--- title: Bogart Zoning Ordinance, Sec. 1116.11. Timing of installation collection: local-codes id: local-code:bogart/zoning/1116.11 cite_as: Bogart, Ga., Zoning Ordinance ยง 1116.11 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1116.11 md_url: https://georgiacommons.org/code/local/bogart/zoning/1116.11.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1116.11/text source_url: https://cityofbogart.com/assets/banners/11_stormwater----08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-11/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/1116.10.md next: https://georgiacommons.org/code/local/bogart/zoning/1116.12.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1116.11@2026-11-14-b57de09771 --- # Bogart Zoning Ordinance, Sec. 1116.11. Timing of installation > As posted on the city's website, retrieved 2026-11-14 Part of: Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT Construction of the stormwater system shall be initiated as part of the grading of the site. Stormwater detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches shall be coordinated with the construction of streets and other site improvements, as appropriate, in accordance with an approved Stormwater Management Plan.