(a) Site analysis. An analysis shall be made of characteristics of the development site, such as site context, geology and soil, topography, climate, ecology, existing vegetation, structures, and road networks, visual features, and past and present use of the site. Development of the site shall be based on the site analysis. To the maximum extent practicable, development shall be located to preserve the natural features of the site, to avoid areas of environmental sensitivity, and to minimize negative impacts and alteration of natural features. (b) Suitability of the land. Land which the zoning administrator finds to be unsuitable for subdivision or development due to flooding, improper drainage, steep slopes, rock formations, adverse earth formations or topography, utility easements or other features which would be harmful to the safety, health, and general welfare of inhabitants of the land and surrounding areas shall not be subdivided or developed unless adequate methods are formulated by the developer and approved by the zoning administrator to solve the problems created by the unstable land conditions. The decision of the zoning administrator as to whether the developer (subdivider) has formulated adequate methods to solve the problems created by the unstable land conditions may be appealed by the property owner and/or subdivider pursuant to the appeal procedure contained in article VI of this chapter.