--- title: Bethlehem Zoning Ordinance, Sec. 89-732. Improvement of parking areas collection: local-codes id: local-code:bethlehem/zoning/89-732 cite_as: Bethlehem, Ga., Zoning Ordinance § 89-732 canonical_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-732 md_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-732.md text_url: https://georgiacommons.org/code/local/bethlehem/zoning/89-732/text source_url: http://bethlehemga.org/assets/2026 Bethlehem Updated UDC.pdf date: 2026-11-11 status: active jurisdiction: city:bethlehem jurisdiction_name: Bethlehem place_fips: "1307612" corpus_version: local-codes-bethlehem-041fe1b2344f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bethlehem/zoning/~chapter-89/~article-vi.md previous: https://georgiacommons.org/code/local/bethlehem/zoning/89-731.md next: https://georgiacommons.org/code/local/bethlehem/zoning/89-733.md index: https://georgiacommons.org/code/local/bethlehem.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bethlehem/zoning/89-732@2026-11-11-3cb9791256 --- # Bethlehem Zoning Ordinance, Sec. 89-732. Improvement of parking areas > As posted on the city's website, retrieved 2026-11-11 Part of: Chapter 89 - UNIFIED DEVELOPMENT CODE / Article VI - PARKING AND LOADING REQUIREMENTS (a) Surfacing and curbing. (1) All parking areas and all access drives except for single-family and two-family dwellings, and within the agricultural districts shall be improved with a permanent dust-free surface consisting of a minimum of a six-inch graded aggregate base overlaid with a minimum two-inch Type E or F asphalt surface, or an appropriate alternative porous paving surface as approved by the Mayor or his or her designee. (2) The parking of any vehicle on any lot in any district on other than a surface treated and hardened to accommodate this vehicle is prohibited except as provided herein. In addition, parking vehicles in the front yard or in front of the principal building line in an R district shall be prohibited except on a hardsurfaced driveway or in a carport or garage. (3) In the commercial and the industrial zoning districts, the above type of surface is required for customer, visitor, and employee automobile parking. In these zoning districts the following surface will be required in areas of loading docks and parking of commercial trucks and other commercial equipment: a. A eight-inch graded aggregate base, overlaid with a two-inch Type B binder and a 1½-inch Type E or F asphalt surface; or, b. A ten-inch graded aggregate base, overlaid with a 12-inch course of 3,000 P.S.I. concrete. (4) Curb and gutter meeting town specifications shall be installed around the periphery of every parking lot and loading area, where required for drainage, and extend along both sides of every access drive between the parking lot or loading area and the street or another parking lot or loading area, as applicable. (5) The minimum thickness specified above shall be evaluated for each application to determine adequacy for projected traffic. (b) Maintenance. Parking areas shall be maintained in proper repair with a dust-free surface. (c) Drainage facilities. For any use that will require a parking area of five spaces or more, or a loading area, to be newly constructed, added to, or altered in such a way as to affect drainage either on or off the site,stormwater drainage plans, including grading plans, shall be submitted to and approved by the public works department, prior to the issuance of a building permit or occupational license. (d) Permit required. Construction of a new parking lot or loading area, or expansion of an existing parking lot or loading area, requiresissuance of a development permit in accordance with the procedures and permits article of this Development Code. (e) Time limit. All required parking areas shall be ready for use, including the above surfacing requirement, before the occupancy of the use (in the case of a new building or addition) or within 45 days after the issuance of an occupational license (in the case of a change of occupancy in an existing building). An extension of time may be granted by the public works department due to adverse weather conditions. ## History (Ord. of 10-13-2020)