Skip to content
Georgia Commons
Menu

Braselton · Zoning Ordinance

Article 12 - TELECOMMUNICATIONS FACILITIES

12.1. Telecommunications

About this text

  • As posted on the city's website, retrieved 2026-11-11

Towers

A. Purpose To establish guidelines for the appropriate location and development of

telecommunications facilities in compliance with Federal Telecommunication Act of 1996 and subsequent federal regulations to serve the residents and businesses of Braselton.

B. Goals The goals of this article are to:

1. Minimize potential adverse visual impact of towers and antennae through careful

design, siting, landscape screening, and innovative camouflaging techniques.

2. Encourage the location of towers in nonresidential areas.

3. Minimize the total numbers of towers throughout the community.

4. Strongly encourage the joint use of new and existing tower sites.

5. Encourage users of towers and antennae to locate them, to the extent possible, in areas where the adverse impact on the

community is minimal.

6. Enhance the ability if the producers of telecommunications services to provide

such services to the community quickly, effectively, and efficiently.

7. Preserve the character and context of areas of significant scenic or historic merit.

8. Avoid potential damage to property caused by wireless communication facilities by

ensuring that such structures are soundly and carefully designed, constructed,

modified, maintained, and removed when no longer uses or when determined to be structurally unsound.

C. Minor and Substantial Changes

1. A minor change in an existing tower or base station is one for which all of the following are true. Under FCC regulations, an application for minor changes may be

approved by the Town by administrative decision, but must be approved within 90 days of application submittal.

a. The height of a tower is not increased by more than 10%.

b. The addition will not extend more than 20 feet from the tower.

c. The modifications will not add more than one equipment shelter or four equipment cabinets.

d. The modification does not involve excavation outside the tower site or existing utility and access easements.

2. A substantial change under FCC regulations is a change in an existing tower or base station for which all of the following are true:

a. The height of a tower is increased by more than 10%.

b. The addition will extend more than 20 feet from the tower.

c. The modifications add more than one equipment shelter or four equipment cabinets.

d. The modification involves excavation outside the tower site or existing utility and access easements.

D. Exclusions The following are exempt from the requirements of this article:

1. Any tower or antenna under 70 feet in height owned and operated by an amateur

radio operator licensed by the Federal Communications Commission.

2. Any telecommunications facility located on property owned, leased or otherwise

controlled by the Town, provided a license or lease authorizing such

telecommunications facility has been approved by the Town Council.

E. Preferred Locations

1. Structure(s) owned by a governmental entity are preferred locations.

2. Any existing site on which a legal personal wireless service facility is currently located is a preferred location.

3. Wholly industrial and commercial structures are preferred locations, particularly where existing visual obstructions or clutter on the roof or along a roof line are removed as part of the

installation of the telecommunications facility.

F. Location and Construction

1. The owner of a telecommunications facility must ensure that it is maintained in

compliance with standards contained in applicable local building codes and the applicable standards for such telecommunications facilities that are published by the FCC. Inspections of such facilities must be conducted at least once every three years to ensure structural

integrity. Inspections must be conducted by a structural engineer licensed to

practice in Georgia. The results of such inspection must be provided to the

Building Inspector.

2. All telecommunications facilities must meet or exceed current standards, rules, and regulations of the FAA, the FCC, and any other agency of the state or federal government with the authority to regulate telecommunications towers and antennas.

If these standards and regulations are changed, then the owners of the telecommunications facilities governed by this article must bring such

telecommunications towers and antennas into compliance with such revised standards and regulations within the date established by the agency promulgating

the standards or regulations.

3. All telecommunications facilities must be enclosed by decay-resistant security

fencing not less than six 6 feet in height and must be equipped with an appropriate anti-climbing device. This requirement may be waived by the Planning Director if it is determined that this would produce

negative visual clutter or obstruct a view corridor.

4. No illumination is permitted on telecommunications facilities unless part of an approved public lighting program or required by the FCC, FAA, or other state or federal agency or competent jurisdiction, in which case the Building Inspector may review the available lighting alternatives and approve the design that would cause

the least disturbance to the surrounding uses and views.

