--- title: Bogart Zoning Ordinance, Sec. 1117.03. Standards for stormwater management collection: local-codes id: local-code:bogart/zoning/1117.03 cite_as: Bogart, Ga., Zoning Ordinance ยง 1117.03 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1117.03 md_url: https://georgiacommons.org/code/local/bogart/zoning/1117.03.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1117.03/text source_url: https://cityofbogart.com/assets/banners/11_stormwater----08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-11/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/1117.02.md next: https://georgiacommons.org/code/local/bogart/zoning/1117.04.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1117.03@2026-11-14-1bd234a0e5 --- # Bogart Zoning Ordinance, Sec. 1117.03. Standards for stormwater management > As posted on the city's website, retrieved 2026-11-14 Part of: Article 11 - Erosion Control and Stormwater Management / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT / 1117 - Stormwater management in the non-urbanized area. a. A combination of storage and controlled release of stormwater runoff on-site detention or retention shall be required when the proposed development shall increase the peak rate of runoff by more than 1 cubic feet per second (CFS) for a 10-year frequency storm. The Rational Method or the Soil Conservation Method shall be used to determine the runoff rate in accordance with sound engineering practice and shall be acceptable to the City Engineer/ Public Works Director and Planning Director. Developments may be exempt from this provision if the design professional can demonstrate that the runoff can be adequately transmitted through existing downstream storm drain structures and will not result in increased flood heights or additional threats to public safety, and will not adversely affect downstream properties, and compliance with Sec. 1117.04 is demonstrated. b. Should on-site retention or detention be required, the outlet device(s) of the retention/detention facility shall be designed to limit post-development runoff rates to less than or equal to the pre-development rates for the 2, 5, 10, 25, and 50 year storm event. c. The retention or detention storage volume to be provided shall be calculated on the basis of the appropriate return frequency rainfall, as published by the National Weather Service or other acceptable service for the affected site. The retention or detention volume required shall be calculated based on the DeKalb hydrograph for inflow and standard reservoir routing at the approved release rates as specified above. However, the design calculation shall include the routing of the 100-year frequency storm event through the retention/detention facility. Said calculations shall indicate that the 100-year frequency storm event can be safely routed through the facility. d. Applicants in non-urbanized areas that choose to handle stormwater management using the standards of urbanized areas may do so as long as all aspects of stormwater management meet the urbanized standards. e. The storm drainage system shall be designed in accordance with Sec. 1117.04 of this Ordinance. At a minimum, the storm drainage system shall be sized to adequately convey the runoff from the 25-year frequency storm event to the retention/detention facility. f. Facilities for the management of stormwater discharges shall be designed and constructed in a manner that enhances and protects the natural beauty and aesthetic qualities of City of Bogart as follows: (1) Any required retention and/or detention areas shall not be developed. (2) Any required retention and/or detention areas shall be incorporated into the common areas of the residential development or incorporated into individual lots. (3) The local government maintains the right, but not the responsibility, to access retention and/or detention areas for purposes of maintenance and inspection. (4) Appropriate vegetation shall be planted in all retention and/or detention areas. (5) Where fencing is required under Section 1117.03.g, evergreen vegetative screening shall be provided with a minimum height of 3 feet at time of planting. Plant materials used for such screening must be in compliance with Table 8.2 of this Development Code. g. Fences a minimum of 4 feet in height with a minimum 8 foot wide gate will be required on all detention ponds where: (1) The sides of the pond have a slope greater than 3 horizontal to 1 vertical, or (2) The depth of water in the pond is greater than 3 feet at one hour after the duration of any storm event up to the 50-year event. h. Drainage easement requirements. (1) The minimum easement width for open ditch where pipe is feeding into the ditch will be determined as follows: Table 11.3: Drainage Ditch Easement Widths Pipe Size Feeding Into Ditch Minimum Easement Width 15 to 30 inches 20 feet 36 to 66 inches 30 feet 72 inches and greater 40 feet (2) Where a subdivision is traversed by a watercourse, drainage way or stream, there shall be a drainage and access easement conforming substantially with the lines of such watercourse, and such further width as will be adequate for the purpose of drainage and maintenance, taking into account possible future development of higher land in the same drainage area, in accordance with Table 11.3 above, or bank plus 20 feet. Such drainage way shall be piped when the City Engineer/ Public Works Director shall find that it is a hazard or that a continual maintenance problem might exist. (3) If the drainage way is totally piped, the easement width shall be based on the associated pipe size above. i. If any stormwater management system proposes to utilize the roadway embankment for the temporary impoundment (detention) of stormwater then additional engineering analysis and approved mitigation measures as determined on a case-by-case basis by the City Engineer/ Public Works Director will be required to ensure the protection of the roadway system during all storm events in order to qualify for the exemption contained in the Private Bridges and Dams on Roadways Section of the Project Design and Construction Standards Article of this Development Code. Said analysis and mitigation measures shall include but are not limited to; (1) No impounded surface water elevation shall encroach into any portion of the public right-of-way, any utility easement/corridor, or any utility easement/corridor on private street easements (2) The 100-year water surface elevation must maintain a minimum of 3 vertical feet of freeboard from the lowest roadway elevation traversing the embankment. (3) The roadway embankment must be protected from seepage, erosion, and undermining from any impoundment of water. Examples of protection measures may include but are not limited to anti-seep collars, special engineered embankment construction, and embankment armoring. At a minimum, embankment armoring protection measures shall be incorporated beginning at the highest water surface elevation calculated at 4.0 hours after the beginning of the storm event for all analyzed return frequencies including the 100 year event. The embankment armoring shall extend to the bottom of the impoundment facility. The City Engineer/ Public Works Director may require additional protection measures based on maintenance needs or critical infrastructure protection needs.