Bogart · Zoning Ordinance
Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT
Sec. 1116.13. Stormwater discharge management.
About this text
- As posted on the city's website, retrieved 2026-11-14
a. Stormwater design manual.
The City Engineer/ Public Works Department will utilize the policy, criteria and information including technical specifications and standards in the latest edition of the Georgia Stormwater Management Manual, Volume 2, and any relevant local addenda, for the proper implementation of the requirements of this Division, except that structural stormwater controls shall require prior approval of the City Engineer/ Public Works Department as described below. The manual may be updated and expanded periodically, based on improvements in science, engineering, monitoring and local maintenance experience.
b. Minimum Stormwater Management Standards.
The Minimum Stormwater Management Standards identified in the Georgia Stormwater Management Manual, Volume 2 shall be the required minimum stormwater management performance criteria for new development or redevelopment sites unless otherwise provided for in this Division. In addition, the Overbank Flood Protection standard shall include control of the post development discharge rates to the predevelopment rates for the 2, 5, 10, 25 and 50-year storm events. If hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the City Engineer/ Public Works Department may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, rate of stormwater runoff, the nature of the post development discharge, or increased nonpoint source pollution loads created on the site in question
(1) Structural stormwater controls.
(a) All structural stormwater controls shall be submitted to the City Engineer/ Public Works Department for review and approval before being included in the design of a stormwater management system. The intent of the approval process is to review independent third-party scientific verification of the structural controls performance and ability to meet water quality treatment objectives, verify the proven record of longevity in the field, verify the ability to function in Georgia conditions, and evaluate the operation and maintenance costs as compared to other alternatives.
(b) Applicants shall consult the Georgia Stormwater Management Manual, Volume 2 for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control.
(2) Stormwater Credits for Nonstructural Measures.
The use of one or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under Water Quality section above. The applicant may, if approved by the City Engineer/ Public Works Department, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual, Volume 2.
c. Stormwater Management Inspection and Maintenance Agreements.
The applicant or owner of the site must execute an inspection and maintenance agreement, which shall be binding on all subsequent owners of the site, for any land development activity requiring a stormwater management facility or practice hereunder and for which the City requires ongoing maintenance.
(1) Prior to the submission of the final plat for approval, or request for a Certificate of Occupancy where a final plat is not required, the owner shall record the inspection and maintenance agreement in the deed records of the Clerk of Court. The owner shall provide a copy of the recorded agreement to the City Engineer/ Public Works Department with the final plat, or request for Certificate of Occupancy where a final plat is not required. The final plat shall have a notation referencing the deed book number and page of the recorded inspection and maintenance agreement indicating that individual lot owners are subject to the terms and conditions of said agreement.
(2) The inspection and maintenance agreement be binding on all affected property, shall run with the land, and shall identify by name or official title the person(s) responsible for carrying out the inspection and maintenance. Responsibility for the operation and maintenance of the stormwater management facility or practice shall remain with the property owner and shall pass to any successor owner. If portions of the land are sold or otherwise transferred, legally binding arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. These arrangements shall designate, for each portion of the site, the person to be permanently responsible for its inspection and maintenance.
(3) As part of the inspection and maintenance agreement, a schedule shall be developed for when and how often routine inspection and maintenance will occur to ensure proper function of the stormwater management facility or practice. The agreement shall also include plans for annual inspections to ensure proper performance of the facility between scheduled maintenance activities and shall also include remedies for the default thereof.
d. Long-Term Inspection and Maintenance of Stormwater Facilities and Practices.
(1) Stormwater management facilities and practices which are subject to an inspection and maintenance agreement shall be inspected and maintained on a routine basis by the responsible person in accordance with the approved inspection and maintenance agreement. Parties responsible for the operation and maintenance of a stormwater management facility shall maintain records of all maintenance and repairs, and provide copies of said records to the City Engineer/ Public Works Department.
(2) In the event that the stormwater management facility has not been maintained, the City shall notify the responsible person in writing of the deficiencies, describe the required corrective action, and the time period to have the deficiencies corrected.
(3) If the responsible person fails to correct the deficiencies within the specified time frame, the City, or its agent, may enter upon the property and make, at the owners’ expense, the necessary repairs or corrections to the system.
(4) In the event deficiencies constitute an imminent danger to public health or public safety, or threatens downstream water resources, the City, or its agent, is authorized to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore the function of the stormwater facilities at the owners’ expense.
e. Access and Inspection of Properties and Facilities.
(1) The owners of property containing stormwater management facilities, detention facilities, or retention facilities shall allow unimpeded access for the City to conduct inspections of the facilities. Inspections may be conducted by the City Engineer/ Public Works Department at any time for any reasonable basis, including, but not limited to: routine inspections, random inspections, inspections based upon complaints or other notice of possible violations, and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; measurement of discharges, location measurements, surveying, sampling of surface and ground waters; and evaluations of the condition of stormwater management facilities and practices.
(2) Any temporary or permanent obstruction that inhibits access to the property or facility to be inspected shall be promptly removed at the written or oral request of the City and shall not be replaced. The costs of clearing such access shall be borne by the owner or operator.
f. Easements.
The owner of property containing a drainage easement shall not allow or cause to be deposited any material which causes a physical obstruction in the easement, including, tree trimmings, and leaves; impervious cover; or any other material that may block the flow of water or otherwise disrupt proper function of the stormwater management system.
All drainage easements shall be kept clear of obstructions along the entire length of the easement whether it be a buried pipe, ditch or other facility contained within the easement. The property owner shall remove any such materials existing prior to, or installed after, the effective date of this Division.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.