a. Construction standards. All materials, construction, and definitions shall conform to the current Georgia Department of Transportation "Standard Specifications for the Construction of Roads and Bridges", latest Edition, and any Amendments thereto, unless otherwise stated herein. b. Curbs and gutters. (1) Vertical or rollback six-inch concrete curbs and gutters with a minimum overall width of 24 inches shall be constructed on all residential, commercial and industrial streets not in the AG, AR-3, and AR zoning classifications. In the AG, AR-3, and AR zoning classifications, concrete curbs and gutters are required in subdivisions where more than one-half of the total number of lots are one acre or less, or where the average street frontage per lot is less than 100 feet, or where at least one-half of the total number of lots in such subdivision have widths of less than 100 feet. (2) Concrete curbs and gutters are required in the cul-de-sac portion of a street to channel water to the stormwater conveyance structure. Stormwater conveyance structures may include, but are not limited to, culverts, storm drainage pipes, catch basins, drop inlets, junction boxes and headwalls, and shall be provided for the protection of public rights-of-way and private properties adjoining project sites and/or public rights-of-way. c. New local residential streets (without curb and gutter). (1) Grassed shoulders and waterways (ditches) are required. (a) The aggregate road base shall be extended one foot beyond the edge of pavement, (pavement is twenty feet wide) and the shoulders and ditch sections shall be constructed in accordance with the City or Oconee County’s typical cross section for unpaved roadways. (b) In no instance shall the shoulder be less than 7 feet. Shoulders shall be graded to no more than ½ inch per foot. (2) Unsuitable topography. Certain tracts of land, because of topographic features or unfavorable or highly erodible soil conditions, should not be developed with grassed shoulders and waterways. (a) When a developer proposes to develop without curb and gutter, data and information showing that conditions are suitable for establishing permanently stabilized grassed shoulders and waterways shall be presented, together with any provisions necessary to correct any unfavorable conditions. (b) An unfavorable condition is generally defined when the velocity of the storm water in the channel exceeds 3.0 feet per second or erosive soils are present. (c) When the City does permit development using grassed shoulders and waterways, additional provisions may be required where slopes and soil conditions are unfavorable. (d) These requirements may include hydro-seeding of shoulders and waterways with specific grass mixtures, grass, sod, planting and erosion mats, rip-rap, concrete ditches, ditch checks, grade stabilization structures where the finished grade exceeds 5%, etc., to ensure permanent stabilization of the shoulders and waterways and to minimize erosion and future maintenance. d. Shoulder requirements. The street right-of-way shall be graded at least 8 feet, measured from the back of the curb (curb & gutter sections) or 7 feet measured from the edge of the pavement (uncurbed sections) on both sides of the street to provide space for installation of utilities, to prevent the encroachment of driveways into the street surface, and to provide walkways off the paved vehicular surface, and provide proper sight distances in curved roadway sections. e. Grassed medians. Vertical or rollback six-inch concrete curb and gutter shall be required for a grassed median on all streets. Such medians shall be designed to slope towards the outside curb of a street or contain an adequate drainage system within the median. f. Backfill, finish grading & grassing. Shoulders shall be sloped and backfilled as necessary following paving and curb and gutter installation as required by the City Engineer/ Public Works Director. All curbs and gutters shall be backfilled according to the designs in these Regulations. All eroded areas shall be reconstructed to the original final grade. Re-grass shall be required for bare spots, areas of insufficient stand and reconstructed areas. g. Sub-surface drainage systems. Sub-surface drainage installations may be required by the City Engineer/ Public Works Director to provide a stable sub-surface and base for fills and base course construction over wet weather springs, soft spots, swamps and other unsuitable soils. The City Engineer/ Public Works Director shall require the owner to have a soil analysis and drainage design performed by the Design Professional of Record if such conditions are encountered. h. Cuts, fills, and subgrade. Cuts, fills, and subgrades shall be subject to the approval of the City Engineer/ Public Works Director. The City Engineer/ Public Works Director may vary the required slope. The City Engineer/ Public Works Director shall specify any improvements necessary to protect community assets and to reduce the potential undue deterioration of street improvements. The developer will be guided by the following general requirements: (1) Slope maximums shall be at a ratio of 3 feet horizontal distance to 1 foot rise (3:1). No slope line shall extend closer than 8 feet to back of curb or 15 feet to edge of pavement on uncurbed sections. Minimum slope shall be ½-inch per running foot. (2) All slopes shall be adequately planted with approved vegetation. A suitable mulch of straw, hay, etc. shall be used. (3) The developer shall be responsible for any erosion that might occur until the expiration of the maintenance period. (4) Compaction shall be 95 percent by Standard Proctor Density Test. Subgrade compaction will be field tested through the use of a "Roll Test", as specified herein. (5) All organic and other unsuitable materials located within the proposed roadbed and 2 feet on either side of the back of curb or edge of pavement shall be removed prior to subgrade preparation. (6) Backfill behind