--- title: Bogart Zoning Ordinance, Sec. 1112. Definitions related to storm drainage and stormwater management collection: local-codes id: local-code:bogart/zoning/1112 cite_as: Bogart, Ga., Zoning Ordinance § 1112 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1112 md_url: https://georgiacommons.org/code/local/bogart/zoning/1112.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1112/text source_url: https://cityofbogart.com/assets/banners/11_stormwater----08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-11/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/1111.md next: https://georgiacommons.org/code/local/bogart/zoning/1113.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1112@2026-11-14-3a0861d831 --- # Bogart Zoning Ordinance, Sec. 1112. Definitions related to storm drainage and stormwater management > As posted on the city's website, retrieved 2026-11-14 Part of: Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT For the purposes of this Division, the following shall mean: Beneficial Owner(s): All property owners in a subdivision that derive benefit from a stormwater management facility, detention facility, retention facility, or drainage easement may be considered owners of that facility or easement. Best Management Practices (BMPs)—Stormwater Management: Schedules of activities, prohibitions of practices, general good housekeeping practices, pollution prevention and educational practices, maintenance procedures, and other management practices to prevent or reduce the discharge of pollutants directly or indirectly to stormwater, receiving waters, or stormwater conveyance systems. BMPs also include treatment practices, operating procedures, and practices to control site runoff, spillage or leaks, sludge or water disposal, or drainage from raw materials storage. Channel: A natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water. Clean Water Act: The federal Water Pollution Control Act (33 U.S.C § 1251 et seq.), and any subsequent amendments thereto. Construction Activity: Activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES Construction Permits. Such activities include but are not limited to clearing and grubbing, grading, excavating, and demolition. Detention: The temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge. Detention Facility: A basin or structure used for the temporary storage of stormwater runoff for the purpose of controlling the peak discharge and which is designed to completely drain after a specified period of time. Developer: A person who undertakes land development activities. Drainage Easement: An easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement. Georgia D.O.T. Standards/Specifications: State of Georgia Standard Specifications – Construction of Transportation Systems, latest edition. Georgia Stormwater Management Manual, Volume 2: Technical Handbook, produced as a result of a collaborative effort between the Atlanta Regional Commission (ARC), the Georgia Department of Natural Resources-Environmental Protection Division (EPD), and 35 cities and counties from across Georgia that provides guidance on the techniques and measures that can be implemented to meet a set of stormwater management minimum standards for new development and redevelopment, as amended from time to time. Greenspace: Permanently protected areas of the site that are preserved in a natural state. See also under “Open Space.” Hazardous Materials: Any material, including any substance, waste, or combination thereof, which because of its quantity, concentration, or physical, chemical, or infectious characteristics may cause, or significantly contribute to, a substantial present or potential hazard to human health, safety, property, or the environment when improperly treated, stored, transported, disposed of, or otherwise managed. Hotspot: A land use or activity on a site that produces higher concentrations of trace materials, hydrocarbons or other pollutants than are normally found in urban stormwater runoff. Examples of hotspots include, but are not limited to: gas stations, vehicle service and maintenance areas, salvage yards, material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity use. Illegal Connection: An illegal connection is defined as either of the following: 1. Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the storm drain system including but not limited to any conveyances which allow any non-stormwater discharge including sewage, process wastewater, and wash water, regardless of whether said drain or connection has been previously allowed, permitted, or approved by an authorized enforcement agency; or 2. Any pipe, open channel, drain or conveyance connected to the City of Bogart separate storm sewer system that has not been documented in plans, maps or equivalent records and approved by an authorized enforcement agency. Illicit Discharge: Any direct or indirect non-stormwater discharge to the City of Bogart storm drain system, except as exempted in the Storm Drainage and Stormwater Management Division of the Erosion Control and Stormwater Management Article of this Development Code. Impervious Cover: A surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, disturbed and compacted soil, and any concrete or asphalt surface. Industrial Activity: Activities subject to NPDES Industrial Permits as defined in 40CFR, Section 122.26 (b) (14). Inspection and Maintenance Agreement: A written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records, constitutes a restriction on the title to a site or other land involved in a land development project. Land Development: Any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover. Land Development Activities: Those actions or activities that comprise, facilitate, or result in land development. Land Development Project: A discrete land development undertaking. National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit: A permit issued by Georgia EPD under authority delegated pursuant to 33 USC § 1342 (b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis. New Development: A land development activity on a previously undeveloped site. Nonpoint Source Pollution: A form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such a sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources. Non-Stormwater Discharge: Any discharge to the storm drain system that is not composed entirely of stormwater. Nonstructural Stormwater Management Practice or Nonstructural Practice: Any natural or planted vegetation or any other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels. Non-Urbanized Area: The area of the City of Bogart not regulated under the National Pollutant Discharge Elimination System (NPDES) Stormwater Phase II Permit. City of Bogart Separate Storm Sewer System: Any facility, owned or maintained by the City, designed or used for collecting and/or conveying stormwater, including but not limited to roads with drainage systems, City of Bogart streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, retention and detention basins, natural and man-made or altered drainage channels, reservoirs, and other drainage structures. Pollutant: Anything that causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; non-hazardous liquid and solid wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any kind. Pollution: Contamination or other alteration of any water’s physical, chemical, or biological properties by addition of any constituent including but not limited to a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any liquid, gaseous, solid, radioactive, or other substance into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental, or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life. Post-development: The time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require. Pre-development: The time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by City of Bogart. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time prior to the first element of construction and/or phase being approved or permitted shall establish pre-development conditions. Premises: Any building, lot, parcel of land, or portion of land whether improved or unimproved including adjacent sidewalks and parking strips. Redevelopment: A land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution. Retention Facility: A basin or structure designed to contain a permanent pool of water with sufficient freeboard to provide for temporary storage and water quality treatment of stormwater runoff. Site: The parcel of land being developed, or the portion thereof on which the land development project is located. Stormwater: Any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation. Stormwater Better Site Design: Nonstructural site design approaches and techniques that can reduce a site’s impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management. Stormwater Discharge: The flow rate of surface water resulting from precipitation.