--- title: Bogart Zoning Ordinance, Sec. 1021.03. Installation of utilities; general collection: local-codes id: local-code:bogart/zoning/1021.03 cite_as: Bogart, Ga., Zoning Ordinance ยง 1021.03 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1021.03 md_url: https://georgiacommons.org/code/local/bogart/zoning/1021.03.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1021.03/text source_url: https://cityofbogart.com/assets/banners/10_design-standards---08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-10/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/1021.02.md next: https://georgiacommons.org/code/local/bogart/zoning/1021.04.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1021.03@2026-11-14-0c3b01b46e --- # Bogart Zoning Ordinance, Sec. 1021.03. Installation of utilities; general > As posted on the city's website, retrieved 2026-11-14 Part of: Article 10 - Project Design and Construction Standards / Division II - PROJECT CONSTRUCTION / 1021 - Installation of streets and utilities. All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed plus 2 feet of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at 50 foot intervals to insure proper utility locations as specified in Sec. 1017. The developer shall coordinate the location of all utilities and provide a copy of all as-built and proposed locations at final plat.