--- title: Bogart Zoning Ordinance, Sec. 1022. Building construction collection: local-codes id: local-code:bogart/zoning/1022 cite_as: Bogart, Ga., Zoning Ordinance ยง 1022 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1022 md_url: https://georgiacommons.org/code/local/bogart/zoning/1022.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1022/text source_url: https://cityofbogart.com/assets/banners/10_design-standards---08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-10/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/1021.05.md next: https://georgiacommons.org/code/local/bogart/zoning/1022.01.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1022@2026-11-14-5deeb3bf4e --- # Bogart Zoning Ordinance, Sec. 1022. Building construction > As posted on the city's website, retrieved 2026-11-14 Part of: Article 10 - Project Design and Construction Standards / Division II - PROJECT CONSTRUCTION All testing shall be scheduled with the City Engineer/ Public Works Director, or his/her duly appointed representative no less than 24 hours in advance. Compaction testing shall not be performed until the surface/material is to the lines and grades shown on the plans. Once an embankment, subgrade, or base course has been certified then that material shall not be disturbed or additional testing will be required. All areas or sections of the subgrade and base course, which do not pass compaction testing, shall be corrected. Once the Developer makes all necessary corrections, it shall be his/her responsibility to schedule any and all subsequent test. The City Engineer/ Public Works Director may require that in addition to the compaction testing required, a roll test be performed in accordance with Sec. 1008.05.k. All certifications provided shall contain all test data and results to support certification. f. Seasonal limits. No roadway construction material shall be deposited or shaped when the subgrade is frozen at any depth or thawing at any depth or during unfavorable weather conditions including rain of any intensity. Paving material installation shall be subject to temperature and weather conditions as contained in Georgia DOT construction standards. The time period from December 1 to March 1 will require special construction procedures unique to the individual sites and weather conditions. The Contractor/Developer shall consult with the City Engineer/ Public Works Department during a supplemental Pre-Construction Conference prior to beginning or continuing any roadway construction work during this period. It shall be the responsibility of the Developer to schedule this conference. Sec. 1022. Building construction.