--- title: Bethlehem Zoning Ordinance, Sec. 89-1190. Storm drainage collection: local-codes id: local-code:bethlehem/zoning/89-1190 cite_as: Bethlehem, Ga., Zoning Ordinance § 89-1190 canonical_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1190 md_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1190.md text_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1190/text source_url: http://bethlehemga.org/assets/2026 Bethlehem Updated UDC.pdf date: 2026-11-11 status: active jurisdiction: city:bethlehem jurisdiction_name: Bethlehem place_fips: "1307612" corpus_version: local-codes-bethlehem-041fe1b2344f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bethlehem/zoning/~chapter-89/~article-x.md previous: https://georgiacommons.org/code/local/bethlehem/zoning/89-1189.md next: https://georgiacommons.org/code/local/bethlehem/zoning/89-1191.md index: https://georgiacommons.org/code/local/bethlehem.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bethlehem/zoning/89-1190@2026-11-11-b1448dcac3 --- # Bethlehem Zoning Ordinance, Sec. 89-1190. Storm drainage > As posted on the city's website, retrieved 2026-11-11 Part of: Chapter 89 - UNIFIED DEVELOPMENT CODE / Article X - PROJECT DESIGN STANDARDS (a) Applicability and exemptions. (1) An adequate drainage system, designed in accordance with this section, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be provided for the proper drainage of allsurface water. (2) All persons proposing development or construction in the Town shall prepare a stormwater management plan. The stormwater management plan shall address the requirements of this section, and the on-site drainage including lot-to-lot drainage and off-site impacts. The stormwater management plan shall also meet the minimum standards of the current edition of the "Georgia Stormwater Management Manual." No final subdivision plat shall be approved and no development or building permit shall be issued until and unless the stormwater management plan has been reviewed and approved by the appropriate reviewing agency, except as exempt below. (3) Exemptions from storm drainage requirements. The following development activities are exempt from the provisions of this section and the requirement of providing a stormwater management plan: a. Agricultural land management. b. Additions or modificationsto existing single-family detached dwellings. c. New construction of single-family detached dwellings on lots that are not included in a major subdivision. d. Residential development consisting ofsingle-family houses, each on a lot of two acres or greater. (b) Stormwater detention facilities. (1) All development plans shall require a hydrology study certified by a registered design professional. If detention has been waived or provided in a previous phase or unit of development then a letter from the design professional with supporting documents shall be provided. (2) All stormwater detention facilities shall be designed to detain the one-year storm runoff, for the area draining to the pond, for 24 hours. For the project, this volume called the channel protection volume, shall be equal to or greater than the one-year storm runoff volume from the project. In addition, these facilities shall control the peak flow rates associated with storms having two-year, five-year, ten-year, and 25-year return frequencies so that flows from the developed site do not exceed those associated with predevelopment conditions at the project boundary nor increase the peak flows downstream from the project to the point in the drainage basin where the project area is ten percent of the total basin. Where adverse impacts occur during the 100-year storm, the 100-year storm shall also be regulated. (3) To eliminate detention facilities forstormwater, a registered design professionalshall evaluate the basin utilizing the ten percent rule as defined in the current edition of the "Georgia Stormwater Management Manual." The design professional shall demonstrate that post-developed peak flows at the ten percent point of analysis are not increased for all storm events up to and including the 25-year storm. Where adverse effects occur for the 100-year storm, the 100-year storm shall also be regulated. (4) Non-detained, post development runoff shall leave the project site as sheet flow and will not have an adverse impact on downstream properties. (5) Permanent detention facilities, when required, shall be designed so that the following standards shall apply: a. The location and size of all proposed stormwater improvements shall be designed in accordance with and meet all standards relating to stormwater management of this Development Code and the current edition of the "Georgia Stormwater Management Manual." b. Stormwater detention facilities providing for the storage and controlled release of runoff shall be required for any development activity that will increase the peak rate of discharge by one cubic foot per second or more for the ten-year frequency storm at any point of discharge from the property. All stormwater detention facilities shall be designed to control the runoff volumes associated with storms having two-year, five-year, ten-year and 25-year frequencies and safe overflow for 100-year storm. c. The structure shall be constructed such that trash and pollutants are prevented from exiting the pond. d. The reservoir routing method or an equivalent method shall be used in sizing detention ponds. (The bowstring method is not acceptable.) e. An emergency overflow device (which does not include the throttling device) for a detention pond shall be designed to pass the 100-year peak developed inflow without overtopping the dam. f. Pond discharge locations shall be in defined drainage ditches. The developer's engineer shall include in the hydrology study a discussion of existing conditions downstream of the detention pond and an explanation of how downstream property owners will not be adversely affected by the "concentrated" runoff from the project boundary up to and including the ten percent point of analysis. g. The steepest fill slopes shall be 3:1. Cut slopes shall be no steeper than 2:1. h. The top of the berm shall be a minimum of ten feet wide when 3:1 slopes are used. i. Slopes shall be stable under all conditions including maintenance. j. Full and living coverage of an approved permanent grass or ground cover devoid of noxious weeds shall be provided. k. Fences are required around the perimeter of a detention facility except as provided by paragraph 3 of this subsection. 