifier shall be shown on the plat. Sheet size shall be 18 inches by 24 inches. The final plat shall contain the items as summarized in the Bartow County Final Plat Review Checklist incorporated herein by reference (A) A statement indicating the type of mail delivery available by the United States Postal Service (i.e. delivery to individual mailboxes or central delivery via cluster mailbox station(s)) shall be on the plat. The location and related improvement shall be shown on the final plat for each cluster mailbox station. CDB:20.3 Supp. No. 9 (4) Preparation of final plat and application for approval. The developer shall provide a final plat of the subdivision drawn and sealed by a professional registered land surveyor as outlined in these development regulations. Ten copies of the plat shall be filed with the community development department, along with the following: (A) Application for final plat approval shall be submitted to the community development department using an application form to be determined by the director. (B) Copy of existing and proposed covenants. (C) A copy of deed to the property. (D) A copy of each deed for all property proposed to be deeded to Bartow County. (E) Proof that taxes on the property has been paid. (F) A soil analysis overlaying the final plat prepared in accordance with Section 3.3. The report shall also include wetland delineation and any soil features or conditions, which may affect the proper function of subsurface sewage disposal, including absorption rates at specific depths. Six copies shall be submitted carrying soil analysis certificates printed or stamped thereon. (5) As-built certificates from developer. At the time the final plat is submitted to the engineering division the developer must also submit an affidavit signed by his engineer certifying that the streets, drainage structures and any other design features have been constructed according to the development construction drawings (or to approved modifications) approved by the appropriate county department. This will include street grades, drainage structures, drainage pipe size and profiles, street paving specifications, utility locations, stormwater management facilities, dam construction and any other facilities incorporated into the development. (6) Maintenance surety. Upon submission of the final plat for a subdivision in which all required improvements have been completed and are being dedicated to the county, the developer must provide written proof that a surety bond has been furnished to the engineering division, in a form acceptable to the county (bond, irrevocable letter of credit, or escrow deposit) in an amount established by the engineering division, payable to the county for repairs for any items which will be under perpetual maintenance by the county, including new roads, off-site modifications to existing roads and stormwater conveyance and management facilities, or other improvements being conveyed. This bond shall be provided for a minimum of two years to commence at the time of acceptance of the streets and other improvements by the commissioner by resolution adopted at a public meeting. Should the development consist of more than one phase, the bonding period shall run concurrently during all phases of development. Expiration shall occur two years after completion of all required improvements of the final phase. Should the development consist of more than one phase, the bond for subsequent phases shall include all streets located in prior phases used for construction traffic as delineated by the engineering division. The county will release this surety at the end of the maintenance period for the subsequent phase. In the alternative, the county will, upon proof of construction of a satisfactory temporary construction entrance servicing subsequent phases, waive the renewal of required bonding for any streets in prior phases. To secure county acceptance of new roads and stormwater management facilities, the developer must submit to the engineering division all documentation and guarantees as specified herein and as required by the county engineer. Such documentation and guarantees include, but are not necessarily limited to a final plat identifying all roads and stormwater conveyance and management facilities proposed for acceptance by the county, a warranty deed to such roads and facilities and a maintenance bond or other acceptable instrument in an amount approved by the engineering division. All required documentation and guarantees must be submitted by the developer to the engineering division no later than ten working days, excluding weekends, and holidays preceding the meeting date of the Bartow County Commissioner when acceptance of such roads and facilities will be considered. (7) Street markers. All subdivision, commercial and industrial developers shall provide adequate and proper street markers and traffic-control signs, according to the requirements set forth by the engineering division for final approval of said development. (8) Review of final plat. The development review committee shall review the documents. The review staff will meet in session to discuss any problems or corrections necessary before final approval is granted. After the review staff has completed its review of the final plat and granted approval, each department will stamp and sign the final plat. If the final plat is disapproved, a notation of this action shall be made on the final plat or via letter and all prints of the final plat, including a statement of the reasons for disapproval. If action is not taken by the review committee within 21 working days of the date of receipt (excluding weekends and holidays) the final plat shall be considered approved and a certificate of approval shall be issued on demand, provided that streets have been accepted by the Bartow County Commissioner, and the water and sewer facilities have been approved by the environmental health department and/or the water and sewer department. (9) Authority to grant final approval. The development review staff shall grant final plat approval if a developer meets the requirements of these regulations. No permits or development activity of any kind shall be authorized without compliance with all provisions of these development regulations. (10) Copies of the approved final plat. Once the subdivision plat has been approved, stamped and signed by the review staff, and the community development department has obtained a digital version of the final product, meeting the digital data submission standards listed in Section 3.43, the community development director will authorize the plat to be CDB:20.5 Supp. No. 9 recorded with the clerk of superior court to obtain a plat book and page number, for the subdivision. Once final plat is recorded, five copies should be returned to the community development department. (Ord. of 4-15-2015, § III; Ord. of 5-11-2016, § II) Sec. 3.23. Final plat certificates. The following certifications and acknowledgements must appear on the final plat presented for approval. The language of each must be verbatim as it appears below: (1) Owner's acknowledgment. (A) Subdivisions with public infrastructure: I hereby certify that I am the owner of the land shown on this plat (or a duly authorized agent thereof) whose name is subscribed hereto. I acknowledge that this plat was made from an actual survey, and for value received the sufficiency of which is hereby acknowledged, I do hereby convey all streets and rights-ofway, detention pond lots, water mains and sewer lines shown hereon in fee simple to Bartow County and further dedicate to the use of the public forever all alleys, parks, watercourses, drains, easements, and public places hereon shown for the purposes and considerations herein expressed. In consideration of the approval of this Construction Plan and other valuable considerations, I further release and hold harmless Bartow County from any and all claims, damages, or demands arising: on account of the design, construction, and maintenance of the property shown hereon; on account of the roads, fills, embankments, ditches, cross drains, culverts, water mains, sewer lines, and bridges within the proposed rights-of-way and easements shown; and on account of backwater, the collection and discharge of surface water, or the changing of courses of streams. And further, I warrant that I own fee simple title to the property shown hereon and agree that Bartow County shall not be liable to me, my heirs, successors, or assigns for any claims or damages resulting from the construction or maintenance of cross drain extensions, drives, structures, streets, culverts, curbs, or sidewalks, the changing of courses of streams and rivers, flooding from natural creeks and rivers, surface waters, and any other matter whatsoever. I further warrant that I have the right to sell and convey the land according to this plat and do hereby bind owners and myself subsequent in title to defend by virtue of these presents. (B) Subdivisions with private infrastructure (replaces owner's acknowledgement section (A) above): I hereby certify that I am the owner of the land shown on this plat (or a duly authorized agent thereof) whose name is subscribed hereto. I acknowledge that this plat was made from an actual survey, and for value received the sufficiency of which is hereby acknowledged, do hereby convey the private roadways and utility easements to the association named on this plat for its maintenance and upkeep and the purposes and considerations herein expressed. In consideration of the approval of this Construction Plan and other valuable considerations, I further release and hold harmless Bartow County from any and all claims, damages, or demands arising: on account of the design, construction and maintenance of the property shown hereon; on account of the roads, lack of access, fills, embankments, ditches, cross drains, culverts, water mains, sewer lines, and bridges within the proposed private roadways and easements shown; and on account of backwater, the collection and discharge of surface water, or the changing of courses of streams. And further, I warrant that I own fee simple title to the property shown hereon and agree that Bartow County shall not be liable to me, my heirs, successors, or assigns for any claims or damages resulting from the construction or maintenance of cross drain extensions, drives, structures, streets, culverts, curbs, or sidewalks, the changing of courses of streams and rivers, flooding from natural creeks and rivers, surface waters, and any other matter whatsoever. I further warrant that I have the right to sell and convey the land according to this plat and do hereby bind owners and myself subsequent in title to defend by virtue of these presents. Signature Date Printed Name (2) Surveyor's acknowledgment. I hereby certify that the plan shown and described hereon is a true and correct survey made on the ground under my supervision, that the monuments have been placed as shown hereon, and is to the accuracy and specifications required by the Bartow County Development Regulations. Registered Ga. Land Surveyor Printed Name (3) Bartow County Board of Health Certification. This plat has been approved for individual septic tank systems (except noted) and individual septic tank permits will be issued upon receipt of individual plans showing the septic tank system in a suitable place on the lot. Dated this day of 20 . Environmental Health Program Manager, Bartow County Board of Health Notes on Individual Septic Systems Out: Means unsuitable for septic system SP: Means approval of individual site plan required prior to issuance of septic tank permit CDB:20.7 Supp. No. 9 PP: Means approval of individual plot plan required prior to issuance of septic tank permit (4) Bartow County Development Certification. This plat, having been submitted to Bartow County and having been found to comply with the Bartow County Development Standards and the Bartow County Zoning Ordinance, is approved subject to the installation and dedication of all streets, utilities, easements and other improvements in accordance with the Development Regulations and the posting of a two year maintenance security. Bartow County Water System Date Engineering Division Date Zoning Division Date The following certifications and acknowledgements must appear on the final plat for any condominium or subdivision that includes private roadways and utilities: I hereby certify as the owner of the land shown on this plat and whose name is subscribed hereto, acknowledge that this plat was made from an actual survey, and for value received the sufficiency of which is hereby acknowledged, do hereby convey the private roadways and utility easements to the association named on this plat for its maintenance and upkeep and the purposes and considerations herein expressed. In consideration of the approval of this Construction Plan and other valuable considerations, the owner further releases and holds harmless Bartow County from any and all claims, damages, or demands arising: on account of the design, construction and maintenance of the property shown hereon; on account of the roads, fills, embankments, ditches, cross drains, culverts, water mains, sewer lines, and bridges within the proposed private roadways and easements shown; and on account of backwater, the collection and discharge of surface water, or the changing of courses of streams. And further the owner warrants that he owns fee simple title to the property shown hereon and agrees that Bartow County shall not be liable to him, his heirs, successors or assigns for any claims or damages resulting from the construction or maintenance of cross drain extensions, drives, structures, streets, culverts, curbs, or sidewalks, the changing courses of streams and rivers, flooding from natural creeks and rivers, surface waters and any other matter whatsoever. I further warrant that I have the right to sell and convey the land according to this plat and do hereby bind owners and myself subsequent in title to defend by virtue of these presents. Signature Date Printed Name (Ord. of 4-15-2015, § III) Sec. 3.24. Final plat revisions. Should a developer/sub-divider desire to amend or revise a previously approved final plat then the developer/sub-divider shall submit to the community development department the following: (1) A letter specifically identifying the modifications/revisions to the final plat and stating that all necessary infrastructure (storm, sanitary sewer, and water) has been adjusted in accordance with Bartow County Code to address the modifications. (2) Submission of the latest original recorded plat with a specific statement regarding the nature of the revision on the face thereof. The format for such a revision statement shall be as follows: This plat supersedes the plat recorded in Plat Book , Page . The purpose of this revision is to: (3) If the original final plat is otherwise unavailable, then the developer/sub-divider may submit a plat prepared to show the specific revision to the original plat of record with the revisions noted thereon with references to the previously recorded plat (latest revision). (4) Approved by: Bartow County Community Development Department Bartow County Water System (Ord. of 4-15-2015, § III) Sec. 3.25. Phased development. Each construction phase of any development shall be capable of standing on its own if subsequent phases will be constructed at some future time. Subdivisions may be divided into units. Units may be further divided into phases. Phases may be divided into sub-phases. No subdivision element, whether phase or sub-phase, shall be served by any utility to be constructed in the future. Developed phases shall be numbered in sequence (i.e., Phase Two must follow Phase One and precede Phase Three). Sub-phases must also be labeled in a like fashion (i.e., Sub-phase B must follow Sub-phase A and precede Sub-phase C). Units will be denoted by Roman numerals. Phases will be denoted by Arabic numbers. Units and phases may be referenced by spelling out the number, if both unit and phase are spelled out. Sub-phases are to be always referenced by alphabetic characters, beginning with the letter GAG. (Ord. of 4-15-2015, § III) CDB:20.9 Supp. No. 9 Sec. 3.26. Private subdivisions. A developer may construct a single-family subdivision in which the streets, drainage, and stormwater management facilities contained therein are not dedicated to the county only upon compliance with all of the following: (1) General application. All provisions of the Bartow County Development Regulations shall apply to the development of said subdivision except subsection 5.31(15) (which provides for the streets to be dedicated to the county); (2) One entrance. There shall be only one entrance/exit from the subdivision to a public street, unless total units exceed 150 (See subsection 5.31(3)). In no event shall a private street be constructed so as to permit said street, in any configuration, to serve as a connecting street between two public streets. Other than the entrance/exit to the private subdivision, no private street shall adjoin any property outside the limits of the private subdivision; (3) Easements. The plat of the subdivision shall reflect and reserve all necessary utility easements and private rights-of-way to service the subdivision; (4) Plat notations. All plats shall be labeled as a Hprivate subdivisionH and shall contain on the face thereof the following language in prominent bold capital letters: ITHE STREETS, DRAINAGE AND STORMWATER MANAGEMENT FACILITIES IN THIS SUBDIVISION ARE PRIVATE STREETS, DRAINAGE AND STORMWATER MANAGEMENT FACILITIES AND ARE NEITHER MAINTAINED BY BARTOW COUNTY NOR CONSIDERED PART OF THE ROAD SYSTEM OF BARTOW COUNTY. THE RESPONSIBILITY FOR THE UPKEEP AND MAINTENANCE OF THE STREETS, DRAINAGE AND STORMWATER MANAGEMENT FACILITIES SHOWN HEREON ARE THE RESPONSIBILITY OF THE INDIVIDUAL HOMEOWNERS THROUGH THE SUBDIVISION'S INCORPORATED HOMEOWNER'S ASSOCIATIONI; (5) Deed notations. All deeds of conveyance for individual lots shall contain on the face thereof the following language in prominent bold capital letters: ITHE GRANTEE HEREIN ACKNOWLEDGES THAT ANY AND ALL MEANS OF INGRESS AND EGRESS TO THE PROPERTY CONVEYED HEREIN ALONG THE STREETS OF THE SUBDIVISION AS OUTLINED ON THE PLAT OF SAID SUBDIVISION ARE PRIVATE STREETS AND ARE NEITHER MAINTAINED BY BARTOW COUNTY NOR CONSIDERED PART OF THE ROAD SYSTEM OF BARTOW COUNTY. THE GRANTEE FURTHER ACKNOWLEDGES THAT THE DRAINAGE AND STORMWATER MANAGEMENT FACILITIES ARE PRIVATE, AND ARE NEITHER MAINTAINED BY NOR CONSIDERED PART OF THE BARTOW COUNTY SEWER/STORMWATER SYSTEM. THE RESPONSIBILITY FOR THE UPKEEP AND MAINTENANCE OF THE STREETS, DRAINAGE AND STORMWATER MANAGEMENT FACILITIES SHOWN THEREON ARE THE RESPONSIBILITY OF THE INDIVIDUAL HOMEOWNERS THROUGH THE SUBDIVISION'S INCORPORATED HOMEOWNER'S ASSOCIATION AND NOT BARTOW COUNTY"; (6) Homeowners' association. Provide proof to the county engineer from the Georgia Secretary of State of the incorporation of the subdivision's homeowners' association and proof that said association holds title to the right-of-way of the streets, drainage and stormwater management facilities on behalf of the purchasers and requires all purchasers of lots in said subdivision to be members of said homeowners' association; (7) Public notice. Place at the entrance to said subdivision a sign, approved by the county engineer, indicating that the streets in the subdivision are private streets; (8) Gated subdivisions. If a gate or other controlled access is installed at the entrance to the subdivision, a place which provides emergency access to the subdivision by emergency agencies must first be approved by the emergency agencies of the county. Access must also be provided to anyone providing utilities to said subdivision; and (9) Documentation to county. All agreements, restrictive covenants