curbs shall be free of organic material (roots, trunks, etc.), stone, broken concrete, etc. Topsoil and other similar unsuitable soil types removed from the roadbed may be utilized for shoulder construction, but not for fill construction, beyond 8 feet on either side of the back of curb or edge of pavement. The use of topsoil within 8 feet of the back of curb or edge of pavement shall be limited to a maximum depth of 6 inches. (7) Cut and fills shall be extended beyond the right-of-way as required, but a slope easement must be provided for maintenance purposes. Trees outside of the graded right-of-way with driplines extended into the right-of-way shall be removed at the direction of the City Engineer/ Public Works Director, or Planning Director. Such tree removal shall be required on a case-by-case basis due to public safety concerns, potential interference with public infrastructure, or the survivability of the tree. (8) Sub-base stabilization may be required by the City Engineer/ Public Works Director specified herein if necessary to allow safe access of construction vehicles and equipment. (9) Shaping and backfilling of shoulders, ditches and slopes shall be accomplished to final grade lines following the installation of underground utilities by the owner. Care shall be taken to fill and compact settled or eroded areas. (10) Grassing of all cleared portions of the shoulders and slopes shall be accomplished immediately following the achievement of final grade lines. If limitations require the application of temporary vegetative cover, the owner shall make contractual provisions for regrassing with permanent cover. Requirements for grass species, mixture, fertilizer and application methods in each individual subdivision shall be in accordance with the Georgia Soil and Water Conservation Commission standards for critical areas. Bermuda grass shall be required during the season from May through September and as permanent grass species. (11) Conduits for utility crossings shall be installed before subgrade inspection. Said conduits shall be indicated on the construction plans. No bores will be allowed for utility distribution/transmission systems after subgrade inspections or paving operations without prior approval of the City Engineer/ Public Works Department. i. Street base. (1) Base course; description. The base course shall consist of graded aggregate of a minimum compacted thickness placed on a stabilized subgrade in accordance with these specifications and in conformity with the lines, grade and typical cross-section as shown on the drawings approved by the City. Tolerance is +/-0.10 foot. Base course depth requirements vary based on estimated traffic volumes and street classification. See Sec. 1008.04.a. (2) Base course materials. (a) All materials shall be secured from Georgia Department of Transportation approved sources. (b) All aggregate material shall meet the GDOT requirements as contained in Section 800 for Group I or II; and Class A or B. (c) Graded Aggregate shall consist of hard, durable particles of fragments of stone, and stone mortar, and shall be graded as follows: j. Required base and pavement thicknesses. (1) The following Table 10.4 shall be used to determine the minimum thickness for each layer of the pavement structure based on the classification of the roadway. Please refer to Sec. 1008.04.a for roadway classification criteria and associated traffic volumes. The pavement structure for development entrances shall be based on the classification of the adjacent mainline roadway. Table 10.3: Standards for Graded Aggregate Sieve Size Designation Percent by Weight Passing Square Mesh 2 inches 100% 1 ½ inches 95% - 100% ¾ inches 60% - 100% No. 10 30% - 45% Material Passing No. 10 Sieve Percent Passing No. 10 Sieve 100% Passing No. 60 Sieve 15% - 70% Passing No. 200 Sieve 3% - 25% Siltless Clay 9% - 25% Table 10.4: Minimum Base and Pavement Thickness Industrial / Business 1 Arterial Major Collector Minor Collector Local Street Graded Aggregat e Base Course 10 inches 10 inches 8 inches 8 inches 6 inches Asphalt Binder Course 9 inches 6 inches 4 inches 2 ½ inches 2 inches Surface 1 ½ inches 1 ½ inches 1 ½ inches 1 ½ inches 1 ½ inches NOTE: The use of RAP mix designs are not permitted on initial construction of roadways. Binder course may use RAP with prior approval of the City Engineer/ Public Works Director. 1 The Industrial / Business Uses classification shall apply to all industrial parks, commercial developments, and all other public roadways which are planned to support business and industry typically classified under the Industrial and Business Zoning Districts. Private facilities are not included in this classification. (2) Alternative pavement structures may be considered by the City for approval for Arterial and higher classification streets, or streets with unusual or poor subgrade conditions. Unusual or poor subgrade conditions shall be defined as soil structures with a modulus of subgrade reaction of less than or equal to 100 psi/in or a soil structure that is not stable after conventional compaction techniques. Said structures shall be designed by a registered professional engineer, licensed in the state, in accordance with AASHTO and GDOT design policies and procedures. Design data and calculations shall be provided with any alternative design. The design professional shall consult with the City Engineer/ Public Works Department for the appropriate design methodology and factors that are to be used in the design process. k. Roll testing. Both the subgrade and base course will be load tested when required by the City Engineer/ Public Works Director with a minimum 18 ton hauling capacity tandem dump truck, fully loaded or an equivalent. The test shall cover the material thoroughly to assure a maximum tolerance of a ½-inch settling and the absence of any cracking or pumping, prior to all paving. This test shall be witnessed by the City Engineer/ Public Works Director or his or her designee.