--- title: Bogart Zoning Ordinance, Sec. 1019.01. Initiation of clearing and grading activities collection: local-codes id: local-code:bogart/zoning/1019.01 cite_as: Bogart, Ga., Zoning Ordinance ยง 1019.01 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1019.01 md_url: https://georgiacommons.org/code/local/bogart/zoning/1019.01.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1019.01/text source_url: https://cityofbogart.com/assets/banners/10_design-standards---08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-10/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/1019.md next: https://georgiacommons.org/code/local/bogart/zoning/1019.02.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1019.01@2026-11-14-2b692bdab3 --- # Bogart Zoning Ordinance, Sec. 1019.01. Initiation of clearing and grading activities > As posted on the city's website, retrieved 2026-11-14 Part of: Article 10 - Project Design and Construction Standards / Division II - PROJECT CONSTRUCTION a. Clearing and grading shall not proceed until issuance of an approved development permit authorizing such activities. No development permit authorizing clearing or grading shall be issued prior to review and approval by the City of construction plans as applicable to the property. See the Procedures and Permits Article of this Development Code for details. b. Grading shall be done in accordance with the lines and grades drawn on the approved grading plan. Protective devices for undisturbed areas, if any are required, must be installed, inspected and approved in accordance with the approved construction plans prior to the initiation of clearing and grading activities. c. Erosion and sedimentation control measures. Required erosion and sedimentation control measures must be installed, inspected and approved in accordance with the approved soil erosion and sedimentation control plan prior to any major development activity, and shall be maintained or supplemented as development progresses. d. Stormwater drainage facilities. Required stormwater drainage facilities are to be installed in accordance with the approved stormwater management plan as development progresses.