and other documentation related to the development shall be furnished and approved by the county engineer, prior to commencement of development. (10) Street and development names shall be in accordance with section 5.68. Street signs shall be in accordance with section 5.69. (Ord. of 5-11-2016, § III) Sec. 3.27. Private townhome developments. Private Townhome developments (that is, where the streets are not to be dedicated to the county) have additional requirements as follows: (1) Prior to commencement of development, the developer must provide to the county engineer copies of all agreements, restrictive covenants and other documentation related to the development. The county engineer must approve said documents prior to commencement of development. (2) Prior to final plat approval of a private townhome development the developer must provide to the county engineer proof from the Georgia Secretary of State of the incorporation of the development's homeowners' association and proof that said association holds title to the right-of-way of the streets on behalf of the purchasers and requires all purchasers of townhouses in said development to be members of said homeowners' association. The county engineer must review and approve such documentation prior to final plat approval. (Ord. of 5-11-2016, § IV) Sec. 3.28. Lot splits; recording of plats. No lot shall be split nor shall any plat be recorded in the office of the Clerk of Superior Court of Bartow County without a signature of approval on the following signature block: This plat meets the requirements of the Bartow County Zoning Ordinance and Development Regulations and is authorized to be recorded. CDB:20.11 Supp. No. 13 Signature Date Such signature block shall only be signed by the community development director or his or her designee, upon review that the lots shown on the proposed plat meet the requirements for road frontage, minimum lot size, and all other applicable requirements of the Bartow County Code of Ordinance, appendix A (Zoning ordinance) and appendix B (Development regulations). Any plat recorded after the effective date of this amendment without such signature block shall be an illegal plat and shall vest no rights in the property owner. The county reserves the right to take legal action to reverse illegal lot creations, illegal lot splits, or other actions in violation of this section, including creation of substandard-sized lots or remnants. (Ord. of 5-11-2016, § V) Sec. 3.29. Reserved. Sec. 3.30. Unfinished subdivisions. In order to ensure consistency in developments, this ordinance shall apply to any residential subdivision of more than 20 lots as shown on the final plat where at least ten homes have been constructed, and a period of more than three years has elapsed since the last home was built. The following regulations shall apply to any further homes built in the subdivision: (1) The conditioned square footage of the home shall be at least 80 percent of the median conditioned square footage of the existing homes in the subdivision, as shown by the tax records of the county. The calculated value shall be rounded down to the next lowest hundred (for example if the median is 2,680 square feet, 80 percent would be 2,112, rounded down to 2,100). This value shall be calculated at the time of the resumption of construction and shall apply from that time forward. (2) The colors and materials used in the exterior construction of the home shall be consistent with the materials used for the exterior finishes of the existing homes in the subdivision. (3) The architectural style of the home shall be consistent with the style of the existing homes in the subdivision. (4) The front setback to building line shall be a distance substantially consistent with the existing homes in the subdivision. The zoning administrator shall from time to time identify subdivisions that are subject to this ordinance, and for new permit applications in such subdivisions, may require information or documentation reasonably necessary to show compliance with section. No building permit or certificate of occupancy shall issue for a home that is not constructed in compliance with this section. (Ord. of 4-11-2018(1), § VIII; Ord. of 10-7-2020(1), § I) Sec. 3.31. Special district assessments. (1) Purpose and Authority. This section is adopted pursuant to the authority of Article IX, Section II, Paragraph IV of the Georgia Constitution of 1983, authorizing the County to create special districts by ordinance to provide local government services and to provide for assessments to pay for such services. This section is intended to address the problems created by failed subdivisions where the original developer has dissolved, gone bankrupt, or otherwise lost ownership before completing the roads and streets, paving and sidewalks, stormwater, detention, ponds, water and sewer or other infrastructure within the development to the required standards of these development regulations; or when the original developer has failed to complete the final wearing surface of the roads within five years of final plat recording; or when the original developer has performed substandard work and there is no maintenance bond; or otherwise created other problems with roads, sidewalks, utility infrastructure, stormwater structures, drainage, ponds, dams or other structures and is no longer available to repair such problems. In compliance with the Development Impact Fee Act (O.C.G.A. § 36-71-1 et seq.), only project improvements (as defined below) shall be constructed under this section. However, in any conflict between authority exercised under the above-cited paragraph of the Constitution and the Development Impact Fee Act, the Constitution shall control. (2) Creation. There is hereby created a special district pursuant to Article IX, Section II, Paragraph IV of the Georgia Constitution of 1983 for purposes of correcting, finishing or repairing a particular development's internal streets and roads and related water, sewer, and storm water infrastructure, for each subdivision or development that requires project improvements, provided all of the following occur: (A) The community development director certifies in writing to the Bartow County Commissioner that a residential subdivision has been lawfully final platted in the unincorporated county; that more than five lots have been sold by the original developer and homes are erected and certificates of occupancy have been issued on such lots; that the original developer no longer owns the development and there is no successor developer who can provide appropriate surety for completion of the roads or other infrastructure (or that the successor developer has failed or refused to do so). The community development director shall further certify that work is necessary to provide correction of problems with roads, stormwater structures, etc., or that the original developer has not placed the final wearing surface on the roads within five years of final plat recording, or that all or a portion of the roads and streets (and other related stormwater or other community infrastructure) shown on the final plat do not comply with these development regulations; and that adequate funds or surety for proper completion of the roadways and infrastructure within the residential development was not obtained or has not been honored or otherwise received. (B) The community development director shall also provide the cost of constructing all project improvements to bring the development into compliance with the developAPPENDIX B—DEVELOPMENT REGULATIONS § 3.31 CDB:20.13 Supp. No. 13 ment regulations and/or repair any problems or deficiencies, and provides a cost per vacant lot of constructing such necessary improvements. Any partial amounts received from surety or maintenance bonds available and received related to the subdivision shall be credited against the assessment figure before the per-lot fee is calculated. (C) The county commissioner adopts a resolution designating the subdivision as a special district under this section and approves the construction of the necessary street and related improvements and the implementation of the assessment to recover the costs, such assessment to be imposed only on lots meeting the definition of vacant lots as of the date of the adoption of the commissioner's resolution. Such district can be created either before the work is performed or after the work is performed. (3) Construction and Assessment. Upon creation of the special district, the county shall be authorized to impose the assessment on each vacant lot in the subdivision. The building inspections division shall collect the assessment at the time of issuance of a building permit. This fee shall be in addition to and separate from regular building permit fees, water and sewer tap fees, and any other fees required by the Code of Bartow County and regulations adopted thereunder. (4) Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: (A) Project improvement means site improvements required to provide all the street, road, stormwater, sewer, water or other utility or infrastructure improvements within the right-of-way or serving a specifically identified residential development that are necessary for the use and convenience of the occupants of the development and necessary to bring the development into compliance with the standards set forth in the Bartow County Development Regulations or other applicable laws and agreements. Such street, road and utility improvements include, but are not limited to, streets, roads, sidewalks, curb and gutter, and associated utility improvements in the right-of-way such as storm water structures, sewer manholes, water and sewer lateral connections and similar items. Such term can also mean improvements made necessary to repair substandard work or to repair other problems to the roads, sidewalks, curb and gutter, stormwater structures, drainage infrastructure, ponds, dams and other related appurtenances. (B) Vacant lot means a lot within a residential subdivision for which no certificate of occupancy (C.O.) has been issued by the county, or for which a C.O. has been revoked. This shall include lots with foundations or partially built homes. (5) Restrictions. (A) Assessments collected under this section shall be spent only on the specific project improvements necessary for the specific development designated as a special district. (B) It is not intended that this section be used to provide upgrades to a subdivision that were not called for in the original plat (for example, providing sidewalks where none were called for by the plat) but minor improvements necessitated by changing conditions or new information but not shown on the final plat (for example, an additional storm drain) can be included as a project improvement. (C) Once sufficient assessments have been collected to equal to the cost of construction of the project improvements, the assessments shall be lifted. (Ord. of 8-5-2020(1), § V) Sec. 3.32 Consultation for Rome Cartersville development corridor project. (1) Parcels of land potentially affected by the Georgia Department of Transportation Project (PI 0013238), known as the "Rome Cartersville Development Corridor" (RCDC) are shown on the map entitled "Rome-Cartersville Development Corridor Parcel Map," dated September 15, 2021 and maintained in the office of the Community Development Department at 135 W Cherokee Avenue, Cartersville. Said map is incorporated herein by reference. This map shall be referred to herein as the "RCDC Parcel Map." (2) Any applicant seeking approval for a proposed subdivision, development or redevelopment, or land disturbance that is located on a parcel shown as a potentially affected parcel on the RCDC Parcel Map, shall be required to consult with the District 6 office of the Georgia Department of Transportation (located at 30 Great Valley Parkway, White, GA), to determine if the proposed subdivision, development or redevelopment, or land disturbance activity has an impact on the RCDC project. (3) The Community Development Department shall review the RCDC Parcel Map for all subdivision, development or redevelopment, or land disturbance permits requested after the date of adoption of this ordinance. If the permit is requested for a parcel shown as potentially affected by the RCDC on the RCDC Parcel Map, the Community Development Department require the applicant to conduct the following consultation process: (a) Contact GDOT District 6 and obtain the latest plans for the RCDC. (b) Show such proposed plans on their site plan/concept plan/development plan. (c) Schedule a meeting to consult with GDOT regarding whether their project impacts the RCDC. (d) Work with GDOT to find a mutually satisfactory solution so that the proposed project does not negatively impact the RCDC project. (4) Direct access to the RCDC is not permitted by GDOT and the applicant shall have to show access to their property or project via other roadways. (5) Bartow County will not approve proposed plans for land disturbance, development or re-development, or subdivision subject to this section unless it receives a letter of concurrence from GDOT District 6 that the proposed project or activity does not have a negative impact on the RCDC. (Ord. of 9-15-2021(2), § II) CDB:20.15 Supp. No. 14 Secs. 3.33—3.40. Reserved. Sec. 3.41. Dedication of rights-of-way and easements. (1) Any property other than shown on approved development plats, which are to be dedicated to Bartow County in fee or by easement shall be accomplished by the following method: (A) The developer shall, upon completion of the final plat submittal requirements, cause to be prepared a deed of dedication to Bartow County with a proper legal description, providing for dedication to and acceptance by Bartow County of the roadways and associated infrastructure improvements. No final plat shall be recorded unless signed deeds are tendered to the county. The county shall not be required to accept the dedication until all criteria of these regulations, including placement of final wearing surface, are met. Acceptance shall only occur by resolution of the commissioner adopted at a public hearing. Unless the property is conveyed via a development agreement, the property owner shall furnish a maintenance surety contemporaneously with the deeds. Upon formal acceptance of a road or street, the same shall be open to the general public at all times subject only to any restrictions placed upon it by Bartow County. (B) The property owner shall submit with the deed a plat demonstrating the boundary limits of the property to be dedicated consistent with the requirements of the Georgia Plat Act. (C) The property owner shall execute and submit an owner's affidavit and evidence that the development is in conformity with these standards and specifications and evidence of good and marketable title in a form approved by the county attorney's office. (D) In the event the property is encumbered by liens or mortgages, the property owner shall furnish consent of lender/lien holder affidavits on forms approved by the county attorney's office. (E) Any dedication relating to streets, sidewalks, and rights-of-way shall be submitted to the Bartow County Road Department. Any dedication relating to storm drainage, drainage channels, retention and detention, and storm sewer shall be submitted to the Bartow County Road Department. Any dedication relating to water lines or sanitary sewers shall be submitted to the Bartow County Water System. (F) All materials in the right-of-way that have salvage value, as determined by the inspector, shall remain property of Bartow County and shall be utilized as shown on the plans or returned to the Bartow County Road Department. Any item damaged during removal or relocation shall be replaced in kind. (Ord. of 4-15-2015, § III) Sec. 3.42. Utility construction prior to completion. (1) It shall be the developer's responsibility to notify the necessary utility companies involved in burying main and/or service cable and/or pipe (including conduit) in commercial and residential developments where there are streets to be dedicated to Bartow County for maintenance. (2) Sufficient notice shall be given so as to allow for the burying of long side services, intersectional crossings and to make splices, taps or relocations within acceleration/ deceleration lanes at project entrances. No paving work on the public right-of-way shall be done until clear of all above and below ground utility work. (3) All utilities shall be installed as set out in Bartow County Standard Details For Development. (4) All utilities shall be installed prior to approval of final plat or certificate of occupancy. (Ord. of 4-15-2015, § III) Sec. 3.43. Digital data submission standards. Bartow County has adopted geographic information system (GIS) technologies to store, manage and maintain geographic/spatially-related data. The civil engineering community has evolved as well to the point where the predominant design environment is computer aided design and drafting (CAD) or GIS. It is the goal of the county to use both CAD and GIS technologies to expedite the design and review processes within the administration, by developing standards and procedures for integration of digital engineering CAD drawings in to the GIS environment, maintaining the integrity and positional accuracy of the data. Below are the requirements and options for submission of digital data as required for county construction projects. Please note that those levels shown in bold italics are required concurrent with plan submission. (1) File format. Acceptable file formats are Autocad.DWG, Microstation.DGN, Esri Shapefile.SHP, XML Workspace Document.XML, Esri File Geodatabase.GDB or Esri Personal Geodatabase.MDB. (2) Acceptable media formats for data submission include CDs, DVDs or email. CDB:20.16.1 Supp. No. 14 (3) Coordinate system. The standard coordinate system for all digital mapping in Bartow County shall be in the Georgia State Plane Coordinate System, West Zone, 1983 North American Datum. This coordinate system uses base units of U.S. Survey foot. Bartow County will accept digital data files only in this projection. (4) Other information: (A) Contact name. (B) Contact phone number. (C) Contact address. (5) Overview of layers. Bartow County recognizes that each engineering and design firm has created their own set of standard CAD and data layers. Therefore Bartow County will accept digital files with any layering scheme as long as there is sufficient separation of categories. Listed below are the minimum layer categories for separation: BUILDING FOOTPRINT Existing Building Footprint Building Footprints (for non-residential) CADASTRAL LAYER Parcel lines CONTROL LAYER Land lot lines (for reference) Survey Monuments City limit line, if property is adjoining County line, if property is adjoining CULTURAL LAYER Parks Historical Landmark Golf Course FLOODPLAIN Existing Floodplain HYDROLOGY LAYER HydroEdge (creek, river, stream) WaterBody (lake, pond) SANITARY LAYER AirReleaseValve Poly SanitaryManhole CDB:20.17 Supp. No. 13 SanitaryMisc SanitaryPipe SanitaryPumpStation Tap STORMWATER LAYER DetentionPonds SWBMP SWLine SWOPenChannel SWOutfall SWStructure TrackingPolygons TOPOGRAPHY/DTM LAYER Contour lines TRANSPORTATION LAYER Street Centerline Edge of Pavement Parking Lot (for non-residential) Driveway Sidewalk Right-of-way UTILITY LAYER Electric Line Electric Easement Gas Line Gas Easement Other WATER LAYER Hydrant Meter PumpStation Tank Tee Valve WaterEasement WaterManhole WaterMisc WaterPipe (Ord. of 4-15-2015, § III) ARTICLE IV. RESERVED Secs. 4.1—4.9 Reserved. ARTICLE V. TECHNICAL STANDARDS* DIVISION 1. RESERVED† Secs. 5.1—5.25. Reserved. DIVISION 2. STREETS AND DRAINAGE‡ Sec. 5.26. Reserved. Sec. 5.27. Reserved. Sec. 5.28. Reserved. Sec. 5.29. Base and paving of streets in new developments and redevelopments. Base and paving in