Bethlehem · Zoning Ordinance
Chapter 89 - UNIFIED DEVELOPMENT CODE / Article X - PROJECT DESIGN STANDARDS
Sec. 89-1189. Location of utilities and street cuts.
About this text
- As posted on the city's website, retrieved 2026-11-11
All utility work, encroachments, pavement cuts and associated road or lane closures must be reviewed, approved and permitted by the appropriate transportation agency.
(a) Location of utilities in streets.
(1) Above-ground utilities. Street light poles, junction boxes, transformers and other public or private utility structures placed above ground within a street right-of-way must be at least eight feet back from the back of the street curb (or edge of pavement) and one foot back from the edge of any sidewalk, whichever is farthermost from the roadway.
(2) Underground utilities.
a. All proposed public underground utilities shall be located within the right-of-way of a public street or within an easement designed for such use.
b. All electric, telephone, cable TV and other wires shall be placed underground in any major subdivision and in any multi-family or nonresidential development.
c. Utilities placed underground shall be placed within the right-of-way as shown on the standard details. Where required because of topography, location of existing utilities, or other factors, the Town Council may allow the installation of utilities in other areas.
d. No private improvements or permanent structures, such as private lawn sprinkler systems, yard lighting, and the like, shall be installed within a public right-of-way except by authorization of the Town or its designee. Such authorization, if issued, shall require the owner to assume all repair costs of the owner's facilities should they become damaged.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.