8.10. Final Subdivision Plat Approval

About this text

  • As posted on the city's website, retrieved 2026-11-11

A. Prior to submission of a final subdivision plat, either:

1. For minor subdivisions, the Town Engineer must certify that all lots are adequately served by existing streets and public

utilities; or,

2. Except for minor subdivisions, all of the stormwater drainage and management

facilities; water and sewer utilities; private utilities (power, gas, cable, etc.); signs, striping, and traffic control devices; street base, and curbing construction required

for final plat approval must be properly installed and completed and, for those

required improvements not yet completed (grassing, required landscaping, sidewalks, etc.) a performance bond must be filed by the subdivider.

3. Prior to submission, the applicant must provide all of the following to the Town Engineer and all other applicable

departments and agencies:

a. As-built surveys for all public improvements required by this Article.

b. A developer must maintain and keep in good repair all improvements required

under this article and constructed by him or her from the date of completion and acceptance of the work by the Town for a period of 18 months for water, sanitary sewer, and reuse water system improvements, and for a period of 24 months for streets, drainage, and all other improvements. In the event that the development has not completed at least 90 percent build-out by the end of the original guarantee period, the guarantee must be renewed in 18-month intervals until 90 percent build out is achieved.

c. Prior to approval of a final subdivision plat or issuance of a certificate of

occupancy, maintenance surety for all public improvements required under this article must be provided by the developer, and performance surety must be provided for all required improvements not yet completed.

B. Application for a final subdivision plat approval must be made to the Planning

Director. The application must include all of the following:

1. A properly completed application form, as furnished by the Planning Department,

requesting final subdivision plat review.

2. A number of prints of the final subdivision plat drawing to be determined by the

Planning Director prepared in conformance with the specifications in this Section.

3. Payment of all applicable final subdivision plat application, review, and recording

fees, as established by the Town Council from time to time.

C. The Planning Director, Town Engineer, and all other applicable departments and agencies must review the application for completeness.

Incomplete applications will be returned to the applicant.

D. Following receipt of the application, the Town Engineer must inspect the development and indicate on the drawing or in writing all comments related to compliance with this Development Code. The Planning Director

must inspect the final plat for all zoning requirements.

E. The owner is responsible for compliance with all codes, regulations and zoning

requirements, and for the satisfaction of all the noted and written comments by all

applicable departments and agencies.

Resubmission of all revised drawings must be made to the applicable departments and

agencies.

F. When all of the requirements of this Development Code, and any conditions of zoning approval, have been met, the Public Utilities and Planning Director must certify approval with signature and date on the plat.

G. CERTIFICATE OF FINAL PLAT APPROVAL

stamped or printed on a reproducible copy of the final subdivision plat. The applicant with the Planning Director and Public Utilities Director approval must then record the plat, with the Clerk of Superior Court. An executed original of the approved drawing must be transmitted to the applicant.

H. After the final plat is recorded, the lots may be sold and building permits on the lots may be obtained.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/8.10@2026-11-11-f9c132a35b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Braselton Zoning Ordinance, 8.10. Final Subdivision Plat Approval | Georgia Commons