A. Findings The Town Council of the Town of Braselton finds that buffers adjacent to streams provide numerous benefits, including: 1. Protecting, restoring, and maintaining the chemical, physical, and biological integrity of streams and their water resources. 2. Removing pollutants delivered in urban stormwater. 3. Reducing erosion and controlling sedimentation. 4. Protecting and stabilizing stream banks. 5. Providing for infiltration of stormwater runoff. 6. Maintaining base flow of streams. 7. Contributing organic matter that is a source of food and energy for the aquatic ecosystem. 8. Providing tree canopy to shade streams and promote desirable aquatic habitat. 9. Providing riparian wildlife habitat. 10. Furnishing scenic value and recreational opportunity. 11. Providing opportunities for the protection and restoration of greenspace. B. Purpose It is the purpose of these regulations to protect the public health, safety, environment, and general welfare; to minimize public and private losses due to erosion, siltation, and water pollution; and to maintain stream water quality by provisions designed to create buffer zones along the streams of the Town of Braselton for the protection of water resources and to minimize land development within such stream buffers by establishing buffer zone requirements, and by requiring authorization for any such activities. C. Definitions Impervious cover: Any manmade paved, hardened, or structural surface regardless of material. Impervious cover includes but is not limited to rooftops, buildings, streets, roads, decks, swimming pools, and any concrete or asphalt. Permit: A permit issued by the Town of Braselton for undertaking any land development activity. Stream protection area: The combined areas of all required stream buffers and setbacks applicable to a stream. Setback: The area established by Sec. 11.2G extending beyond any stream buffer applicable to the stream. Stream: Any stream beginning at either the location of a spring, seep, or groundwater outflow that sustains streamflow; or a point in the stream channel with a drainage area of 25 acres or more. Where evidence indicates the presence of a stream in a drainage area of other than 25 acres, the Town of Braselton may require field studies to verify the existence of a stream. The cost of these required studies must be paid by the property owners. D. Applicability 1. This article applies to all land development activity on property containing a stream protection area. 2. After the effective date of these regulations, they will apply to new subdividing and platting activities. Any land development activity within a buffer established by this article or any impervious cover within a setback established by this article is prohibited unless a variance is granted in accordance with Sec. 11.2H. 3. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under state law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under state law or from other applicable local, state, or federal regulations. 4. This article is not intended to interfere with, abrogate, or annul any other ordinance, rule or regulation, statute, or other provision of law. The requirements of this article should be considered minimum requirements, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment must take precedence. E. Grandfathering These regulations do not apply to the following activities: 1. Work consisting of the repair or maintenance of any lawful use of land that is zoned and approved for such use on or before the effective date of these regulations. 2. Existing development and on-going land disturbance activities, including but not limited to existing agriculture, commercial forestry, landscaping, gardening, and lawn maintenance, except that new development or land disturbance activities on such properties are subject to all applicable stream buffer requirements. 3. Any land development activity that is under construction, fully approved for development, scheduled for permit approval, or has been submitted for approval as of the effective date of this ordinance. 4. Land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as for an office park or other phased development that has been previously approved within two years of the effective date of this ordinance. F. Exemptions The following specific activities are exempt from this section. Exemption of these activities does not constitute an exemption for any other activity proposed on a property. 1. Activities for the purpose of building one of the following: a. A stream crossing by a driveway, transportation route or utility line. b. Public water supply intake or public wastewater outfall structures. c. Intrusions necessary to provide access to a property. d. Public access facilities that must be on the water including boat ramps, docks, unpaved walking trails leading directly to the river, fishing platforms and overlooks. e. Unpaved walking trails. f. Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used. 2. Public sewer line easements paralleling the creek, except that all easements (permanent and construction) and land disturbance must be at least 25 feet from the top of the bank. This includes impervious cover necessary for the operation and maintenance of the utility, including but not limited to manholes, vents, and valve structures. This exemption shall not be construed as allowing the construction of roads, multiuse trails, or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in subsection F(1) above. 3. Land development activities within a rightof-way existing at the time this ordinance takes effect or approved under the terms of this ordinance. 4. Within an easement of any utility existing at the time this ordinance takes effect or approved under the terms of this ordinance, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents, and valve structures. 5. Emergency work necessary to preserve life or property. However, when emergency work is performed under this section, the person performing it must report such work to the Town of Braselton on the next business day after commencement of the work. Within 10 days thereafter, the person must apply for a permit and perform such work within such time period as may be determined by the Town of Braselton to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability, or water quality of the stream protection area. 6. Commercial forestry. If such activity results in land disturbance in the stream buffer that would otherwise be prohibited, then no other land disturbance activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the stream buffer. 