all residential and non-residential developments, subdivisions, and/or manufactured housing parks shall meet the following minimum specifications: (1) Pavement width. a. Residential project pavement widths shall be a minimum of 20 feet wide except in A-1 and RE districts wherein the pavement shall be a minimum of 22 feet wide. A cul-de-sac on any dead end road shall be graded, based and paved to provide a minimum 70-foot turnaround diameter. b. Commercial and Industrial pavement widths shall be a minimum of 26 feet wide. A cul-de-sac on any dead end road shall be graded, based and paved to provide a minimum 150 feet turnaround diameter. c. Road beds and pavement width in curves shall be properly elevated and paved to provide safe travel. (2) Compaction. The road or street must be graded and must achieve a minimum 95 percent modified compaction using a "sheep foot roller" or the equivalent. The community development department must inspect the graded road bed before base material may be applied. (3) Drainage pipes. Proper road and street drainage must be installed by the developer at no expense to the county including driveway pipes. A minimum 36 feet of drain pipe shall be provided at each intersection. Pipe shall be of sufficient diameter for maximum water flow projections. The pipe shall be either concrete or pure aluminum pipe. Pipes outside the roadbed may be designed per GDOT standards for HDPE pipe. (4) Base. Following inspection of the road bed, the minimum specified approved aggregate base must be applied. Base material and installation must be inspected by the community development department prior to the application of any hard surface (paving). The paving contractor is required to have an inspection sticker issued by the Georgia Department of Transportation (GDOT) on the asphalt spreader and chip spreader. a. Residential Projects: A minimum of six inches of approved aggregate base must be applied. b. Commercial and Industrial Projects: A minimum of eight inches of approved aggregate base must be applied. (5) Core testing. Bartow County reserves the right to require core testing under the direction of county engineer to assure compliance. (6) Paving; final surfacing. Specifications for plant mix asphalt for all roads and streets shall be as follows: 1) any plant mix asphalt must comply with GDOT guidelines for the appropriate road or street; 2) all streets shall have a minimum thickness of two inches of "B" mix and one and one half inches of "E" mix. See Bartow County Site and Utility Details for Development, for base requirements and complete roadway cross-section specifications. The timing of the paving for roads and streets depends on the type of residential subdivision as follows: a. No Curb and Gutter. In residential subdivisions where curb and gutter are not required, the final wearing surface shall be placed prior to final plat recording. b. Curb and Gutter and Sewer. In residential subdivisions with sewer, the developer shall wait to apply final wearing surface until after 80 percent build out of all lots in the subdivision, and a letter of credit for the road improvements (at a rate determined by the County Engineer) shall be required. See subsection 5.28(e) for requirements. c. Curb and Gutter but No Sewer. In residential subdivisions without sewer, but where curb and gutter are required, the developer shall have the option of placing the final wearing surface before recording of the final plat, or waiting to place the final wearing surface until after 80 percent build out of all lots in the subdivision, but in the latter case, a letter of credit for the road improvements (at a rate determined by the County Engineer) shall be required. See subsection 5.28(e) for requirements. d. Five Year Limitation. In no event shall the final wearing surface be placed later than five years after the recording of the final plat. e. For all commercial and industrial projects paving shall be completed and final wearing surface applied prior to issuance of any certificates of occupancy. Specifications for plant mix asphalt shall be as follows: 1) any plant mix asphalt must comply with GDOT guidelines for the appropriate road or street; 2) all streets shall have a minimum thickness of two inches of "B" mix and one and one half inches of "E" mix. See Bartow County Site and Utility Details for Development for base requirements and complete roadway cross-section specifications. (7) Drainage at low points. Drainage of roadway shall be provided at low points through weep holes to catch basins (see Bartow County Site and Utility Details for Development). (8) Right-of-way erosion control. Rights-of-way and road shoulders shall be graded, grassed, and/or re-grassed until sufficient ground cover is achieved. (9) Final inspection; acceptance. After the road or street has been completed and as-built certified by the engineer of record (see subsection 5.31(14)), the county engineer must perform a final inspection of all paving, drainage and any other aspects related to future maintenance of the road or street. Provided all criteria are met, including final wearing surface having been applied, the county shall officially accept the "roadway as-built certificate." After this point, provided the roadway is to be a public CDB:20.21 Supp. No. 13 street, the roadway shall be dedicated to the county. The developer shall cause to be prepared a deed of dedication to the county with a proper legal description, providing for dedication to and acceptance by the county of the roadways and associated infrastructure improvements. Upon acceptance of said road or street, the same shall be open to the general public at all times subject only to any restrictions placed upon it by the county. The county shall not be required to accept the dedication until all criteria of these regulations (including application of final wearing surface) are met. (10) Construction warnings. The developer shall furnish and maintain all necessary barricades and warning signs in the right-of-way while roadway frontage improvements are being made. (11) Warranty and maintenance period. Roadways (including associated infrastructure improvements) shall be warranted for a period of two years from the date of acceptance by the county of the roadways, except for roadways with sanitary sewer, in which case the warranty period shall extend two years from the date of acceptance by the county of the roadways. Work in an existing county right-of-way (for example, access for a new development) shall be warranted for a period of two years. In all cases, the warranty period begins to run on the date the commissioner accepts the deed of dedication by resolution at a public hearing. The warranty shall mean that if the road fails within the warranty period, the road shall be repaired by the permit holder, or else the county shall call the surety to pay for the repair. Road failures include dips in the surface, raveling, potholes, and any other defect that means the road does not meet the standards of county regulations, as determined solely by the county. The surety required by subsection 5.28(e) shall remain in effect the applicable warranty period to secure maintenance. See also subsection 5.31(16). (Ord. of 5-11-2016, § IX) Sec. 5.30. Reserved. Sec. 5.31. Street design. The following criteria and requirements are applicable to all street design plans and street designs, in all developments and subdivisions: (1) Road plan. Developer must provide road plan and profiles for all streets in the development design. (2) Intersection angle. All streets must intersect with other streets at a 90 degree angle. (3) Multiple entrances. A maximum number of 150 residential dwelling units shall be allowed with only one street outlet to an existing public road. The second entrance location and design must be approved by county engineer and community development department. If a second access to an existing public road is not available or, in the opinion of the county engineer, could induce non-residential traffic through the development, a single entrance may be allowed. However, such single entrance must be designed with a traffic signal and/or sufficient right-of-way and improvements to provide a protected left-turn lane, subject to the approval of the county engineer and community development department. In such cases, a "knockdown" gate-type second entrance (that is, a gate designed to discourage routine access but able to be knocked down by an emergency vehicle) shall be provided for emergency vehicle access, accessing at least a gravel drive connecting to an interior street. (4) Intersection radii. The curb or pavement radii at intersections shall not be less than 25 feet. (5) Grades. Street grades shall not be less than 1.5 percent grade nor more than 15 percent grade. (6) Sight distance. Intersection sight distance (not to be confused with stopping sight distance) shall be measured from centerline of each proposed intersecting entrance street or driveway. See additional design criteria in Bartow County Site and Utility Details for Development. Intersection sight distance is determined with an assumed height of drivers eye of 3.50 feet and an assumed height of object of 4.25 feet when measuring in the vertical plane. When measuring in the horizontal plane, the intersection sight distance is determined with an assumed driver's eye location of ten feet from edge of pavement of the main street on the centerline of the intersecting street and an object location on the centerline of the main street. When measuring in either plane, the line of sight must remain in the proposed dedicated ROW, unless the designer provides a plan showing unimpeded line of sight. Intersection sight distance for internal subdivision streets shall not be less than 200 feet. (7) Curve radii. Horizontal curve radii at street centerline shall be not less than 200 feet for streets intersecting with county roads and 100 feet for all other streets. A minimum of 100 feet of tangent must be provided between reverse curves and a minimum of 50 feet of tangent must be provided on intersecting streets. (8) Intersections. All intersections with existing county roads must be approved by the community development department. Acceleration and deceleration lanes shall be installed as required by the community development department or engineering department. Determination of whether such lanes are required shall be based on sound engineering principles, traffic safety considerations, and the circumstances of the site, proposed use, and development. Acceleration and deceleration lanes must conform with the details found in Bartow County Site and Utility Details for Development. CDB:21 Supp. No. 15 (9) Driveway and access permits. A permit must be obtained from the county road department for any street or driveway entering a county road. The permit for a driveway must be obtained before a building permit will be issued except where curb and gutter has been previously installed. (10) Right-of-way width. Any road or street in any non-commercial or non-industrial area shall have sufficient right-of-way for proper utility and drainage easements or 60 feet whichever is greater with a cul-de-sac diameter of not less than 70 feet. Right-of-way in any commercial or industrial development shall be not less than 60 feet with a cul-de-sac diameter of not less than 150 feet. (11) Curb for non-commercial and non-industrial streets. All non-commercial and nonindustrial streets shall have vertical face curb and gutter with a distance of not less than 24 feet back of curb to back of curb (except as hereafter provided). Vertical face curb shall conform to the specifications contained in the Bartow County Site and Utility Details for Development. "Roll-back" curb and gutter is prohibited. If a subdivision development consists of a minimum of two (2) acres per lot, the developer shall not be required to install curb and gutter; provided however, the developer, prior to the commencement of construction shall provide the county engineer with a copy of the recorded plat of said subdivision which shall contain a restrictive covenant, in addition to any other covenants, providing that said lots may not be re-subdivided into smaller lots and an affidavit that upon the conveyance of a lot to a third party, the deed shall specifically contain therein the provision that said lot cannot be re-subdivided into smaller lots not withstanding anything contained herein to the contrary. (12) Sidewalks. Except in A-1 or RE Districts, sidewalks, 60 inches wide or greater, shall be constructed on at least one side of all streets throughout any subdivision developments. Sidewalks shall also be installed along the frontage of an existing County road for any residential or commercial development. Industrial developments may be required to install sidewalks, at the discretion of the County Engineer, where connectivity may be accomplished. Sidewalks shall be constructed in conformity with the details found in the Bartow County Site and Utility Details for Development. (13) Curb for commercial and industrial streets. All commercial and industrial streets shall have six inch by 30 inch vertical face curbs with a distance of not less than 31 feet "back of curb to back of curb." (14) As-built certification. The developer's engineer shall, upon completion of roadway construction in compliance with these regulations, cause to be prepared an as-built certification for all roads, streets, and drainage systems for design compliance. A standard form of certification will be provided by the county. (15) Deed of dedication. The developer shall, upon completion of the above requirements, cause to be prepared a deed of dedication to Bartow County with a proper legal description, providing for dedication to and acceptance by Bartow County of the roadways and associated infrastructure improvements. Upon acceptance of said road or street, the same shall be open to the general public at all times subject only to any restrictions placed upon it by Bartow County. The county shall not be required to accept the dedication until all criteria of these regulations, including placement of final wearing surface, are met. Acceptance shall only occur by resolution of the commissioner adopted at a public hearing. (16) Warranty and maintenance period; requirements. Commercial or industrial roadways (including associated infrastructure improvements) shall be warranted for a period of two years from date of acceptance by the county of the roadways. Non-commercial and non-industrial roadways (including associated infrastructure improvements) shall be warranted for a period of two years from acceptance by the county of the roadways, except for roadways with sanitary sewer, in which case the warranty period shall extend two years from the date of acceptance by the county of the roadways. In all cases, the warranty period begins to run on the date the commissioner accepts the deed of dedication by resolution at a public hearing. The warranty shall mean that if the road fails within the warranty period, the road shall be repaired by the permit holder, or else the county shall draw on the surety to pay for the repair. Road failures include dips in the surface, raveling, potholes, and any other defect that means the road does not meet the standards and regulations of the county, as determined solely by the county. The surety required by subsection 5.28(e) shall remain in effect the applicable warranty period to secure maintenance. Work in an existing county right-of-way (for example, to tie in a new development) shall be warranted for a period of two years. (17) Subdividing or development on existing county roads. If a subdivision (subdividing a property into three or more lots) or a residential, commercial or industrial development occurs on an existing county road, the right-of-way should be increased to 60 feet. The developer is only responsible for the one side of the road he or she owns, unless the development is on both sides of the road. For example, if the existing right-of-way is 40 feet, the developer should grant 10 feet of right-of-way. (18) Right-of-way in addition to 60 feet. Subdividing or development on certain major thoroughfares will require additional right-of-way in excess of 60 feet. Minor arterials, as identified on the Bartow County Functional Classification Road Network Map, will require 100 feet of right-of-way. Major collector roads, as identified on the road classification map, will require 80 feet of right-of-way. (19) Horizontal Alignment (or Traffic calming). For all new Local streets as defined in FHWA's "Highway Functional Classification: Concepts, Criteria and Procedures". As a traffic calming feature, shall provide a maximum tangent length of 500 feet between slow point such as a controlled intersection, cul-de-sac, or curve with a centerline curvature radius between 300 feet and 100 feet. Where this cannot be accomplished or is not desirable, active traffic calming measures shall be installed with the approval of the county engineer. (Ord. of 11-9-2005(3), § 4.5; Ord. of 9-10-2008, §§ I(4.5.15), II(4.5.16); Ord. of 9-11-2013, § I; Ord. of 4-14-2021(1), §§ I, III; Ord. of 8-10-2022(1), § I; Ord. of 12-6-2023(3), § I) APPENDIX B—DEVELOPMENT REGULATIONS CDB:22.1 Supp. No. 16 Sec. 5.32. Storm water drainage facilities. The following criteria and requirements are applicable to all storm water and drainage plans and facilities, in all developments and subdivisions: (1) Professional preparation. A registered professional engineer or landscape architect currently registered in the State of Georgia must design and provide documentation that the proposed storm drainage improvements indicated on the site development plan are adequate and will not adversely impact downstream property owners. Said documentation shall include but not be limited to, storm pipe design calculations for hydraulic design review, calculations to show adequacy of receiving ditch including effects of concentrated discharge and engineer's certificate regarding storm water runoff. (2) Connection to existing storm drain required. If a storm drainage sewer system exists in the governmental area, then the proposed development must contain an underground storm drainage system that will be connected to the existing area system. Such system shall be indicated on the plat. (3) Provision for stormwater facilities. If an adequate storm drainage sewer system does not exist in the governmental area, then adequate surface drainage facilities, as designed by an engineer or landscape architect and documented by a surveyor currently registered in the State of Georgia, shall be included in the site development plan and so indicated on the plat. (4) Standards. Commercial, industrial and residential site development plans shall include storm water management facilities which limit surface water discharge to predevelopment rates for all frequencies from the two-year through the 100-year storm events. All stormwater detention facilities shall contain concrete or pure aluminum pipe. All stormwater detention facilities shall be designed and certified by a professional engineer currently registered in the State of Georgia. (5) Security and access. All ponds proposed to be deeded to the county shall be contained on an "out parcel" and shall have a four-foot high security fence with a 12-foot access gate around the perimeter of the out parcel. A minimum 20-foot wide access ramp must be provided to the facility. Owner/developer shall take precautionary measures to deter children from going near detention ponds. "KEEP OUT" and other warning signs shall be posted. All private stormwater detention facilities shall have a four-foot high security fence around the perimeter of the detention pond, with a 12-foot access gate. Owner/developer shall take precautionary measures to deter children from going near detention ponds. "KEEP OUT" and