5. No signs are permitted on telecommunications facilities.

6. Telecommunications facilities must, subject to applicable standards of the FAA or other federal or state agencies, be

maintained with a galvanized metal finish, painted a neutral color, or painted and/or textured to match the existing structure so as to reduce visual obtrusiveness. If

federal or state regulations require, telecommunications facility must maintain a galvanized steel finish or other required finish.

a. If an antenna is installed on a structure other than a tower and is generally

visible to the public, the antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible. Roof mounted antennas must be made visually unobtrusive by screening to match existing air conditioning units, stairs, elevator towers, or other background.

b. Antennas should be placed directly above, below or incorporated with vertical design elements of a building to help in camouflaging.

c. Any equipment shelter or cabinet must be concealed from public view or made

compatible with the architecture of the surrounding structures or placed underground. The shelter or cabinet must be regularly maintained.

7. Landscaping must be used to screen effectively the view of the tower compound from adjacent public ways, public property and residential property.

a. Native vegetation on the site should be preserved to the greatest practical

extent. The applicant must provide a site plan showing existing significant vegetation to be removed and vegetation to be replanted to replace that lost.

b. The Town Council may waive or modify the landscaping requirement where lesser requirements are desirable for adequate visibility for security purposes or for continued operation of existing

bona fide agricultural or forest uses such as farms, nurseries, or tree farms.

8. Equipment at a telecommunications facility must be automated to the greatest extent possible to reduce traffic and

congestion. Where the site abuts or has access to a collector or arterial street as well as a local street, access for

maintenance vehicles must be exclusively by means of the collector or arterial street.

9. Accessory structures used in direct support of a tower are allowed but may not be used for offices, vehicle storage, or other outdoor storage. Mobile or immobile equipment not used in direct support of a tower facility must not be stored or parked on the site of the tower. Towers may be

located on sites containing another principal use in the same buildable area.

Joint use of a site is prohibited when a proposed or existing principal use includes the storage, distribution, or sale of volatile, flammable, explosive, or hazardous

materials such as propane, gasoline, natural gas, or dangerous chemicals.

G. Height, Setbacks, and Spacing

1. All telecommunications towers must be set back from any residential district at a

distance that is at least the height of the tower.

2. Towers taller than 70 feet must not be located any closer than 2,500 feet from

any existing tower, measured in a direct line, either within or outside the Town

limits unless a variance has been granted per Sec. 14.7. All other structures may be located as close to each other as

technologically feasible, provided tower failure characteristics of the towers on the site will not lead to multiple failures in the event that one fails.

H. Application Procedures All of the following must be included in an application for a telecommunications facility.

1. Site plan or plans to scale prepared by a registered surveyor licensed to practice in the State of Georgia specifying the location of telecommunications facilities,

transmission buildings and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses.

2. Landscape plan to scale indicating size, spacing and type of plantings as required in this section.

3. An impact statement fully describing the impact that the proposed

telecommunications facility will have on the environment and surrounding area

including the impact on adjacent residential structures and districts, impacts on structures and sites of historic significance and impacts on streetscapes.

The impact statement must include a description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic noise or safety impacts of maintenance.

4. Report from a professional structural engineer licensed in the state of Georgia, documenting all of the following:

a. Telecommunications facility height and design, including technical,

engineering, economic, and other pertinent factors governing selection of the proposed design.

b. Total anticipated capacity of the telecommunications facility, including number and types of antennas that can be accommodated.

c. Evidence of structural integrity of the tower structure (i.e., engineer's

statement that structure is built to meet or exceed standard building code).

d. Structural failure characteristics of any telecommunications tower over 70 feet

and demonstration that site and setbacks are of adequate size to contain debris.

5. A definition of the area of service to be served by the antenna or tower and

whether such antenna or tower is needed for existing coverage or capacity.

6. The identity of a community liaison officer to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility; including name, address, telephone number,

facsimile number and electronic mail address, if applicable.

7. Existing towers and tall structures located within the geographic service area must be identified on a map along with written

justification as to the need for a new tower in place of an existing structure.

a. A map indicating all existing tower and antenna sites located within the Town

and within 2 miles of the town limits.

b. Any other information requested by the Building Inspector, Planning Director, or Town Council, to evaluate fully and

review the application and the potential impact of a proposed

telecommunications facility.

c. Grant or Denial of Permit.

i. The Building Inspector must review the completed application for a building permit and must issue a grant or denial of a building permit.

The Planning Director must review the completed application for a special use and must forward the application for consideration to the Town Council pursuant to Sec. 14.5.