7. Local governments may exempt those structures existing, under construction, or for which a complete application for a land disturbance permit, building permit, or similar government approval has been submitted as of the effective date of the ordinances adopted pursuant to this rule, or on which construction will commence no later than one year following the date of the adoption of the ordinances required pursuant to this rule. However, any modification or expansion of such existing structure which results in a net increase in the structure footprint or of the impervious surface area within the buffer will subject the structure to the applicable criteria hereunder. Further, local governments may exempt parcels with one single-family detached dwelling, provided that this exemption does not apply to parcels that are subdivided into lots after the effective date of ordinances adopted pursuant to this rule. 8. After the effective date of the ordinance, the local government will have one year to implement the stormwater ordinance and two years to design and implement a Division-approved public education program and a Division-approved monitoring program. The local jurisdiction must submit a report on the aforementioned activities to the Division and get approval from the Division to proceed with buffer reductions. G. Stream Buffer and Setback Requirements All land development activity subject to this article must meet the following requirements and the requirements of Sec. 11.3: 1. An undisturbed natural vegetative buffer must be maintained for 50 feet, measured horizontally in all directions, on both banks (as applicable) of the stream as measured from the point where vegetation has been wrested by normal stream flow or wave action. 2. An undisturbed natural vegetative buffer must be maintained for 150 feet, measured horizontally, on both banks (as applicable) of the Mulberry River as measured from the point where vegetation has been wrested by normal stream flow or wave action. 3. An additional setback must be maintained for 25 feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover is prohibited. Grading, filling, and earthmoving must be minimized within the setback. 4. No septic tanks or septic tank drain fields are permitted within the stream buffer or the setback. H. Variances Variances from the stream buffer and setback requirements in subsection (G) of this section may be granted in accordance with the following provisions: 1. The Zoning Board of Appeals of the Town of Braselton may grant a variance from the stream buffer and setback requirements in this article, provided such variance require mitigation measures to offset the effects of any proposed land development on the parcel. 2. Except as provided above, the Zoning Board of Appeals of the Town of Braselton may grant no variance from any provision of this article without first conducting a public hearing on the application for variance and authorizing the granting of the variance by an affirmative vote of the Zoning Board of Appeals. The Town of Braselton must give public notice of each such public hearing in a newspaper of general circulation within the local jurisdiction. The Town must require that the applicant post a sign giving notice of the proposed variance and the public hearing. The sign must be of a size and posted in such a location on the property as to be clearly visible from the primary adjacent road right-of-way. 3. The applicant must bear the burden of proof when the Zoning Board of Appeals is asked to consider a variance. 4. Variances will be considered only in one or more of the following cases: a. A parcel platted prior to the effective date of these regulations. b. A property with a shape, topography, or other physical conditions that prevents land development consistent with these regulations unless a stream buffer variance is granted. c. Unusual circumstances when strict adherence to the requirements of the article would create an extreme hardship. 5. Variances will not be considered when, following adoption of this article, actions of any property owner of a given property have created conditions of a hardship on that property. 6. At a minimum, a variance request must include the following information: a. A site map that includes locations of all streams, wetlands, floodplain boundaries and other natural features, as determined by field survey; b. A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property; c. A detailed site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the stream buffer and setback. The exact area of the stream buffer to be affected must be accurately and clearly indicated; d. Documentation of unusual hardship should the stream buffer be maintained; e. At least one alternative plan, which does not include a stream buffer or setback intrusion, or an explanation of why such a site plan is not possible; f. A calculation of the total area and length of the proposed intrusion; g. A stormwater management site plan, if applicable; and, h. Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed. 7. The following factors will be considered in determining whether to issue a variance: a. The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property; b. The locations of all streams on the property, including along property boundaries; c. The location and extent of the proposed stream buffer or setback intrusion; d. Whether alternative designs are possible which require less intrusion or no intrusion; e. The long-term and construction waterquality impacts of the proposed variance; f. Whether issuance of the variance is at least as protective of natural resources and the environment. I. Additional Information Required for Development on Stream Buffer Properties Any permit applications for property requiring stream buffers and setbacks must include all of the following: 1. A site plan showing all of the following: a. The location of all streams on the property. b. Limits of required stream buffers and setbacks on the property. c. Stream buffer topography with contour lines at no greater than five-foot contour intervals. d. Delineation of forested and open areas in the stream buffer. e. Detailed plans of all proposed land development in the stream buffer and of all proposed impervious cover within the setback. 