A. Application 1. When required. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the construction codes, or to cause any such work to be done, must first make application to the building official and obtain the required permit for the work. A permit may not be issued to an owner, who is neither a licensed contractor nor the occupant of the structure being built or altered. 2. Work authorized. A building, electrical, gas, mechanical, or plumbing permit carries with it the right to construct or install the work, provided the same are shown on the drawings and set forth in the specifications filed with the application for the permit. Where these are not shown on the drawings and covered by the specifications submitted with the application, separate permits are required. 3. Repairs. a. Minor repairs. Ordinary minor repairs with a value of less than $1,500.00, involving no structural changes and new electrical, HVAC, or plumbing installations, may be made without a permit, provided that these repairs do not violate any of the provisions of the construction codes. b. Emergency Repairs. Where equipment replacements and repairs must be performed in an emergency situation, the permit application must be submitted within the next working business day to the Building official. c. Work exempt from permit. Exemptions from permit requirements of this section do not grant authorization for any work to be done in any manner in violation of the provisions of this section or any other laws or ordinances, including the Development Code, of the Town. Permits are not required for the following: i. Building: • One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area is not greater than 200 square feet (11m2). • Oil derricks • Retaining walls that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or IIIA liquids. • Water tanks supported directly on grade if the capacity is not greater than 5,000 gallons (18,925 L) and the ratio of height to diameter or width is not greater than 2:1. • Walkways and driveways not more than 30 inches (762 mm) above adjacent grade, and not over any basement or story below and are not part of an accessible route. • Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. • Temporary motion picture, television and theater stage sets and scenery. • Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches (610 mm) deep, are not greater than 5,000 gallons (18,925 L) and are installed entirely above ground. • Shade cloth structures constructed for nursery or agricultural purposes, not including service systems. • Swings and other playground equipment accessory to detached one-and-two family dwellings. • Window awnings, supported by an exterior wall that do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support. • Nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches (1753 mm) in height. ii. Electrical: • Repairs and maintenance. Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. • Radio and television transmitting stations. The provisions of this article do not apply to electrical equipment used for radio and television transmissions but do apply to equipment and wiring for a power supply and the installations of towers and antennas. • Temporary testing systems. A permit is not required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus. iii. Fuel Gas: • Portable heating appliance. • Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe. iv. Mechanical: • Portable heating appliance. • Portable ventilation equipment. • Portable cooling unit. • Steam, hot or chilled water piping within any heating or cooling equipment regulated by this article. • Replacement of any part that does not alter its approval or make it unsafe. • Portable evaporative cooler. • Self-contained refrigeration system containing 10 pounds (5kg) or less of refrigerant and actuated by motors of 1 horsepower (746 W) or less. v. Plumbing: • The stopping of leaks in drains, water, soil, waste or vent pipe, provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work is considered as new work and a permit must be obtained and inspection made as provided in this article. • The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. vi. Public service agencies: • A permit is not required for the installation, alteration or repair of generation, transmission, distribution or metering or other related equipment that is under the ownership and control of public service agencies by established right. 4. Information required. Each application for a permit, with the required fee, must be filed with the building official on a form furnished for that purpose, and must contain a general description of the proposed work and its location. The application must be signed by the owner, or his or her authorized agent. The building permit application must indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure, and must contain such other information as may be required by the building official. 5. Time limitations. An application for a permit for any proposed work will be deemed to have been abandoned six months after the date of filing for the permit, unless before then a permit has been issued. One or more extensions of time for periods of not more than 90 days each may be allowed by the building official for the application, provided the extension is requested in writing and justifiable cause is demonstrated. B. Drawings and specifications. 1. Requirements. When required by the building official, two or more copies of specifications and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work, must accompany the application for a permit. Such drawings and specifications must contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the construction codes. This information must be specific, and the construction codes may not be cited as a whole or in part, nor may the term "legal" or its equivalent be used, as a substitute for specific information. All information, drawings, specifications and accompanying data must bear the name and signature of the person responsible for the design. 2. Additional data. The building official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and the basis of calculations. All drawings, specifications, and accompanying data required by the building official to be prepared by an architect or engineer must be affixed with their official seal. 3. Design professional. a. The design professional must be an architect or engineer legally registered under the laws of Georgia regulating the practice of architecture or engineering and must affix their official seal to drawings, specifications, and accompanying data, for the following: i. All Group A, E, and I occupancies. ii. Buildings and structures three stories high or more in height. iii. Buildings and structures 5,000 square feet (465 m2) or more in area. b. For all other buildings and structures, the submittal must bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered. c. Single-family dwellings, regardless of size, require neither a registered architect or engineer, nor a certification that an architect or engineer is not required. 4. Structural and fire resistance integrity. Plans for all buildings must indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistance wall, floor, or partition will be made for electrical, gas, mechanical, plumbing, signal and communication conduits, pipes, and systems and indicate in sufficient detail how the fire integrity will be maintained where required fire resistance floors intersect the exterior walls. 