--- title: Bogart Zoning Ordinance, Sec. 1018.02. Development phase inspections collection: local-codes id: local-code:bogart/zoning/1018.02 cite_as: Bogart, Ga., Zoning Ordinance § 1018.02 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1018.02 md_url: https://georgiacommons.org/code/local/bogart/zoning/1018.02.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1018.02/text source_url: https://cityofbogart.com/assets/banners/10_design-standards---08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-10/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/1018.01.md next: https://georgiacommons.org/code/local/bogart/zoning/1018.03.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1018.02@2026-11-14-60f83b2e27 --- # Bogart Zoning Ordinance, Sec. 1018.02. Development phase inspections > As posted on the city's website, retrieved 2026-11-14 Part of: Article 10 - Project Design and Construction Standards / Division II - PROJECT CONSTRUCTION Requests for inspections shall be made by the owner or contractor to the Planning, City Engineer/ Public Works, or Water Resources Department in accordance with the listing of inspection responsibilities established by the City of Bogart. Such requests shall be made at least 24 hours prior to when the inspection is needed. Inspections shall be made and passed prior to continuation of further activity or proceeding into new phases. Inspections are required Sec. 1018 Overview—project construction. of each of the following phases, as applicable to the actual work to be performed under the development permit: a. Prior to clearing or clearing and grubbing of the property or any portion included under the development permit, inspection of erosion and sedimentation control measures and protective devices for undisturbed areas. Inspection of erosion and sedimentation control measures will be conducted on a continuing basis. b. Upon completion of street grading, inspection and approval shall be required prior to trenching or continuation with subgrade preparation. c. Upon installation of storm drainage pipe, detention, or other storm water facilities. d. Street curbing and gutter (if provided). Inspection shall be requested after the forms or string line have been set. Street width and vertical and horizontal alignment may be spot-checked. e. Sub-grade of streets. The sub-grade may be roll tested in accordance with Sec. 1008.05.k. f. Street base. The base may be string-lined for depth and crown. The street base will be tested for depth and compaction in accordance with Sec. 1021.05.e, and may be rolltested in accordance with Sec. 1008.05.k, at the discretion of the City Engineer/ Public Works Director. g. Paving. A Road & Bridge Inspector may be on site during the paving process to check consistency, depth, and workmanship, as applicable. For asphalt paving, the temperature of the material will be monitored, the asphalt will be tested for depth and compaction in accordance with Sec. 1021.05.e, and may be roll-tested in accordance with Sec. 1008.05.k, at the discretion of the City Engineer/ Public Works Director.