--- title: Blythe Zoning Ordinance, 8.21. Solar Farms collection: local-codes id: local-code:blythe/zoning/8.21 cite_as: Blythe, Ga., Zoning Ordinance ยง 8.21 canonical_url: https://georgiacommons.org/code/local/blythe/zoning/8.21 md_url: https://georgiacommons.org/code/local/blythe/zoning/8.21.md text_url: https://georgiacommons.org/code/local/blythe/zoning/8.21/text source_url: https://assets.cdn.filesafe.space/qZoImwgTjkosLa9r01WA/media/69a78afab701fe4a3873c164.pdf date: 2026-11-14 status: active jurisdiction: city:blythe jurisdiction_name: Blythe place_fips: "1309040" corpus_version: local-codes-blythe-8997f26b7258 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/blythe/zoning/~article-viii.md previous: https://georgiacommons.org/code/local/blythe/zoning/8.20.md next: https://georgiacommons.org/code/local/blythe/zoning/article-ix.md index: https://georgiacommons.org/code/local/blythe.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:blythe/zoning/8.21@2026-11-14-6c448f7bd2 --- # Blythe Zoning Ordinance, 8.21. Solar Farms > As posted on the city's website, retrieved 2026-11-14 Part of: Article VIII - SUPPLEMENTARY REGULATIONS 1. Application Process. Once a solar project location is selected by a developer and a plan has been developed, a presentation shall be scheduled with the City of Blythe's Planning Commission. This presentation shall provide the complete details of the project, including drawings/layout of the proposed site, total energy generation, parcel maps including parcel numbers, total anticipated investment, decommissioning plan, and detailed written plans for addressing all line items of this ordinance. 2. Permit and Fees. The City of Blythe will require a site improvement permit on all land use projects. The permit cost will depend on the amount of the investment, and must be purchased at City Hall prior to commencement of the work. The Georgia EPD may also require a land disturbance fee for any project exceeding one acre. The project owner is responsible for obtaining this permit from EPD. Once a permit is issued for a Solar Project, the applicant must commence construction within six months of issuance, or the permit shall expire. Construction must be completed within eighteen months of permit issuance unless the permit expressly provides otherwise. Exceptions to these time limitations may be made at permit issuance for good cause. For tax purposes, the Solar Project shall be considered complete and operational no later than eighteen months after commencement of construction. Page48 of 85 3. Site Considerations. The electric energy produced in Solar Electric Power Generation establishments that is used to provide electric power transmission systems or to electric power distribution systems and shall be subject to the following conditions: a. Glint & Glare: Solar components must have a UL listing and must be designed with an anti-reflective coating(s). All construction shall be in compliance with the National Electric Code and the Georgia Building Code. The developer shall graphically demonstrate to the City of Blythe's Planning Commission through the use of renderings, photographs, or similar credible media that the proposed solar collection device or combination of devices shall be designed and located to avoid glare or reflection onto adjacent properties and adjacent roadways, and shall not interfere with traffic or create a safety hazard. Screening, using fencing of at least eight (8) feet in height, along with vegetative buffers placed outside the security fence, shall be provided along all sides of the project that face a public road or a residential area. If it is determined by the City of Blythe's Planning Commission that buffering or screening is needed, one or more of the following may be implemented: 1. On-site mature vegetation exists at a minimum height of ten (10) feet and a depth of seventy-five (75) feet between the security fence and adjacent properties or rights-of-way; or 11. A single row of evergreens in combination with mature vegetation, installed at a minimum height of five ( 5) feet, and achieving opaqueness and a minimum height often (10) feet within five (5) years; or iii. A double row of off-set evergreens, absent mature vegetation installed at a minimum height of five (5) feet, and achieving opaqueness and a minimum height often (10) feet within five (5) years. Panels are to be located and situated so that glare does not create a distraction or nuisance to traffic or adjacent residential properties. An engineer or qualified consultant must submit a statement that the glint and glare will not be offensive to residents or traffic. b. Lot Size: The minimum lot size required for a solar collection facility shall be three (3) acres. This excludes any proposed solar collection facility to be installed on an existing building. c. Set Backs: A minimum building setback of two hundred fifty (250) feet where abutting residential property and seventy-five (75) feet from public rights-of-way is required for ground mounted systems. This excludes any proposed solar collection facility to be installed on an existing building. d. Height Limitations: No structure shall exceed a height greater than ten (10) feet, except for existing poles and overhead wiring. This is measured from the finished grade at the base of the structure to its highest point. This would exclude any roof-mounted solar collection systems. e. Roof Mounted Systems: Roof-mounted panels shall not extend beyond the perimeter of the building on which the system is mounted or constructed. The total height of the solar. panels shall not exceed the maximum building height of the underlying zoning district. Elevation drawings must be submitted to show: