If an on-site sewage management system is proposed to serve a lot or building, the County Health Department may require larger lot sizes in individual cases based on a variety of factors,1 such as: a. The following land areas are not considered as a part of a lot when calculating the required minimum lot size for an on-site sewage management system under State requirements: easements (such as power line or pipe line) that exclude installation of an on-site sewage management system, and land within 50 feet of a lake, river, stream, wetland or other bodies of water. b. Such lots located in groundwater recharge areas are subject to increase. See the Aquifer Recharge Area Section of the Environmental Protection Article of this Development Code. c. The minimum lot area per dwelling shown on Table 4.1 may be increased for a home larger than a “typical size home,” which is defined as follows: a 3- or 4- bedroom home with basic appurtenances such as: driveway, minimum number of trees, and water supply line. If larger homes, swimming pools, tennis courts or outbuildings, etc. are proposed to be constructed or if trees would interfere with installation of an on-site sewage management system, the County Health Department may require larger lots to assure useable soil area. d. The County Health Department may also require larger lot sizes when physical factors indicate the need to do so. These factors include, but are not limited to, the availability of sufficient unobstructed land areas for an approved on-site sewage management system and approved replacement system, slope greater than 5 percent, percolation rates higher than 45 minutes per inch, need for subsurface drainage or adverse topographic features. e. Lots shall be a minimum width of 100 feet or 150 feet measured within the area where an approved on-site sewage management system and replacement system are to be located when served by a public water supply system or nonpublic water supply system (private well), respectively. f. There must be an unobstructed area on each lot for installation of an approved on-site sewage management system and an area equal in size for a conventional system or larger area, as appropriate, for an approved replacement system; this will include sufficient area for necessary site modifications for installation of both the initial system and a replacement system. All pertinent zoning setbacks and other space requirements must also be met. g. The maximum daily sewage flow for each lot or parcel of land shall not exceed 600 gallons per acre per day (gpad) when served by non-public or individual water supply system or 1,200 gpad when served by public water supply system. When sewage flows exceed these quantities (600 or 1,200 gpad as indicated) for a given dwelling structure, the minimum lot size or parcel of land shall be increased proportionally following Health Department guidelines.