Skip to content
Georgia Commons
Menu

Braselton · Zoning Ordinance

Article 13 - CONSTRUCTION CODE

13.6. Building Official

About this text

  • As posted on the city's website, retrieved 2026-11-11

A. Generally. The building official is hereby authorized and directed to enforce the

provisions of the construction codes. Copies of the adopted construction codes will be maintained by the building official, and may be viewed by the public upon request. The building official is further authorized to render interpretations of the construction codes, which are consistent with its intent and purpose. These policies and procedures do not waive requirements specifically provided for in this article.

B. Right of entry.

1. Whenever necessary to make an inspection to enforce any of the provisions of the construction codes, or whenever the building official has reasonable cause to believe that there exists in any building or upon any premises any condition or code

violation which makes such building, structure, premises, electrical, gas, mechanical, or plumbing systems unsafe, dangerous, or hazardous, the building official may enter such building, structure, or premises at all reasonable times to

inspect the same or to perform any duty imposed upon the building official by these construction codes, provided that if the building or premises is occupied, they

must first present proper credentials and request entry. If such building, structure, or premises is unoccupied, they must first

make a reasonable effort to locate the owner or other persons having charge or control of such and request entry. If entry is refused, the building official has

recourse to every remedy provided by law to secure entry.

2. When the building official has first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having the charge, care or control of any building, structure, or premises may fail or neglect, after proper request is made as herein provided, to promptly

permit entry therein by the building official for the purpose of inspection and

examination pursuant to the construction codes.

C. Stop work orders. Upon notice from the building official, work on any building, structure, electrical, gas, mechanical, or plumbing system that is being done contrary to the provisions of the construction codes or in a dangerous or unsafe manner must

immediately cease. Such notice must be in writing and must be given to the owner of the property, or to their agent, or to the person doing the work, and must state the conditions under which work may be resumed. Where an emergency exists, the building official is not required to give a written notice prior to stopping the work.

D. Revocation of permits.

1. Misrepresentation of application. The building official may revoke a permit or approval, issued under the provisions of the construction codes, in case there has been any false statement or

misrepresentation as to the material fact in the application or plans on which the permit or approval was based.

2. Violation of code provisions. The building official may revoke a permit upon

determination by the building official that the construction, erection, alteration,

repair, moving, demolition, installation or replacement of the building, structure,

electrical, gas, mechanical, or plumbing systems for which the permit was issued is in violation of, or not in conformity with, the provisions of the construction codes.

E. Unsafe buildings or systems. All buildings, structures, electrical, gas, mechanical, or plumbing systems which are unsafe,

unsanitary, or do not provide adequate egress, or which constitute a fire hazard, or are otherwise dangerous to human life, or which in relation to existing use, constitute a hazard to safety or health, are considered unsafe buildings or service systems.

F. Requirements not covered by codes. Any requirements necessary for the strength, stability, or proper operation of an existing or proposed building, structure, electrical, gas, mechanical, or plumbing system, or for the public safety, health, and general welfare, not specifically covered by the construction codes, is determined by the building official.

G. Alternate materials and methods. The provisions of the construction codes are not intended to prevent the use of any material or method of construction not specifically

prescribed by them, provided any such alternate has been reviewed by the building official. The building official must approve any such alternate, provided the building official finds that the alternate for the purpose intended is at least the equivalent of that prescribed in the construction codes, in quality, strength, effectiveness, fire

resistance, durability, and safety. The building official must require that sufficient evidence or proof be submitted to substantiate any claim made regarding the alternate.

H. Modifications. Where there are practical difficulties involved in carrying out the provisions of this section, the building official has the authority to grant modifications for individual cases, upon application of the owner or owner’s authorized agent, provided that the building official must first find that special individual reason makes the strict letter of this section impractical, the

modification is in compliance with the intent and purpose of this section and that such modification does not lessen health,

accessibility, life and fire safety or structural requirements. The details of action granting modifications must be recorded and entered in the files of the department of building safety.

I. Flood hazard areas. The building official may not grant modifications to any provision required in flood hazard areas as established by Section 1612.3 of the International

Building Code, and/or Section R322 of the International Residential Code, unless a determination has been made that:

1. A showing of good and sufficient cause that the unique characteristics of the size, configuration or topography of the site

render the elevation standards of sections 1612 or R322, as applicable,

inappropriate.

2. A determination that failure to grant the variance would result in exceptional

hardship by rendering the lot undevelopable.

3. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public response, cause fraud on or victimization of the public, or conflict with existing laws or ordinances.

4. A determination that the variance is the minimum necessary to afford relief,

considering the flood hazard.

5. Submission to the applicant of written notice specifying the difference between the design flood elevation and the

elevation of which the building is to be built, stating that the cost of flood

insurance will be commensurate with the increased risk resulting from the reduced floor elevation, and stating that

construction below the design flood elevation increases risks to life and property.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/13.6@2026-11-11-1151b84313

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Braselton Zoning Ordinance, 13.6. Building Official | Georgia Commons