--- title: Bethlehem Zoning Ordinance, Sec. 89-1253. Site clearing and grading collection: local-codes id: local-code:bethlehem/zoning/89-1253 cite_as: Bethlehem, Ga., Zoning Ordinance § 89-1253 canonical_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1253 md_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1253.md text_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1253/text source_url: http://bethlehemga.org/assets/2026 Bethlehem Updated UDC.pdf date: 2026-11-11 status: active jurisdiction: city:bethlehem jurisdiction_name: Bethlehem place_fips: "1307612" corpus_version: local-codes-bethlehem-041fe1b2344f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bethlehem/zoning/~chapter-89/~article-xi.md previous: https://georgiacommons.org/code/local/bethlehem/zoning/89-1252.md next: https://georgiacommons.org/code/local/bethlehem/zoning/division-2.md index: https://georgiacommons.org/code/local/bethlehem.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bethlehem/zoning/89-1253@2026-11-11-2dc8729fa0 --- # Bethlehem Zoning Ordinance, Sec. 89-1253. Site clearing and grading > As posted on the city's website, retrieved 2026-11-11 Part of: Chapter 89 - UNIFIED DEVELOPMENT CODE / Article XI - LAND DEVELOPMENT ACTIVITIES (a) Development permit required. (1) Clearing and grading shall not proceed until issuance of an approved development permit. See the procedures and permits article of this Development Code for details. (2) Grading shall be done in accordance with the lines and grades drawn on the approved grading plan. (b) Erosion and sedimentation control measures. Required erosion and sedimentation control measures must be installed in accordance with the approved soil erosion and sedimentation control plan prior to any major development activity and as development progresses. (c) Stormwater drainage facilities. Required stormwater drainage facilities are to be installed in accordance with the approved stormwater management plan as development progresses. (d) Clearing and grubbing. (1) The entire area within the typical grading section shall be cleared and grubbed of all trees, bushes, stumps and debris. Such debris shall be disposed of in a lawful manner. Burial of clearing and grubbing debris on-site is not authorized. (2) Grading plans shall outline the areas, which are required to remain undisturbed, including tree protection areas, buffers and shall indicate protective fencing to be placed surrounding such areas. (3) Grading plans shall show existing and proposed contour lines at an interval of no more than two feet with additional spot elevations for critical areas. (e) Earthen embankments. Earthen embankments shall be placed in uniform layers not to exceed a compacted thickness of six inches per layer and shall be compacted to a density of 95 percent of the maximum laboratory dry weight per cubic foot as determined by standard proctor test method in all areas where structures, parking lots and drives streets, and utilities are to be placed. If necessary in order to obtain this compaction, the contractor shall add moisture to the material as it is placed. All other embankments are to be compacted to at least 90 percent. Floodproofing shall be accomplished prior to placement of embankmentsto detectsoftspots. (f) Slopes. (1) The maximum slope for all cut or fill slopes shall be as shown on Table 11.1. (2) The depth of cut referenced in the table shall be construed to be the maximum cut or fill occurring in any one section of cut or fill. The slope on cut or fill shall be uniform throughout for each section of cut or fill, except when the Town’s designee approves benching. When a cut is made in rock that requires blasting, slope may be changed to vertical slope may be steeper if pre-splitting is employed and upon submission of a certified geotechnical report which substantiates the integrity of the rock in the steeper condition, subject to review and approval of the Town’s designee. (3) Some soils exhibit a low shearing and resistance and a low cohesiveness. These soils typically are micaceous silts and sandy soils with little or no clay. If the 2:1 slope shows evidence of shearing, noncohesiveness, sliding, or an inability to maintain compaction, the slope shall be stabilized at 3:1 or by using such mechanical methods as needed, such as retaining walls or "grow mats" stapled in place to maintain slope height and integrity. Table 11.1: Maximum Cut or Fill Slopes Depth of Cut or Fill Cut Slopes* Fill Slopes* 2 feet or less 2 to 1 3 to 1 2 feet to 5 feet 2 to 1 3 to 1 Over 5 feet 2 to 1 3 to 1** * Maximum distance of run to rise. ** Guardrails required. (g) Construction waste materials. Construction waste material at construction sites shall be managed in accordance with Chapter 78, Article II of this Development Code.