--- title: Bethlehem Zoning Ordinance, Sec. 89-1259. Installation of stormwater drainage facilities collection: local-codes id: local-code:bethlehem/zoning/89-1259 cite_as: Bethlehem, Ga., Zoning Ordinance ยง 89-1259 canonical_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1259 md_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1259.md text_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-1259/text source_url: http://bethlehemga.org/assets/2026 Bethlehem Updated UDC.pdf date: 2026-11-11 status: active jurisdiction: city:bethlehem jurisdiction_name: Bethlehem place_fips: "1307612" corpus_version: local-codes-bethlehem-041fe1b2344f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bethlehem/zoning/~chapter-89/~article-xi/~division-3.md previous: https://georgiacommons.org/code/local/bethlehem/zoning/89-1258.md next: https://georgiacommons.org/code/local/bethlehem/zoning/89-1260.md index: https://georgiacommons.org/code/local/bethlehem.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bethlehem/zoning/89-1259@2026-11-11-ef27207ade --- # Bethlehem Zoning Ordinance, Sec. 89-1259. Installation of stormwater drainage facilities > As posted on the city's website, retrieved 2026-11-11 Part of: Chapter 89 - UNIFIED DEVELOPMENT CODE / Article XI - LAND DEVELOPMENT ACTIVITIES / Division 3 - FLOOD DAMAGE PREVENTION ORDINANCE (a) Timing of installation. Construction of the stormwater system shall be initiated as part of the grading of the site. Stormwater detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches, shall be coordinated with the construction of streets and other site improvements, as appropriate. (b) Maintenance responsibilities. (1) It shall be the responsibility of the developer to maintain all facilities required by the stormwater management plan during construction and for a 1.5-year maintenance period following approval of the final subdivision plat or issuance of a certificate of occupancy, as applicable. The developer shall be responsible for periodic removal of silt that may collect during that period and for removing temporary structures or facilities at the completion of the construction. (2) The owner of the property shall be responsible for maintaining the permanent facilities identified by the stormwater management plan to remain after construction is complete, following the 1.5-year maintenance period. (3) Should an owner or developer, whichever is the responsible party, fail to maintain the stormwater management facilities in a state of service intended by the stormwater management plan, then the public works department shall notify the responsible party in writing of the deficiencies and specific minimum maintenance requirements to remedy such deficiencies. (4) If the responsible party fails to perform the required maintenance work within a reasonable period of time (30 days maximum) then the owner shall be in violation of the provisions of this Development Code and subject to enforcement under the provisions of the administration and enforcement article of this Development Code.