8. An applicant and owner must allow future wireless communication companies,

including public and quasi-public agencies using similar technology, to co-locate

antenna equipment and facilities on any tower unless specific technical constraints prohibit said co-location. An applicant may negotiate any type of agreement for colocation but may not charge fees which are so unreasonable as to prohibit co-location in accordance with commercially

reasonable standards.

9. Appeals from any decision of the Building Inspector (in the case of a building permit) or the Town Council (in the case of a

special use) may be made as outlined in Sec. 14.5 and Sec. 14.11. Any decision on a request to build a tower or to approve a tower as a special use must be in writing, and any denial of any such request or

special use must be supported by substantial evidence and a written record.

10. Telecommunications facilities, including, without limitation, power source,

ventilation and cooling, must be operated at all times within the limits of any

applicable noise ordinance, must not be operated so as to cause the generation of heat that adversely affects a building

occupant and must not be maintained or operated in such a manner as to be a nuisance.

11. All telecommunications facilities must be maintained in compliance with standards

contained in applicable building and technical codes so as to ensure the structural integrity of such facilities. If upon inspection by the Building Inspector,

Planning Director, or their designees any a telecommunications facility is determined not to comply with the minimum standard

building code or to constitute a danger to persons or property, then upon notice

being provided to the owner of the facility and the owner of the property if such

owner is different, the owners have 30 days to bring the facility into compliance.

In the event that the telecommunications facility is not brought into compliance

within 30 days, the Town may provide notice to the owners requiring the telecommunications facility to be removed.

12. In the event that the telecommunications facility is not removed within 30 days of receipt of the notice, the Town may remove the facility and place a lien upon the

property for the costs of removal or seek costs incurred through court action. Delay by the Town in taking action does not in any way waive the Town’s right to take

action. The Town may pursue all legal rights to ensure that telecommunications facilities not in compliance with the

minimum standard building code standards or which constitute a danger to persons or property are brought into

compliance or removed. Braselton may seek to have the telecommunications facility removed regardless of the owner’s or operator's intent to operate the tower or antenna and regardless of any permits,

federal, state or otherwise, which may have been granted.

I. Abandoned Towers

1. Any telecommunications facility that is not operated for a continuous period of 12

months is considered abandoned, whether or not the owner or operator intends to make use of it or any part of it. The owner of a telecommunications facility and the owner of the property where the facility is located must remove the abandoned

telecommunications facility. If such antenna and/or tower is not removed within 60 days of receipt of notice from the Town notifying the owner(s) of such

abandonment, the Town may remove the tower and/or antenna and place a lien upon the property for the costs of removal or seek costs incurred through court

action. The Town may pursue all legal remedies available to it to insure the abandoned telecommunications facilities are removed. Delay by the Town in taking action does not in any way waive the

Town’s right to take action. The Town may seek to have the telecommunications

facility removed regardless of the owners' or operator's intent to operate the tower or antenna and regardless of any permits,

federal, state or otherwise, which may have been granted.

2. If the owner of an abandoned tower or antenna wishes to use such abandoned

tower or antenna, the owner first must apply for and receive all applicable permits and meet all of the conditions of this

Development Code as if the tower or antenna were a new tower or antenna.

J. Pre-Existing Towers/Non-Conforming Uses

1. All telecommunications facilities operative on the effective date of this Development Code are allowed to continue their present usage as a non-conforming use and will be treated as a non-conforming use. Routine maintenance, including replacement with

a new tower or antenna of similar construction and height, is permitted on existing telecommunications facilities.

New construction other than routine maintenance must comply with the requirements of this Development Code.

2. A telecommunications facility that has received Town approval in the form of

either a building permit or as a special use, but which has not yet been constructed or placed in operation is considered an

existing telecommunications facility so long as the approval is current and not expired.

3. Placement of an antenna on a nonconforming structure is not considered an expansion of the non-conforming

structure.

K. Coordination with Federal Law Whenever the Town Council finds that the application of this Development Code would unreasonably discriminate among providers of functionally equivalent services or prohibit or have the effect of prohibiting the provision of personal wireless services, the Town

Council may waive any or all of the provisions of this article as part of a special use approval.

Regulations from the FAA, other federal entities, and the Georgia Streamlining of Wireless Facilities & Antenna Act (SWFAA) in place at the time of the application shall supersede any contrary local regulations.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/12.1@2026-11-11-cf356da646

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.