1. The fence shall be commercial gage chain link fence of six feet in height with a 12-foot wide two-section gate aligned with the access easement. A ten-foot wide clear area shall be provided outside of the fenced area. 2. The fence shall be constructed within the drainage easement for a detention pond and enclose the outlet piping. 3. The reviewing agency may waive the fencing requirement if the slope of the interior side slopes of the detention facility is no more than 3:1, and the 100-year ponding depth is less than four feet. 4. The reviewing agency may waive the fencing requirement in commercial developments when the detention facility is located more than 500 feet from a residential district, or in instances of unusual topography. l. A silt gauge, consisting of a durable weather - resistant post, shall be installed and maintained on all normally dry detention facilities and sediment forebays. The post shall be installed at the lowest ground elevation of the detention facility or sediment forebay. The post shall be embedded a minimum of two feet into the ground and extend a minimum of five feet above ground. Numbers and adjacent tick marks must be on the post beginning with the number "1" at one foot above the post installation elevation and thereafter a number tick mark for each corresponding foot. Numbers and tick marks must be clear, readable, weather resistant, and durable. A comparable alternative may be used upon approval of the reviewing agency. (6) As part of the hydrological study, the design professional shall complete a downstream analysis in accordance with the current edition of the "Georgia Stormwater Management Manual." Consideration shall be given to the flow capacity of downstream drainage structures from the property line up to and including the ten percent point of analysis. If the downstream system is inadequate, the developer is required to either improve the down stream drainage structure or provide additional storage in the detention facility. (7) In approved cases, damming a natural basin with minimal clearing may provide the detention. In such cases: a. The required discharge structure opening must be large enough to prevent stoppage from leaves and other debris naturally occurring. Also, the volume should be adequate to account for natural growth of vegetation. b. Documentation shall be provided for the natural drainage way that it is not jurisdictional state waters or for an approved Georgia EPD Buffer Variance Application. c. Documentation shall also be provided showing compliance with the Clean Water Act Section 404, permitting requirements. d. Fencing of natural ponds shall be considered by the reviewing agency on a case-by-case basis. (8) Detention facility location criteria. For purposes of these regulations, a detention facility shall be deemed to consist of the area within the maximum design ponding limits, the dam (if one) including all embankment slopes and wall footings (if applicable), primary and emergency outlet works, any drainage and access easements, and any energy dissipation devices. a. In residential subdivisions, any required retention and/or detention areas shall be incorporated into the common areas of the residential development or incorporated into an individually platted parcel, which the homeowners association shall be responsible for its maintenance and continuing operation. b. (In nonresidential subdivisions, the detention facility may be located on a separate lot and owned by a property owners' association, which shall be responsible for its maintenance and continuing operation; orlocated on each lot within the subdivision and constructed when the lot is developed. c. In multi-family and nonresidential development projects, separate detention facilities shall be provided for each development. The owner of the property shall be responsible for maintenance and continuing operation of the facility. d. The Town may approve stormwater detention facilities serving two or more developments, provided that private ownership of the facilities and provisions for their perpetual maintenance and continuing operation are clearly established in a manner acceptable to the Town attorney. e. No portion of any detention facility shall disturb any required (as opposed to voluntary) buffer not otherwise authorized without first obtaining the required approvals. (9) Detention facility easement requirements. a. An easement at least 25 feet in width shall be required to provide access to all detention facilities from a public street. This easement shall be cleared, grubbed and/or graded so that it can be utilized by rubber-tired construction vehicles. The easement shall include a 15-foot access drive graded to maximum 15 percent grade. Its location shall be such as to minimize the amount of grading required. b. Every normally dry detention basin or detention facility shall be completely enclosed within a drainage easement. The drainage easement shall extend at least ten feet beyond the limits of the detention facility and related facilities including fencing. (c) Long-term maintenance and inspection ofstormwater facilities and practices. (1) Stormwater management facilities and practices must undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the documents approved as part of the permitting process pertaining to those facilities/practices. If no such documents were required to be approved when the facility/practice was installed, the facility/practice must be maintained in good working condition. (2) A stormwater management facility or practice shall be inspected on a periodic basis by the owner and/or operator of the subject property or other responsible person named in the applicable stormwater management facility maintenance agreement or plan. Those facilities which are subject to an approved maintenance agreement shall be inspected in accordance with that agreement. In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public health, the stormwater department may notify the person responsible for carrying out the maintenance, or the property owner on which the facility exists, by registered or certified mail. The notice shall specify the need to comply with the agreement, the plan or, in the absence of an agreement or approved plan,standard maintenance practices and shallspecify the time within which such measures shall be completed. If the responsible person fails or refuses to meet the requirements of the maintenance agreement or notice as provided herein, the stormwater department may correct the violation as provided in subsection (e) of this section. (3) Inspection programs by the stormwater department may be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to, reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices. (d) Records of maintenance activities. Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to the stormwater department when requested. (e) Failure to maintain. If a responsible person fails or refuses to meet the requirements of the maintenance agreement or the standards contained herein, the stormwater department, after ten days' written notice (except that, in the event the violation constitutes an immediate danger to public health or public safety, immediate action may be taken), may correct a violation of the design standards or maintenance requirements by performing the necessary work to place the facility or practice in proper working condition. The stormwater department may assess the owner of the facility for the cost of repair work which shall be a lien on the property, and may be placed on the ad valorem tax bill for such property and collected in the ordinary manner for such taxes. (f) Alternate structural stormwater controls. a. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the current edition of the "Georgia Stormwater Management Manual." All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the current edition of the "Georgia Stormwater Management Manual," or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the reviewing agency before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the reviewing agency may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question. b. Applicants shall consult the current edition of the "Georgia Stormwater Management Manual" for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control. (g) Dam design guidelines. (1) Any land disturbing activity that involves a site, which proposes a dam, shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable. (h) Stormwater management facility maintenance agreement. (1) Prior to the issuance of any permit for a land development activity requiring a stormwater management facility or practice hereunder and for which the Town requires ongoing maintenance, the applicant or owner of the site must, unless an on-site stormwater management facility or practice is dedicated to and accepted by the town, execute an inspection and maintenance agreement, and/or a conservation easement, if applicable, that shall be binding in perpetuity on all subsequent owners of the site. (2) The inspection and maintenance agreement, if applicable, must be approved by the Town prior to plan approval, and recorded in the deed records upon final plat approval. (3) The inspection and maintenance agreement shall identify by name or official title the person(s) responsible for carrying out the inspection and maintenance. Responsibility for the operation and maintenance of the stormwater management facility or practice, unless assumed by a governmental agency, shall remain with the property owner and shall pass to any successor owner. If portions of the land are sold or otherwise transferred, legally binding arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. These arrangements shall designate for each portion of the site, the entity to be responsible in perpetuity for its inspection and maintenance. (4) The terms of the maintenance agreement shall provide for the Town to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when it has a reasonable basis to believe that a violation of this article is occurring or has occurred and to enter when necessary for abatement of a public nuisance or correction of a violation of this article. (i) Water quality treatment applicability. (1) The provisions of this article shall be applicable to all land development within the incorporated area of the Town of Bethlehem, including, but not limited to, site plan applications,subdivision applications, and grading applications, unless exempt pursuant to subsection b. hereof. The provisions of this article further apply to any new development or redevelopment site that meets one or more of the following criteria: a. New development that includes the creation or addition of 5,000 square feet or greater of new impervious surface area, or that involves land disturbing activity of one acre of land or greater; b. Redevelopment that includes the creation, or addition of 5,000 square feet or greater of new impervious surface area, or that involves land disturbing activity of one acre or more; c. Any commercial or industrial new development or redevelopment, regardless of size, with a Standard Industrial Classification (SIC) code that falls under the NPDES Industrial Stormwater Permit program, or is determined by the Mayor or his or her designee to be a hotspot land use; or d. Land development activities that are smaller than the minimum applicability criteria set forth in subsections (i)(1) and (2) hereof ifsuch activities are part of a larger common plan of development, even though multiple, separate and distinct land development activities may take place in connection with such development at different times on different schedules. (2) The following activities are exempt from this article: a. Individual single-family or duplex residential lots that are not part of a subdivision or phased development project; b. Additions or modifications to existing single-family or duplex residential structures that are not part of a subdivision or phased development project; c. Agricultural orsilvicultural land management activities within areas zoned for these activities; and d. Repairs to any stormwater management facility or practice deemed necessary by the governmental agency with jurisdiction. (j) Modificationsfor off-site facilities. (1) The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. (2) A stormwater management plan must be submitted to the public works department that shows the adequacy of the off-site or regional facility. To be eligible for a modification, the applicant must demonstrate to the satisfaction of the public works department that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas: a. Increased threat of flood damage to public health, life, and property; b. Deterioration of existing culverts, bridges, dams, and other structures; c. Accelerated streambank orstreambed erosion orsiltation; d. Degradation of in-stream biological functions or habitat; or e. Water quality impairment in violation of state water quality standards, and/or violation of any state of federal regulations. ## History (Ord. of 10-13-2020; Ord. of 4-13-2021, § 1)