5. Site drawings. Drawings must show the location of the proposed building or structure and of every existing building or structure on the site or lot. The building official may require a boundary line survey prepared by a qualified surveyor. 6. Hazardous occupancies. The building official may require the following: a. General site plan. A general site plan, drawn at a legible scale, which must include, but not be limited to, the location of all buildings, exterior storage facilities, permanent accessways, evacuation routes, parking lots, internal roads, chemical loading areas, equipment cleaning areas, storm and sanitary sewer accesses, emergency equipment, and adjacent property uses. The exterior storage areas must be identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored. b. Building floor plan. A building floor plan, drawn to a legible scale, which must include, but not be limited to, all hazardous materials storage facilities within the building and must indicate rooms, doorways, corridors, exits, fire rated assemblies with their hourly rating, location of liquid tight rooms, and evacuation routes. Each hazardous materials storage facility must be identified on the plan with the hazard classes and quantity range per hazard class or the hazardous materials stored. C. Examination of documents. 1. Plan review. The building official or designee must examine or cause to be examined each application for a permit and the accompanying documents, consisting of drawings, specifications, computations, and additional data, and must determine by such examinations whether the construction indicated and described is in accordance with the requirements of the construction codes and all other pertinent laws or ordinances. D. Issuing permits. 1. Action on permits. The Department of Planning and Development must act upon an application for a permit without unreasonable or unnecessary delay. If the building official is satisfied that the work described in an application for a permit and the contract documents filed therewith conform to the requirements of the construction codes and other pertinent laws and ordinances, they must issue a permit to the applicant. 2. Refusal to issue permit. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the construction codes or other pertinent laws or ordinances, the building official may not issue a permit, but must return the contract documents to the applicant with their refusal to issue such permit. This refusal must, when requested, be in writing and must contain the reason for refusal. 3. Special foundation permit. When application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the building official may, at his or her discretion, issue a special permit for the foundation only. The holder of such a special permit is proceeding at his or her own risk and without assurance that a permit for the remainder of the work will be granted nor that corrections will not be required in order to meet provisions of the construction codes. 4. Public right-of-way. A permit may not be given by the building official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections fronting on any street, alley, or public lane, or for the placing on any lot or premises of any building or structure removed from another lot or premises, unless the applicant has made application with the Town Engineer for the lines of the public street on which he or she proposes to build, erect, or locate the building; and it is the duty of the building official to see that the street lines are not encroached upon. E. Contractor responsibilities. It is the duty of every contractor who must make contracts for the installation or repairs of buildings, structures, electrical, gas, mechanical, sprinkler, or plumbing systems, for which a permit is required, to comply with state or local rules and regulations concerning licensing which the applicable governing authority may have adopted. In such case that the state requires a contractor to have obtained a state license before they are permitted to perform work, the contractor must supply the Town with its license number before receiving a permit for work to be performed. F. Conditions of the permit. 1. Intent. A permit issued is a license to proceed with the work and not an authority to violate, cancel, alter, or set aside any of the provisions of the construction codes. Issuance of a permit does not prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of the construction codes. Every permit issued becomes invalid unless the work authorized by the permit begins within six months after the permit is issued, or if the work authorized by the permit is suspended or abandoned for a period of six months after the time the work begins. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension must be requested in writing and justifiable cause demonstrated. Extensions must be in writing by the building official. 2. Issued on basis of an affidavit. Whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official, are hazardous or complex, the building official must require that the architect or engineer who prepared the drawings or computations supervises the work. In addition, they are responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the construction codes. In the event that the architect or engineer is not available, the owner must employ in their place a competent person or agency whose qualifications are reviewed by the building official. 3. Plans. When the Town issues a permit, they must endorse, in writing or by stamp, both sets of plans "reviewed for code compliance." One set of drawings so reviewed must be retained by the building official and the other set must be returned to the applicant. The permitted drawings must be kept at the site of work and must be open to inspection by the building official or their authorized representative. G. Fees. 1. Prescribed fees. A permit may not be issued until the fees prescribed by the Town Council have been paid. Nor may an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical, or gas systems, etc., has been paid. 2. Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical, or plumbing, etc., system before obtaining the necessary permits are subject to a penalty of 100 percent of the usual permit fee in addition to the required permit fees. 3. Schedule of permit fees. On all buildings, structures, electrical, plumbing, mechanical, and gas systems or alterations requiring a permit, a fee for each permit must be paid as required at the time of filing application, in accordance with the fee schedules as set by the Town Council. 4. Building permit valuations. If, in the opinion of the building official, the valuation of building, alteration, structure, electrical, gas, mechanical, or plumbing systems appears to be underestimated on the application, the permit must be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Permit valuations must include total cost, such as electrical, gas, mechanical, plumbing equipment, and other systems, including materials and labor. 5. Refunds. The Planning Director is authorized to establish a refund policy. 6. Revocation of permit. The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this article wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of this article.