Commission: The Georgia Soil and Water Conservation Commission (GSWCC). CPESC: Certified Professional in Erosion and Sediment Control with current certification by EnviroCert, Inc., which is also referred to as CPESC or CPESC, Inc. Cut: A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as “excavation.” Department: The Georgia Department of Natural Resources (DNR). Design Professional: A Professional licensed by the State of Georgia in the field of: engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by EnviroCert, Inc. Design Professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure. Development Permit: The authorization necessary to initiate and conduct a land-disturbing activity and to carry out the planned development of land and structures. Director: The Director of the Environmental Protection Division or an authorized representative. District: The Oconee River Soil and Water Conservation District. Division: The Environmental Protection Division (EPD) of the Department of Natural Resources. Drainage Structure: A device composed of a virtually nonerodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for storm-water management, drainage control or flood control purposes. EPD: The Environmental Protection Division of the Georgia Department of Natural Resources. EPD Director: The Director of the Environmental Protection Division of the Georgia Department of Natural Resources. Erosion: The process by which land surface is worn away by the action of wind, water, ice, or gravity. Erosion, Sedimentation and Pollution Control Plan: A plan required by the Erosion and Sedimentation Act, O.C.G.A. chapter 12-7, that includes, as a minimum protections at least as stringent as the State General Permit, best management practices, and requirements in Sec. 1106 of this Code. Fill: A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation. Final Stabilization: All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100% of the soil surface is uniformly covered in permanent vegetation with a density of 70% or greater, or landscaped according to the Plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent permanent stabilization measures as defined in the Manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final Stabilization applies to each phase of construction. Finished Grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design. Grading: Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping, or any combination thereof, and shall include the land in its cut or filled condition. Ground Elevation: The original elevation of the ground surface prior to cutting or filling. Land-Disturbing Activity: Any activity that may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting and filling of land but not including those practices that are exempt under the Soil Erosion and Sedimentation Control provisions of this Development Code. Larger Common Plan of Development or Sale: A contiguous area where multiple, separate and distinct construction activities are or may be occurring at different times on different schedules under one plan of development or sale. For purposes of this paragraph, “plan” means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot. Local Issuing Authority: The governing authority of any City or municipality which is certified pursuant to subsection (a) O.C.G.A. 12-7-8. Metropolitan River Protection Act (MRPA): A state law referenced as O.C.G.A. 12-5-440 et seq., which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins. Natural Ground Surface: The ground surface in its original state before any grading, excavation or filling. Nephelometric Turbidity Units (NTU): Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed particles are present. NOI: A Notice of Intent form provided by EPD for coverage under the State General Permit. NOT: A Notice of Termination form provided by EPD to terminate coverage under the State General Permit. One-Hundred-Year Flood Plain: A land area subject to a 1 percent or greater statistical occurrence probability of flooding in any given year. Operator: The party or parties that have: 1) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or 2) day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions. Outfall: The location where storm water in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water. Permit: the authorization necessary to conduct a land-disturbing activity under the provisions of this ordinance. Person: Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State, any interstate body or other legal entity. Phase or Phased: Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site. Project: 1) The entire proposed development project regardless of the size of the area of land to be disturbed. 2) For stormwater management, see “Land Development Project.” Properly Designed: Designed in accordance with the design requirements and specification contained in the Manual for Erosion and Sediment Control in Georgia (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the Manual as approved by the Commission up until the date of NOI submittal. Qualified Personnel: Any person who meets or exceeds the education and training requirements of O.C.G.A. 12-7-19. Roadway Drainage Structure: A device such as a bridge, culvert or ditch, composed of a virtually non-erodible material such as concrete, steel, plastic or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled way consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side. Sediment: Solid material, both organic and inorganic, that is in suspension, is being transported or has been moved from its site of origin by wind, water, ice or gravity as a product of erosion. Sedimentation: The process by which eroded material is transported and deposited by the action of water, wind, ice, or gravity. Soil & Water Commission: The State Soil and Water Conservation Commission. Soil and Water Conservation District Approved Plan: An erosion, sedimentation and pollution control plan approved in writing by the Oconee River Soil and Water Conservation District. Soil & Water District: The Oconee River Soil and Water Conservation District. Stabilization: The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity. State General Permit: The National Pollution Discharge Elimination System general permit or permits for storm-water runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the State’s authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251, et seq., and subsection (f) of O.C.G.A. 12-5-30. State Waters: Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation. Stream Buffer: See “Buffer, Stream.” Structural Erosion and Sedimentation Control Measures: Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sedimentation control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures, and sediment traps, etc. Such practices can be found in the publication Manual for Erosion and Sediment Control in Georgia. Trout Streams: All streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of O.C.G.A. 12-5-20 et. seq., in the rulesand regulations for Water Quality Control, Chapter 391-3-6 at www.epd.georgia.gov. Streams designated as primary trout waters are defined as supporting a self-sustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.