--- title: Bogart Zoning Ordinance, Sec. 334.01. Application requirements collection: local-codes id: local-code:bogart/zoning/334.01 cite_as: Bogart, Ga., Zoning Ordinance ยง 334.01 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/334.01 md_url: https://georgiacommons.org/code/local/bogart/zoning/334.01.md text_url: https://georgiacommons.org/code/local/bogart/zoning/334.01/text source_url: https://cityofbogart.com/assets/banners/03_restrictions---08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-3/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/334.md next: https://georgiacommons.org/code/local/bogart/zoning/334.02.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/334.01@2026-11-14-8c77c5c6e3 --- # Bogart Zoning Ordinance, Sec. 334.01. Application requirements > As posted on the city's website, retrieved 2026-11-14 Part of: Article 3 - Restrictions on Particular Uses / Division II - RESTRICTIONS ON CERTAIN PRINCIPAL USES An application for approval of a quarry or mining operation shall include the following in addition to any applicable requirements under the Procedures and Permits Article of this Code: a. An operation plan containing the following must be a part of such application: (1) Date of commencement of the operation and its expected duration. (2) Proposed hours and days of operation. (3) The description of the method of operation, including the disposition of topsoil, overburden and by-products. (4) A description of the equipment to be used in the extraction process. The applicant shall provide an estimate of the potential noise and dust levels produced by the use and the placement of such equipment. b. The applicant shall submit a copy of the operations plan and all documents submitted to the State of Georgia for the purpose of obtaining a State Mining Permit including the reclamation plan which shall include a description of how the excavated land will be restored, statement of intended future use of the land, and phasing and timing estimates of reclamation and rehabilitation activities. Operations and reclamation plans, if approved, shall be considered conditions of development approval. c. A study prepared by the applicant that shall identify any state, county, or City maintained road within or adjacent to the property, and shall state any repaving, alterations, turning lanes or other additions necessary to accommodate the potential increase of traffic volume or weight occasioned by the proposed operations. d. The applicant shall provide a statement regarding the intended use of explosives or other hazardous materials and the methods and procedures proposed for handling, use, storage and disposal of the materials. e. The applicant shall provide a copy of the well and soil study to be completed by applicant in connection with the application submitted to the State of Georgia for a surface mining permit, which shall include all properties within 1,000 feet of the property. f. In the event the applicant is not required to obtain a bond in connection with the surface mining permit issued by the State of Georgia, the Mayor and Council may at its discretion require a bond calculated on a specific amount per acre for the purposes of insuring proper reclamation. The Mayor and Council shall not require a bond if the applicant is required to obtain a bond in connection with its surface mining permit. g. The applicant shall provide documentation that it has obtained a surface mining permit from the State of Georgia and the bond required in conjunction with the surface mining permit.