--- title: Blue Ridge Zoning Ordinance, Sec. 111-32. Modifications for off-site facilities collection: local-codes id: local-code:blue-ridge/zoning/111-32 cite_as: Blue Ridge, Ga., Zoning Ordinance § 111-32 canonical_url: https://georgiacommons.org/code/local/blue-ridge/zoning/111-32 md_url: https://georgiacommons.org/code/local/blue-ridge/zoning/111-32.md text_url: https://georgiacommons.org/code/local/blue-ridge/zoning/111-32/text source_url: https://library.municode.com/ga/blue_ridge/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:blue-ridge jurisdiction_name: Blue Ridge place_fips: "1308928" corpus_version: local-codes-blue-ridge-0a572ed19c1f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/blue-ridge/zoning/~part-iii/~chapter-111/~article-ii.md previous: https://georgiacommons.org/code/local/blue-ridge/zoning/111-31.md next: https://georgiacommons.org/code/local/blue-ridge/zoning/111-33.md index: https://georgiacommons.org/code/local/blue-ridge.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:blue-ridge/zoning/111-32@2026-11-11-1e568ae077 --- # Blue Ridge Zoning Ordinance, Sec. 111-32. Modifications for off-site facilities > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - LAND USE CODE / Chapter 111 - STORMWATER MANAGEMENT / Article II - POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT (a) The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. (b) A stormwater management plan must be submitted to the city which shows the adequacy of the off-site or regional facility. (c) To be eligible for a modification, the applicant must demonstrate to the satisfaction of the city that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas: (1) Increased threat of flood damage to public health, life, and property; (2) Deterioration of existing culverts, bridges, dams, and other structures; (3) Accelerated streambank or streambed erosion or siltation; (4) Degradation of in-stream biological functions or habitat; or (5) Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations. ## History (Ord. No. BR2020-09, art. I, § 14, 8-11-2020)