a. Roadway grading and embankments. (1) All streets and roads shall be graded to their full width by the sub-divider so that pavements and sidewalks, where required or proposed for future installation, can be constructed on a level plane as shown in the cross-sections on the approved plans. (2) The entire area within the typical grading section shall be cleared and grubbed of all trees, bushes, stumps and debris. Such debris shall be disposed of in a lawful manner, and shall not be buried in the right-of-way or within the project limits. (3) Road fill of suitable material free of organic matter shall be placed in uniform eightinch layers compacted to at least 95 percent of maximum density throughout as specified for construction and testing in the Georgia DOT standards for embankments. Embankment compaction test shall be taken at an interval not exceeding 2500 cubic yards. All storm drainage and other underground utilities installed under the roadbed and the backfill in all ditches shall be compacted to at least 95 percent maximum density. Compaction testing of backfill for said structures shall be taken at a minimum interval not less than 1 between any 2 structures. Compaction test results shall be reported to the City immediately after results are obtained. (4) Cut and fill slope ratios shall start at the edge of the right-of-way and shall not exceed 3:1 in the right-of-way and 2:1 outside of the right-of-way. In lieu of a cut or fill slope, a retaining wall may be utilized where necessary with the approval of the City. (5) Cut or fill slopes shall be uniform for each section of cut or fill. The depth of cut or fill shall be constructed to the maximum cut or fill occurring in any one section. When a cut made in rock requires blasting, the slope may be changed to an alternative slope grade upon written approval of the City. (6) If paving is to be delayed, provisions shall be made to drain low points in the roadway. If curbing has not been installed, a break in the berm section may be provided. If curbing is in place, 4-inch pipe sections shall be used to provide drainage under the curb to side slopes. (7) All work must be approved by the City prior to preparation of the subgrade. It is the design professional’s duty to inspect that road grading specifications has been met. The developer will provide to the City a statement of inspection completed by a registered professional engineer, licensed by the state, that all construction requirements have been met for roadway grading. The developer shall also provide to the City certification to the City by a professional land surveyor or engineer licensed in the state that grading has been completed to the lines and grades to a tolerance of +/- 6 inches. The developer will also provide staking of the roadway centerline in conjunction with said certification for verification by the City Engineer/ Public Works Director. Upon presentment and approval of such documentation by the City, road construction may continue. b. Preparation of subgrade. (1) All boulders, organic material, soft clay, spongy material and any other objectionable material shall be removed and replaced with approved material. The subgrade shall be properly shaped, rolled and uniformly compacted to conform with the lines, grades and typical cross-sections as shown on the drawings approved by the City. (2) The subgrade shall be scarified to a depth of 8 inches, and compacted to 95% maximum dry density and within +/- 3 percent of the optimum moisture content. Subgrade compaction shall be determined by field testing at intervals not to exceed 1500 feet. Compaction testing shall be accomplished in accordance with the standardized testing protocols of GDOT. Written test results shall be provided to the City immediately after results are obtained. (3) It is the design professional’s duty to inspect that subgrade preparation specifications have been met. The Developer will provide to the City a statement of inspection completed by a registered professional engineer, licensed by the state, that all construction requirements have been met for roadway subgrade preparation. Upon presentation and approval of such documentation by the City, roadway construction may continue. c. Preparation of aggregate base course. (1) All base course material shall be deposited and spread by means of spreader boxes, or approved mechanical equipment, or from moving vehicles equipped to distribute the material in a uniform layer. (2) Immediately following the spreading of the coarse aggregate, all material placed shall be compacted to the full width by rolling with a smooth wheel power roller of adequate size and weight to achieve compaction. (3) Any irregularities, areas of segregation, or depressions that develop under such rolling shall be corrected by loosening the material at these places and adding or removing material until the surface is smooth and uniform. The application of water, applied uniformly over the base course, may be required to achieve adequate compaction. Shaping and rolling shall be performed alternately as required to maintain a uniform compacted base until a surface or treatment has been applied to the base. Along curbs, headers and walls and at all places not accessible to the roller, the base course material shall be tamped thoroughly with mechanical tampers or approved hand tampers. (4) Graded aggregate base shall meet the requirements of Georgia DOT Specifications for graded aggregate. Graded aggregate