Skip to content
Georgia Commons
Menu

Blue Ridge · Zoning Ordinance

Part III - LAND USE CODE / Chapter 135 - SUBDIVISION REGULATIONS / Article IV - DESIGN AND IMPROVEMENT STANDARDS

Sec. 135-107. Utilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Water supply and sanitary sewer.

(1) The water system and sanitary sewer design, materials and construction methods shall be approved by the city. Extensions shall be made at the developer's expense.

(2) When a water main is to be located in a street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot before the street base is applied.

(b) Electrical, telephone, and cable service. All electrical, telephone, and cable service to subdivisions developed after the adoption of the ordinance from which this chapter is derived shall be required to be placed underground. All electrical, telephone, and cable service shall be installed meeting any construction specifications of the city relative to said utilities.

History

The history line the source prints at the end of the section.

(Ord. No. BR2023-20, § 1(Exh. A), 8-15-2023)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:blue-ridge/zoning/135-107@2026-11-11-7fafbe1d25

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Blue Ridge Zoning Ordinance, Sec. 135-107. Utilities | Georgia Commons