The following shall apply:* Minimum Lot Area Minimum Lot Width Minimum Front Setback Minimum Side Yard Minimum Rear Yard Max Height Feet None required None 5 ft. None* 5 ft. 35 ft. *Except where buffers are required between the commercial area and abutting residential districts and uses, then the 15 feet of buffer shall create a greater required minimum setback. The buffer is required on the side and rear lines. All existing buildings as of June 15, 2021 in CBD zone if destroyed by fire or natural disaster can be replaced at current height.