other warning signs shall be posted. As-built detention pond certification (standard form provided by engineering department) shall be provided by the design engineer to ensure compliance with design. (6) Performance standards. In all cases site development plans shall include adequate storm water management facilities which are designed and constructed to avoid any adverse impact on downstream property owners including, without limitation, recorded downstream drainage easements to the county. The "rational method" is not acceptable for stormwater detention design. See the Bartow County Development Checklist for acceptable methods. (7) Dedication in single-family subdivisions. The developer of single-family subdivisions shall, upon completion of the above requirements for detention ponds and access easements, cause to be prepared a deed of dedication to the county with a proper legal description, providing for dedication to and acceptance by the county. Upon acceptance of said detention pond, the developer shall warrant the facility for a period of one year after acceptance. (8) Indemnification. All developments shall provide an owner's indemnification statement. (9) Drainage easements. Where a proposed development is traversed by a water course, drainage way, channel, or stream, there shall be provided a minimum ten feet of storm water easement or drainage right-of-way along each side of the channel or course for the purpose of widening, deepening, relocating, improving or protecting such drainage easement. Open drainage ditches shall have no greater than 4:1 side slopes and fall entirely within the easement. Proposed ditches within a development shall be maintained and protected by the individual lot owner, unless shown otherwise. Notice of same shall be included on the recorded plat of the development and on each individual deed of conveyance. (10) Standards on structures. All drainage systems must utilize drop inlets and/or catch basins constructed to Georgia Department of Transportation standards, unless a drainage study sealed by a professional engineer or landscape architect currently registered in the State of Georgia and approved by the county, indicates the conditions require a different drainage structure. Spillways are prohibited within the right-ofway. All structures not conforming to Georgia Department of Transportation standards must be designed by a registered professional engineer or landscape architect currently registered in the State of Georgia and must be approved by the county. (11) Street grading. Street grades must be such that drainage flows away from intersecting streets. Each street shall have low points constructed at a minimum of 12 feet from the edge of the paving on intersecting streets and a minimum of six inches below the edge of the pavement. (12) Flood hazard area delineation. Location of 100-year flood hazard area, if any, must be delineated on the plan. FEMA procedures shall be followed in arriving at flood plain determinations and the Bartow County Flood Damage Prevention Ordinance (Code section 34-31 et seq.) shall be complied with. Where encroachment is proposed, an engineer's certificate for flood plains must be provided along with an as-built certification upon construction completion. (13) Plat acceptance criteria. Proposed preliminary and final plats of development, both residential and commercial, located contiguous to or within flood hazard areas shall not be accepted, except in accordance with the following requirements: a. Base flood elevation. Each plat shall contain a notation clearly stating the water surface elevation of the base flood in relation to mean sea level or as accepted by the engineering department. Any lands below this elevation shall be designated on the plat by a heavy contour-type line, depicting the base flood level and created as a drainage easement. b. Individual lot plat and certification. A property plat of each residential lot, any portion thereof which is flooded by the base flood, shall be submitted to the engineering department for review and acceptance prior to issuance of the building permit. Said plat shall have located and noted thereon the building, driveway, setbacks, finished floor elevations (including basement) above base flood, floodplain coverage and elevations, area above base flood elevation, and all easements. All elevations shall be referenced to NGVD (mean sea level) or acceptable datum. Prior to rough inspection, certification of compliance with Bartow County Flood Damage Prevention Ordinance shall be submitted to the engineering department for acceptance. This requirement is applicable to all subdivision lots encumbered by a flood hazard area which are unbuilt and unpermitted as of the February 21, 1996. Base flood is defined in the Bartow County Flood Damage Prevention Ordinance and is to include the pool of stormwater created by the base storm resulting from manmade stormwater drainage structures or constrictions to flow including pipes, culverts, dams, channelizations, etc. (14) Flood hazard area kept clear. All owners of any property subject to regulation under these regulations shall maintain all areas on their property within any special flood hazard area free of debris or obstructions which may be hazardous to the public welfare or safety, or which would interfere with the free flow of water in such a way as would increase the need for flood protection, raise the flood level, or increase the risk of hazardous inundation of adjacent properties or developments, as contemplated by these regulations. Where debris or obstructions have accumulated in areas within the base flood contour elevations in such a manner as to interfere with the free flow of water as would increase the need for flood protection, raise the flood level, or increase the risk of hazardous inundation of adjacent properties or jurisdictions, and the owners fail to remedy the problem, upon reasonable notice to the owner, the county is hereby authorized to enter upon such special flood hazard area and clear or remove such debris or obstructions as are hazardous to the public safety. The cost thereof may be charged to the individual or entity causing, creating, or adding to the obstruction, in the judgment of the county. (15) Maintenance surety. In accordance with the Bartow County stormwater management ordinance, prior to approval of final plat or issuance of certificate of occupancy, the developer shall cause to be executed in favor of Bartow County surety in the form of a maintenance bond, or an irrevocable standby letter of credit. In lieu of providing a new letter of credit, the developer shall have the option of utilizing funds that would otherwise be released for satisfaction of the E & S requirements in the existing surety, providing the amount meets the requirements of the stormwater management ordinance, and provided the form of the existing surety encompasses the warranty and maintenance obligations contained therein. If the existing surety is not adequate in amount or form for these purposes, the surety must be reissued or a new surety provided. The purpose of the surety shall be for the guarantee of the CDB:25 Supp. No. 11 stormwater management facilities if the developer intends to deed the facilities to the county and the county is agreeable to accept ownership. See subsection 9.4.5 of the stormwater management ordinance. (Ord. of 11-9-2005(3), § 4.6; Ord. of 9-10-2008, § II(4.6.15); Ord. of 11-7-2018(2), § III) Secs. 5.33—5.60. Reserved. DIVISION 3. ADDITIONAL REGULATIONS Sec. 5.61. Construction in right-of-way. No building or other structure may be erected in a county road right-of-way. Landscaping, irrigation systems and other similar features are not permitted in the county rights-of-way, and are subject to being removed at the owner's expense if a utility service is installed or repaired, or road widening or maintenance occurs. Driveways and walkways may cross rights-of-way. (Ord. of 11-9-2005(3), § 5.1) Sec. 5.62. Off-street parking areas. (a) Purpose. The purpose and intent of this section is to ensure the provision of off-street parking, loading, queuing and on-site circulation facilities in proportion to the demand created by each use. By requiring such facilities, it is the intent of this section to ensure the provision of functionally adequate, aesthetically pleasing and safe off-street parking, loading, queuing and circulation areas. It is the intent of this regulation to provide standards for the layout and maintenance of display or parking areas, and to provide space for the use of landscape beautification and natural plant growth for developments where off-street parking and open-lot sales, display and service areas are provided. (b) General requirements. The standards of this section shall apply to all new development or existing development that is modified. (1) New buildings or a change of use. Off-street parking and loading facilities shall be provided for any new building constructed, for any new use established or any change in occupancy in an existing building. (2) Additions and enlargements with no change of use. Off-street parking and loading facilities shall be provided for any addition to or enlargement of an existing building, existing use or existing manner of operation that would result in additional parking and loading spaces being required. The additional parking and loading spaces shall be required only in proportionate amount to the extent of the addition, enlargement, or change, not for the entire building. Renovations or additions to vehicular use areas shall provide landscape improvements in accordance with this section. Existing vegetation shall be preserved and incorporated into the landscaping for the vehicular use area. Creation of 5,000 square feet or more of impervious surfaces shall meet the requirements of the Bartow County Stormwater Management Ordinance, Ch. 34, Article VIII of the Code of Bartow County. (c) Location of required parking. All buildings, structures, and uses of land shall provide, on the same lot with the principal use, off-street parking and loading spaces in an amount sufficient to meet the needs caused by the uses of the land. The location of off-street parking spaces shall not interfere with normal traffic flow or with operation of queuing and backup CDB:27 Supp. No. 11 areas. Loading areas shall not obstruct pedestrian pathways. Each parking space shall be accessible from a driveway and maneuvering and turning areas shall be provided so that no vehicle will be required to back into a public street. (1) Adjacent parking lots serving nonresidential or mixed-use buildings shall provide for future interconnectivity. Future interconnectivity provisions for parking lots serving residential development are optional. (2) Location on other property. If the required automobile parking spaces cannot be reasonably provided on the same lot on which the principal use is conducted, such spaces may be provided on adjacent or nearby property within a similar zoning district, provided a major portion lies within 400 feet of the main entrance to the principal use for which such parking is provided per the approval of the engineering department. (d) Use of required off-street parking areas. Off-street parking spaces shall be provided for the use of residents, customers, patrons, and employees. Required parking spaces shall specifically not be used for the storage, sale or display of goods or materials or for the sale, repair, or servicing of vehicles. All vehicles parked within off-street parking areas shall be registered and operable. Delivery vehicles shall utilize loading areas and not required parking spaces. (1) Required off-street parking and loading spaces associated with newly erected or altered buildings or newly established uses of land shall be a continuing obligation of the owner of said building or land so long as the structure or use exists or its use requiring vehicle parking or loading facilities continues. In addition, it shall be unlawful for: 1) said owner to discontinue, change or dispense with, or to cause the discontinuance, or change of the required vehicle parking or loading spaces (apart from the discontinuance, sale or transfer of the building or use) without establishing alternative vehicle parking or loading spaces which meet the requirements of and are in compliance with this ordinance, or 2) any person to use a building or lot without providing vehicle parking or loading spaces which meet the requirements of and are in compliance with this ordinance. (2) The maximum number of off-street parking and loading spaces shall be calculated based on the schedule of standards in Table 5.1 of the Development Regulations, maximum off-street parking and loading standards. However, in an effort to reduce the amount of impervious area on developed sites, the actual number of parking and loading spaces constructed shall be determined by the owners' engineer. In any event the minimum number of parking spaces provided shall be no less than 50 percent of the maximum number as identified in Table 5.1. (3) Reduced, shared, or off-site parking for single-family residential districts shall be prohibited. For all other districts, the applicant may request an administrative variance for a reduction of parking standards based on the following criteria: a. Reduction of parking requirements through a shared parking arrangement may be permissible only through the permission of the engineering department provided the arrangement shall avoid conflicting parking demands and provide for safe pedestrian circulation and access. b. Parking plan drawn to scale indicating location of proposed parking spaces shall be provided. c. A shared or off-site parking calculation projection shall be provided that demonstrates that each use will have adequate parking provisions at all times. d. For contiguous properties sharing parking spaces under this provision, cross easements shall be filed establishing access to the parking spaces in perpetuity. e. A reduction in the number of parking spaces that would otherwise be required for each of the various uses on a multiple-use property must be clearly shown on the development plan. If shared or off-site parking is proposed for a combination of contiguous properties, a plan must be submitted covering all of the properties that will be sharing the parking spaces. f. A written agreement among all owners of record shall be provided and held on file with the engineering department. (4) For any use not listed in Table 5.1, the standards for the most similar use shall be applied. The engineering department shall determine the proper required maximum number of spaces by classifying the use among the uses specified. In making a determination, any evidence of actual parking and loading demands shall be considered as well as other reliable traffic engineering and planning information that is available to ensure sufficient parking and loading spaces are provided to meet the needs caused by the uses of the land. If the number of parking and loading spaces are less than the maximum number calculated in Table 5.1, the owner shall reserve area on the site which will provide for the installation of additional spaces up to the maximum number. The reserve area shall be accessible from the driveway serving the constructed parking area. In the interim, the reserved parking site shall remain a grassed landscaped area. Based on accident reports, traffic studies, and other information related to the development, the engineering department may require the owner to install additional parking spaces to ensure public safety. If it is deemed by the engineering department that adequate parking has not been provided to serve the particular land use, additional parking shall be installed no later than 90 days from the date of official notice from the engineering department. Enforcement procedures shall be as provided in these regulations. The cost for the installation of additional parking and/or associated traffic studies, required by the engineering department, shall be born by the owner. (5) Stormwater quality and quantity requirements of the Bartow County Stormwater Management Ordinance, Ch. 34, Art. VIII of the Code of Bartow County, shall be satisfied for all parking areas. Additional parking spaces, which exceed the maximum number calculated in Table 5.1, shall be constructed to allow the infiltration of stormwater by utilizing a permeable typical section with a pervious surface course. The pervious typical section and surface shall be designed in accordance with the Georgia Stormwater Management Manual. Striping and/or curbing may be excluded in the overflow parking area upon review and approval by the engineering department. The type of pervious material, conditions of the property, and the type of land use shall be considered in the decision to exclude the striping and/or curbing. (6) The maximum designated parking areas, constructed parking areas, and overflow parking areas, if applicable, shall be denoted on the approved construction plan and the approved final "as-built" as shown in Figure 5-1. a. Off street parking and loading spaces shall be provided in accordance with the following schedule of standards in Table 5.1. Table 5.1: Maximum Off-street Parking and Loading Standards Use Parking Loading Apartment or other multi-family use (excluding duplex) 2 spaces per dwelling unit + 0.25 guest parking spaces per unit for all dwelling units with common parking areas N/A Appliance sales 1 space per 200 sf of GFA B Use Parking Loading Automotive or machinery sales and service garage 1 space per 400 sf of GFA + 1 space per employee A Automotive paint or body shop 1 space per 250 sf of GFA N/A Bank or financial institution 1 space per 200 sf of GFA N/A Beauty, barber shop, and personal services 3 spaces per operator N/A Boarding or rooming house 1 space per bedroom N/A Bowling alley 2 spaces per lane + 1 space per 250 sf of non bowling recreation area C Church or place of worship 1 space per 45 sf of main assembly area if fixed seats (pews) or 1 space per 21 sf if moveable seats (chairs) N/A Club or organization hall 1 space per 100 sf of assembly space + 1 space per 2 employees N/A College or university 1 space per 2 students + 1 space per 4 seats in auditorium and gymnasium + 1 space per 300 sf of administrative and educational office space C Communications tower 1 space + 1 additional space for each 1,000 sf of equipment building N/A Day care center 1 space per employee + 2 spaces per classroom Less than 100 capacity 5 transient spaces + 1 space per employee N/A 100 or more capacity 10 transient spaces + 1 space per employee N/A Duplex 2 spaces per dwelling unit N/A Entertainment, indoor (except bowling alleys) 1 space per 250 sf of GFA C Entertainment, outdoor 10 spaces per acre N/A Fraternity or sorority house 1 space per bedroom with a maximum of 2 spaces N/A Funeral home or mortuary 1 space per 3 seats in chapel or 1 space per 50 sf of public area, whichever is greater 1 for each hearse, ambulance, and nonpassenger vehicle Use Parking Loading Restaurant, general and specialty 1 space per 80 sf, including outdoor seating areas + 1 space per employee on the greatest shift C Retail store 1 space per 200 sf of GFA A School, elementary 1 space per classroom + 1 space per employee C School, secondary 0.25 spaces per student enrollment + 1 space per employee C Self-service storage facility 1 space per 75 storage bays + 1 space per employee + 2 customer spaces N/A Shopping center, community or regional 1 space per 200 sf of GLFA B Single-family residence, townhouse cluster 2 spaces per dwelling unit N/A Small item service and repair shop 1 space per 250 sf of GFA N/A Stable, commercial 1 space per 300 sf within stable + 1 space per 3 animal stalls N/A Swimming pool, private community or public 1 space per 50 sf of pool area N/A Tennis court, private community or public 