2. A description of all proposed land development within the stream buffer and setback. 3. Any other documentation that the Town of Braselton may reasonably deem necessary for review of the application and to ensure that the stream buffer requirements are addressed in the approval process. All stream buffer and setback areas must be recorded on the final plat of the property following plan approval. J. Responsibility Neither the issuance of a development permit nor compliance with the conditions thereof, nor with the provisions of this article relieve any person from any responsibility otherwise imposed by law for damage to persons or property; nor does the issuance of any permit hereunder serve to impose any liability upon the Town of Braselton or its officers or employees, for injury or damage to persons or property. K. Inspection The Town may cause inspections of the work in the stream buffer or setback to be made periodically during the course thereof and must make a final inspection following completion of the work. The permittee must assist the Town in making such inspections. The Town of Braselton has the authority to conduct such investigations as it may reasonably deem necessary to carry out its duties as prescribed in this article, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the stream protection area. No person may refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor may any person obstruct, hamper, or interfere with any such representative while in the process of carrying out official duties. L. Violations and Enforcement Any action or inaction which violates the provisions of this article or the requirements of an approved site plan or permit may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below may not prevent such equitable relief. M. Notice of Violation If the Town determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved site plan or the provisions of this article, it may issue a written notice of violation to such applicant or other responsible person. Where a person is engaged in activity covered by this article without having first secured the appropriate permit, the notice of violation should be served on the owner or the responsible person in charge of the activity being conducted on the site. The notice of violation must contain all of the following: 1. The name and address of the owner or the applicant or the responsible person. 2. The address or other description of the site on which the violation is occurring. 3. A statement specifying the nature of the violation. 4. A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the approved site plan, or this article and the date for the completion of such remedial action. 5. A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed. 6. A statement that the determination of violation may be appealed to the Town by filing a written notice of appeal within thirty days after the notice of violation (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours’ notice is sufficient). N. Penalties In the event that the remedial measures described in the notice of violation have not been completed by the date set forth in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, the Town of Braselton must first notify the applicant or other responsible person in writing of its intended action, and must provide at least ten days (except that in the event that the violation constitutes an immediate danger to public health or public safety, 24 hours’ notice is sufficient) to cure the violation. In the event that the applicant or other responsible person fails to cure the violation after the notice and cure period, the Town may take one or more of the following actions or impose any one or more of the following penalties. 1. Stop Work Order: The Town of Braselton may issue a stop work order to the applicant or other responsible person. The stop work order will remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided that the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take necessary remedial measures to cure such violation or violations. 2. Withhold Certificate of Occupancy: The Town of Braselton may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein. 3. Suspension, Revocation or Modification of Permit: The Town of Braselton may suspend, revoke, or modify the permit authorizing the land development project. A suspended, revoked, or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided that the permit may be reinstated (upon such conditions as the Town may deem necessary) to enable the applicant or other responsible person to take the necessary remedial measures to cure the violations. 4. Civil Penalties: In the event that the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days (or such greater period as the Town of Braselton deems appropriate) (except that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours’ notice is sufficient) after the Town has taken one or more of the actions described above, the Town may impose a penalty not to exceed $1,000 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation. 5. Criminal Penalties: For intentional and flagrant violations of the requirements of this article, the Town of Braselton may issue a citation to the applicant or other responsible person, requiring such person to appear in Braselton Municipal Court to answer charges for such violation. Upon conviction, such person may be punished by a fine not to exceed $1,000 or imprisonment for 60 days or both. Each act of violation and each day upon which any violation occurs constitutes a separate offense. O. Administrative Appeal Any person aggrieved by a decision or order of the Town of Braselton, may appeal in writing within 10 days after the issuance of such decision or order to the Planning Director and is entitled to a hearing before the Zoning Board of Appeals within 60 days of receipt of the written appeal. P. Judicial Review Any person aggrieved by a decision or order of the Town of Braselton, after exhausting all administrative remedies, has the right to appeal de novo to the Superior County Court.