Skip to content
Georgia Commons
Menu

Bogart · Zoning Ordinance

Article 5 - Subdivisions and Planned Developments

Sec. 505.03. Yield plan.

About this text

  • As posted on the city's website, retrieved 2026-11-14

No later than the time of rezone (or preliminary plat submittal, in the case of property which was rezoned prior to the date of adoption of these requirements), the applicant for a Conservation Subdivision shall submit a yield plan at the same size as the conservation concept plan, prepared by a Georgia registered Landscape Architect, Engineer or Land Surveyor for the purpose of determining the maximum allowable net density for the development. Said plan shall contain the following information with respect to the tract:

a. A topographic map prepared from aerial or field data of a contour interval of two feet or less;

b. Exact boundary lines of the tract with bearings and distances

c. The location, width and names of all existing or platted streets, easements or other public ways within or adjacent to the subdivision, existing permanent buildings, railroad rightsof-way, natural watercourses, flood hazard areas, wetlands, utilities and other significant natural and man-made features;

d. Proposed street rights-of-way and pavement locations and widths;

e. Proposed lot locations with preliminary lot dimensions noted and designed to the requirements of the City of Bogart Zoning Ordinance;

f. Designation on each proposed lot of a minimum of 25,500 square feet (not including house and pavement footprints) of soil areas suitable for residential septic systems based on a Level II Soil Scientist Report or higher, prepared by a Georgia licensed Soil Scientist or other professional licensed by the State of Georgia to perform soil analysis;

g. Proposed location of storm water detention or retention facilities;

h. Graphic scale and north arrow;

i. Notation as to the number of lots on the Yield Plan, the total acreage of the property, minimum lot size, average lot size;

j. Any additional information as maybe reasonably required to permit an adequate evaluation of the proposed Yield Plan to accurately determine the maximum number of lots.

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bogart/zoning/505.03@2026-11-14-3ce838377f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bogart Zoning Ordinance, Sec. 505.03. Yield plan | Georgia Commons