Skip to content
Georgia Commons
Menu

Berrien County · Zoning Ordinance

Appendix D - LAND DEVELOPMENT CODE / 12 - ADMINISTRATION, ENFORCEMENT AND PENALTIES

12-3. Application for building/development permit.

About this text

  • As published by Municode, current through 2010-11-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All applications for building/development permits shall be accompanied by a site plan, drawn to scale, showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units, the setback lines of the building on the "permit lot," the various easements on the lot and such other information as required by the county. The following information is required to be included with each site plan prior to any review by the land development administrator and any permits being issued:

1. Survey plat, prepared by a registered surveyor, including a certification from the clerk of superior court for Berrien County [that] said lot is a lot of record;

2. Set of building plans or drawings for the proposed building(s);

3. An approved application for septic tank and well installation, signed by the county health department sanitarian;

4. Location of all proposed driveways;

5. Other information required by the code enforcement officer, to include, but not limited to, topographic survey, proposed drainage plans, wetlands delineation, etc.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:berrien-county/zoning/12-3@2010-11-09-c3736e4061

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Berrien County Zoning Ordinance, 12-3. Application for building/development permit | Georgia Commons