1.5 spaces per court N/A Utility, public or private 1 space per 10,000 sf + 1 space per employee N/A Vehicle sales and rental 1 space per 500 sf of enclosed area + 1 space per 4,500 sf of outdoor sales, rental, and display area + 1 space per service bay + 1 space per employee A Warehouse 1 space per 2,000 sf + 1 space per employee 2 spaces for the first 5,000 sf of GFA + 1 space for each additional 10,000 sf or fraction thereof Wholesale store 1 space per 400 sf of GFA + 1 space per full-time employee A sf = square feet N/A = Not Applicable GFA = Gross (total) floor area in square footage of a building footprint GLFA = Gross leasable floor area Loading space ratio: The letter shown in the loading column of the schedule shall correspond to the following ratios: a. Standard "A": 1 space for the first 5,000 sf of floor area + 1 space for each additional 30,000 sf of floor area. b. Standard "B": 1 space for the first 10,000 sf of GFA + 1 space for each additional 15,000 sf of floor area. c. Standard "C": 1 space for the first 10,000 sf of GFA + 1 space for each additional 100,000 sf of floor area. d. Standard "D": 1 space per 50 beds for all facilities containing 20 or more beds. The number of handicapped spaces required may be included within the overall total number of parking spaces required based on the maximum calculation in Table 1 and, if applicable, the number above the maximum spaces required. The maximum number of handicapped spaces shall comply with the following table. (e) General design and construction standards. Parking facilities shall be designed and located on the site in a manner that results in minimal visual impact along the street. Location, landscaping, earthwork, and buffering should all be implemented as necessary to reduce the negative visual impacts of parking facilities on the aesthetic quality of the street. (1) There shall be safe, adequate, and convenient arrangement of pedestrian pathways, bikeways, roads, driveways, and off-street parking and loading spaces within parking areas. Streets, pedestrian walks, parking areas, and open space shall be designed as integral parts of an overall design which shall be properly related to existing and proposed buildings, adjacent uses, and landscaped areas. (f) Parking facilities shall be maintained in a clean, safe, sanitary and attractive condition. Parking spaces and driving lanes shall be clearly defined and maintained as such. Parking lots shall not be operated when any damage impairs the drivability of the parking lot. (g) All off-street parking, loading or open-lot sales areas established pursuant to this section shall be designed, constructed and continuously maintained in accordance with the following standards: (1) Access. Adequate ingress and egress to such areas for vehicles shall be provided by means of clearly limited and defined paved drives. Each parking space shall have appropriate access to a street or an alley. Only dwelling units with no more than two units shall be allowed backward egress from a driveway onto a local street. In all other cases, maneuvering and access aisle area shall be sufficient to permit vehicles to enter and leave the vehicular use area in a forward motion. CDB:28.7 Supp. No. 14 (2) Stacking. Adequate off-street stacking lanes or queuing areas shall be provided for vehicles entering the vehicular use area so as to avoid backup and congestion on adjacent public streets. A minimum queuing distance of 20 feet is required between the property line and the first parking space. (3) Parking access aisles. Adequate aisle width in vehicular use areas shall be provided for vehicle bypass and maneuvering areas to ensure efficient on-site circulation. For one-way drive, parallel and perpendicular or angle parking the minimum driveway width shall be 16 feet. For two-way drive, parallel parking and perpendicular or angle parking the minimum driveway width shall be 24 feet. (4) Pedestrian circulation. Structures, vehicular circulation lanes, parking spaces, driveways, and open spaces shall be designed to provide logical, impediment free pedestrian movement. The site shall be arranged so that pedestrians moving between buildings are not unnecessarily exposed to vehicular traffic. Where off-street parking spaces directly face a structure, and are not separated from the structure by an access aisle, a paved pedestrian walkway shall be provided between the front of the structure and the parking spaces. The walkway shall be a minimum of four feet in width, exclusive of vehicle overhang, and shall be separated from the parking space by concrete wheel-stops or continuous curbing. If the pedestrian walkway adjacent to parking spaces is six feet, six inches wide with continuous curbing, then wheel stops shall not be required. There shall be a pedestrian walkway a minimum width of four feet connecting ground level parking to the public sidewalks and to all building entrances. This provision shall not apply to residential vehicular use areas. a. Surface parking lots shall include a pedestrian circulation system that provides access from the parking area to the building entrance, major bus stops or other critical access points. The circulation system shall be adequately lit and appropriately signed and marked. Shrub material taller than two-feet in height is not recommended along pedestrian walkways within surface parking lots. (5) Drainage of vehicular use areas. Areas used for display or parking shall be drained so as to eliminate surface water, unless the area or some portion of it is approved as a detention/retention area by the engineering department. Drainage is encouraged in infiltration swales located in the landscaped islands. See section 5.32 Stormwater and drainage facilities of these regulations. The drainage design shall be reviewed and approved by the engineering department prior to the issuance of a permit. (6) Paving standards. All parking lots, access ways, storage lots, loading or open lot sales shall be paved and constructed of a minimum of four inches of concrete or two inches of asphaltic concrete on six inches of graded aggregate base (gab), or a base and surface material of equivalent durability as certified by the developer's engineer. Such paved areas shall be maintained in good condition by the owner to prevent any hazards, such as cracked asphalt or potholes. Responsibility for pavement failure occurring as a result of inadequate alternative base and surface material design shall fall on the certifying engineer. The following are exceptions to the above paving standards: a. Storage lots serving facilities within an industrial or light industrial zoning district may be constructed of six inches of graded aggregate at a minimum provided the following requirements are met: 1. The storage area is setback a minimum of 100 feet from a public right-of-way excluding interstate highway rights-of-way. 2. Clearly limited and defined vehicular drives for ingress and egress to the storage area are provided; drive widths shall not exceed 30 feet. 3. A vegetated buffer 20 feet in width and consisting of evergreen plants is installed along the perimeter of the storage lot. The vegetative buffer shall create a visual screen that is 75 percent or more opaque and reaches a height of six feet within two years. 4. Water and other dust control measures shall be applied during the installation of graded aggregate. b. Drives serving unmanned facilities may be constructed of six inches of graded aggregate provided the required drive, from the edge of the public roadway for a distance of 100 feet, meets the paving standards of this section. c. Alternative paving methods or parking lot surfaces may be considered if adequate standards and installation procedures are followed per the manufacturer's recommendations or approved design plans. The alternative method will need to be reviewed and approved by the county engineer. Such alternative methods may include but are not limited to the following: porous concrete, pervious pavers, or gravel parking pads. The purpose of these methods is to limit the large, open impervious parking lots. Concrete and asphalt paving requirements may not be logical or affordable for large parking areas that are not adjacent to buildings, therefore the county engineer is authorized to determine that paving requirements may be lessened for industrial and commercial overflow parking areas as well as for commercial outdoor storage parking areas. To lessen such regulations, the county engineer may decide based on the proposed civil plans that the reduction is consistent with the spirit and intent of the code, will not harm the public interest or adjacent property, and is in the best interests of the county. Any such approved modification shall be noted on the civil plans to provide public record of the fact that existing regulations have been varied for the proposed development. (h) Standard parking space dimensions and marking. Each required regular parking space shall measure a minimum of nine feet wide by 18 feet deep for perpendicular or angle parking, and a minimum of nine feet by 22 feet for parallel parking. Each parking space shall be delineated with white, street marking paint with stripes four inches wide on each side for the required length of the parking or loading space. CDB:28.9 Supp. No. 14 (i) Compact parking spaces. Developments where 30 or more parking spaces are provided shall be required to have a minimum of five compact parking spaces. Compact parking spaces shall be identified by pavement markings and/or by appropriate signage and shall not be less than eight feet wide by 15 feet deep. (j) All parking space dimensions and markings shall be designed to conform to the geometric design standards of the Institute of Transportation Engineers (ITE). (k) Handicapped parking space standards. Handicapped-accessible parking spaces shall meet the requirements of the Georgia Accessibility Code. (l) Off-street loading and unloading. Every building or structure used for business, trade, or industry, shall provide space for the loading and unloading of vehicles off the right-of-way of the street or public alley. Such space shall have access to an alley or if there is not alley, to a street. Each required loading space shall measure a minimum of ten feet in width and 30 feet in length, with a 14-foot overhead clearance, except that loading spaces to be utilized by wholesale and industrial operations shall be a minimum of 50 feet in length. Such space shall be so arranged that no vehicle is required to back onto a public street, road, or highway in order to leave the premises. (m) Landscaping and curbing. Landscaped areas shall be provided and maintained around the perimeter and within the area used for parking, loading or open-lot sales as set forth in section 5.63. Wheel-stops or continuous curbing shall be placed two and one-half feet back from walls, poles, structures, pedestrian walkways or landscaped areas. (n) Lighting. If a vehicular use area is to be open for use after dark, it shall be lighted. Lighting shall be arranged and designed so that no source of light is directed toward any adjoining or nearby land used or classified for residential use. Lighting shall be designed to shield public streets and all other adjacent lands from direct or distracting glare, or hazardous interference of any kind. Lighting shall be arranged so as not to conflict with tree heights at maturity. (1) Parking lot lighting shall be provided throughout after dark parking facilities to equal a minimum of one-fifth (0.2) footcandle of light. A footcandle of light is a uniformly distributed flux of one lumen on a surface of one square foot in area. Where applicable, public street lighting may be utilized to either partially or totally fulfill the lighting requirements; however, where such street lighting is removed, it shall be the responsibility of the parking facility to independently provide these required levels of illumination. (2) Parking lots adjacent to residential buffer areas shall reduce light spillage onto residential properties by providing cutoff luminaires which have a maximum 90 degree illumination. (3) Parking deck lighting fixtures at a maximum of seven feet above grade shall not be visible from any public right-of-way. (o) Signs. Traffic control signs and other pavement markings shall be installed and maintained as necessary to ensure safe and efficient traffic operation of all vehicular use areas. (p) Parking decks and structures. The following regulations shall apply to all parking decks and parking structures: (1) Parking deck façades shall conceal automobiles from visibility from any public right-of-way or private drive or street that are open to the general public, and shall have the appearance of a horizontal storied building. (2) All parking decks and parking structures shall have pedestrian walkways a minimum width of four feet connecting ground level parking to the public sidewalks and to all building entrances. (3) All parking decks and parking structures shall have a landscape strip a minimum width of six feet immediately contiguous to the parking facility for the whole of the exterior perimeter of the parking facility containing at least one understory or overstory tree, as appropriate, and additional shrubs, groundcover, or sod as specified in the landscape installation requirements of this section. (q) Plan approval required. Plans for the layout and design of all areas to be used for parking, loading or open-lot sales must be approved by the engineering department for compliance with the development regulations. (Ord. of 11-9-2005(3), § 5.2; Ord of 5-6-2009, § I; Ord. of 1-5-2022(1), § I) Sec. 5.63. Landscape requirements for non-residential development. (a) Purpose. The purpose of this section is to establish minimum requirements for landscape areas and buffers in Bartow County's non-residential, and multi-family zoning districts. Said requirements are designed to: (1) Improve the appearance of Bartow County's commercial and industrial corridors and multi-family developments; CDB:28.10.1 Supp. No. 14 (2) Minimize noise, glare, and erosion; (3) Provide a visual separation between incompatible uses; (4) Maintain the county's environmental standards for quality new development; (5) Maximize opportunities for trees and other landscaping to create a high quality open space; (6) Enhance environmental conditions by providing shade, air purification, and reduction of storm water run-off; (7) To help filter noise and light; (8) Provide character by enhancing visual appearance; and (9) Establish measures for water conservation. Off-street parking associated with such uses shall be governed by such requirements within these development regulations. Landscaped areas shall be provided and maintained around the perimeter and within the area used for parking, loading or open-lot sales as set forth hereinafter; and concrete curbs of a design approved by the engineering department shall be installed around the perimeter of all landscaped areas. Consideration will be given to alternate designs when islands are used for stormwater management to assist in achieving water quality/quantity requirements. (b) Landscape plan submission. The applicant shall submit to the engineering department five sets of construction plans depicting the layout and design of the proposed off-street parking, loading and/or open lot sale area, hereinafter identified as the "vehicular use area." Said plan depicting the layout and design of the proposed vehicular use area shall provide the information required for a predevelopment site plan as set forth in section 5.62 of the development regulations. The plan shall be submitted and approved as part of the construction plan as required by the provisions of these regulations and the Bartow County Stormwater Management Ordinance. The plan shall show lot or parcel dimensions, building dimensions, tree/landscape preservation areas, and the location and size of all tree and plant materials. All landscape plans must be prepared and stamped by a registered landscape architect licensed to practice in the State of Georgia and should follow the general landscape principles of preservation, creativity, quality and an emphasis should be placed on the use of Xeriscape. (c) General requirements. Plan submission and required landscaping features for vehicular use areas. (1) The areas used for the display or parking of any and all types of vehicles, boats or heavy construction equipment, whether such vehicles, boats or equipment are selfpropelled or not, and all land upon which vehicles traverse the property as a function of the primary use, hereinafter referred to as "other vehicular uses," including but not limited to activities of a drive-in nature such as, but not limited to, filling stations, grocery and dairy stores, banks, restaurants, and the like, shall conform to the minimum landscaping requirements hereinafter provided, except areas used for parking or other vehicular uses under, on or within buildings, and parking areas serving single-and two-family uses as normally such residential areas are voluntarily landscaped. (d) Landscaping requirements. All vehicular use areas shall comply with the following landscaping requirements: (1) Perimeter landscape requirements. All building perimeters shall have a landscape area or sidewalk of not less than five feet in width. In no case shall asphalt paving areas be contiguous to the base of a building. All exterior perimeters of all vehicular use areas shall have a perimeter landscaped area with no horizontal dimension less than five feet. A minimum of one tree for every 75 linear feet of perimeter area shall be required. A decorative masonry wall, earth berm, natural landscaping screen, new plantings, or some combination of these elements shall be installed in such a manner as to partially screen the vehicular use area from adjacent properties. Such screening shall be maintained at a minimum height of three feet. In no case shall these requirements be interrupted to allow an obstruction of site distance. See corner visibility requirement in subsection (2) below. (2) Street landscape requirements. When abutting a public street right-of-way, landscaping areas shall have a minimum dimension of ten feet from the right-of-way line to the vehicular use area. A minimum of one tree for every 30 linear feet of road frontage area (minimum two trees) shall be required. If a parcel or lot has more than one street planting area (i.e. more than one street frontage), each shall be considered separately. If a building site contains more than one parcel or lot, the entire site shall be treated as a single entity. Forty percent of the street planting area shall be comprised of shrub materials. Signs may be placed within the street planting area, monument style, and placed at least ten horizontal feet from all property lines, or one foot behind right-of-way for every foot of height, whichever is greater. No sign or planting shall be erected that obstructs sight distance at an intersection or along a public right-of-way. In all zoning districts, no sign of any type or design that obstructs vision between the heights of three feet and 15 feet above grade shall be permitted within 20 feet of the intersection of the right-of-way lines of street and/or railroads. Traffic control signs and signals are exempt from this regulation. In addition, the requirements for corner visibility must be met as follows: There shall be provided an unobstructed view across the triangle formed by joining points measured 20 feet distant along the property line from the intersection of two streets or 20 feet along both the street and alley line from the intersection of a street and an alley. Within said triangle there shall be no sight-obscuring wall, fence or foliage higher than 30 inches above grade or, in the case of trees, foliage lower than eight feet. Vertical measurement