Bogart · Zoning Ordinance
Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT
Sec. 1116.06. Drainage system construction.
About this text
- As posted on the city's website, retrieved 2026-11-14
All pipe sizes shall be approved by the City Engineer/ Public Works Director to meet the drainage conditions of the watershed and area of the potential runoff, per current design standards and requirements.
a. The minimum cross drain diameter shall be 18 inches.
b. Minimum cover shall be 24 inches.
c. In all instances, depth requirements shall meet or exceed manufacturer’s guidelines.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.