--- title: Bogart Zoning Ordinance, Sec. 334.02. Restrictions collection: local-codes id: local-code:bogart/zoning/334.02 cite_as: Bogart, Ga., Zoning Ordinance § 334.02 canonical_url: https://georgiacommons.org/code/local/bogart/zoning/334.02 md_url: https://georgiacommons.org/code/local/bogart/zoning/334.02.md text_url: https://georgiacommons.org/code/local/bogart/zoning/334.02/text source_url: https://cityofbogart.com/assets/banners/03_restrictions---08.12.2024.pdf date: 2026-11-14 status: active jurisdiction: city:bogart jurisdiction_name: Bogart place_fips: "1309068" corpus_version: local-codes-bogart-4cae533395d4 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bogart/zoning/~article-3/~division-ii.md previous: https://georgiacommons.org/code/local/bogart/zoning/334.01.md next: https://georgiacommons.org/code/local/bogart/zoning/334.03.md index: https://georgiacommons.org/code/local/bogart.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:bogart/zoning/334.02@2026-11-14-f35387adc0 --- # Bogart Zoning Ordinance, Sec. 334.02. Restrictions > As posted on the city's website, retrieved 2026-11-14 Part of: Article 3 - Restrictions on Particular Uses / Division II - RESTRICTIONS ON CERTAIN PRINCIPAL USES In addition to all requirements and restrictions imposed by the State of Georgia on a quarrying or surface mining operation, the following shall apply to any such operation in the City of Bogart: a. No operation shall be allowed between the hours of 7:00 p.m. and 7:00 a.m. during the months of November, December, January, February, and March. No operation shall be allowed between the hours of 9:00 p.m. and 6:30 a.m. during the months of April, May, June, July, August, September and October. No operation shall be permitted on Sundays, New Year’s Day, Independence Day, Thanksgiving or Christmas Day. These restrictions shall not apply to routine maintenance and may be varied for special projects, including Department of Transportation projects and large commercial projects, with the approval of the Mayor and Council. b. The area being excavated for stone mining and quarrying shall be entirely enclosed within a barrier fence of at least 6 feet high located at least 10 feet back from the edge of any excavation and such construction and height as to be demonstrably able to exclude Sec. 335 Radio, television and telecommunications. children and animals from the quarry area. For other mining operations covered by this section, the excavation area shall be surrounded by earthen berms of at least 4 feet in height covered with thorny shrubs. c. Gates must be provided at all points of vehicular and pedestrian ingress and egress and shall be locked when not in regular use. d. All work areas shall be sufficiently illuminated, naturally or artificially, in accordance with the form of the operation and the stated hours of operation. No direct artificial illumination resulting from the operation shall fall on any land not covered by the application. e. All gravel and pit access roads shall be maintained in accordance with state issued air quality permits. f. For quarries and open pit mines, the maximum depth of excavation shall not be below existing groundwater, except in cases where the reclamation plan indicates that a lake or lakes will be a part of the final use of the land or where such plan indicates that adequate fill from overburden is to be used to refill such excavation. No excavation shall be allowed to lower the water table of the surrounding inhabited properties to the extent there are wells with potable water within 1000 feet of the excavation area. g. Notices shall be posed at regular intervals along the outer limits of the property, which shall warn against trespassing and shall contain a statement pertaining to the use of explosives, if applicable.