shall be made at the top of the curb on the street or alley adjacent to the nearest side of the triangle, or, if no curb exists, from the edge of the nearest traveled way. See Bartow County Zoning Ordinance, Appendix A of the Code of Bartow County, for additional sign regulations. (3) Mandatory terminal island design. Each single and double row of parking spaces shall be terminated by landscaped islands contoured as indicated in the diagram below or approved similar design. A terminal island shall be no less than nine feet in width and no less than 15 feet in length and shall include at least one tree having a clear trunk of at least five feet, with the remaining area adequately landscaped with shrubs, ground cover or other authorized landscaping material not to exceed three feet in height. Larger islands should be considered for planting of larger-maturing trees. At the discretion of the County Engineer this requirement may be varied to allow for an alternate design for large truck storage lots with additional perimeter landscaping in lieu of terminal islands with landscaping. (4) Mandatory interior island design. Interior landscaped islands shall be provided within each row of parking spaces and contoured as indicated in the diagram below. A minimum of one interior island shall be provided for every 15 parking spaces or fraction thereof. Landscaped interior islands shall measure not less than nine feet in width. The length of the interior islands shall be no less than the minimum required depth of parking space. Landscape strips a minimum of five feet in width shall be provided for every other interior-parking isle. Larger islands should be considered for planting of larger-maturing trees. At the discretion of the County Engineer this requirement may be varied to allow for an alternate design for large truck storage lots and student parking areas with additional perimeter and/or terminal-island landscaping in lieu of interior islands with landscaping. CDB:28.13 Supp. No. 9 (5) The perimeter of terminal islands and interior islands shall be surrounded with a continuous, raised curb. Exemptions include those landscaped islands intended for stormwater retention/detention. See Georgia Stormwater Management Manual for additional requirements regarding stormwater management. Landscape island width shall be measured from the inside edge of the curb. Trees planted in vehicular use areas shall be allowed to grow to a mature height and a full canopy. Pruning shall be limited to periodic trimmings to maintain the health of the trees or shrubs. (6) Minimum landscape installation requirements. All landscaping shall be installed in accordance with accepted good planting procedures. (7) Tree protection. During development of any project there shall be erected and maintained suitable protective barriers around all trees to be retained so as to prevent damage thereto. All building materials, soil stockpiles or other debris shall be kept outside the barriers. There shall be no paving with any impervious materials or grading within 15 feet of any tree to be retained. (e) New plant materials. All new living plant materials shall satisfy the requirements of subsection (a) or better as defined in the most current edition of Grades and Standards for Nursery Plants. (1) Xeriscape requirements. All street frontage, parking lot, and side yard landscape areas shall be planted with water-conserving groundcover and vegetation. Other conservation measures are encouraged, including: a. Irrigation systems which are electronically set for night and/or early morning irrigation; b. Designs which collect and recycle water; and c. The minimization of overspray onto non-landscaped areas to avoid wasting water. (2) All separate landscaped areas shall have a minimum variety of two living plant materials. (3) Paving (other than walks) and artificial plants shall not be permitted within landscaping areas. (4) Trees. A tree shall attain an average crown spread over 15 feet at maturity. Trees having an average crown spread less than 15 feet may be substituted by grouping the same so as to create the equivalent of a 15-foot crown spread. All trees shall be of a species which can be maintained with a minimum of five feet of trunk height. Trees shall have a minimum of two inches DBH (diameter at breast height) measured four and one-half feet above the ground and shall be a minimum of eight feet in overall height immediately after planting. (5) Shrubs. Shrubs shall be a minimum of one foot in height when measured at the time of planting except where they are to act as screening for residential use or districts, in which case, they shall be a minimum of three feet in height at the time of planting and maintained at a minimum height of five feet at maturity, unless otherwise indicated in this section. (6) Lawn grass and ground covers. Grass may be sodded, plugged, sprigged, or seeded except that solid sod shall be used in swales or other areas subject to erosion. In areas where plant material other than solid sod or grass is used, a fast-growing grass seed shall be sown for immediate effect and protection until coverage is otherwise achieved. Grass sod shall be clean and reasonably free of weeds and noxious pests or disease. Ground covers which present a finished appearance and meet the requirements of final stabilization as defined in the Erosion and Sedimentation Control Ordinance at time of planting may be used in lieu of grass sod. (f) Tree species. The owner/developer should contact the Georgia Forestry Commission or the University of Georgia Extension Service to obtain a list of native trees and plantings which are most tolerant of the urban environment. (g) Existing plant material. Desirable existing natural plant material shall be preserved to the extent feasible. (h) Earthwork. Earth berms may be utilized within a buffer or perimeter landscaping area. Berms shall be of variable height and slope with required landscaping material installed on top and slopes stabilized with ground cover. Swales and ponds shall be permitted for on-site retention of stormwater provided they are approved by the county engineer. (i) Encroachment. Landscaped areas, walls, structures, and walks shall require appropriate protection from vehicular encroachment by utilizing wheel stops, curbs, posts, wood, brickwork, and/or other devices. Placement of these devices shall be located at least two and one-half feet from walks, walls, and structures and may be placed one foot from landscaped areas to prevent a vehicular overhang of no more than one and one-half feet of landscaping area which may be counted as part of the required depth of each parking space. (j) Maintenance. The owner or his agent shall be responsible for the maintenance of all landscaping which shall be attractively maintained in good condition so as to present a healthy, neat, and orderly appearance and shall be kept free from refuse and debris. All landscaped areas shall be provided with a sprinkler system, and/or other readily available water supply with at least one faucet equipped with a double check valve located within 150 feet of all plant material to be maintained. No irrigation or sprinkler system shall be allowed on the right-of-way. The owner shall replace all landscaped materials required if, for any reason, they die or are severely damaged within one year of the final approval of the installation. The owner is thereafter responsible to maintain the landscaping in a healthy manner. All dead and/or diseased plants shall be replaced annually as a condition of occupancy. CDB:28.15 Supp. No. 11 (k) Planting bed. The planting bed for all landscaping materials shall be free of weeds, debris, and noxious material and shall consist of a healthy plant growth medium. The planting bed soil shall provide adequate support, drainage, and nutrients for the plants and thus may require the incorporation of sand, peat, and/or topsoil into the soil. Such planting soil shall be placed throughout the planting hole for each plant, and this hole shall be at least twice as wide as the width of the plant ball and one and one-half times as deep as the depth of the plant ball. (l) Prohibited plants. No plants with vigorous root systems shall be planted within any sanitary sewer or public water easement. Such plants include the following: Eastern Cottonwood, Willow, Lombardy Poplar Certificate of compliance. All landscaping for each phase of development shall be completed prior to the recording of the final plat for that phase or prior to the issuance of certificate of occupancy for that phase. Upon completion of the landscape improvements, the site shall be inspected by the engineering department for compliance with the approved landscape plan. A certificate of compliance certified by the design professional who prepared the plan must be submitted and accepted the by engineering department before a certificate of occupancy can be issued for any related structures. In the event that the requirements of this article have not been met at the time that a certificate of occupancy could otherwise be granted in the case of an undue hardship or circumstances beyond the owner/developer's control, the owner or his agent shall post a landscape performance bond, letter of credit or other county approved surety in the amount equal to 100 percent of the cost of materials, labor, and other attendant costs, incidental to the installation of the required landscaping. Said surety shall be drawn in favor of Bartow County, be in a form satisfactory to the county, and specify the time for the completion of the landscaping requirements of this article which shall not be longer than six months following the issuance of a temporary certificate of occupancy. (m) Lot remnant plantings. All land surfaces other than those that are covered by buildings, structures, paving, or other required site elements shall be landscaped with well maintained grass, flowers, shrubs, or other suitable plant materials approved by the engineering department. The location and detail of all other landscaped areas shall be depicted on the required landscaping/tree protection plan. (n) Impervious area. Impervious surface areas shall not be allowed to cover more than 75 percent of the lot. (o) Landscape bond. Upon final installation of new trees, shrubs or other landscape material planted to meet the requirements of this ordinance, and before approval of final plat or certificate of occupancy, the owner shall either post a maintenance bond or letter of credit in an amount equal to 75 percent of the value of the new trees or landscape material and their installation, warranting the new trees, shrubs or landscape material for a period of no less than 15 months from approval of final plat or certificate of occupancy. The county engineer shall be authorized to reduce or eliminate the bonding requirement as an incentive to install better landscaping materials (for example, sodding rather than seeding disturbed areas). (Ord. of 11-9-2005(3), § 5.3; Ord. of 5-6-2009, § II; Ord. of 5-11-2016, § XII; Ord. of 11-7-2018(2), § IV) Sec. 5.64. Debris fills. Debris fills (i.e. the burying of construction waste, scrap lumber, stumps and branches, etc.) are prohibited, including debris fills at all construction sites and within any development, and including bury pits. The burying of construction debris, cleared trees and shrubs, CDB:28.16.1 Supp. No. 11 and similar by-products of development is strictly prohibited. All solid waste, demolition debris and construction debris generated from construction must be properly disposed of in the county landfill. However, Qfills,Q defined as earth embankments for construction purposes (as opposed to disposal purposes) made up of soil materials, are acceptable using acceptable soil materials. Acceptable soil materials are as follows: gravel, silt, clay, sand or loose rock up to six inches in diameter. All fills shall be marked on the recorded plat and site plans. No fill may exceed 250 cubic yards without a variance. See also the provisions of the Bartow County Soil Erosion and Sedimentation Control Ordinance for further regulations of cuts and fills. (Ord. of 11-9-2005(3), § 5.4) Sec. 5.65. Stream buffers. (a) Undisturbed buffer. An undisturbed vegetative buffer is required for any watercourse, river or stream shown on a 7.5 degree quadrangle map (1:24,000 scale) United States Geological Survey map most recently published, or on any other official U.S. Geological Survey map. Such buffer is to be a minimum of 50 feet on each side of the river or stream, as measured horizontally either from the top of the stream bank, or from the point where vegetation has been wrested by normal stream flow or wave action, whichever provides a larger buffer. Access points to the stream for livestock watering shall be allowed, but must be constructed following best management practices (BMPs) to minimize pollution and sedimentation to the stream or river. Georgia Environmental Protection Division (EPD) regulations should also be consulted. (b) Setback buffer. A further 25-foot setback buffer is imposed outside the 50-foot buffer; in the setback buffer, no impervious surfaces (including driveways, walkways, patios, other paving, etc.), nor septic tanks, septic drain fields or similar disposal systems, may be placed. Grading, filling, and earthmoving shall be minimized within the setback buffer. Any unauthorized disturbance of the buffer during construction must be restored to a vegetative density similar to the adjacent buffer areas, and also constitutes a violation of these regulations. Georgia Environmental Protection Division (EPD) regulations should also be consulted. (c) Applications. Any permit applications for property requiring buffers and setback buffers under this section must include all information requested by the county engineer to insure compliance with this section, with the following as a minimum: a site plan showing: the location of all streams on the property, the limits of required stream buffers and setbacks on the property, buffer zone topography with contour lines at no greater than five-foot contour intervals; delineation of forested and open areas in the buffer zone, and detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback. Additionally, a description of all proposed land development within the buffer and setback is required. CDB:28.17 Supp. No. 9 (d) Variances. Variances shall be granted under Article V. Additional provisions apply to variances from stream buffers, as contained therein. Georgia Environmental Protection Division (EPD) regulations should also be consulted. (Ord. of 11-9-2005(3), § 5.5) Sec. 5.66. Inspection of required buffers and requirements. Any buffer or other requirement of these regulations is subject to periodic inspections by the county engineer to determine that such buffer or requirement is in existence, and is being properly maintained. Failure to provide or maintain any requirement of these regulations may be deemed a violation of these regulations. (Ord. of 11-9-2005(3), § 5.6) Sec. 5.67. Construction exits. (a) A temporary construction exit must be installed and maintained for any land disturbance or other construction occurring in the county. Such exit must be maintained while any construction and/or grading equipment will be leaving a construction site to a public right-of-way, street, or parking area until construction is completed. (The construction exit may be the same as the driveway exit.) (b) The pad shall be adequate to substantially eliminate the transport of mud from the construction site by either motor vehicles and equipment or from water run-off. (c) Any materials or mud spilled, dropped, washed, or tracked from vehicles or from the site onto roadways or into storm drains must be removed within 24 hours or the county may perform any necessary corrective work and the owner/developer shall reimburse county for any expenses incurred. In the event the county undertakes the corrective work, no building permits for said development shall be issued until said expenses have been reimbursed to the county. (d) The exit pad of gravel or stone must at least be 12 feet in width by 20 feet in length with a depth of four inches, and a geo-textile pad underneath. The pad may be required to be an additional width, length, and/or depth if, in the opinion of the community development department, conditions so warrant. (e) In addition, construction sites other than one- and two-family dwellings, must comply with the Bartow County Soil Erosion and Sedimentation Control Ordinance (Code section 34-251 et seq.). (Ord. of 11-9-2005(3), § 5.7; Ord. of 9-11-2013, § I) Sec. 5.68. Street and development names. (a) Subdivision or development names. Proposed subdivision or development names must be reviewed and approved prior to the issuance of a development permit. Names will be reviewed by the Information Services/GIS Department upon submittal of the preliminary plat or site plan. (1) Proposed subdivision or development names shall not duplicate or too closely approximate, phonetically, the name of any other subdivision or development in Bartow County or its municipalities except for extensions of existing subdivisions or developments. (2) Subdivision and development names may be reserved if submitted and approved along with a concept plan for the project. Such names may not be reserved for more than six months prior to submission of a preliminary plat. (b) Road and street names. Proposed street names must be reviewed and approved by the Information Services/GIS Department prior to approval of a final plat for recording. Street names may be reserved through approval as shown on an approved preliminary plat for the subdivision. Proposed names for streets within a private or gated development shall follow the same rules as for public streets. (1) Street names shall consist of a root name of the developer's choosing and a suffix designation (such as RStreetR, RAvenueR, RDriveR, etc.), and shall be followed by a quadrant suffix. Directional prefixes (i.e., RNorthR, RSouthR) and the prefixes ROldR or RNewR shall not be used. (2) All streets shall bear the proper quadrant suffix appropriate to its location within the county (i.e. NE, NW, SE and SW), as determined by the department. (3) A proposed street that is obviously in alignment with another already existing and named street shall bear the name of such existing street, unless this requirement is waived by the Information Services/GIS Department. (4) No proposed street name shall duplicate (be spelled the same or be phonetically the same) as an existing street name within Bartow County regardless of the use of such suffix designations as RStreetR, AvenueR, RBoulevardR, RDriveR, RPlaceR, RWayR, RCourtR, or however otherwise designated. (5) All street root names and suffix designations are subject to the approval of the department. Obscene or otherwise unacceptable language, abbreviations, contractions, or initials may not be used. (6) Root names shall consist of no more than 13 characters including space, hyphens, etc. Letters not occurring in the English alphabet, and numerals, shall not be used. (7) Street name signs shall conform to the latest edition of MUTCD. (c) Private road/path names. For the purposes of this sub-section it shall apply only to residential roads/streets. A private road or path shall be determined to be a road or driveway (paved or gravel surface) serving three or more dwellings in which the residents desire to have the road or drive named. Proposed private road names, or proposed changes to private road names must be reviewed and approved by the Information Services/GIS Department prior to approval. (1) Private Road names shall consist of a root name of the owner's or residents' choosing and the suffix designation shall be RPathR followed by a quadrant suffix. Directional prefixes (i.e., RNorthR, RSouthR) and the prefixes ROldR or