Braselton · Zoning Ordinance
Article 10 - EROSION AND SEDIMENTATION CONTROL
10.3. Definitions
About this text
- As posted on the city's website, retrieved 2026-11-11
Best Management Practices (BMPs): These include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and
Sediment Control in Georgia published by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
Buffer: The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified personnel: A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Commission: The Georgia Soil and Water Conservation Commission (GSWCC).
CPESC: Certified Professional in Erosion and Sediment Control with current certification by EnviroCert International, Inc., which is also referred to as CPESC or CPESC, Inc.
Cut: A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as excavation.
Department: The Georgia Department of Natural Resources (DNR).
Design professional: A professional licensed by the State of Georgia in the field of engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by EnviroCert International, Inc. Design
professionals must practice in a manner that complies with applicable Georgia law governing professional licensure.
Director: The Director of the Environmental Protection Division or an authorized
representative.
Division: The Environmental Protection Division (EPD) of the Department of Natural Resources.
Drainage structure: A device composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes.
Erosion: The process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, sedimentation, and pollution control plan: A plan required by the Erosion and Sedimentation Act, O.C.G.A. Chapter 12-7, which includes, as a minimum, protections at least as stringent as the State General Permit, best management practices, and requirements in Sec.
11.4E and 11.4F.
Fill: A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation.
Final stabilization: All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by
permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100% of the soil surface is uniformly covered in permanent vegetation with a density of 70% or greater, or landscaped according to the plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent
permanent stabilization measures as defined in the Manual for Erosion and Sediment Control in Georgia (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.
Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Grading: Altering the shape of ground surfaces to a predetermined condition. This includes stripping, cutting, filling, stockpiling, and shaping or any combination thereof and includes the land in its cut or filled condition.
Ground elevation: The original elevation of the ground surface prior to cutting or filling.
Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land, but not including agricultural practices as described in Sec.
11.4D.5.
Larger common plan of development or sale: A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, “plan” means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
Local issuing authority: The governing authority of any county or municipality which is certified pursuant to subsection (a) O.C.G.A. 12-7-8.
Metropolitan River Protection Act (MRPA): A state law referenced as O.C.G.A. 12-5-440 et seq.
which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins.
Natural ground surface: The ground surface in its original state before any grading, excavation, or filling.
Nephelometric turbidity units (NTU): Numerical units of measure based upon photometric
analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
Notice of intent (NOI): A notice of intent form provided by EPD for coverage under the State General Permit.
Notice of termination (NOT): A notice of termination form provided by EPD to terminate coverage under the State General Permit.
Operator: The party or parties that have: (1) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications;
or (2) day-to-day operational control of those activities that are necessary to ensure
compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
Outfall: The location where stormwater in a discernible, confined, and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source
discharging into that receiving water.
Permit: The authorization necessary to conduct a land-disturbing activity under the provisions of this article.
Phase or phased: Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site.
Project: The entire proposed development project regardless of the size of the area of land to be disturbed.
Properly designed: Designed in accordance with the design requirements and specifications contained in the Manual for Erosion and
Sediment Control in Georgia (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the Manual as approved by the Commission up until the date of submittal of a Notice of Intent.
Roadway drainage structure: A device such as a bridge, culvert, or ditch, composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water under a street by intercepting the flow on one side of a traveled way consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Sediment: Solid material, both organic and inorganic, which is in suspension, is being transported, or has been moved from its site of origin by wind, water, ice, or gravity as a product of erosion.
Sedimentation: The process by which eroded material is transported and deposited by the action of water, wind, ice, or gravity.
Soil and Water Conservation District Approved Plan: An erosion, sedimentation and pollution control plan approved in writing by the applicable Soil and Water Conservation District.
Stabilization: The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice, or gravity.
State general permit: The National Pollution Discharge Elimination System (NPDES) general permit or permits for Stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state’s authority to implement the same through federal delegation under the Federal Water Pollution Control Act 33 U.S.C.
Section 1251, et seq., and subsection (f) of Code Section 12-5-30.
State waters: Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
Structural erosion, sedimentation and pollution control practices: Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc. Such practices can be found in the publication Manual for Erosion and Sediment Control in Georgia.
Trout streams: All streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A. 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.epd.georgia.gov. Streams designated as primary trout waters are defined as water supporting a self- sustaining population of rainbow, brown or brook trout. Streams
designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but which are capable of
supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.
Vegetative erosion and sedimentation control measures: Measures for the stabilization of erodible or sediment-producing areas by covering the soil with (1) Permanent seeding, sprigging or planting, producing long-term vegetative cover, or
(2) Temporary seeding, producing short-term vegetative cover; or (3) Sodding, covering areas with a turf of perennial sod-forming grass. Such measures can be found in the publication Manual for Erosion and Sediment Control in Georgia.
Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.