Bogart · Zoning Ordinance
Article 9 - Environmental Protection / Division II - WATERSHED PROTECTION
Sec. 907. Water supply watersheds.
About this text
- As posted on the city's website, retrieved 2026-11-14
(1) Disturbance is required to construct mulched pedestrian paths;
(2) Road and utility crossings; and
(3) For the installation of a dam necessary for stormwater detention or green stormwater infrastructure as approved by the City Engineer/ Director of Public Works.
c. Construction plans.
No construction plans for a development containing a conservation corridor will be released until copies of all necessary state and federal permits have been provided to the City of Bogart.
Figure 9.1. Conservation Corridor Conservation Corridors consist of a natural undisturbed stream buffer, measured from the top of the stream bank, and an additional setback area in which impervious surfaces and septic tanks and their drainfields are not allowed.
Source: Ga. Department of Community Affairs
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.