a. Guarantee in lieu of completed improvements. Procedures for final plat approval. No final subdivision plat shall be approved by the City or accepted for recordation by the Clerk of the Superior Court until one of the following conditions has been met: (1) All public improvements shall have been properly installed and completed in accordance with all requirements and standards of this Development Code (other than traffic signs, street name signs, and signalization) and as-built data drawings of the improvements shall have been approved by the Water Resources Director and City Engineer/ Public Works Director, as appropriate; or, (2) The Mayor and Council has received performance surety in the form of a letter of credit issued by an acceptable surety licensed to do business in the State of Georgia in the amount of 110% of the estimated cost of installation of the required improvements. Completion of the improvements covered under the performance surety shall be completed within 24 months of approval of the final subdivision plat. (3) The improvements funded through the performance surety shall be limited to final grassing of street shoulders, landscaping, and sidewalks for residential developments. In the case of commercial and industrial developments and upon written request from the developer to the responsible City or County department, performance surety can be accepted by the City for all required improvements. (4) The executed contract shall call for completion of the grassing and landscaping improvements within 12 months of approval of the final subdivision plat, and for completion of sidewalks prior to the end of the continuing maintenance period. (5) Upon completion of deferred improvements: (a) The as-built data drawings are to be updated by the developer and submitted to the City Engineer/ Public Works Department; (b) The engineer's report listed under Sec. 1229.02.b(1) above shall be provided prior to release of the Letter of Credit; and (c) The maintenance surety required under Sec. 1229.03.b shall commence for those deferred improvements. b. Construction quality assurance. To insure the quality of construction of the improvements in the project required by this Development Code, the following maintenance surety shall be required: (1) At the time of acceptance of the improvements by the City for final plat approval, the subdivider or developer shall provide maintenance surety in the form of a Letter of Credit from an acceptable surety licensed to do business in the State of Georgia. (2) Said Letter of Credit shall be payable to the City, in an amount not less than 20% of the actual cost, or estimated cost as approved by the City Engineer/ Public Works Director for street(s), drainage, and other improvements, as appropriate. Where water and/or sewer utilities are installed, a letter of credit in an amount of not less than 10% of the actual estimated cost shall be approved by the Water Resources Director. (3) Said Letter of Credit shall conform to the continuing maintenance time period established under Sec. 1004.04, and must provide for additional time to complete final repairs required of the developer under Sec. 1232.06.e. (4) For improvements that are deferred at the time of final plat approval pursuant to Sec. 1229.03.a, the requirements of this Sec. 1229.03.a(2) shall commence upon acceptance by the City of said deferred improvements.