--- title: Bethlehem Zoning Ordinance, Sec. 89-1180. Required improvements collection: local-codes id: local-code:bethlehem/zoning/89-1180 cite_as: Bethlehem, Ga., Zoning Ordinance ยง 89-1180 canonical_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1180 md_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1180.md text_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1180/text source_url: http://bethlehemga.org/assets/2026 Bethlehem Updated UDC.pdf date: 2026-11-11 status: active jurisdiction: city:bethlehem jurisdiction_name: Bethlehem place_fips: "1307612" corpus_version: local-codes-bethlehem-041fe1b2344f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bethlehem/zoning/~chapter-89/~article-x.md previous: https://georgiacommons.org/code/local/bethlehem/zoning/89-1179.md next: https://georgiacommons.org/code/local/bethlehem/zoning/89-1181.md index: https://georgiacommons.org/code/local/bethlehem.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bethlehem/zoning/89-1180@2026-11-11-e3e9237773 --- # Bethlehem Zoning Ordinance, Sec. 89-1180. Required improvements > As posted on the city's website, retrieved 2026-11-11 Part of: Chapter 89 - UNIFIED DEVELOPMENT CODE / Article X - PROJECT DESIGN STANDARDS (a) Minor subdivisions. By definition, a minor subdivision does not involve the construction of major public improvements, such as new streets or stormwater detention. However, the following improvements are required in order to adequately serve the lots and protect the safe operation of the existing road: (1) Right-of-way shall be dedicated along the property's frontage from the centerline of the existing road equal to one-half of the minimum requirement for the classification of the road, as established in this article. (2) The potential location of a driveway connection serving each lot and meeting the requirements of these development regulations shall be indicated on the final subdivision plat. (3) The stormwater carrying capacity of the road, whether in an existing ditch or gutter, shall not be compromised. If the stormwater characteristics of the existing road are inadequate to accommodate the new lots, the Town may require improvement of the roadway ditch as appropriate. (4) Survey monumentation shall be provided in accordance with section 89-1181. (5) A natural resource easement is to be provided along any perennial stream or water impoundment in accordance with the requirements for greenways under the Environmental Protection Article of this Development Code. (b) Major subdivisions, multi-family and nonresidential developments. The following improvements shall be provided by the developer or at the developer's expense in every major subdivision or individual multi-family or nonresidential development in accordance with the requirements and standards contained in this article. (1) Survey monumentation in accordance with section 89-1181. (2) Dedication of easements as set forth under section 89-1182. (3) Streets providing access to such a development and to all lots in such a subdivision, including the extension of streets required to provide access to adjoining properties, in accordance with section 89- 1183. a. Streets contained wholly within such a subdivision shall be improved to the full standards contained in this article. Existing streets that adjoin such a development shall be improved to the minimum standards from the centerline of the street along the development's frontage. b. Curb and gutter where required along all roadways. c. Dedicated right-of-way along existing streets. (4) Street name signs, stop bars, striping and traffic control signs as approved by the Town shall be paid for by the developer and installed by the Town in accordance with section 89-1184. (5) Street lights, if desired, in accordance with section 89-1185. (6) Driveway access to each lot under the provisions ofsection 89-1186. (7) Deceleration and turn lanes, if required under section 89-1187. (8) Sidewalks, if required under subsection 89-1187(b)(7). (9) Stormwater drainage and detention facilities in accordance with section 89-1190. (10) Public or private water supply as required under section 89-1192. (11) Public or private sanitary waste disposal as required under section 89-1193. (c) Improvement guarantees. At the option of the Town Council, the developer may be required to provide to the Town financial security to guarantee the installation of project improvements required in this article. The developer's financial guarantee shall be as provided for in section 89-1252(e). The guarantee shall be in an amount sufficient to secure the full costs, as determined by the Town Council, of the construction cost of the improvements, based on the most recent edition of Georgia Department of Transportation "Item Means Summary" or other comparable standardized cost estimation procedure. (d) Guarantee in lieu of completed improvements. No final subdivision plat shall be approved by the Town until one of the following conditions has been met: (1) All required improvements have been constructed or funded in a satisfactory manner and approved by the Mayor or his or her designee; or (2) The Mayor or his or her designee has received a guarantee, as provided for in section 89-1252(e), in the amount of 150 percent of the estimated cost of installation of the required improvements, and has approved an executed contract as appropriate for installation of the improvements by a qualified contractor. a. The improvements funded through the guarantee shall include final pavement topping for streets, grassing of street shoulders, landscaping, sidewalks, street and parking lot striping, and all other improvements required by this Development Code. b. The executed contract shall call for completion of the grassing, landscaping and striping improvements within nine months of approval of the final subdivision plat, and for completion of final street topping and sidewalks prior to the end of the maintenance surety period. See the maintenance surety provisions of Land Development Activities, article 11 of this Development Code regarding the maintenance surety period.