RNewR shall not be used. (2) All streets shall bear the proper quadrant suffix appropriate to its location within the county (i.e. NE, NW, SE and SW), as determined by the department. CDB:28.19 Supp. No. 9 (3) No proposed road name shall duplicate (be spelled the same or be phonetically the same) as an existing street name within Bartow County. (4) All road root names are subject to the approval of the department. Obscene or otherwise unacceptable language, abbreviations, contractions, or initials may not be used. (5) Root names shall consist of no more than 13 characters including space, hyphens, etc. Letters not occurring in the English alphabet, and numerals, shall not be used. (6) Street name signs shall be blue and conform to the latest edition of MUTCD. (d) Recording and changing names. All Bartow County public and private streets shall be designated on the Official Map and Official Index of Bartow County. Assigned street names once recorded on the final plat, or once a deed of dedication of the street to the county has been granted (whichever is sooner), cannot be changed without officially recording the final plat and/or re-deeding the street to the county. Such changes must first be approved by the Information Services/GIS Department. (Ord. of 11-9-2005(3), § 5.8; Ord. of 9-11-2013, § I; Ord. of 5-11-2016, §§ XIII, XIV) Sec. 5.69. Structural numbering; display of property address numbers. (a) Structural numbering required. All residential, commercial and industrial structures including dwelling units, places of business, industrial locations and all other structures not otherwise exempted herein, shall be required to display numbers indicating the street address of their property. Such numbers shall be assigned by the Information Services/GIS department. The GIS department shall keep a record of all numbers assigned. (b) No permits without compliance. No building, electrical, plumbing or mechanical permit for any new or remodeled or repaired structure will be issued by the building official the owner, developer or builder has procured from the engineering department the official structure number or numbers. Final approval for a certificate of occupancy of any principal building erected or repaired, or use requiring said number, shall be withheld until permanent and proper numbers have been displayed in accordance with the regulations contained herein. (c) Procedures. For any new structure proposed on a property which has not been assigned an address, a street number will be assigned upon confirmation or establishment of the property as a buildable lot of record, or as otherwise stated below: (1) Subdivisions. House numbers will be assigned after the preliminary plat is approved for the property. The developer shall submit two copies of the plat to the engineering department. Block number assignments shall also be designated for abutting major street name signs at this time. Each street must be named. (2) Commercial/industrial projects or buildings. Projects will be numbered after the developer submits the site plan for development review. Each street must be named. (3) Apartment projects. Projects will be numbered after the developer submits copies of the site plan for development review. The overall development will be issued a single street address. The developer will be responsible for numbering/lettering individual buildings and units. (4) Condominium projects. Projects will be numbered after the developer submits the site plan for development review. Individual units shall be numbered consecutively if located along public or private streets. Units in the Sstacked-flatS configuration shall use the same numbering approach as applies to an apartment project. (5) Individual residences. If not a part of a subdivision or other development, the owner or builder should bring in a plat showing the new lot, which must be a legal lot under all Bartow County regulations, including the zoning ordinance, to receive a number. (d) Posting of structural numbers for non-single-family residential uses. Such numbers as have been assigned shall be placed so as to be clearly visible from the street, as detailed below. (1) New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible at all times from the street or road fronting the property. (2) These address numbers shall be a minimum of four inches (101.6 mm) high with a minimum stroke of 0.5 inch (12.7 mm) and shall contrast in color with the background on which they are affixed. (3) New and existing properties utilizing a mailbox or signage for address identification shall post numbers on both sides, meeting the requirements of paragraphs (1) and (2) that can be viewed from either direction of vehicular travel. (4) Buildings or lots with multiple buildings utilizing one street address and containing multiple commercial occupancies with separate entry doors shall post suite numbers or letters above the main entry door to each occupancy or building meeting the requirements of paragraphs (1) and (2). (5) For multiple properties that share a common single private drive, each owner shall display address numbers at the vehicular access point to the private drive and at the vehicular access point to each individual building meeting the requirements of paragraphs (1) and (2). (e) Posting of structural numbers for all single-family residential uses. Such numbers as have been assigned shall be placed so as to be clearly visible from the street, as detailed below. (1) New and existing residential properties shall have approved address numbers placed in a position that is plainly legible and visible at all times from the street or road fronting the property. CDB:28.21 Supp. No. 9 (2) These address numbers shall be a minimum of four inches (101.6 mm) high with a minimum stroke of 0.5 inch (12.7 mm) and shall contrast in color with the background on which they are affixed. (3) New and existing properties utilizing a mailbox or signage for address identification shall post numbers on both sides, meeting the requirements of paragraphs (1) and (2) that can be viewed from either direction of vehicular travel. (4) New and existing residential properties utilizing a mailbox or signage for address identification shall post numbers on both sides, meeting the requirements of paragraphs (1) and (2) that can be viewed from either direction of vehicular travel. (5) Neighborhoods, subdivisions, or residential properties utilizing a cluster mailbox or utilizing a post office box and not having individual mailboxes to use as address identification shall post individual address identification signage meeting the requirements of paragraphs (1), (2) and (3). (6) Address signage shall be no more than ten feet from the driveway and no more than 25 feet from the road. (7) For multiple residential properties that share a common single private drive, each owner shall display address numbers at the vehicular access point to the private drive and at the vehicular access point to each individual structure meeting the requirements of paragraphs (1), (2) and (3). (8) All new residential, office, institutional, commercial and industrial lots shall be numbered with the approved street address number and suite numbers or letters, if applicable, at the time the certificate of occupancy or the certificate of completion is issued. (9) It shall be the responsibility of the property owners to post and maintain the address identification. (f) Cluster mailboxes. In situations where the U.S.P.S. determines that individual mail delivery will not be available to a new development, the following requirements shall apply: (1) Installation of the mailbox unit(s), as well as any associated shelters, lighting, parking, and other related amenities shall be the responsibility of the developer. (2) Maintenance of the mailbox unit(s), as well as any associated shelters, lighting, parking, and other related amenities shall be the responsibility of the homeowners. The establishment of a homeowners' association is strongly encouraged in developments where individual mail delivery will be unavailable. (3) Cluster mailbox units shall be prohibited within the public right-of-way. (4) Cluster mailbox units, and any associated structures, shall not adversely impact sight distance to any driveway or road intersection, as determined by the Bartow Community Development Director. Whenever feasible, the mailbox unit should be located within an amenity center, if one is proposed for the development. (5) Cluster mailbox unit(s) shall be located in area(s) that will best allow for vehicle stacking or parking without creating pedestrian safety or vehicle safety issues, as determined by the Community Development Director. (6) A paved area with adequate ingress/egress, designed to meet the requirements of the Bartow Community Development Director, shall be provided to allow vehicles to pull off the county roadway safely while retrieving mail. (7) All access to cluster mailbox unit(s) shall comply with current Americans with Disabilities Act and the Georgia Accessibility Code. Any sidewalks required by other provisions of this Ordinance shall be incorporated into the mailbox area(s). (8) The mailbox unit(s) must be installed according to the manufacturer's standards. (9) The mailbox unit(s) and shelter, if any, shall be exempt from the normal setback requirements; however, shelters or other structures must be submitted to the building official for review and must meet all applicable building codes. (10) Any required cluster mailbox station and related improvements shall be installed and approved prior to the recording of the final plat. (g) Exempt and excluded structures. The intent of this article is to exclude from this chapter those structures that do not present a significant danger to human life if destroyed by fire or other events. Buildings used as dwelling units, offices or work spaces for employees shall not be exempt. The following structures shall be excluded from the provisions: (1) Agricultural buildings not requiring a separate mailing address such as a barn, poultry house, outbuilding or equipment storage buildings. (2) Storage and accessory buildings for the use of the occupant of another building on the property. (Ord. of 11-9-2005(3), § 5.9; Ord. of 5-11-2016, §§ XV, XVI) Sec. 5.70. Campground standards. (1) All campgrounds, regardless of whether the campsites are offered for sale, developed as rental sites, or let on assignment, are subject to the regulations concerning subdivisions contained herein unless separate standards are specified. Plat requirements for subdivisions set out in the development regulations of Bartow County apply to all campgrounds. (2) The following standards shall apply to all campgrounds containing two or more campsites or camp lots, including sites for tents, accommodations for backpackers, recreational vehicles (RVs) and camping from automobiles: (A) All proposed and required water sources and sanitary facilities serving campgrounds shall conform to the requirements of the Georgia Department of Human Resources, Public Health Division, and the Georgia Department of Natural Resources, Water Supply Section, as appropriate. CDB:29 Supp. No. 9 (B) Permanent structures other than camp platforms and recreational, support and sanitary facilities shall be prohibited unless the developer or the owner can prove, to the planning commission's satisfaction, the necessity or desirability for such a structure. (C) Conventional, industrialized and manufactured houses are prohibited on all campsites. (D) In lieu of providing individual parking spaces for each campsite, the developer may widen minor collector streets and cul-de-sacs to accommodate parking on road rights-of-way, provided sufficient width is maintained to allow normal flow of traffic. (See Bartow County Campground Design Standards, incorporated herein by reference, for suggested designs.) Widening of streets to permit parking on main thoroughfares is prohibited. Other requirements of the Bartow County Development Regulations may apply to such developments, and should be consulted by the developer. (E) Continuous camping shall be restricted to a period of no more than 90 days. (F) Each campground shall have access to a source of potable water approved by the applicable health authority. It is preferable to provide one water outlet per camping unit; however, a minimum of one outlet for every two units shall be provided with two hose bibs equipped with vacuum breakers. Each unit shall have access to water within 50 feet of an RV pad. All water taps or outlets serving camp sites shall be of a type compatible with garden hose connections. Water outlets shall be located at least ten feet from sanitary sewer line taps and electrical outlets. (G) The road circulation pattern shall be a one-way paved or gravel-reinforced system attached to a main two-way circular thoroughfare. If a loop system is used, it shall contain a pull-through site arrangement or back-in site ranging from a 45-degree to a 90-degree angle. (1) Road widths on the one-way loop shall be at least 15 feet; double lane roads shall have a minimum width of 20 feet. The circulation system shall parallel existing contours as closely as possible and shall not exceed a 16 percent slope. The turning radius in loops and turns shall not be less than 30 feet, including parking spurs at individual RV sites. (2) Parking spurs shall be located so that trailer doors face away from interior roads and into the site. Utility hookups shall be located to the left rear of the RV. (3) Permanent drainage structures shall be designed for anticipated run-off and shall be installed in the initial phase of road construction. (4) Depths of cuts and fills shall be held to a minimum in order to avoid excessive land disturbance. The smallest practical area shall be denuded at any one time during the construction period. Slopes steeper than 2:1 shall not be cut. Cuts into steeper slopes must be justified. A soil and erosion sedimentation plan shall be filed and approved prior to any construction. (H) All campfires shall be contained and controlled. Stoves, grills, fireplaces, pits, and fire rings are recommended. Facilities shall either be provided for campsites or fires restricted to designated locations. No fire shall be allowed within ten feet of a bottled gas container or other combustible source of fuel, and no open fire shall be left unattended. (I) All campgrounds shall provide fly-proof, watertight, rodent-proof containers for the disposal of refuse. Containers shall be provided in sufficient number and capacity to properly store all refuse. Refuse for camping areas shall be collected at least once a week. (Ord. of 4-25-2015, § V) Sec. 5.71. Campsites for accommodation of RVs. (1) Camp sites for accommodation of RVs shall meet the requirements of the TRules of Department of Public Health for Tourist Accommodation,T as now or hereafter amended. (2) To prevent intensive site use and to maintain an aesthetic camping atmosphere, density shall not exceed ten sites per acre. CDB:31 Supp. No. 9 (3) Each recreational vehicle site with individual parking shall contain at least one reinforced surface parking space incorporated into the site itself and shall be level from side to side with sufficient crown to provide adequate drainage. (4) Parking dimensions may vary from single auto trailer attached vehicle back-in of 14 × 60 feet to side-by-side arrangements of trailer and auto of 29 feet long and 30 feet wide. Various combinations may be used, but dimensions to accommodate trailer width with extended outside awning shall be at least 14 feet. (5) RV sites shall be at least 20 feet apart, edge-to-edge and the center of all camping units shall be at least 30 feet from the edge of the campground road. (6) Electrical outlets: Each RV site shall have access to a minimum of one 110-volt electrical outlet supplying 30 amperes of electrical current. All electrical outlets shall be located a minimum of ten feet from water connections, sanitary sewer line taps, and wastewater disposal facilities. (Ord. of 4-25-2015, § V) Sec. 5.72. Sanitary facilities for accommodation of independent RVs. In campgrounds with access to a sewage system, each campsite shall contain a sewer connection with suitable fittings to permit a watertight junction with the RV outlet. Each sewer connection shall be constructed so that it can be closed and when not in use shall be capped to prevent escape of odors. (1) A sanitary dump station built to the requirements of the local sanitarian shall be provided at the entrance to the campground or other location convenient to all campsites. The dump station shall be located so that the left rear of vehicles will slope slightly toward the dump station when connected for emptying. (2) Sites that do not have access to a sewer hookup shall have convenient access to a suitable place for disposal of sink or tub water. (Ord. of 4-25-2015, § V) Sec. 5.73. Sanitary facilities for accommodation of dependent RVs. All campgrounds for the accommodation of dependent RVs (i.e., trailers, non-motorized RVs) and tents shall provide sanitary facilities connected to a sewerage system. Whenever possible, these facilities shall be connected to a public sewage system. (1) Toilets, lavatories, and bathing facilities shall be provided as follows: A minimum of one toilet stool per four camping units or fraction thereof, and one urinal for each toilet facility designated for men; one lavatory and one tub or shower head for every ten persons or fraction thereof, with a minimum of one stool, one lavatory and one tub or shower head for each sex. CDB:32.1 Supp. No. 8 (2) Toilet facilities shall be plainly marked, separate for each sex, lighted at night, and shall be located no farther than 200 feet from any camp pad. Toilet facilities may be located in a central building or in two or more buildings according to the size of the campground and location of the campsites in relation to the facilities. (3) Adequate provisions shall be made for the disposal of dishwater according to the size of the campground. A suggested ratio is one disposal unit per ten campsites. (Ord. of 4-25-2015, § V) Sec. 5.74. Campsites for tents. Construction of tent pads is not required for pup tents or other small shelters used by backpackers. Provisions for walk-in campgrounds are contained in section 3.6. (1) Each tent site shall contain a minimum space of 30 × 30 feet. Density shall not exceed ten sites to the acre. Tent sites with individual parking arrangements shall contain one automobile parking space at least 20 × 10 feet. (2) Each site shall contain a reinforced, fairly level tent pad. The pads shall be approximately 16 × 16 feet to provide maximum flexibility of use but shall not contain less than an area of 12 × 12 feet. The tent pad shall be a minimum of six inches high and constructed of gravel, crushed aggregate, or equivalent material that will allow runoff from precipitation to flow through the pad. Pads constructed of tamped earth, asphalt or other impervious materials are prohibited. Tent pads in excess of ten percent slope shall be leveled. A three to five percent slope is preferable. (3) Provisions for sanitary facilities are the same as for dependent RVs set out hereinabove. (Ord. of 4-25-2015, § V) Sec. 5.75. Walk-in campgrounds. Camping is prohibited in areas where a source of potable water and access to sanitary facilities are not provided. (1) Walk-in campgrounds shall have access to a source of potable water within 75 feet of all sleeping areas. In locations where a water supply system is not possible, potable water may be supplied by an approved well with a hand pump or by water from pickup stations. (2) All walk-in campgrounds shall have access to the use of a toilet facility containing a minimum of one seat for every 15 campers and a minimum of one facility for each area. A toilet facility shall be located within 300 feet of each