All land development activity subject to this article shall meet the following buffer and setback requirements: (1) An undisturbed natural vegetative buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank. However, the setback from the Toccoa River shall be 100 feet. (2) An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be minimized within the setback. (3) No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback.