If the work authorized by the building permit has not commenced within six (6) months of the date the permit was issued or is suspended or abandoned for a period of six (6) months after commencement, the building permit shall become invalid. The building inspector may renew the permit. A renewal fee is required to be paid by the applicant before the permit is renewed.