camping space. (Ord. of 4-25-2015, § III) Sec. 5.76. Campsites for mixed uses. Campgrounds may be developed to provide more than one type of camping site in the same area. When uses are mixed, the highest, or most strict, standards shall apply to development of the entire campground with the exception of development of walk-in camping areas in a campground designed for mixed uses. In such a development, areas for walk-in campers shall be separated from other types of camp sites and located so that camp fire smoke or noise from group activities will not constitute a nuisance to other campers. (Ord. of 4-25-2015, § V) Sec. 5.77. Campground design. The designs for campgrounds as well as detailed designs for specific features are contained in the Bartow County Campground Design Standards, available from the county engineer, and are recommended for compliance with the requirements contained in the article. The ideal design is one which will be compatible with the natural features and topography of the tract undergoing development; and one which will provide safe, healthful, and convenient camping facilities for campground users consistent with minimum land disturbance. (Ord. of 4-25-2015, § V) Sec. 5.78. Enforcement and interpretation. Violations of this article shall be enforced in accordance with the provisions of the Bartow County Development Regulations, and/or pursuant to the general enforcement provisions of the Code of Bartow County. Citations shall be served and heard in magistrate court, and fines shall be assessed at a minimum of $200.00. The county shall also be authorized to seek injunctive relief. The article shall be administered, interpreted, and enforced by the county engineer and the engineering department. Appeals of decisions shall be heard in accordance with the procedure in the Bartow County Development Regulations. (Ord. of 4-25-2015, § V) Secs. 5.79—5.100. Reserved. DIVISION 4. ENFORCEMENT Sec. 5.101. Enforcement officer; appeals and variances. The provisions of these regulations shall be administered and enforced by the county engineer. Decisions of the county engineer shall be heard and decided by the board of appeals in accordance with the provisions of section 5.127. Requests for a variance shall be heard and decided by the board of appeals in accordance with the provisions of section 5.128. (Ord. of 11-9-2005(3), § 6.1) Sec. 5.102. Enforcement actions. (a) Enforcement options. Enforcement of these regulations may be through criminal prosecution, civil fines, or other civil proceedings. Any person, firm, partnership, corporation or other legal entity who shall do anything prohibited by these regulations as the same exists CDB:32.3 Supp. No. 8 or as it may hereafter be amended or which shall fail to do anything required by these regulations as the same exists or as it may hereafter be amended shall be subject to an enforcement action. (1) Representatives of the county shall have the power to conduct such investigations as may reasonably be deemed necessary to assure or compel compliance with the requirements and provisions of these regulations, and for this purpose to enter at reasonable times upon any property for the purpose of investigation and inspection, as permitted by law. Officers and officials may seen inspection warrants or search warrants on probable cause of a violation occurring inside a structure. No warrant shall be required to investigate visible and open violations or uses. (2) No person shall obstruct, hamper or interfere with any county representative while in the process of carrying out his official duties in the enforcement of these regulations. (b) Persons who may be cited. Owners are ultimately responsible for the condition of their property and ensuring that their property and all activity occurring on such property is in compliance with these regulations. For any violation, both the owner of the property and/or the individual agent, tenant or invitee of the owner responsible for the violation may be cited, where appropriate. Agents of the owner would include, but not be limited to, developers, builders, contractors, and sub-contractors. Tenants and invitees would include, but not be limited to, any renter, leaseholder, owner of any vehicle or structure on the property, or other person conducting an activity on the property who is not a trespasser. Corporations and companies responsible for the work may be cited in addition or in lieu of or in addition to citations issued to the actual individuals on-site committing violations. (c) Daily violations. Each day during which the violation or failure or refusal to comply continues shall constitute a separate violation, subjecting the offender to a new citation, or other civil or criminal proceeding. (d) Multiple violations. Each separate action, omission, or occurrence relating to any specific provision of these regulations shall be a separate violation, subjecting the offender to a separate citation. (e) Criminal prosecution. The county engineer, or designated code enforcement personnel, or other authorized personnel, may issue criminal citations for violations of these regulations, or violation of any stop-work order. (1) Criminal prosecutions for violation of these regulations shall be commenced by the completion, signing, and service of a citation by an authorized county official or enforcement officer. No warning need be issued prior to a citation being issued. The original of the citation shall be personally served upon the accused, his or her authorized representative or, if a corporation, an officer of the corporation or its on-site representative or the person or persons in charge of the activity on the property; a copy shall be promptly filed with the magistrate court. A stop-work order may be issued in conjunction with a citation. (2) Each citation shall state the time and place at which the accused is to appear for trial in magistrate court, shall identify the offense with which the accused is charged, shall have an identifying number by which it shall be filed with the court, shall indicate the identity of the accused and the date of service, and shall be signed by the deputy sheriff or other authorized officer who completes and serves it. (3) Any defendant who fails to appear for trial shall thereafter be arrested on the warrant of the magistrate and required to post a bond for his or her future appearance. (4) The district attorney, county attorney, or another attorney designated by Bartow County may act as prosecuting attorney for violations of these regulations. (5) Fines shall be assessed in accordance with section 5.104. (f) Civil fines and proceedings. In addition to or in lieu of any other remedy, the county may seek injunctive, mandamus or other appropriate relief in superior court to enjoin or prevent a violation of any provision of these regulations. Such action may also seek civil fines at the mandatory rates specified in section 5.104 for violation of these regulations, and may additionally seek the costs of restitution, and any other costs associated with the action to enjoin or prevent any violation of any provision of these regulations. The county shall be entitled to its reasonable attorney's fees and costs for bringing an action in superior court wherein any relief is granted or fine assessed. (g) Additional criminal penalties. Persons cited criminally are also subject to the other penalties within the jurisdiction of the magistrate court, including incarceration up to 60 days, community service, and probation. (Ord. of 11-9-2005(3), § 6.2) Sec. 5.103. Stop-work orders. (a) Upon notice from the county engineer, designated code enforcement officers, or other authorized personnel, work on any project that is being done contrary to the provisions of these regulations shall be immediately stopped. (b) Stop-work orders shall affect all work being done on a project or development (including work done on other lots in the subdivision owned by the same violator). Stop-work orders stop not only the work in violation, but all other work by contractors or sub-contractors on the same property. Only work to remedy the deficiency shall be allowed until the stop-work order is lifted. (c) A stop-work order shall be in writing and shall be given to the owner of the property, his authorized agent or the person or persons in charge of the activity on the property, and shall state the conditions under which work may be resumed. Where an emergency or other exigent circumstances exist, no written notice shall be required, and a verbal stop-work order may be issued, with a written order to be provided within three working days. CDB:33 Supp. No. 6 (d) Stop-work orders may be issued on their own, or in conjunction with criminal citations, or civil proceedings in superior court. (e) Issuance of a stop-work order may be appealed to the board of appeals. (Ord. of 11-9-2005(3), § 6.3) Sec. 5.104. Fines. (a) Fine schedule. Fines assessed under these regulations shall be assessed according to the following mandatory schedule, whether assessed as a civil fine in superior court, or assessed as a criminal penalty upon conviction in magistrate court. The maximum permissible fine shall be $1,000.00 per offense. In no event shall a fine be reduced below the mandatory minimum, as set forth below. Fines may be increased by mandatory add-ons under state law. (b) Repeat offenders. As a deterrent to violation, second and subsequent violations by the same offender of any provision of these regulations, whether violations of the same or different provisions of these regulations as the initial violation, and whether involving the same or different property, shall increase the fine owing. However, repeated citations for the same violation on a second and subsequent days shall not count as a subsequent violation, but shall rather be assessed at the same rate as the initial violation. (1) First violation. For the first violation of any provision of these regulations by any violator (whether an individual or corporation), the fine shall be $200.00. (2) Second violation. For the second violation of any provision of these regulations (whether the same or different as the first violation) by the same violator (whether an individual or corporation), the fine shall be $400.00. (3) Third and subsequent violations. For the third and subsequent violation of any provision of these regulations (whether the same or different as the prior two violations) by the same violator (whether an individual or corporation), the fine shall be $600.00. (Ord. of 11-9-2005(3), § 6.4) Sec. 5.105. Records. The engineering department shall keep records of violators, whether corporate or individual, in order to determine when second or subsequent violations occur. (Ord. of 11-9-2005(3), § 6.5) Sec. 5.106. Nuisance abatement. (a) Any owner of property who permits the same to become or remain in a condition prohibited under these development regulations may be notified in writing by the code enforcement officer to remove or remedy the condition within 15 calendar days of the date of such notification. (b) Unless the condition complained of is removed, the county, at the expiration of such 15-calendar-day period shall be authorized to remove the condition or hire a private contractor to remove the condition. (c) The cost of removal and abatement of the nuisance will be charged against the property and the property owner thereof, and it shall constitute a lien on the property which shall be recorded in the deed records of the county. (d) In the event the costs of abating the nuisance are not paid, the lien recorded may be collected in the same manner as that provided by law for executions for ad valorem taxes due the county. (e) In addition, the creation of a nuisance shall be deemed unlawful. (f) The provisions of this section are cumulative and in addition to issuance of a citation, or other civil action to remedy a nuisance. (Ord. of 9-11-2013, § II) Secs. 5.107—5.125. Reserved. DIVISION 5. APPEALS AND VARIANCES Sec. 5.126. Board of appeals. The board of appeals, as established by the Bartow County Zoning Ordinance, shall be empowered to hear appeals of interpretations of the county engineer under these regulations, and to hear applications for variances from the requirements of these regulations. Its proceedings and procedure shall follow the procedure and requirements as stated in the Bartow County Zoning Ordinance regarding notice, hearing procedure and other matters not covered herein. (Ord. of 11-9-2005(3), § 7.1) Sec. 5.127. Appeals. The board of appeals shall hear and decide appeals where it is alleged there is error in any order, requirement, decision, or determination made by the county engineer in the enforcement of these regulations. Appeals to the board of appeals may be taken by any person aggrieved or by any officer, department, board, or bureau of Bartow County affected by any decision of the county engineer. Such appeal shall be taken within 30 days of said decision by filing with the county engineer a written notice of appeal specifying the grounds thereof. Decisions on appeals shall be issued in writing within ten days of the appeal. (Ord. of 11-9-2005(3), § 7.2) CDB:35 Supp. No. 15 Sec. 5.128. Variances. (a) Variances. The board of appeals has the power to hear requests for variances from the provisions of these regulations. Variance may be granted only if the board finds all of the following to exist: (1) That one of the following is true, through no action or fault of the property owner or predecessor: a. The property is exceptionally narrow, shallow or unusually shaped; b. The property contains exceptional topographic conditions; c. The property contains other extraordinary or exceptional conditions; or d. There are existing other extraordinary or exceptional circumstances; and (2) That the strict application of the requirements of these regulations would result in practical difficulties to, or undue hardship upon, the owner of this property; and (3) That the requested variance relief may be granted without substantially impairing the intent and purpose of these regulations. Variance decisions shall be issued in writing within ten days of the hearing. (b) Conditions. In granting a variance, the board of appeals may attach such conditions regarding the location, character and other features of the proposed building, structure or use as it may deem advisable so that the purpose of these regulations will be served, public safety and welfare secured and substantial justice done. (c) Limitations on variances; improper variance requests. Variances cannot be given to totally remove a requirement or to exempt a property or applicant entirely from a requirement. Variances can only be given to alter a numeric value, or modify a requirement due to hardships such as those listed in subparagraph (a)(1) above. A variance application shall not be accepted if the variance seeks something that cannot be varied, or to eliminate rather than modify a requirement or regulation. A variance application shall not be accepted if the variance is contradictory to the ordinance (such as reducing a requirement to zero or totally eliminating a requirement). The Board shall not grant variances when the hardship was created by the property owner or his predecessor, and shall not grant hardship variances based on shape or topography for lots of record not existing prior to February 21, 1996. Configuring a subdivision to create lots that are difficult to build is an example of a hardship created by the property owner or predecessor, that do not justify a variance. (d) Special stream buffer provisions. If the variance is related to section 64-65 stream buffers, variances will only be considered when a property's shape, topography or other physical conditions existing as of April 30, 2004 prevents land development unless a buffer variance is granted, or if unusual circumstances exist wherein strict adherence to the minimal buffer requirement of that section would create extreme hardship. Variances will not be considered when actions of the property owner have created the conditions of hardship on the property. Variances may be conditioned or limited to serve the purposes of this chapter, and only the minimum variance necessary shall be given. (e) Special stream buffer application requirements. If the variance is related to section 64-65 stream buffers, the application shall contain the following information, and other information as required by the county engineer: (1) A site map that includes locations of all streams, wetlands, floodplain boundaries and other natural features, as determined by field survey; (2) A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property; (3) A detailed site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the buffer and setback. The exact area of the buffer to be affected shall be accurately and clearly indicated; (4) Documentation of unusual hardship should the buffer be maintained; (5) At least one alternative plan, which does not include a buffer or setback intrusion, or an explanation of why such a site plan is not possible; (6) A calculation of the total area and length of the proposed intrusion; (7) A stormwater management site plan, if applicable; and, (8) Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed. (f) Administrative variance. If in the judgment of the county engineer, the application of any particular numeric criteria, standard or requirement contained in these development regulations causes undue hardship on the applicant, the county engineer shall be empowered to grant an administrative variance to alter said requirement by up to 20 percent, if in doing so, the purposes of the regulations are not impaired, and there is not a negative impact on the surrounding uses, properties, or neighbors. The county engineer cannot grant a variance to a provision of the zoning ordinance, or to State-issued manuals and design standards (for example MUTCD, the GDOT Driveway Encroachment Standards, etc.), street design standards, sureties, and reporting. In granting an administrative variance, the county engineer may attach such conditions as the county engineer may deem advisable so that the purpose of this ordinance will be served, public safety and welfare secured and substantial justice done. An administrative variance shall be granted or denied in writing. Notice of the grant of an administrative variance shall be sent to all adjoining property owners via first class mail by the applicant. The notice shall describe the variance granted and state that interested parties have 30 days in which to file an appeal of the variance. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. Proof of mailing, shall be submitted to the zoning department within ten days of grant of the variance. "Proof of mailing" means either a first class "certificate of mailing" or a first class "certified mail" receipt; a proof of delivery is not required. The 30 days shall be counted from the date of mailing of the notice. (Ord. of 11-9-2005(3), § 7.3; Ord. of 10-7-2020(1), § II; Ord. of 8-10-2022(1), § II) CDB:37 Supp. No. 15 Ordinance Number Date Section Section this Code 5, 6 74-184, 74-185 02-1 1-23-2002 II—IV 44-401—44-403 V, VI 44-409, 44-410 VII 44-404 VIII(a), VIII(b) 44-405, 44-406 IX, X 44-407, 44-408 XI—XIII 44-411—44-413 99-2 2- 6-2002 III 14-1 IV—VIII 14-5—14-9 IX(a)—IX(e) 14-81—14-85 X, XI 14-86, 14-87 XII, XIII 14-10, 14-11 XIV(a)(1) 14-121 XIV(a)(2) 14-123 XIV(b)(1) 14-122 XIV(b)(2)— XIV(b)(5) 14-123—14-126 XIV(c)—XIV(e) 14-127—14-129 XV 14-41 XV(a)—XV(d) 14-42—14-45 XV(e), (f) 14-46 XVI, XVII 14-88, 14-89 XVIII 14-4 XIX 14-47 XX, XXI 14-2, 14-3 95-3 4- 3-2002 1 66-73 2 66-72 3(a) 66-75 3(b) 66-78 3(c) 66-77 4, 5 66-81, 66-82 6 66-84 7, 8 66-86, 66-87 9 66-71 10, 11 66-88, 66-89 12, 13 66-79, 66-80 14 66-74 15 66-76 16 66-88 17 66-85 18 66-83 19—23 66-90—66-94 24, 25 66-101, 66-102 26 66-95 27 66-103 28, 29 66-96, 66-97 30 66-104