--- title: Bogart Zoning Ordinance, Sec. 1206.04. Impact analysis collection: local-codes id: local-code:bogart/zoning/1206.04 cite_as: Bogart, Ga., Zoning Ordinance § 1206.04 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/1206.04 md_url: https://georgiacommons.org/code/local/bogart/zoning/1206.04.md text_url: https://georgiacommons.org/code/local/bogart/zoning/1206.04/text source_url: https://cityofbogart.com/assets/banners/12_procedures---08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-12/~division-i.md previous: https://georgiacommons.org/code/local/bogart/zoning/1206.03.md next: https://georgiacommons.org/code/local/bogart/zoning/1206.05.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/1206.04@2026-11-14-b90702e3a0 --- # Bogart Zoning Ordinance, Sec. 1206.04. Impact analysis > As posted on the city's website, retrieved 2026-11-14 Part of: Article 12 - Procedures and Permits / Division I - APPROVAL OF A ZONING CHANGE A traffic study, a hydrology study and other studies of the impact of the proposed development may be required as deemed necessary for adequate consideration and a fully-informed decision, as follows: a. Zoning impact analysis. If the zoning change has been initiated by an owner or their representative, the application must be accompanied by a written, documented analysis of the proposed zoning change with regard to each of the standards governing consideration, which for rezoning are enumerated under Sec. 1207.01 and for Special Use approval are enumerated under Sec. 1207.02. b. Traffic impact analysis. (1) Every proposed development Concept Plan that is capable of generating 1,000 average daily vehicle trips or more shall be accompanied by a traffic analysis prepared under guidelines available from the City Engineer/ Public Works Director. Anticipated vehicle trips may be based upon the latest edition of Trip Generation published by the Institute of Transportation Engineers. (2) A revised traffic analysis shall also be required for a proposed modification to a previously approved Concept Plan if the average daily vehicle trips will increase by 10% or more than calculated for the original Concept Plan. (3) For developments with less than 1,000 average daily vehicle trips or increases of less than 10%, the City Engineer/ Public Works Director may require a traffic analysis when conditions on the public street system warrant. (4) Negative impacts on area roads and intersections must be minimized in the design of the development project. The traffic analysis required by this Section shall demonstrate that, following completion of the development, the surrounding roads and affected intersections included in the traffic analysis will operate at a Level of Service no lower than “C”, considering both projected traffic demand/capacity on the existing system and improvements proposed by the developer. c. Impact analyses upon request. A traffic study, a hydrology study and other studies of the impact of the proposed development may be required by the Mayor and Council as deemed necessary for adequate consideration and a fully-informed decision on the proposed zoning change. The studies shall be prepared under the direction of the City Engineer/ Public Works Director at the applicant’s expense.