Skip to content
Georgia Commons
Menu

Braselton · Zoning Ordinance

Article 10 - EROSION AND SEDIMENTATION CONTROL

10.5. Minimum Requirements Using Best

About this text

  • As posted on the city's website, retrieved 2026-11-11

Management Practices

A. General Provisions Excessive soil erosion and resulting sedimentation can take place during landdisturbing activities if requirements of the ordinance and the NPDES General Permit are not met. Therefore, plans for those landdisturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and

pollution control measures and practices shall conform to the minimum requirements of Sec.

10.5B and Sec. 10.5C. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements.

Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this article and the NPDES General Permit.

B. Minimum Requirements/BMPs

1. Best management practices as set forth in this subsection and subsection (C) are

required for all land-disturbing activities.

Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the Planning Director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar

terms contained in a permit for the discharge of storm water issued pursuant to subsection (f) of O.C.G.A. 12-5-30, the "Georgia Water Quality Control Act". As

used in this subsection the terms "proper design” and “properly designed” mean

designed in accordance with the hydraulic design specifications contained in the

Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. 12-7-6 subsection (b).

2. A discharge of storm water runoff from disturbed areas where best management

practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local Issuing Authority or of any state general permit issued by the Division pursuant to subsection (f) of

O.C.G.A. 12-5-30, the "Georgia Water Quality Control Act," for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than 10 nephelometric turbidity

units for waters classified as trout waters.

The turbidity of the receiving waters shall be measured in accordance with

guidelines to be issued by the Director.

This paragraph does not apply to any land disturbance associated with the

construction of single-family dwellings which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.

3. Failure to properly design, install, or maintain best management practices shall constitute a violation of any landdisturbing permit issued by a Local Issuing Authority or of any state general permit issued by the Division pursuant to

subsection (f) of Code Section 12-5-30, the "Georgia Water Quality Control Act," for each day on which such failure occurs.

4. The Planning Director may require, in accordance with regulations adopted by

the Board of Natural Resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbance

activities occur.

5. The LIA may set more stringent buffer requirements than stated in C 15, 16 and 17, in light of O.C.G.A. § 12-7-6 (c).

C. The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A. 12- 7-1 et. seq. for the purpose of governing landdisturbing activities require, as a minimum, protections at least as stringent as the state general permit; and best management

practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water

Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:

1. Stripping of vegetation, regrading and other development activities shall be

conducted in a manner so as to minimize erosion;

2. Cut-fill operations must be kept to a minimum;

3. Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;

4. Whenever feasible, natural vegetation shall be retained, protected and

supplemented;

5. The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;

6. Disturbed soil shall be stabilized as quickly as practicable;

7. Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;

8. Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;

9. To the extent necessary, sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed

area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of

continuous compliance with the requirements of O.C.G.A. 12-7-1 et. seq.;

10. Adequate provisions must be provided to minimize damage from surface water to

the cut face of excavations or the sloping of fills;

11. Cuts and fills may not endanger abutting property;

12. Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other

property owners;

13. Grading equipment must cross flowing streams by means of bridges or culverts

except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;

14. Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate

sedimentation control facilities to retain sediments on-site or preclude

sedimentation of adjacent waters beyond the levels specified in Sec. 10.5B.2;

15. Except as provided in paragraph (16) of this subsection, and Sec. 11.2G, there is established a 25 foot buffer along the

banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the Planning Director determines to allow a variance that is at least as protective of natural resources and the environment,

where otherwise allowed by the Planning Director pursuant to O.C.G.A. 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are

implemented; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream: that

under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water

table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow, Unless exempted as along an

ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the

"Georgia Water Quality Control Act," remain in force unless a variance is granted by the Planning Director as provided in this

paragraph. The following requirements apply to any such buffer:

a. No land-disturbing activities may be conducted within a buffer and a buffer must remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final

stabilization of the site is achieved, a buffer may be thinned or trimmed of

vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for their own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative

cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and

b. The buffer does not apply to stream crossings for water or sewer lines, provided that they occur at an angle (as measured from the point of crossing)

within 25 degrees of perpendicular to the stream, that they cause a width of disturbance of not more than 50 feet within the buffer, and that adequate erosion control measures are incorporated into the project plans and specifications and are implemented.

16. There is established a 50 foot buffer as measured horizontally from the point

where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to Article 2 of Chapter 5 of Title 12, the “Georgia Water Quality Control Act," except where a

roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout

streams which discharge an average annual flow of 25 gallons per minute or less have a 25 foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the Board of Natural Resources, so long as any such pipe stops short of the downstream

landowner’s property and the landowner complies with the buffer requirement for any adjacent trout streams. The Planning Director may grant a variance from such

buffer to allow land-disturbing activity, provided that adequate erosion control

measures are incorporated in the project plans and specifications and are

implemented. The following requirements apply to such buffer:

a. No land-disturbing activities may be conducted within a buffer and a buffer must remain in its natural, undisturbed, state of vegetation until all landdisturbing activities on the construction site are completed. Once the final

stabilization of the site is achieved, a buffer may be thinned or trimmed of

vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed: provided, however, that any person constructing a single–family residence, when such residence is constructed by or under contract with the owner for their own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative

cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and

b. The buffer does not apply to stream crossings for water or sewer lines, provided that they occur at an angle (as measured from the point of crossing)

within 25 degrees of perpendicular to the stream, that they cause a width of disturbance of not more than 50 feet within the buffer, and that adequate erosion control measures are incorporated into the project plans and specifications and are implemented.

D. Nothing contained in O.C.G.A. 12-7-1 et. seq.

will prevent any Local Issuing Authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer

requirements that exceed the minimum requirements in Sec. 10.5B and Sec. 10.5C.

E. The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another neither constitutes proof of nor creates a presumption of a

violation of the standards provided for in this article or the terms of the permit.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/10.5@2026-11-11-80566d4699

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Braselton Zoning Ordinance, 10.5. Minimum Requirements Using Best | Georgia Commons