All development and building construction activities or site work conducted after approval of the aquifer protection site plan shall conform with the specifications of said site plan. Significant changes to the site plan, that would alter the amount and velocity of storm water runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction, or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval of City of Bogart. Minor changes, such as realignment of streets, or minor alterations to drainage structures and other infrastructure, to meet unexpected conditions, are exempted from this requirement.