base compaction test shall be taken at an interval not exceeding 1 per 1500 linear feet. No graded aggregated base shall be placed on muddy or frozen subgrade. The moisture content of the graded aggregate base shall be uniformly distributed and shall be adequate to allow compaction to the specified density. After the material placed has been shaped to line, grade and cross section, it shall be rolled until the course has been uniformly compacted to at least 100 percent of the maximum dry density when Group 2 aggregate is used, or to at least 98 percent of maximum dry density when Group 1 aggregate is used. The theoretical maximum dry density shall be established using the appropriate test methods of the Georgia DOT Sampling, Testing and Inspection Manual. Moisture content shall be within +/- 3 percent of the optimum content. Compaction test results shall be reported to the City immediately after results are obtained. (5) After the base course has been installed and inspected, and before any surface is applied, all residential streets shall be primed with suitable asphaltic materials as per Georgia DOT Specification 412 unless asphalt paving commences within two weeks from acceptance of the certification from the period March 1 to December 1 or within 24 hours during the period December 1 to March 1. (6) It is the design professional’s duty to inspect that graded aggregate base course preparation specifications have been met. The Developer will provide to the City a statement of inspection completed by a registered professional engineer, licensed by the state, that all construction requirements have been met for roadway graded aggregate base course preparation. Upon presentation and approval of such documentation by the City, roadway construction may continue. d. Asphaltic concrete construction. (1) Paving material shall consist of a conventional Bituminous Plant Mix. The use of “Superpave” mix design will be permitted. Recycled asphalt products (RAP) will not be permitted for initial construction of roadways. RAP may be used in the binder course but only with prior approval of the City Engineer/ Public Works Department. (2) Material, equipment, seasonal and weather limitations, preparation of road surface, material application and construction methods shall be the same as set out in the Georgia Department of Transportation’s Standard Specifications for Road and Bridges, latest edition, and any amendments thereto. (3) Mix design(s) shall be provided to the City for approval at least a minimum of 2 weeks prior to paving operations. (4) If paving will not be completed within 2 weeks after the base course is completed during the period March 1 to December 1, then, the base will need to be primed in accordance with GDOT Standards with the roadway being barricaded thereafter. The above will be required within 24 hours during the period of December 1 – March 1. (5) One asphaltic concrete extraction test per type mix shall be taken per subdivision. Extraction test results shall be reported to the City immediately after results are obtained. (6) Asphaltic concrete compaction test for each type mix shall be taken at an interval not exceeding 1 per 1000 linear feet per 1 lane of roadway. All asphalt courses shall be compacted to no less than 95.5 percent of the target density. Compaction ranges of 95.4 percent to 93.4 percent will require a specific and separate 3 year maintenance bond in the amount of 20 percent of the paving costs for the street affected. Compaction less than 93.4 percent will be cause for rejection and rework of the street section affected. The maximum Pavement Mean Air Voids will not exceed 7.8 percent in any instance. Compaction testing shall be accomplished in accordance with the appropriate standardized protocols for the GDOT Sampling, Testing, and Inspection Manual. Compaction test results shall be reported to the City immediately after results are obtained. (7) Where a binder course is provided on streets, a tack coat shall be applied to all prepared road surfaces as provided in Georgia DOT Specifications. (8) On streets where a binder course is provided, the final layer of asphalt shall be placed no later than 1 year after the binder course is laid or when 80 percent of the project is built-out whichever comes first. (9) The City Engineer/ Public Works Director shall require that all work meet or exceed the above requirements. (10) It is the design professional’s duty to inspect that the roadway asphaltic concrete construction specifications have been met. The Developer will provide to the City a statement of inspection completed by a registered professional engineer, licensed by the state, that all construction requirements have been met for roadway asphaltic concrete construction. Upon presentation and approval of such documentation by the City, roadway construction will be considered as complete for the purpose of final plat. e. Base, asphalt and compaction testing. (1) Depth testing. The City reserves the right to require depth checks on base materials and asphalt cores shall be taken at random locations at five hundred foot intervals along each road at the discretion of the City Engineer/ Public Works Director. Any area found deficient shall be brought up to the required thickness prior to placing any additional layer of material. All asphalt core holes shall be filled with hot mix asphalt of similar grade prior to final acceptance. (2) Additional testing requirements/coordination.